1、混合離子交換器Mixed of ion exchange使用說明書Operating Instruction一、工藝原理 Technical principle本公司生產(chǎn)的混合離子交換器(簡稱混床),在脫鹽水工程中,用于二級(jí)脫鹽水的制備, 被處理的水由上向下流經(jīng)按一定的比例配比裝填并混合形成的強(qiáng)酸、 堿樹脂層來制取成品水。 均勻混合的樹脂層中,陽樹脂與陰樹脂緊密地交錯(cuò)排列,每一對(duì)陽樹脂與陰樹脂顆粒似于一 組復(fù)床,混床就象無數(shù)組串聯(lián)運(yùn)行的復(fù)床。通過混合離子交換后進(jìn)入水中的氫離子與氫氧離 子會(huì)立即生成電離度很低的水分子(H20),很少可能形成陽離子或陰離子交換時(shí)的反離子, 使交換反應(yīng)進(jìn)行的十分徹底

2、,因而能制取純度相當(dāng)高的成品水。0ur company produces the mixed ion exchanger (referred to as ) of the mixed bed, in desalted water engineering, preparation for secondary desalting water, treated water by the down flow of mixed in certain proportion ratio of loading and the formation of acid, alkali, resin layer to

3、manufacture the finished water. Evenly mixed resin layer, with Yin Yang resin resin tightly staggered, each pair of Yang Yin resin particles and resin on a set of double bed, mixed bed, like countless group of double bed series operation. After ion exchange in the water by mixing hydrogen ion and hy

4、droxide ion will immediately generate low degree of ionization of water molecules (H20), less likely to form the cation or anion exchange of ions, make the exchange reaction of very thoroughly, thereby making high purity of the finished water.混床的再生工藝較陽、陰床的再生工藝復(fù)雜,混床樹脂層失效后,需先對(duì)床中樹脂進(jìn)行 反洗分層,使陽樹脂與陰樹脂徹底分離,

5、然后分別對(duì)陽、陰樹脂進(jìn)行再生、清洗、恢復(fù)交換 能力并均勻混合,方可繼續(xù)投入運(yùn)行。Mixed bed regeneration process is cation exchanger、 anion exchanger regeneration process complex, mixed bed resin layer expires, should first to backwashing stratification of resin in the bed, make with cation resin and anion resin separation thoroughly, then

6、respectively for cation resin 、 anion resin regeneration, cleaning, restore the exchange capacity and mixing, may continue to put into operation.二、技術(shù)參數(shù) Technical parameters1. 進(jìn)水 Inlet water:一級(jí)脫鹽水或 R0產(chǎn)水Level of desalted water or Reverse osmosis water2. 出水水質(zhì) Effluent quality : 0.2 卩 S/C25C)SiO2泄漏20ug/

7、l, PH接近中性SiO2 leak 20 ug/l, the PH near neuter3. 工作壓力 Working pressure: 0.6MPa4. 工作溫度 Working temperature:5-45C5. 運(yùn)行流速 Operating velocity:40-60m/h6. 水反洗強(qiáng)度 Water backwashing strength: 8-12m/h7. 再生流速 Regeneration velocity:4-6m/h8. 再生液濃度 Renewable liquid concentration: 4-5%9. 填料高度 Packing layer height:

8、 陽樹脂 Cation陰樹脂 Anion resins201X7:500mm1000mm三、結(jié)構(gòu)形式 Structure form設(shè)備由本體、 布水裝置、集水裝置、外配管及儀表取樣裝置等組成。 進(jìn)水裝置為上進(jìn)水、 擋板布水,集水裝置為多孔板濾水帽集水;設(shè)備的本體外部配管配帶閥門并留有壓力取樣接 口,便于用戶現(xiàn)場安裝和實(shí)現(xiàn)裝置正常運(yùn)行。Equipment by ontology, cloth water equipment, water equipment, piping and instrument sampling device, etc. Feed device for water, ba

9、ffle on water distribution, water catchment device for porous plate filter water cap; External piping equipment ontology matching valve and had pressure sampling interface, making it easy for users to the site installation and equipment normal operation.四 . 設(shè)備的安裝 The installation of the equipment1)

10、安裝前檢查土建基礎(chǔ)是否按設(shè)計(jì)要求施工。1) Before the installation check whether civil engineering foundation construction according to design requirements.2) 設(shè)備按設(shè)計(jì)圖紙進(jìn)行就位,調(diào)整支腿墊鐵并檢查進(jìn)出口法蘭的水平度和垂直度。2) Equipment in place in accordance with design drawings and leg to adjust shim and check the levelness of the import and expor

11、t of the flange and verticality.3) 將設(shè)備和基礎(chǔ)預(yù)埋鐵板焊接固定,固定后再次校驗(yàn)進(jìn)出口法蘭的水平度和垂直度。3) Based embedded iron welding equipment and fixed, fixed after once again check the levelness of the import and export of the flange and verticality.4)將設(shè)備本體配管按編號(hào)區(qū)分后依設(shè)計(jì)圖紙進(jìn)行組裝, 每段管道組裝前應(yīng)用干凈抹布對(duì) 內(nèi)壁進(jìn)行清潔工作,組裝后應(yīng)保持配管軸線橫平豎直,閥門朝向合理(手動(dòng)閥手柄朝

12、前,氣動(dòng)閥啟動(dòng)頭朝上)。4)Piping equipment body according to the numbered in accordance with the design drawings for assembly, after each section of the pipe assembly application clean dishcloth to clean the lining work before, after assembly should maintain the pipe axis horizontal even vertical, valve towards

13、 reasonable (manual valve handle forward, pneumatic valve start upside).5)檢查本體閥門開關(guān)靈活,有不靈活的情況及時(shí)整改。5)Check valve body flexible switch, timely rectification is not flexible.6)設(shè)備本體配管完成后應(yīng)對(duì)閥組進(jìn)行必要的支撐工作等。6)Piping equipment ontology cope with valve set after the completion of necessary support work, etc.7)安裝

14、設(shè)備上配帶的進(jìn)出水壓力表、取樣閥等;進(jìn)出水管道上如有流量、電導(dǎo)等探頭座 應(yīng)用堵頭堵住。7)Installation of equipment on display in and out of the water pressure gauge, sampling valve, etc.; In and out of the water pipe channel such as traffic, conductance probe plug seat application block.五、初次運(yùn)行 For the first time to run1)沖洗 wash 考慮到設(shè)備和管道連接時(shí)的電焊

15、殘?jiān)?、管道初次投用時(shí)的表面污物,設(shè)備初次投入運(yùn)行 時(shí)應(yīng)進(jìn)行沖洗。Considering the equipment and pipeline connection welding residue, pipe surface dirt putting-in-service proactively for the first time, equipment should be put into operation for the first time to wash.A、打開設(shè)備的人孔法蘭將設(shè)備內(nèi)的零件重新緊固,并確認(rèn)罐內(nèi)部件(如水帽等)不缺少; 封閉人孔法蘭。A、 Open the equipm

16、ent of manhole flange will be retightened equipment within the parts, and confirm the tank parts (like a cap, etc.) no lack; Close the manhole flange.B、打開設(shè)備的下排閥,確認(rèn)設(shè)備的出水閥關(guān)閉。B 、 Open the discharge valve of the device, make sure equipment water valve closed.C、打開設(shè)備進(jìn)水閥、排氣閥,開啟前系統(tǒng),至設(shè)備排氣口出水后關(guān)閉排氣閥,沖洗設(shè)備至 出水清晰

17、為沖洗終點(diǎn)。C、 Open the inlet valve, exhaust valve, open system before, to close the discharge valve, after equipment outlet water flushing equipment to clear water to rinse the end.2)裝填樹脂 Filling resin打開人孔,如果出水裝置采用承托層結(jié)構(gòu)則按所設(shè)計(jì)的承托層高度裝填,裝填完畢后再 裝樹脂。按所設(shè)計(jì)的樹脂高度,依次裝入,填完后抹平,以中排裝置支管以上 200mm 為基準(zhǔn) 線(已包括壓脂層的高度)。沒有中排裝置的

18、應(yīng)在交換器裝填前劃線確認(rèn)。濾料裝填完畢后 封閉人孔。Open manhole, if water device adopts the retainer structure is designed according to the layer of retainer high loading, loading after the reload resin. According to the designed height of resin, load, in turn, after complete branch of the middle device above 200 mm for ref

19、erence line (including the height of the lipid layer pressure). No bottom of device should be crossed in front of the switch loading confirmation. Filter material manhole closed when loading is finished.3)按新樹脂處理方法進(jìn)行再生處理。3)According to the new resin treatment method for regeneration.4) 設(shè)備正常運(yùn)行后應(yīng)檢測進(jìn)出水壓

20、差不大于0.5bar,檢驗(yàn)進(jìn)出水的流量顯示。4) After the normal operation of equipment should detection in and out of the water pressure difference is not greater than 0.5 bar, check in and out of the water flow.六、操作說明 Operating instructions1 正洗 Conventional well-flushing啟動(dòng)一級(jí)脫鹽水泵,打開混床進(jìn)水閥,排氣閥,水流由上而下,當(dāng)水充滿設(shè)備時(shí)關(guān)閉排氣閥,打開下排閥,穩(wěn)定其

21、正常產(chǎn)水流量,工作流速40m/h,出水電導(dǎo) 0.2卩s/,即轉(zhuǎn)入制水。Launched the desalting water pump, open the inlet valve of the mixed bed, exhaust valve, flow top-down, when the water is full of equipment close the discharge valve, open the discharge valve, the stability of its normal production flow, work flow, 40 m/h, water co

22、nductivity 0.2 mu s/cm or less, or into the water.2、制水 Water making 打開混床出水閥,關(guān)閉下排閥,穩(wěn)定產(chǎn)水量達(dá)到規(guī)定的設(shè)定值至制水周期結(jié)束。Open the discharge valve of the mixed bed, close the discharge valve, water rate reached the specified value to the end of the water cycle.3、再生 Regeneration(1)反洗預(yù)分層:打開反洗進(jìn)水閥、上排閥,以流速為10m/h 進(jìn)行反洗分層,或以使

23、樹脂處于充分流動(dòng)狀態(tài),以正常顆粒樹脂不被水流沖出為宜來控制反洗流量,反洗終點(diǎn)以陰、陽樹 脂基本分層為止。( 1)Backwashing early stratified: open the backwashing on the inlet valve, valve, flow velocity as 10 m/h backwashing stratification, or to make the resin is in full flow condition, with normal resin particles are not flow out of advisable to contr

24、ol backwashing flow, backwashing end to cation resin and anion resin basic stratification.(2)失效:打開堿再生水稀釋閥,堿計(jì)量箱出口閥,混床進(jìn)堿閥、下排閥,啟動(dòng)再生泵,流 量以5m/h控制為宜,時(shí)間為5分鐘,再生水溫度為4050C。( 2)Failure: open the dilute alkali reclaimed water valve, alkali dosing tank outlet valve, into the alkali valve, discharge valve of the

25、mixed bed, start the regenerative pump, flow with 5 m/h control advisable, time for 5 minutes, reclaimed water temperature of 40 50C .(3)反洗分層:打開反洗進(jìn)水閥、上排閥,以流速為10m/h 進(jìn)行反洗分層,反洗流速或流量同反洗預(yù)分層,反洗終點(diǎn)以陰、陽樹脂交界處徹底分層為止,反洗結(jié)束時(shí)應(yīng)緩慢關(guān)閉進(jìn)水 閥,使樹脂顆粒逐步沉降,以達(dá)到最佳的分層效果。(3)Backwashing layered: open the backwashing on the inlet v

26、alve, valve, flow velocity as 10 m/h backwashing stratification, backwashing velocity or flow with backwashing stratification, backwashing end to the junction between cation resin and anion resin is completely layered, backwashing should slowly closing at the end of the inlet valve and the settlemen

27、t of resin particles gradually, in order to achieve the best effect of layered.( 4)沉降:關(guān)閉反洗進(jìn)水閥、上排閥,打開排氣閥、下排閥,使反洗后展開的樹脂自然,均 勻地沉降下來,容器內(nèi)液面降至樹脂面以上 200mm 位置。( 4)Settlement: closure backwashing on the inlet valve, valve, open the discharge valve, discharge valve, made in the resin after backwashing nature,

28、 settling down, evenly container liquid level down to resin surface above 200mm position.(5)再生劑注入:采用同步再生法,打開再生系統(tǒng)再生水稀釋閥,酸、堿計(jì)量箱出口閥,混 床進(jìn)酸、進(jìn)堿閥、中排閥,啟動(dòng)再生泵,酸、堿再生流量均以 5m/h 為宜,再生時(shí)間根據(jù)實(shí)際 需要確定,供堿液注入的再生水溫度應(yīng)加熱至4045 C,可以取得較好的再生效果。( 5 ) Regenerant injection: using synchronization method, open the regeneration syste

29、m of reclaimed water dilution valve, acid, alkali dosing tank outlet valve, mixed bed into acid, alkali valve, bottom valve, pump start regeneration, acid, alkali regeneration, flow with 5 m/h advisable, regeneration time according to the actual need to determine, for alkali injection renewable wate

30、r should be heated to a temperature of 40 45C , can achieve a good effect of regeneration. (6)置換:關(guān)閉計(jì)量箱出酸閥,出堿閥,同再生劑注入的工作流速,進(jìn)行置換清洗,時(shí)間 20 分鐘或以中排出水指示達(dá)到設(shè)定指標(biāo)來確定。(6)Valve replacement: closed metering box out of the acid, alkali valve, work with regenerative agent injection velocity, displacement cleansing,

31、 20 minutes of time, or to set out instructions to water indicators to determine.4、混合 Blend(1)排水 Drainage打開排氣閥,下排閥,確認(rèn)容器內(nèi)積水排至樹脂層上200mm位置,使樹脂層有充分的活 動(dòng)空間。Open the exhaust valve, discharge valve, confirm the containers on the water and the resin layer on the 200 mm position, make the resin layer has suff

32、icient mobile space.(2)混合 Blend打開上排閥,排氣閥,進(jìn)氣閥;進(jìn)氣壓力一般控制在0.10.15MPa混合時(shí)間2分鐘,或以容器內(nèi)兩種樹脂充分混合的標(biāo)準(zhǔn)來確定。Open the top valve, exhaust valve, inlet valve; Inlet pressure control in 0.10.15 MPa commonly mixed time for 2 minutes, in container or two standard to determine the resin mix.(3)排水 Drainage打開下排閥;將容器內(nèi)水位排至樹脂層

33、面以下,結(jié)束時(shí)應(yīng)用盡快的速度排水,促使樹脂 迅速下沉,以防止樹脂在沉降過程中重新分離,引起混合不徹底,但同時(shí)要注意防止樹脂層 脫水。Open the discharge valve. Level within the container below the resin level, at the end of the application as soon as possible, the speed of the drainage, prompting resin sink quickly, in order to prevent the resin in the process of se

34、dimentation separation, cause not thoroughly mixed, but at the same time should pay attention to prevent dehydration resin layer.5、正洗 Conventional well-flushing 啟動(dòng)一級(jí)脫鹽水泵,打開混床進(jìn)水閥,關(guān)閉反洗排放閥、下排閥,當(dāng)水充滿設(shè)備時(shí),關(guān) 閉排氣閥,打開下排閥,以制水流量為正洗流量(流量有些變化也無妨),進(jìn)入正洗工況, 直至出水電導(dǎo)0.2卩s/cm設(shè)備即轉(zhuǎn)入正常制水工況或備用狀態(tài)。Launched the desalting water

35、 pump, open the inlet valve of the mixed bed, closure backwashing discharge valve, discharge valve, when the water is full of equipment, close the discharge valve, open the discharge valve, the water flow in system is washed for traffic flow (some changes also just as well), into the washing conditi

36、on, until the water conductivity C)T:交換周期 Switching cycle(h)D:柱直徑 Column diameter(m)H:樹脂層高 Resin layer(m)R:3 樹脂工交容量 Resin labor capacity (eq/m )Q:流量 Flow(m3/h)C:含鹽量 Salinity (meq/l)計(jì)量槽選用Chosing tank:V=vXRXNXK/(1000 V: 計(jì)量槽體積 Gauge tank volume(m3)3 v: 再生一次的樹脂體積 Volume of resin regeneration(m3)N:再生液為HC

37、L時(shí)為35.5,為NAOH時(shí)為40Renewable liquid for 35.5 when HCL, for NAOH to 40K: 強(qiáng)型樹脂為 1.5,弱型為 1.2Strong resin is 1.5, the weak type of 1.2 再生劑濃度HCL 0.3 NaoH 0.4Regenerant concentration of HCL, NaoH 0.4 0.3 或按實(shí)際計(jì) Or according to the actual project附 Attach :新樹脂的預(yù)處理 The pretreatment of the new resin新樹脂中含有過剩的原料及其

38、所帶的雜質(zhì)、反映不完全的產(chǎn)物等,當(dāng)樹脂與水、酸、堿溶液接觸時(shí) ,上述這些雜質(zhì) (如磺酸.胺類等)會(huì)進(jìn)入溶液 ,從而沾污出水水質(zhì)及影響樹脂的工藝 性能。因此 , 新樹脂在使用之前應(yīng)進(jìn)行預(yù)處理 ,以除去新樹脂表面的可溶性雜質(zhì)。處理方法需 按照各種不同使用對(duì)象而定。New resin contained in excess of raw material and with the impurities, which can reflect the incomplete products, such as when the resin when in contact with the water, a

39、cid and alkali solution, these impurities (such as sulfonic acid, amine, etc.) will enter the solution, thus contamination effluent water quality and the influence on the performance of the resin process. Therefore, the new resin should be pretreated before use, to remove the soluble impurities on t

40、he surface of the new resin. Processing methods need to be used according to different objects.一般新樹脂若用在食品或醫(yī)藥工業(yè)的水處理系統(tǒng)時(shí),最好先用樹脂體積 2-3 倍的飽和食鹽水浸泡 20 小時(shí)左右,用自來水沖洗到中性。再用2-5%鹽酸浸泡或低流速處理 ,以除去鐵質(zhì) ,然后用 2-5%燒堿溶液浸泡或低流速處理 ,以去除樹脂中的有機(jī)雜質(zhì) ,并清洗至出水化學(xué)耗氧量 (COD)達(dá)到穩(wěn)定值,最后用純水沖洗至中性。如陽樹脂必須再以2-5%鹽酸轉(zhuǎn)型,然后用純水洗 到出水無氯離子。對(duì)于陰樹脂不必再轉(zhuǎn)型,經(jīng)過燒堿處理已

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論