![建筑施工英語常用對(duì)話_第1頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/14/eb9ec4e7-e5f7-4804-8bd4-a64260bea21a/eb9ec4e7-e5f7-4804-8bd4-a64260bea21a1.gif)
![建筑施工英語常用對(duì)話_第2頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/14/eb9ec4e7-e5f7-4804-8bd4-a64260bea21a/eb9ec4e7-e5f7-4804-8bd4-a64260bea21a2.gif)
![建筑施工英語常用對(duì)話_第3頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/14/eb9ec4e7-e5f7-4804-8bd4-a64260bea21a/eb9ec4e7-e5f7-4804-8bd4-a64260bea21a3.gif)
![建筑施工英語常用對(duì)話_第4頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/14/eb9ec4e7-e5f7-4804-8bd4-a64260bea21a/eb9ec4e7-e5f7-4804-8bd4-a64260bea21a4.gif)
![建筑施工英語常用對(duì)話_第5頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/14/eb9ec4e7-e5f7-4804-8bd4-a64260bea21a/eb9ec4e7-e5f7-4804-8bd4-a64260bea21a5.gif)
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、建筑安裝施工英語常用對(duì)話第一部分 專業(yè)會(huì)話第一課At a Construction Site在建筑工地上第二課Conversation about Construction of Water SupplyPipe, Central Heating and Air-condition 水、暖、空調(diào)施工會(huì)話第三課Conversation with Pipe Fitter管道技工會(huì)話第四課Conversation about Riveters Engineering鉚工施工會(huì)話第五課Conversation about Welding 焊接會(huì)話 第六課Conversation with Fitter
2、s安裝鉗工會(huì)話第七課Signals and Conversation about Hoisting and Mounting 吊裝信號(hào)及會(huì)話第八課Transportation運(yùn)輸?shù)诰耪nSafety安全第十課Accident事故第十一課Conversation about the Installation of PetroleumMachinery石油機(jī)械安裝會(huì)話第十二課Drawings圖紙第十三課Scaffolds腳手架第十四課Isolation and Thermal Insulation隔絕、保溫第十五課Anticorrosion防腐第一課 At a Construction Site 在
3、建筑工地上A:Ill take you to the construction site.我?guī)ソㄖさ?,F(xiàn)ollow me, please.請(qǐng)跟我走。B:Thank you.謝謝您。A: Here we are. 到了。B: Can you introduce me to the section chief on the building site? 您能介紹我同這個(gè)工地的工長(zhǎng)認(rèn)識(shí)嗎?A:Certainly. 當(dāng)然可以This is a Chinese builder, Wang Lin.這是中國建筑工人,王林。C: How do you do. Im glad to meet you.
4、您好.認(rèn)識(shí)您我很高興。A: This is section chief, Mr. S.這是工長(zhǎng),S先生。B: How do you do. Im glad to meet you, too .您好.認(rèn)識(shí)您我也很高興。C: Welcome to our building site.歡迎您來到我們工地。How long will you work here? 您將在這工作多長(zhǎng)時(shí)間?B: About two years.大約兩年Would you introduce me to some of the workers?請(qǐng)您介紹我同一些工人認(rèn)識(shí)好嗎?C: Certainly.當(dāng)然可以.Hello, f
5、ellow workers!喂, 伙伴們!This is our new fellow,這是我們的新伙伴!A Chinese worker, Mr. Wang.中國工人,王先生.D,E,F, G.How do you do, Mr. Wang!王先生,您好!B: How do you do!您們好!Shall we start?我們開始吧!C: Yes, please.好,請(qǐng)吧!Here is the wood.這是木材(red bricks, mixed cement).(紅磚攪拌好的水泥).B: Is that hoist made in Yemen?那臺(tái)卷揚(yáng)機(jī)也是也門制造的嗎?C: Ye
6、s. But that crane over there is made in Japan.是的.但是,那邊那臺(tái)起重機(jī)是日本制造的.B: I think, in Yemen there are many prefabricated houses like this building.我想, 在也門,有許多像這棟摟這樣的預(yù)制裝配式房屋.C: Yes. The prefabricated components are all made in the casting yard.是的,這種預(yù)制廠制造的.B: I think so.我也是那樣想的.A: Stop please. Now, time fo
7、r rest.請(qǐng)停下來.現(xiàn)在休息時(shí)間到了.第二課 Conversation about Construction of Water Supply Pipe, Central Heating and Air-condition水,暖,空調(diào)施工會(huì)話A: Before installing the water supply pipe, you ought to inspect and clean it inside.上水管安裝前,里邊應(yīng)檢查和清掃一下.B: Yes, we have done that.是,我們已經(jīng)都做過了.A: Before mounting the iron casting pi
8、pes, you should test the hydraulic pressure one by one,and then clean them.鑄鐵管安設(shè)前,要逐根試水壓和清掃.B: Yes, were doing that job.是,我們正在進(jìn)行中.A: What is your idea about the height of the bathtub were installing?浴盆安裝高度這樣可以嗎?B: Lift 50 mm. Higher, please.再抬高50毫米吧?A: Why was the cover of the stool not fixed?坐便蓋為何沒
9、安裝?B: Customarily, it should be fixed after theinternal plastering.習(xí)慣上,應(yīng)放在室內(nèi)粉飾工程完了后再安.A: The flange of the ventilating pipeline is well joined. But the nuts are not completely on the same side.風(fēng)管道的法蘭連接很好,只是螺帽沒有完全在同一面.B: Ill correct it at once.我馬上糾正過來.A: May the ventilator have a trial run?通風(fēng)機(jī)可以試車嗎?
10、B: No. First you may check it up and then start it.不,先做一下檢查,然后再啟動(dòng). 第三課 Conversation with Pipe Fitter管道技工會(huì)話A: Are you a pipe fitter?您是管道技工嗎?B: Yes.是的.A: How many years standing have you?您有幾年工齡?B: I have been engaged in pipe engineeringwork for eight years.我已經(jīng)從事管道工作八年了.A: When will the pipe engineerin
11、g project of this workshop be completed?這個(gè)車間的管道工程何時(shí)竣工?B: It will be completed in three more days. And then it will undergo the stage of systematic testing pressure.再有三天就可結(jié)束,然后進(jìn)入系統(tǒng)試壓階段.A: Please disassemble the connective of the pumpand the pipe flange. I want to check it up.請(qǐng)您把泵出口法蘭與管道法蘭連接的螺栓拆開.我檢查一
12、下.B: Yes, O.K.好吧.A: There should be a blind flange between the two flanges here. In state of freedom, stagger joint shouldnt happen.應(yīng)當(dāng)有盲板.處于自由狀態(tài)時(shí),不應(yīng)有錯(cuò)口現(xiàn)象.B: Yes, Ill put the blind flange in and repair it at once.是,我馬上加盲板和修理.A: An overhanging support should be added here.此處應(yīng)添加一個(gè)懸臂支架.B: You ought to f
13、ix a steel plate on the reinforced concrete pile with a expansion bolt and thenweldand angle steel support on the steel plate, shouldnt you?在鋼筋砼柱上用膨脹螺栓固定住一塊鋼板.A: Yes, all right. Please do this way.好,可以.就這么辦.How about the valve installed?閥門安裝的怎樣?B: The position and direction are correct, conjunction
14、is flexible and accurate.位置和方向正確,連接牢固,操作靈活,準(zhǔn)確.A: The pressure in piping system has risen to 15 kilogram per square centimeter.Please check up.管路系統(tǒng)已經(jīng)升壓至15kg/cm2, 請(qǐng)檢查.B: Is the water filled in according to the network drawing?按網(wǎng)絡(luò)圖充水嗎?A: Yes. Ive checked up all such things as blind flange and discharge
15、 valves which should be added, valves which should be closed, the instruments and meters which should be replaced. All are right.是的.該加的盲板和放空閥,該關(guān)的閥門,該換的儀表都做了檢查.全部正確無誤.B: Well, lets start checking up once again.那么,我們開始檢查吧!第四課 Conversation about Riveters Engineering 鉚工施工會(huì)話A: Please check up. Is my loft
16、ing method correct?請(qǐng)檢查一下,我的放樣方法對(duì)嗎?B: Yes. Thats right. Its very good是的,很好.A: Why didnt you make a groove before welding?為什么不開坡口,就焊接呢?B: I think that generally the butt welding Of plate which is thiner than 6 mm. May be done by hand welding. Whats your idea?我認(rèn)為,6毫米以內(nèi)的較薄板材的對(duì)接,一般以手工焊是可以的.您的意見怎樣?A: Plea
17、se measure the thickness of the plate.請(qǐng)量一下板厚.B: This is a plate of 4 mm. Thickness.這是4毫米的板材.A: You may weld it then.那么就可以焊了.The steel column has some windings.鋼柱有些彎曲,Youd better straighten it.要轎直一下.B: The flame correcting method may be used?可以用火焰矯正法嗎?A: No.不可以.B: Then correct it with the straightene
18、r.那么就用機(jī)械矯正.A: In installing the steel column, how many mm. Are the deviation range of elevation and perpendicularity?鋼柱安裝,標(biāo)高和垂直度偏差范圍是多少?B: The elevation deviation is in the range plus 5 to minus 5 mm. .標(biāo)高偏差范圍是±5毫米.The perpendicularity deviation range is: when the column length is shorter than 1
19、0 meters,垂直偏差范圍是: 柱長(zhǎng)10米以內(nèi)的,10mm are allowed;容許10毫米.if the column length is longer than 10 meters, 如柱長(zhǎng)大于10米,is by H per1000, 則按H/1000,but it must be less than 35 mm.但不得大于35毫米.A: Please give the standards of the preheat before welding and those of the heat-treatment after welding.請(qǐng)您提供焊前預(yù)熱和焊后預(yù)熱處理的規(guī)范.B:
20、 Please refer to the standard of American Petroleum Institute請(qǐng)參照美國石油學(xué)會(huì)(API)的規(guī)范.A: How do you plan to mount the floating ?top oil-tank.您們打算如何安裝浮頂式油罐?B: If the source of water is ample, we prepare to constructby adopting water-floating inverted mounting method.如果水源充足的話,我們準(zhǔn)備采用水浮倒裝法施工.A: The cost of wat
21、er is too expensive, isnt it?水的成本太高吧!B: Machine hoisting inverted installation method may be adopted, too.也可以采用機(jī)械提升倒裝法.第五課 Conversation about Welding焊接會(huì)話A: Have you a welders certificate?您有焊工合格證嗎?B: Yes, I have obtained a certificate of versatile position welding.是的,我已經(jīng)取得了全位置焊接合格證.A: What requiremen
22、ts are there for pipeline welded seams?管道焊縫有何要求?B: We must have the records of all the welded seams and the 10%roentgenoscopic selective examination. 所有焊縫都要有記錄,并且要有10%的X射線的抽查.A: This welded seam is found an obvious air hole and an unqualified undercut with macroscopic check.這個(gè)焊口以宏觀檢查發(fā)現(xiàn)明顯的氣孔和超長(zhǎng)的咬邊. I
23、t is unqualified.不合格.B: Well return it to repair at once.馬上返修.A: Here is missing-welding, isnt it?此處是漏焊吧!B: No. The requirement in the drawing is gap (discontinuous) welding.不是.圖紙上的要求是間斷焊.A: The pass of stainless steel needs machine-washing and pickling.不銹鋼的焊道要進(jìn)行機(jī)械清洗和酸洗.B: Yes, we are preparing to d
24、o that.是的,我們正做準(zhǔn)備.A: What inspection items are needed?要做哪些項(xiàng)目的檢查呢?B: Pull test, winding test and hardness test are needed.要做拉力、彎曲和硬度試驗(yàn).第六課 Conversation with Fitters安裝鉗工會(huì)話A: Have you completed the installation of this pump?這個(gè)泵安裝完畢了嗎?B: Yes, we have.是的,已經(jīng)完了.A: How about the circumstances? 情況怎樣?B: Very g
25、ood. 很好!The foundation bolt is upright, 地腳螺栓垂直,the nuts are screwed and the moment of twisting are consistent, 螺栓擰緊而且扭力矩一致,the nuts are contacted with the collars and the collars are contacted with the equipment base closely.螺母與墊圈,墊圈與設(shè)備底座的接觸很緊密.A: How about the pad irons?墊鐵情況怎樣?B: The pad-iron group
26、s are smooth and steady and contacted closely.墊鐵組平穩(wěn),接觸緊密. Every group has no more than three pieces.每組不超過三塊.A: Please explain how many mm. is the requirement of the coupling butt end space?請(qǐng)您說明一下,聯(lián)軸節(jié)端面間隙要求是多少?B: Its all right that the least space comes up tomm.最小間隙達(dá)到毫米即可.A: The elevation of this equ
27、ipment installation is wrong, isnt it?這個(gè)設(shè)備安裝的標(biāo)高不對(duì)吧?B: No. It accords with the demands of drawing standard (specification).不,標(biāo)高符合圖紙規(guī)范的要求.A: Excuse me, whether this compressor needs disintegration for check-up?請(qǐng)問,這臺(tái)壓縮機(jī)是否要解體檢查?B: Yes.是的.A: May I set the machine going?我可以開車啟動(dòng)嗎?B: No. I want to check it
28、up once more.不,還要檢查一下.第七課 Signals and Conversation about Hoisting and Mouting吊裝信號(hào)及會(huì)話Hoisting Signals吊裝信號(hào) Hanger (Grab hook) rising: 吊鉤升起:Put out the forefinger upward and do the rotated action.食指向上伸出,做旋轉(zhuǎn)動(dòng)作.Hook lowering: 吊鉤下降Put out the forefinger downward and do therotated action.食指向下伸出,做旋轉(zhuǎn)動(dòng)作.Hook
29、rising slightly:吊鉤微微上升:Stretch out a hand horizontally with the palm of the hand downward and the forefinger of the other hand upward to the first hands palm and do rotated action.一手平舉,手心向下,另一手食指向上,對(duì)著第一只手的手心, 做旋轉(zhuǎn)動(dòng)作.Hook lowering slightly:吊鉤微微下降Stretch out a hand horizontally with the palm of it upwa
30、rd and the forefinger of the otherhand downward to the first hands palm and do rotated action.一手平舉,手心向上,另手食指向下,對(duì)著第一只手的手心,做旋轉(zhuǎn)動(dòng)作.Boom rising:吊臂升起:The thumb should be upward and do a motion vertically up and down.大拇指向上,做上下運(yùn)動(dòng).Boom lowering:吊臂下降:The thumb should be downward and do a motion Be Ready to Ho
31、ist 準(zhǔn)備好吊裝A: Has the brake device of the crane been examined?吊車制動(dòng)裝置檢查了嗎?B: Yes .It has been examined. All right.是的,檢查了,很好.A: Be careful, not to break the equipment. 注意點(diǎn)!不要把設(shè)備碰壞.Youd better put it down slowly.要慢慢放下.B: O.K. Dont worry about it.好的,請(qǐng)放心.A: May this roof truss be used to hoist an object of
32、 one tonne?此屋架可以利用一下,吊一噸重的物嗎?B: All right. Be careful.可以,要小心.A: Is the wire rope hoisting safety?此鋼絲繩吊裝安全嗎?B: There is no problem.沒有問題,There are 5 times safety coefficient.有五倍的安全系數(shù)呢?A: Dont stay under the crane boom, please.請(qǐng)不要站在吊車臂下!B: Im sorry. Thank you.對(duì)不起,謝謝.A: Can your tyre crane enter such a
33、small site?這么小的場(chǎng)地,B: O.K. Only the soil is too spongy.您的汽車能進(jìn)來嗎?A: Ill level it at once, then pave the steel plates.可以,只是土質(zhì)太軟了.B: Well, we are going to hoist tomorrow.我馬上平整,then pave the steel plates.然后鋪上鋼板.B: Well, we are going to hoist tomorrow.好的,那么明天就吊裝.Objects Handled吊裝物A: What is to be lifted u
34、p?要吊什么東西?B: Bricks and cement.磚和水泥.A: Also those stones?那些石頭也吊嗎?B: No. These are for the foundation.不,這些是地基用的.A: Also some sand, I think. 我想, 還有些砂子.B: Yes, but after bricks and cement.是的,但在磚和水泥之后.A: Will those scaffolds be hoisted or not?那些腳手架吊不吊?B: Yes, they will. But in the afternoon. 要吊,在下午.A: It
35、s going to unload wagons in the afternoon.下午要卸火車.B: What are going to be unloaded from the wagons? 從火車往下卸什么?A: Machine tools, welders, mixers and vibrators. 有工具機(jī)床,電焊機(jī),攪拌機(jī)和振搗器.B: Oh! I have no idea of that.呵! 我不知道.A: Lift them all up before noon possibly!你要盡可能在上午吊完.B: All right, I will do my best. 好吧
36、! 我盡力干.Ropes鋼繩A: Excuse me! Have you got a rope?請(qǐng)問,你有繩子嗎?B: What size do you want?要什么規(guī)格?A: Pair ropes of 20 meters long and 16 mm. in diameter.要對(duì)繩,20米長(zhǎng),16毫米粗的.B: But I have got a rope of 14 mm. in diameter and 18 m. in length.而我有根單繩,14毫米粗,18米長(zhǎng).A: That may not be safe , Im afraid.那恐怕不安全. B: How about
37、 diameter 18 mm.?直徑18毫米粗的怎樣?A: How long is it? 有多長(zhǎng)?B: More than 25 meters.25米以上.A: Is it a new one?是新的嗎?B: Dont mind so much! Ropes here all new and no one is broken in them.放心吧! 這里的繩都是新的,沒有斷繩.A: That will be fine, I will take it.那太好了.就用它.B: Mind you to return it for check when itis not in use.返回檢查.
38、A: Certainly.那是自然.5 . Lifting Machines提升機(jī)械A(chǔ): What lifting machines are there on this site?工地上都有什么吊裝機(jī)械?B: Tower cranes, truck cranes, mobile cranes and bucket or fork loaders.塔式起重機(jī),汽車起重機(jī),輪式起重機(jī)和斗或叉式裝載機(jī).A: Which is available for unloading a container from a wagon?從火車上卸一個(gè)貨柜用什么起重機(jī)?B: How many tones does
39、the container weight?貨柜重多少?A: About seven tones.大約七噸.B: Youd better use the eight-tonne capacity mobile crane.您最好用八噸容重的輪式起重機(jī).A: But the wagon is at the railway station, Its quite a way from here.但火車在站上有相當(dāng)一段路程.B: Well. Eight-tonne capacity truck crane must be preferred. It travels faster.那么,八噸級(jí)的汽車起重機(jī)
40、較好,它跑的快些.A: These bags of cement should also be packed up in the stores.這些袋水泥也應(yīng)當(dāng)垛到倉庫去.B: Fork loader will do.可用叉車.A: Where is the manager?經(jīng)理在哪里?B: The tall man over there.那邊那個(gè)高個(gè)子的.A: Thank you.謝謝您.B: Never mind.不用謝.6. Carrying Rope吊重繩A: How can I rope this case?這個(gè)箱子怎么栓繩呢?B: According to the sign on
41、it.按箱上的標(biāo)記栓。A: Can I use a single rope?我可以用單繩嗎?B: That will cause it to revolve.Its not safe.那將導(dǎo)致旋轉(zhuǎn),不安全。A: Where is the center of gravity?重心在哪里?B: Its not shown. In the middle, I think.沒表示,我想在中間。A: Could I hope it this way?我可以這樣栓嗎?B: Right I think it must be safe.對(duì)!我想一定會(huì)安全的。A: The hook has no rope da
42、mper.釣鉤沒有防脫器。B: Never mind, put the shackles in carefully and lift slowly.不要緊,小心掛上繩扣,慢慢吊。Those bags worried me very much.那些袋子使人煩惱。B: Youd better find a cage to handle them.你最好找個(gè)筐子裝上。A: What a good idea! Thank you.好主意!謝謝你。B: Not at all.不必了。6. Mounting and Fixing安裝和固定A: Have they finished mounting the
43、 tower crane?塔吊裝好了沒有?B: Yes. It was assembled.是的,吊起來了。A: Can we use it tomorrow?明天可以用嗎?B: Balance weight will be put on tomorrow, the day after tomorrow it will be readyfor use.明天裝配平衡重量,后天就可以用了。A: Check it over carefully before putting it into operation!運(yùn)轉(zhuǎn)以前要小心全面檢查。B: Certainly!一定檢查。A: How long will
44、 the building frame be fixed in place?屋子構(gòu)架何時(shí)能裝好?B: It will take five days, I suppose. 我想,得五天。A: It also takes time to put the machines into position.穩(wěn)裝機(jī)器還需要時(shí)間。B: The anchor bolts are all ready.地腳螺栓都現(xiàn)成Whats to be done now is leveling them up.要做的只剩下找平了。A: Have you got a spirit level?您有氣泡水準(zhǔn)儀嗎?B: Yes, I
45、 have got one.是的,我有一個(gè)。A: Are the pipe lines preassembled?管道預(yù)裝沒有?B: No. They will be done next month.沒有。下月預(yù)裝。第八課 運(yùn)輸TransportationA: Have you sent the mixer to the site?攪拌機(jī)運(yùn)到工地沒?B: No, not yet. No truck available還沒有,沒有汽車.A: I t is in urgent need, you know.你知道,很急需要.B: Yes . I Know that, and I am seekin
46、g after a way.是的,我知道,正在想法子.A: What are the wheels, rollers or tyres?攪拌機(jī)是什么輪子的?滾子還是輪胎?B: Tyres.輪胎.A: We can pull it, cant we?我們可以拖,不行嗎?B: Well, but there is no tractor.行,但是沒有拖拉機(jī).A: Bucket loader will be available, and we can carry a case of glass in the bucket by the way.可以用斗式裝載機(jī)拖,順便在斗子里捎去一箱玻璃.B: All
47、 right, lets try.好吧,讓我們?cè)囋嚳?第九課: Safety 安全 A: Whats written on the boom side?大臂側(cè)面寫的什么?B: “Danger! keep away from under boom!”“危險(xiǎn)!不要在臂下停留!”A: But, I have to rope the machine.可我不得不給機(jī)器栓繩啊?B: Leave there as soon as you fixed it.你一固定好,就及時(shí)離開/A: But, I must guide the anchor bolts in.但我必須導(dǎo)入地腳螺栓呀?B: You have
48、to take a risk then.那你只好冒點(diǎn)險(xiǎn)了.A: I think the provision useless.我認(rèn)為規(guī)定條文沒有用.B: No, it isnt. It tells you to keep safety in mind all the time.不,不對(duì).它提醒你隨時(shí)注意安全.A: Yes, I agree. “Safety first.”對(duì),我同意.”安全第一”B: Have you ever seen things dropping down from hoisted height?你看見過吊起的東西掉下來過嗎?A: No, never.沒,從來沒有.B: T
49、hats what used to happen.那是常有的事.A: Really?真的嗎?B: Why not! Especially are the small things like bricks and so on, and breaking rope or dropping boom happened sometimes.怎么不呢,特別是小東西,例如磚什么的;斷繩、 掉臂也時(shí)有發(fā)生.A: Thank you! I will keep that in mind.謝謝你,我一定牢記.第十課 Accident 事故A: Oh! There must be something the mat
50、ter!呵!一定發(fā)生什么事了!B: The crane turned over.起重機(jī)翻了A: Anybody wounded!傷人了嗎?B: One died and several wounded.死了一個(gè),傷了好幾個(gè).A: Have you been there?你在場(chǎng)嗎?B: When I was watching at the hookblock, The accident happened.我正在看吊鉤,事故發(fā)生了.A: How far were you staying?你站在多遠(yuǎn)處?B: Not far. I was standing by the side of the cra
51、ne, but escaped in time.不遠(yuǎn),我正站在起重機(jī)旁,但及時(shí)跑開了.A: It was really a danger.真危險(xiǎn).B: The operator was a young man, he died.司機(jī)是個(gè)年青人,他死了.A: Did they break the crane?吊車壞了沒有?B: Of course .The boom was broken and must be changed for a new one.當(dāng)然,大臂斷了.必須換個(gè)新的.A: The work schedule must be postponed then.那么,工作計(jì)劃必須推遲了
52、.B: And, it costs a lot of money.而且要損失一大筆金錢.第十一課 Conversation about the Installation of Petroleum Machinery.石油機(jī)械安裝會(huì)話A: Good Morning, everyone.諸位,早安.B: Good morning, Mr. D.D先生,早安.Today, our task is installation of this distillation tower. Get ready, please.今天,我們的任務(wù)是安裝這臺(tái)蒸餾塔,請(qǐng)準(zhǔn)備.B: Yes. Tell us the wei
53、ght, length, diameter and center of gravity of this tower, please.是,請(qǐng)告訴我們這臺(tái)塔的重量,長(zhǎng)度,直徑和重心.A: The weight of this tower is thirty-four tons; length, forty-three meters;這塔的重量是34噸;長(zhǎng)度,43米;diameter, nine hundred millimeters; center of gravity,直徑900毫米;fifteen meters from the bottom of the tower.重心在離塔底15米處.B
54、: Who is the director of the installation work?誰是(今天)安裝工作的指揮?A: Engineer Wang is in charge of the installation work today. 王工程師今天負(fù)責(zé)安裝工作.Check over the tools, such as electrical winch, wire ropes, pulleys, and make sure of whether all of them are in good condition. 徹底檢查一下工具,如電動(dòng)絞車,鋼絲繩,滑輪,弄清楚它們是否都處于良好狀
55、態(tài)Please check the anchor bolt once more with the aid of the drawing.進(jìn)一步與圖紙對(duì)照檢查一下基礎(chǔ)螺絲(地腳螺栓)B: O.K., we have checked over them all.我們已對(duì)這些全面檢查了,一切都好.A: Good. Begin working, please.好,請(qǐng)開始工作吧!W: Pay attention everyone! Listen to my whistle on your post.各位請(qǐng)注意! 在崗位上聽我的哨音工作. A: Good, the tower has been on its position, check its perpendicularity.好了!該塔已就位了,檢查一下它的垂直度.W: The pe
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 中國藍(lán)寶石襯底氮化鎵行業(yè)市場(chǎng)前景預(yù)測(cè)及投資價(jià)值評(píng)估分析報(bào)告
- 2020-2025年中國承壓水箱行業(yè)市場(chǎng)調(diào)研分析及投資戰(zhàn)略咨詢報(bào)告
- 電商平臺(tái)的綠色包裝與環(huán)保策略研究
- 高隔斷屏風(fēng)行業(yè)行業(yè)發(fā)展趨勢(shì)及投資戰(zhàn)略研究分析報(bào)告
- 2024-2025年中國手持式信息終端機(jī)行業(yè)市場(chǎng)調(diào)查研究及投資前景預(yù)測(cè)報(bào)告
- 中國汽車扭桿彈簧行業(yè)發(fā)展監(jiān)測(cè)及投資戰(zhàn)略研究報(bào)告
- 印刷委托合同范本
- 全國汽車抵押合同范本
- 兄弟間房屋出租合同范本
- 2021-2026年中國微型無人機(jī)行業(yè)市場(chǎng)全景調(diào)研及投資規(guī)劃建議報(bào)告
- 應(yīng)征公民政治考核表(含各種附表)
- 北工商《概率論與數(shù)理統(tǒng)計(jì)》試題庫
- 2024年湖南環(huán)境生物職業(yè)技術(shù)學(xué)院?jiǎn)握新殬I(yè)適應(yīng)性測(cè)試題庫含答案
- (高清版)JTG D50-2017 公路瀝青路面設(shè)計(jì)規(guī)范
- 20以內(nèi)的加減法練習(xí)題1000道
- 2024協(xié)調(diào)費(fèi)協(xié)議書的格式
- 19J102-1 19G613混凝土小型空心砌塊墻體建筑與結(jié)構(gòu)構(gòu)造
- 新蘇教版三年級(jí)下冊(cè)科學(xué)全冊(cè)知識(shí)點(diǎn)(背誦用)
- 【良心出品】架空輸電線路巡視內(nèi)容
- 《我家漂亮的尺子》課件-定稿
- 代辦電瓶車車牌照委托書
評(píng)論
0/150
提交評(píng)論