![帶式輸送機安裝說明書_(3)_第1頁](http://file2.renrendoc.com/fileroot_temp3/2021-10/14/5a76324a-4a20-4af8-a635-9d1f9cb19524/5a76324a-4a20-4af8-a635-9d1f9cb195241.gif)
![帶式輸送機安裝說明書_(3)_第2頁](http://file2.renrendoc.com/fileroot_temp3/2021-10/14/5a76324a-4a20-4af8-a635-9d1f9cb19524/5a76324a-4a20-4af8-a635-9d1f9cb195242.gif)
![帶式輸送機安裝說明書_(3)_第3頁](http://file2.renrendoc.com/fileroot_temp3/2021-10/14/5a76324a-4a20-4af8-a635-9d1f9cb19524/5a76324a-4a20-4af8-a635-9d1f9cb195243.gif)
![帶式輸送機安裝說明書_(3)_第4頁](http://file2.renrendoc.com/fileroot_temp3/2021-10/14/5a76324a-4a20-4af8-a635-9d1f9cb19524/5a76324a-4a20-4af8-a635-9d1f9cb195244.gif)
![帶式輸送機安裝說明書_(3)_第5頁](http://file2.renrendoc.com/fileroot_temp3/2021-10/14/5a76324a-4a20-4af8-a635-9d1f9cb19524/5a76324a-4a20-4af8-a635-9d1f9cb195245.gif)
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、 帶式輸送機 Blet conveyor 安裝使用說明書Installation and operation instruction 青島永昌泰機械設備有限公司一、 帶式輸送機安裝說明書Belt conveyor installation instruction1. 帶式輸送機安裝標高,均以圖紙為準。Belt conveyor installation length are with drawings2. 在設備安裝中如發(fā)現(xiàn)套用圖紙或土建圖紙所注標高與工藝布置圖不一致時需核對其標高。It is necessary to check its standard height when that o
2、f drawings or buider's work drawing are not the same with Process arrangement in process of installation.3. 帶式輸送機安裝、調整、試運行等內容除按本說明書要求進行外、設備安裝手圖及廠家圖紙說明書和技術要求帶式輸送機施工及驗收技術規(guī)范進行 施工和驗收。對主要設備應建立施工、驗收記錄。Belt conveyor in installation, adjustment, commissioning, etc according to the content in addition to
3、 the specifications, equipment installation hand diagram and drawings specifications and technical requirements of the manufacturer of the belt conveyor technology standard construction and acceptance of construction and acceptance. For major equipment shall establish construction and acceptance rec
4、ord.4. 帶式輸送機安裝前,應對土建施工的建筑物的各層標高、基礎、埋件及預留孔洞等進行全面檢查,確認符合有關的質量驗收標準后方可進行安裝。It had better check completely standard height、foundation、built-in and reserve holes of every floor of the building befor installation of belt conveyor, and installation is feasible after confirming that comply with the relevant
5、quality acceptance standard .5. 所有零部件(包括外協(xié)件)必須經檢驗合格,配套件、外購件等必須有合格證書方可進行安裝。 All components (including outsourcing) must be passed the inspection, fittings, purchased components must be qualified certificate for installation.二、 帶式輸送機安裝的技術要求及驗收的質量標準.Belt conveyor installation technology requirements an
6、d acceptance standards of quality.1. 驅動裝置Actuating device1.1 傳動滾筒中心線與減速器輸出軸中心線同軸度誤差應不大于0.1mm.Error from transmission roller center line and reducer output shaft centerline the coaxial tolerance should not be more than 0.1 mm.1.2 減速器輸入軸中心線與電動機軸中心線同軸度誤差應不大于0.1mm.Error from reducer input shaft centerli
7、ne and motor shaft centerline the coaxial tolerance should not be more than 0.1 mm.1.3 聯(lián)軸器兩半體安裝時,其端面跳動及徑向跳動的允許誤差應不大于下表所列數(shù)值. when installing Coupling half body, allowed error of the ending beat and radial beat shall not be more than that are listed in the following table.檢驗項目Inspection items柱銷聯(lián)軸器Dowe
8、l pin shaft coupling梅花聯(lián)軸器plum blossom coupling端面跳動ending beat0.050.10.1徑向跳動radial beat0.050.10.15注:按圓周測定4點以上,有范圍的數(shù)據下限為目標值,上限及無范圍的數(shù)據均為允許值.Note: by circumferential determination, above 4 points range of data to target, the lower limit and no range of data are allowable values.1.4 傳動裝置支架的水平度0.1mm/n,用水準
9、儀測量.Leveless of transmission device stents 0.1mm/n,measured by suveryors level.1.5 帶式輸送機的逆止器安裝應注意起逆止方向,用手盤動減速器的輸出軸應能自由轉動一周.Installation for non-return ejector of belt conveyor should pay attention to the non-return direction, with the hand shaft reducer output shaft should be able to freely turn for
10、 one week.2. 托輥排列基本原則The basic principle of roller arrangement2.1 均以帶式輸送機布置圖中要求為準.All are based on requirements from arrangement plan of belt converyor.2.2 弧段上下托輥在布置圖中的排列尺寸均以上下架面為基準. Size in arrangement plan of fluctuation roller from arc section are based on fluctuation frame face.3. 機架Frame of mac
11、hine3.1 安裝傳動滾筒、改向滾筒、增面滾筒及張緊裝置滾筒軸承座的兩個對應平面應在同一平面內,其平面度、軸承座孔間距的誤差和對角線長度應不超過下表規(guī)定.The two corresponding plane of installing transmission roller, redirection roller, increase surface roller and tension device roller bearing should in the same plane,and the error of planeness, housings hole spacingand dia
12、gonal length shall not exceed the regulations below.檢驗項目Inspection items 簡 圖Skecth允許誤差Allowed error對應平面平面度corresponding plane1.0mm對應孔間距WThe corresponding hole spacingW±1.0mm對應孔對角線間距差|x-y|Distinction for diagonals of Corresponding hole|x-y|x-y|3.0mm3.2 Car type tension device walk track installa
13、tion allows error press table regulations. 檢驗項目Inspection items 簡 圖Skecth允許誤差Allowed errors軌距Wtrack gaugeW±1.5mm軌頂高差hhW/6003.3 帶式輸送機頭架,尾架,中間架,驅動裝置架等應校正平值.中間架的直線度誤差應不大于1/1000.Belt conveyer frame, tail frame, middle frame, and actuating device etc should be corrected according to average value. T
14、he middle rack of flat straightness error should not be more than 1/1000.4. 整機的安裝質量標準The installation quality standards of machine允許誤差表: 檢驗項目Inspection items 簡 圖Skecth允許誤差Allowed errors滾筒垂直度Verticality of rollerD(mm) b(mm)1000 1.0檢驗項目Inspection items簡 圖Skecth允許誤差Allowed errors滾筒水平度Levelness of rolle
15、rD(mm) b(mm)1000 1.0滾筒中心線偏離Roller center deviation A5mm支腿內間距Interval in ground jack W±2.0mm架面高差Height difference of frameh600/W上托輥孔 roller hole upon 對角線差Difference of diagonal |x-y|2mm每50m一個測點托輥橫向中心線偏離Deviation of Roller transverse center line D3mm檢驗項目Inspection items 簡 圖 skecth 允許誤差Allowed err
16、ors托輥上表面高度差Height difference of upper surface of rollerTwo adjacent|h1-h2|2mm每100m|h1-h2|5mm膠帶中心線蛇形度Tape the centerline serpents degreesL100m時e20mmL=100-300m時e30mm5. 輸送帶 conveying belt5.1 輸送帶膠接前應仔細對照每條帶式輸送機布置圖中的規(guī)格,如上下膠層厚度、層數(shù)、芯層材料、用途要求、強度等.Before conveyingbelt cementing,it should compare specificatio
17、ns in arrangement plan of every belt conveyor carefully, such as the arrangement and the thickness of the fillet, layer number, the core layer materials, the use, requirements, strength, etc.5.2 膠帶應平直,無扭曲、氣泡、坑眼,其蛇行量不應大于0.35%.Tape should be straight without distortion,air bubble, pit eyes, and its S-
18、shaped is not greater than 0.35%. 5.3 輸送帶應采用硫化接頭,接頭強度不應低于膠帶本身強度的90%.Conveyor belt should use vulcanization joint, joint strength should be no less than 90% of the strength of the tape itself.6. 防雨罩Anti-rain cover 6.1 防雨罩安裝之前應先安裝防雨罩支撐架,支撐架與中間架之間采用焊接,焊接時應嚴格按照總裝圖中防雨罩支撐架的位置進行焊接。supporting frame should b
19、e first installed before installation, the support frame and middle frame linked by welding,it should be welded strictly according to the position of anti-rain cover frame in general assembly drawing. 6.2 防雨罩安裝時應按照圖紙中標明的種類進行安裝排布,防雨罩之間搭接應平整順暢,It should be arranged according to kinds signed in drawing
20、s when installing , lap joint of anti-rain cover should be level and smooth. 6.3 其他安裝要求按照圖紙進行。Other installation requirements according to drawing7. 其他 others6.1 清掃器的安裝、調整及接觸壓力等應符合廠家說明書的要求.The sweeper installation, adjustment and the contact pressure should comply with the requirements of the specif
21、ication of factory.6.2 帶式輸送機的拉緊裝置安裝時,必須使用張緊滾筒在初始位置上,以保證最大的行程.Of the belt conveyor tension device installation, it must use a tight roller in the initial position to ensure maximum trip6.3 系統(tǒng)中落料管法蘭接口、人孔門、檢查門及漏斗與設備相接處,均應采用橡膠板或其他材料予以密封,以防粉塵飛揚污染環(huán)境.Joint of dropping materials tube flange interface , manh
22、ole door, switch of inspection door and funnel with equipment in the system,all should be sealed by rubber or other materials to prevent dust so as not to pollute environment.6.4 導料槽上安裝落料管的孔洞現(xiàn)場割制,安裝完畢后割除落料管在接口處超過20毫米的余長,并用鋼板將周邊空隙封嚴.The manger falls feed tube mounted on the site of the hole cut, inst
23、alled after the debate after dropping material in more than 20 mm outlet pipe of the long, and will be more than steel surrounding space seal.6.5 各轉運站頭部漏斗或落料管預留的孔洞待漏斗或落料管安裝完畢后,周邊應砌成護沿并用鋼板將周邊空隙蓋嚴,鋼板與管道連接處應進行點焊.低于地(樓)面處,周邊應砌成100毫米以上的護沿. The transfer station head or down feed tube funnel reserved to fu
24、nnel into the holes or feed tube installation is completed, peripheral should build by laying bricks or stones becomes HuYan and steel will cover tightly around space, pipe joints of the steel plate and should be less than to spot welding. (floor) face place, should build by laying bricks or stones
25、becomes around 6 "(100 mm) above the HuYan.三、對試運的要求及運行維護注意事項The commissioning requirements and operation maintenance matters1. 帶式輸送機必須空轉試運正常后方可帶負荷試運.在設計負荷下輸送帶與驅動滾筒之間不允許打滑.Belt conveyor must work with load after it works normally without load.It isnt allowed skid between conveyingbelt and acuact
26、ing roller with designing load. 2. 系統(tǒng)內各設備試運時,應按廠家規(guī)定的試運大綱或技術要求進行.基本要求是:各轉動件應運轉平穩(wěn),無卡磨現(xiàn)象,軸承溫度不超過允許溫升.Within the system commissioning, should press equipment by a manufacturer of commissioning outline or technical requirement is: basic requirements.Each turn a should operates smoothly, no card grinding
27、phenomenon, do not exceed the allowable bearing temperature temperature rise.3. 系統(tǒng)中各設備安裝完畢后,應按進行如下項目的檢查:After installation of all equpments in the system,it should be checked items below:單機運行Light running空載運行No-load running聯(lián)動運行Ganged ruuning負荷運行Load running4. 運行維護Operation and maintenance4.1 應加強設備的檢
28、查和維修,建立和健全必要的規(guī)章制度,保證設備的完好狀態(tài).It should take more inspection and maintaince of equpments,establish and improve regulations necessary so as to keep they in a perfect condition.4.2 各條帶式輸送機的拉緊鋼絲繩應經常檢查,如發(fā)現(xiàn)異常或破損要及時更換.It should inspect constantly the taut wire rope of every conveying belt,it should be chang
29、ed timely when anomalous and broken.4.3 設備安裝或檢修起吊時,放置設備處的樓面板應采取措施使載荷不超過允許范圍. When installing of servicing , floor slabs in equipment place should be taken measures to make load not more than allowed scope4.4 凡在轉運站各層預留的加設蓋板的安裝孔洞,檢修時需將蓋板移開,孔洞周圍應設 置臨時欄桿以確保人身安全. And in each layer of the reserved adding
30、transfer station cover installation holes, maintenance should remove cover plate, hole should be set for temporary railings around to ensure the security of person.4.6 運行每班交接前,應將落料管,導料槽等處的積料清理干凈,以防自燃引起火災.Before the handover of Each squad,it should clean up dropping material tube and product material
31、 in feed channel to prevent fire hazard.4.7 引起帶式輸送機故障及跑偏的因素較復雜,下表給出了常見跑偏和故障現(xiàn)象產生的原因及預防對策.It is just due to many factors causing stoppage and wandering,it shows common Reasons and countermeasures against stpppaage and wandering below.序號Serial number現(xiàn) 象appearance原 因resons對 策countermessures1整機膠帶向一個方向跑偏T
32、he tape of overall unit wandering to a directiona承載托輥,滾筒不在同一直線上,承載托輥安裝不水平.carrying idler ,roller arent on the same line,carrying idler wasnt installed horizontally調整承載托輥及架構Adjust carrying idler and frameb 膠帶邊緣因摩擦而損傷Tape edge broke because of friction清除摩擦障礙,修補或更換膠帶Elimilate friction obstacle,mend or
33、change the tapec 物料偏斜不在受料中心Material is not skewed in materials expected centre調整物流使其對中Adjust material flow and make it centered2膠帶在同一托輥處跑偏The tape wandering in the same rollera機架的一部分不在同一直線上.Parts of frame are not on the same line調整機架并使其左右同高Adjust fame and make it the same height of R&Lb 托輥與膠帶的運行
34、方向不垂直Running direction of roller is not vertical with tape.空載時調整跑偏最大處前23倍托輥間距處的托輥,需經二三次調整,調正后牢固固定When the wandering no-load adjustment before both 2 3 times the distance between roller in roller, subject to 23 times, after the adjustment is firmlyc 托輥轉動不良Roller turns no that good更換不良托輥Change the bad rollerd 托輥粘結物料roller bonds materials清洗粘結物料Clean the b
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 山西省陽曲縣八年級地理上冊 第二章 自然環(huán)境 我們賴以生存的基本條件說課稿 晉教版
- 2024-2025學年五年級語文上冊第二單元5裝滿昆蟲的衣袋教案設計蘇教版
- 2024-2025學年高中歷史第四單元中國社會主義建設發(fā)展道路的探索第19課經濟體制改革教案含解析岳麓版必修2
- 馬栗種子提取物片說明書
- 湘教版地理八年級下冊:9 建設《永續(xù)發(fā)展的美麗中國》 聽課評課記錄
- 音體美教研組學期工作總結
- 車禍脖子鑒定委托書
- 內科護士長年終工作總結
- 年度營銷計劃書
- 人事行政部個人年終工作總結
- 2025年湖南中醫(yī)藥高等??茖W校高職單招職業(yè)技能測試近5年常考版參考題庫含答案解析
- 寧波2025年浙江寧波市鄞州區(qū)衛(wèi)健系統(tǒng)其他事業(yè)單位招聘事業(yè)編制46人筆試歷年參考題庫附帶答案詳解
- 【七上HK數(shù)學】安徽省蚌埠市固鎮(zhèn)縣2024-2025學年七年級上學期1月期末試卷數(shù)學試題
- 電信網和互聯(lián)網圖像篡改檢測技術要求與測試方法
- 2025屆江蘇省南京市鹽城市高三一??荚囌Z文試題 課件
- 《水稻生長進程》課件
- 2024版企業(yè)高管職務任命書3篇
- 青少年鑄牢中華民族共同體意識路徑研究
- 廣西出版?zhèn)髅郊瘓F有限公司招聘筆試沖刺題2025
- 江蘇省南京市2024年中考英語試題(含解析)
- 外科圍手術期處理(外科學課件)
評論
0/150
提交評論