



全文預覽已結束
下載本文檔
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
What are the Westgard rules?For convenience, we adopt a short hand notation to abbreviate different decision criteria or control rules, e.g., 12s to indicate 1 control measurement exceeding 2s control limits. We prefer to use subscripts to indicate the control limits, but other texts and papers may use somewhat different notation (e.g. 1:2s rather than 12s) Combinations of rules are generally indicated by using a slash mark (/) between control rules, e.g. 13s/22s.The individual rule are defined below. The thumbnail graphic next to a rule shows an example of control results that violate that rule. You can click on a graphic to get a larger picture that more clearly illustrates the application of each control rule.13s refers to a control rule that is commonly used with a Levey-Jennings chart when the control limits are set as the mean plus 3s and the mean minus 3s. A run is rejected when a single control measurement exceeds the mean plus 3s or the mean minus 3s control limit.12s refers to the control rule that is commonly used with a Levey-Jennings chart when the control limits are set as the mean plus/minus 2s. In the original Westgard multirule QC procedure, this rule is used as a warning rule to trigger careful inspection of the control data by the following rejection rules.22s - reject when 2 consecutive control measurements exceed the same mean plus 2s or the same mean minus 2s control limit.R4s - reject when 1 control measurement in a group exceeds the mean plus 2s and another exceeds the mean minus 2s.41s - reject when 4 consecutive control measurements exceed the same mean plus 1s or the same mean minus 1s control limit.10x - reject when 10 consecutive control measurements fall on one side of the mean.In addition, you will sometimes see some modifications of this last rule to make it fit more easily with Ns of 4:8x - reject when 8 consecutive control measurements fall on one side of the mean.12x - reject when 12 consecutive control measurements fall on one side of the mean.The preceding control rules are usually used with Ns of 2 or 4, which means they are appropriate when two different control materials are measured 1 or 2 times per material.What are other common multirules?In situations where 3 different control materials are being analyzed, some other control rules fit better and are easier to apply, such as:2of32s - reject when 2 out of 3 control measurements exceed the same mean plus 2s or mean minus 2s control limit;31s - reject when 3 consecutive control measurements exceed the same mean plus 1s or mean minus 1s control limit.6x - reject when 6 consecutive control measurements fall on one side of the mean.In addition, you will sometimes see some modification of this last rule to include a larger number of control measurements that still fit with an N of 3:9x - reject when 9 consecutive control measurements fall on one side of the mean.A related control rule that is sometimes used, particularly in Europe, looks for a trend where several control measurements in a row are increasing or decreasing:7T - reject when seven control measurements trend in the same direction, i.e., get progressively higher or progressively lower.How do you perform multirule QC?You collect your control measurements in the same way as you would for a regular Levey-Jennings control chart. You establish the means and standard deviations of the control materials in the same way. All thats changed are the control limits and the interpretation of the data, so multirule QC is really not that hard to do! For manual application, draw lines on the Levey-Jennings chart at the mean plus/minus 3s, plus/minus 2s, and plus/minus 1s. See QC - The Levey Jennings chart for more information about preparing control charts.In manual applications, a 12s rule should be used as a warning to trigger application of the other rules, thus anytime a single measurement exceeds a 2s control limit, you respond by inspecting the control data using the other rules. Its like a warning sign at the intersection of two roads. It doesnt mean stop, it means look carefully before proceeding.How do you look carefully? Use the other control rules to inspect the control points. Stop if a single point exceeds a 3s limit. Stop if two points in a row exceed the same 2s limit. Stop if one point in the group exceeds a plus 2s limit and another exceeds a minus 2s limit. Because N must be at least 2 to satisfy USA CLIA QC requirements, all these rules can be applied within a run. Often the 41s and 10x must be used across runs in order to get the number of control measurements needed to apply the rules. A 41s violation occurs whenever 4 consecutive points exceed the same 1s limit. These 4 may be from one control material or they may also be the last 2 points from a high level control material and the last 2 points from a normal level control material, thus the rule may also be applied across materials. The 10x rule usually has to be applied across runs and often across materials.Computer applications dont need to use the 1
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年光伏建設項目勞務分包協(xié)議書
- 事業(yè)單位房屋安全管理體系優(yōu)化
- 教師教育能力提升中的自我反思與成長
- 物資儲備中的人工智能技術應用
- 高端人才引進與經開區(qū)競爭力提升
- 2025年歐幾里得數學競賽(Euclid)模擬試卷(解析幾何與函數證明)經典例題解析
- 軟組織修復材料的生物力學性能基礎知識點歸納
- 農業(yè)科技創(chuàng)新對農民收入增長的影響
- 推動人工智能健康有序發(fā)展的背景意義及必要性
- 一年級家長的教育之路
- 湖北省武漢市2025屆高中畢業(yè)生四月調研考試生物試題及答案(武漢四調)
- 人音版七年級下冊賽乃姆教學設計
- 病媒生物知識課件
- SL631水利水電工程單元工程施工質量驗收標準第2部分:混凝土工程
- 八年級下冊英語2025電子版人教版單詞表
- 2025年山東濟南歷城金融控股集團有限公司招聘筆試參考題庫含答案解析
- 末梢血糖監(jiān)測操作流程
- 心理學基礎知識題庫及解析
- GB/T 10810.3-2025眼鏡鏡片第3部分:透射比試驗方法
- 武漢2025屆高中畢業(yè)生二月調研考試數學試題及答案
- 初級美甲考試試題及答案
評論
0/150
提交評論