1、.WELDING PROCEDURE SPECIFICATION(WPS)WPS No.:W-HL-001Date:APPROVED BY安徽鴻路鋼結(jié)構(gòu)(集團(tuán))股份有限公司Anhui Honglu Steel Construction(Group)LTD., Co.DATECHECKED BYDATEDRAWN BYDATE安徽鴻路鋼結(jié)構(gòu)(集團(tuán))股份有限公司HONGLUWPSWPS No.: W-HL-001 According PQR No.: P-HL-001 According standard: AWS D1.1-2006 Welding Process: FCAW Date: JOI
2、NT DESIGN USEDTYPE: Square Groove For Fillet Joint Single or Double Weld: Double Root opening: 01mm Root Face Dimension: N/A Groove Angle: N/A Backing: N/A Backing Material: N/A Backing Gouging: N/A Method: N/A BASE MATERIAL Specification: Q345B:GB/T 1591-94 Type or Grade: Q345B+Q345B Thickness Rang
3、e: Unlimited Diameter Range: 600mm FILLER MATERIALSpecification: AWS A5.20E71T-1 Brand Name: ATYJ502(Q) Diameter: 1.2mm SHIELDINGFlux: N/A Gas: N/A Gas flow: N/A Any Special Backing or Drying:Flux: N/A POSITIONPosition of Groove: 2 F Fillet: Yes Vertical Progression(Up or Down): N/A TECHNIQUEStringe
4、r o r Weave Bead: Stringer and Weave Bead Multi-pass or Single Pass(per side): Multi-pass Max. Width of Weave: 18 mm Interpass Cleaning: Wire Brush/Grinding (If necessary) Number of Electrodes: Single PREHEAT Preheat Temp., Min.: Ambient,( 30mm;150) Interpass Temp., Min.: Ambient,( 30mm;150) Interpa
5、ss Temp., Max.: 250 Heating Method: Burner with gas POSTWELD HEAT TREATMENTTemp.: N/A Time: N/A EQUIPMENTType: KR500 WELDING SITE CONDITIONS: In The Shop OTHER: N/A PREPAREDREVIEWEDAUTHORITYDATEDATEDATE安徽鴻路鋼結(jié)構(gòu)(集團(tuán))股份有限公司HONGLUWPW No.: W-HL-001WELDING PROCEDUREWeldingprocessWeldpassFillermaterialCurre
6、ntVoltsSpeed(cm/min)Energyinput(kj/cm)NameDia.(mm)Type&polarityAmp.FCAWRootATYJ502(Q)1.2DCRP19025022282540-FCAWFillATYJ502(Q)1.2DCRP22028024302540-FCAWCapATYJ502(Q)1.2DCRP22028024302540-Joint Detail Welding SequenceNote: 1. Cleaning the weld before welding.PREPAREDREVOEWEDAUTHORITYDATEDATEDATEWE
7、LDING PROCEDURE SPECIFICATION(WPQR)WPS No.: P-HL-001Date:APPROVED BY安徽鴻路鋼結(jié)構(gòu)(集團(tuán))股份有限公司Anhui Honglu Steel Construction(Group)LTD., Co.DATECHECKED BYDATEDRAWN BYDATE安徽鴻路鋼結(jié)構(gòu)(集團(tuán))股份有限公司HONGLUPQRWPS No.: P-HL-001 According PQR No.: W-HL-001 According standard: AWS D1.1-2006 Welding Process: FCAW Date: JOIN
8、T DESIGN USEDTYPE: Square Groove For Fillet Joint Single or Double Weld: Double Root opening: 01mm Root Face Dimension: N/A Groove Angle: N/A Backing: N/A Backing Material: N/A Backing Gouging: N/A Method: N/A BASE MATERIAL Specification: Q345B:GB/T 1591-94 Type or Grade: Q345B+Q345B Test Piece Thic
9、kness: 16mm+16mm FILLER MATALSpecification: AWS A5.20 E71T-1 Brand Name: ATYJ502(Q) Diameter: 1.2mm SHIELDINGFlux: N/A Gas: N/A Gas flow: N/A Any Special Backing or Drying:Flux: N/A POSITIONPosition of Groove: 2 F Fillet: Yes Vertical Progression(Up or Down): N/A TECHNIQUEStringer o r Weave Bead: St
10、ringer and Weave Bead Multi-pass or Single Pass(per side): Multi-pass Max. Width of Weave: 18 mm Interpass Cleaning: Wire Brush/Grinding (If necessary) Number of Electrodes: Single PREHEAT Preheat Temp., Min.: Ambient Interpass Temp., Min.: Ambient Interpass Temp., Max.: 196 Heating Method: Burner w
11、ith gas POSTWELD HEAT TREATMENTTemp.: N/A Time: N/A EQUIPMENTType: KR500 WELDING SITE CONDITIONS: In The Shop OTHER: N/A PREPAREDREVIEWEDAUTHORITYDATEDATEDATE安徽鴻路鋼結(jié)構(gòu)(集團(tuán))股份有限公司HONGLUPQR No.: P-HL-001WELDING PROCEDUREWeldingprocessWeldpassFillermaterialCurrentVoltsSpeed(cm/min)EnergyInput(kj/cm)Interp
12、assTemp()NameDia.(mm)Type&polarityAmp.FCAW1ATYJ502(Q)1.2DCRP2302532.810.521FCAW2ATYJ502(Q)1.2DCRP2402736.210.765FCAW3ATYJ502(Q)1.2DCRP2402737.410.485FCAW4ATYJ502(Q)1.2DCRP2402734.511.397FCAW5ATYJ502(Q)1.2DCRP2402738.910.0124FCAW6ATYJ502(Q)1.2DCRP2402737.510.4196Joint Detail Welding SequenceNote:
13、 1. Cleaning the weld before welding.PREPAREDREVOEWEDAUTHORITYDATEDATEDATE安徽鴻路鋼結(jié)構(gòu)(集團(tuán))股份有限公司HONGLUPQR TEST RESULTS:VISUAL INSPECTION: Acc. Reprot No. VI2009-001RT EXAMINATION: N/A Reprot No. N/A UT EXAMINATION: Acc. Reprot No. N/A MT EXAMINATION N/A Reprot No. UT2009-001TENSILE TESTSpecimenNo.Width(m
14、m)Thickness(mm)TensileLoad(KN)TensileStrength(N/mm2)Location of FranctureResultReportNo.-BEND TESTSpecimenNo.Type of bendRollersdiameterAngleResultReportNo.-IMPACT TESTSpecimenNo.SpecimenSize(mm)LocationOf notchType ofnotchTemp.()Energy value(Transverse)ReportNo.123Average-HARDNESS:(C01) Yes See Rep
15、ort LH2009-001 MACROETCH(C02) Yes See Report LH2009-001 OTHER TEST: N/A Welders Name: Welding date: We, the undersigned, certify that the statement in this record are correct and that the test welds were prepared, welded, and in accordance with the requirements of Rules for AWSD1.1-2006.Note:1.Clean
16、ing the weld before welding.PREPAREDREVOEWEDAUTHORITYDATEDATEDATE焊接工藝評定外觀檢驗(yàn)報告WELDING PROCDURE QUALIFICATION VISUCL INSPECTION REPORT單位名稱:安徽鴻路鋼結(jié)構(gòu)(集團(tuán))股份有限公司 報告號: REPORT NO,:HL-2009-001序號No.焊接工藝評定編號WPQ NO.焊 工 號 碼Welder No.結(jié) 果Result1P-HL-001HL-050ACC備注: 經(jīng)外觀檢查,焊縫表面無任何缺陷。Remarks: After visual inspection,
17、No any defects in the surface of welds.焊接監(jiān)督員Welding Supervisor批準(zhǔn)Authority日期Date日期Date 磁粉檢測報告Magnetic powder inspection report項目名稱:焊接工藝評定(WPQ)評定號P-HL-001報告編號MT2009-001WPQ NoReport No部件名稱試片(Test Piece)執(zhí)行標(biāo)準(zhǔn)JB/T 4730-2005Part nameAcc. Stand探傷部位-檢件材質(zhì)Q345B+Q345BTest LocationMaterial表面狀態(tài)打磨檢測比例100%評定級別Level
18、 1Surface preparationGrindingTest RateInspection Stand儀器型號B310S電流類型AC檢驗(yàn)方法濕磁粉Instrument typeElectric CurrentInspect MethodWet Magnetic particle磁化方式連續(xù)法提升力45N磁極間距200mmMagnetizing MethodContinue MethodLifting ForceMagnetic Pole Distance磁化方向交流磁軛磁粉種類Fe3O4懸浮劑水劑Magnetic DirectorAC-YOKEMagnetic ParticleDetecting MediumWater磁化時間2S磁懸液濃度15g/l靈敏度試片A-30/100Magnetizing TimeConcentrationSensitivity Block部件編號焊縫編號
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- T/CHTS 10046-2021高性能瀝青路面施工技術(shù)指南
- T/CHINABICYCLE 21-2023電動自行車用鈉離子蓄電池
- T/CGCC 56-2021文化知識產(chǎn)權(quán)服務(wù)商業(yè)模式分類
- T/CGCC 54.4-2021網(wǎng)絡(luò)平臺環(huán)境下服務(wù)交易規(guī)范
- T/CECS 10306-2023智能城鎮(zhèn)燃?xì)庹{(diào)壓裝置
- T/CECS 10224-2022預(yù)拌透水混凝土
- T/CCS 063-2023井工煤礦智能化供排水系統(tǒng)運(yùn)維管理規(guī)范
- T/CCMA 0170-2023挖掘裝載機(jī)燃油消耗量試驗(yàn)方法
- T/CCMA 0015-2023高處作業(yè)吊籃和擦窗機(jī)檢查、維護(hù)保養(yǎng)和安全操作規(guī)則
- T/CC 5-2020商貿(mào)流通企業(yè)誠信管理體系
- 雇人包工免責(zé)協(xié)議書
- 2025屆高三5月份全國各地聯(lián)考文言文閱讀分類匯編(解析版)
- 土建項目分包協(xié)議書
- 吐魯番市高昌區(qū)招聘社區(qū)工作者考試真題2024
- 山東省濟(jì)南市2025屆高三三模歷史試卷(含答案)
- 2025年中考道法答題技巧與模板構(gòu)建專題08主觀題答題技巧(觀點(diǎn)概括類試)(學(xué)生版+解析)
- 2024-2025學(xué)年廣東省深圳市高一數(shù)學(xué)下學(xué)期7月期末考試(附答案)
- “教-學(xué)-評”一體化下初中英語寫作教學(xué)評價措施
- 2025團(tuán)員考試試題及答案
- 2025年軟件測試工程師考試題及答案
- 血管內(nèi)導(dǎo)管相關(guān)性血流感染預(yù)防與診治指南(2025)解讀課件
評論
0/150
提交評論