版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、 Vol . 3 No . 3 Sep t . 2007 Xinjiang Q il & Gas ( Edition of Natural Science tion - p rouduction p ressure system , as thus oilfield development is to achieve the desired results . A s Shanshan O ilfield is in the m iddle - high watercut development stage, the injection - p roduction p ressure syst
2、em estab2 lished in the low watercut developm ent stage can no longer meet the needs of the developm ent of oilfields at p res2 ent . Therefore, through restudied the whole oilfield, reasonable injection - p roduction p ressure system was estab2 lished in the m iddle - high watercut stage, and the c
3、urrent oilfield injection - p rouduction p ressure system was e2 valuated. Key W ords: Pump ing System; W ater Injection System; M iddle - high W atercut Stage; Injection - p rouduction Pressure System STUDY O N SEPARATE LAY ER FRACTUR ING TECHNOLO GY AND ITS APPL ICAT I O N IN TUHA OI L F IELD / L
4、i J un, Gong X iaox iong, L i X iang, et a l. TuHa oilfield Com pany Explora tion and D evelopm en t R e2 sea rch Institu te, Ham i X in jiang 839009 /X in jiang S h iYou T ianR an Q i, 2007, 3 ( 3 : 50 55 Abstract: Tuha oilfield is a low per m eability oilfield w ith multi - layer development, rese
5、rvoir p rofile heterogenei2 ty is serious , w ith obvious interlayer difference, uneven reconstruction p roblem s caused by p reviously combined layer fracturing have severely restrained the reconstruction effect in recent years。A s for the reservoir characteris2 tics in Tuha oilfield, by studying t
6、he p revious fracturing technology , separate layer fracturing strings w ith packer of“Y341 + Y241 ” 、 “Y221 + Y111 ” 、 “Y511 + Y453 ”are developed and m atched , well selective and layer se2 lective p rincip le and operation parameters op ti m ization design of separate layer fracturing have been f
7、ormed , which have significant effects in field app lication. Key W ords: separate layer fracturing; technology; string matching; op ti m ization design APPL ICAT I O N O F TURNARO UND FRACTURE TECHNOLO GY IN ZHUNDO NG O I L F IELD / L iu J in jun , Gu L im an, X ie L ijun, et a l . ( X inJ iang O i
8、l Com pany Z hunD ong O il P roduction Factory /X in jiang S h iYou ( T ianR an Q i, 2007, 3 3 : 56 58 Abstract: U sually hydraulic re - fracturing treatm ent for old p roducers only sp lits the original fractures again. W ith the development of the oilfield, p roduction potential of the reservoir a
9、round the original fractures is becom 2 ing less and less, and the effect of enhancing p roductivity decreases year by year . To turn around fracture and create new fracture are an effective way for old p roducers to increase p roduction. In this paper, the mechanis m of fracture creation for re - f
10、racturing, the condition of new fracture creation, the op tim ization of block agent and its volum e are studied. This study is app lied to Zhundong low per m eability reservoir, and better effect of enhancing p roductivity is achieved. Key W ords: Zhundong O ilfield; Turnaround Fracture; Effect of
11、app lication M EASURES TO ENHANCE EFFECT O F CLASS II RESERVES W ITH H IGH TEM PERATURE POL 2 YM ER FLOOD ING IN SHUANGHE O I L F IELD / X u X ue - pin, L i Z h i - ping, L ong Guo - qin, et a l . . Ch i2 na U n iversity of Geosciences , B eijing 100083 /X in jiang S h iYou T ianR an Q i, 2007, 3 (
12、3 : 59 61 Abstract: V formation is the first Pilot test unit of class II reserves w ith high temperature polym er flooding in Henan oilfield. In this paper, perfected polym er flooding well - net and enhancing well - net controlling extent is put for ward, using reservoir numerical si m ulation to o
13、p tim ize injection parameters, adjusting p rofile control to block the larger reservoir channels before injecting polymer, and instantly enhancing p roduction of effective oil well. Obvious effect of increasing oil and decreasing water p roduction is achieved: daily oil output increased from 105 t
14、before polymer flooding to 182 t, and average water - cut lowed 3. 3% w ith total additional oil 23, 500 t . A set of technologies to enhance effect of class II reserves w ith high temperature polymer flooding is formed. It p ro2 vides a referential evidence for development of class II reserves w it
15、h high temperature polym er flooding . Key W ords: class II reserves; high temperature; polymer flooding; effect THE PHASE BEHAV I O R AND CHARACTER IZAT I O N O F CO ND ENSATE GAS RESERVO IR FL U2 I D S AND THE AFFACT ING FACTO RS / L iu Chang - lin, Z hang M ao - lin, M ei Ha i - yan, et a l. S ou
16、 thw est Petroleum U n iversity, S ichuan, Chengdu, 610500 /X in jiang S h iYou T ianR an Q i, 2007, 3 ( 3 : 62 66 Abstract: Condensate gas reservoir is a particular type of gas reservoir w ith high econom ic value. The study of fluid phases is very important during its development . The paper intro
17、duces its different functions at the begin2 Vol . 3 No . 3 Sep t . 2007 Xinjiang Q il & Gas ( Edition of Natural Science ning and in the p rocess of the condensate gas reservoir developm ent, and the factors that affect phase state of the condensate gas , also focuses on the analysis of the effect o
18、f the cap illary p ressure in porous media , cap illary condensation and hum idity on phase equilibrium. Key W ords: Key Words Condensate Gas Reservoir; Phase State; cap illary p ressure; cap illary condensation; hu2 m idity; Deposition of O rganic Solid APPL ICAT I O N O F“GAS RECO VERY BY L IQU I
19、D D RA INAGE ”TECHNOLO GY THRO UGH GAS L IFT FO R LOW PRESSURE GAS W ELL IN M AZHUANG GAS RESERVO IR /W ang J in - d i, W ang Hu i - qing, W ang Guo - x ian, et a l . Z hundong O il P roduction Com pany, X in jiang O ilfield, PetroCh ina, Fukang, X in jiang 831511 /X in jiang S h iYou T ianR an Q i,
20、 2007, 3 ( 3 : 67 68 Abstract: In view of low p ressure and serious liquid loading of J3q in M azhuang gas reservoir, “Gas Recovery by L iquid D rainage ”Technology through Gas L ift was carried out w ith the op tim ized gas lift string . It is effective not only for resum ing p roduction of gas wel
21、l, but also for p reventing from Second pollution of gas reservoir . It p ro2 vides an effective way for the sam e kinds of gas reservoirs to imp rove recovery rate. Key W ords: gas well w ith low p ressure; gas lift; gas recovery by liquid drainage; tubing string op tim ization STUDY O F L I M IT I
22、NG TEM PERATURE ABO UT LOW TEM PERATURE TRANSPO RTAT I ON OF W ATERCUT O I L / Hang Hong - sheng, L i W en - qing, W ang X iao - bing. College of Petroleum Eng ineering, D aqing Petroleum Institu te, D aqing, Heilong jiang 163318 /X in jiang S h iYou T ianR an Q i, 2007, 3 ( 3 : 69 72 Abstract: In c
23、ompany w ith the increase of water content, the water percentage in p ipeline network can reach 90%. In order to research the influencing factor to lim iting temperature of low temperature transportation, the ex2 perim ent have been made. In this paper, by means of contrsating the data from the expe
24、ri m ent, we know that re2 ducing flux rate, increasing p ipe diam eter and concentration of flow i m p rover can reduce the lim iting tempera2 ture. The effect of adding flow im p rover is most remarkable, and it can be operated easily, so it has a good app li2 cation future. Key W ords: watercut o
25、il; lim iting temperature; flow imp rover; p ressure drop THE STUDY O F ECO NOM ICAL RUNN ING SCHEM E O N THE BUR IED CRUD E P IPEL INE / X ie Y ing, Yuan Z ong - m ing, X iao yan, et a l . S ou thw est Petroleum U n iversity, chengdu S ichuan 610500 /X in jiang S h iYou T ianR an Q i, 2007, 3 ( 3 :
26、 73 76 Abstract: In order to solve the conflict betw een energy consump tion and energy supp ly of the p ipeline perfectly, it is very i m portant to research on a reasonable and scientific operation scheme which is econom ical at the sam e tim e for reducing the transporting cost of oil on the serv
27、ice buried crude p ipeline, this paper has established math2 em atical model on buried crude p ipeline, put forward the solution of mathem atical model, which adop t the com 2 bination of schem e comparison method and TLNET softw are . W hen the flux of p ipeline is a certainty, This paper has p res
28、ented the econom ical operation scheme. The expense of p ipeline is m inim um. Inc: the number of running pump ing station and heat station, the com bination mode of pump unit in the pump ing station, in and out p ressure of every station, in and out temperature of every station, one hour running expense of p ipeline, the rotate speed of frequency conversion tim ing electricity machine,
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- YY/T 1950-2024組織工程醫(yī)療器械絲素蛋白
- YY/T 0860-2024心臟射頻消融治療設備
- 貴州財經職業(yè)學院《小組工作》2023-2024學年第一學期期末試卷
- 貴陽職業(yè)技術學院《建筑風景表現(xiàn)》2023-2024學年第一學期期末試卷
- 2025陜西省安全員-B證考試題庫附答案
- 紅棗小鎮(zhèn)建設項目可行性研究報告-紅棗市場需求持續(xù)擴大
- 廣州中醫(yī)藥大學《食品微生物學(雙語)》2023-2024學年第一學期期末試卷
- 2025年湖南省安全員考試題庫及答案
- 2025年山東省安全員《B證》考試題庫
- 廣州醫(yī)科大學《小學語文教學設計與實訓》2023-2024學年第一學期期末試卷
- 2023-2024學年浙江省杭州市上城區(qū)教科版四年級上冊期末考試科學試卷
- 期末 (試題) -2024-2025學年外研版(三起)(2024)英語三年級上冊
- 2023年彌渡縣廣播電視臺(融媒體中心)招聘筆試題庫及答案解析
- 體能訓練講解健身課件
- 2023年成都溫江興蓉西城市運營集團有限公司招聘筆試題庫及答案解析
- 地震工程學-反應譜和地震時程波的相互轉化matlab編程
- 建筑工程施工現(xiàn)場視頻監(jiān)控布置實施方案
- 施工現(xiàn)場節(jié)前安全檢查表
- 松下vf100變頻器使用手冊
- 機械設計制造及其自動化實習總結報告——某
- 角的概念推廣說課課件.
評論
0/150
提交評論