供應(yīng)商質(zhì)量審核檢查表_第1頁
供應(yīng)商質(zhì)量審核檢查表_第2頁
供應(yīng)商質(zhì)量審核檢查表_第3頁
供應(yīng)商質(zhì)量審核檢查表_第4頁
供應(yīng)商質(zhì)量審核檢查表_第5頁
已閱讀5頁,還剩37頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

檢查表——供應(yīng)商質(zhì)量審核,,,,,,,,,,,

,,,,,,,,,,,,

Checklist——supplieraudit,,,,,,,,,,,

,,,,,,,,,,,,

供應(yīng)商名稱/suppliername,,,,,產(chǎn)品型號(hào)/partno.,,,審核日期/auditdate,,,BDH261

,,,,,,,,,,,,

,,,,,,,,,,,,

1、平面布置圖和過程流程圖/PlantLayoutandProcessFlowDiagram,,,,,,,,,,,

NO.,文件要求/documentquestions,,,,,,評(píng)價(jià)evaluate,記錄/comments,,,

1.1,是否有最新版平面布置圖?,,,,,,,,,,

,isthereadatedcopyofthecurrentfloorplanreadilyavailable?,,,,,,,,,,

1.2,平面布置圖上是否有所有裝配、生產(chǎn)和檢測(cè)崗位、原材料、半成品、成品的區(qū)域劃分?,,,,,,,,,,

,"doesthefloorplanidentifythefollowing:allrequiredassembly,processandinspectionstations?locationsforallrawmaterial,workinprocess(WIP)andfinishedproduct?",,,,,,,,,,

1.3,流程圖是否是最新版本的并標(biāo)注有日期?,,,,,,,,,,

,areprocessflowchartsdatedandcurrent?,,,,,,,,,,

,操作要求/implementation/processquestions,,,,,,,,,,

1.4,生產(chǎn)過程中,材料和產(chǎn)品流動(dòng)是否與過程流程圖一致?,,,,,,,,,,

,doestheactualmaterialandproductionflowfollowtheprocessflowchart?,,,,,,,,,,

2、設(shè)計(jì)和過程FMEA/designandprocessFMEA,,,,,,,,,,,

NO.,文件要求/documentquestions,,,,,,評(píng)價(jià)evaluate,記錄/comments,,,

DFMEA(含有設(shè)計(jì)職責(zé))/DFMEA(ifsupplierisdesignresponsible),,,,,,,,,,,

2.1,DFMEA的零件編號(hào)、修訂版本、原始日期和審定日期是否正確?,,,,,,,,,,

,"doestheDFMEAhavethecorrectPart#,RevisionLevel,Orig.DateandRev.Date?",,,,,,,,,,

2.2,DFMEA是否包括了顧客的所有性能要求、外觀標(biāo)準(zhǔn)、特殊特性和安全要求?,,,,,,,,,,

,"doestheDFMEAincludeallfunctionalspecifications,appearancespecifications,SCsandSafetyRequirementsasdefinedbycustomerdrawings?",,,,,,,,,,

2.3,是否對(duì)每個(gè)失效模式的RPN都進(jìn)行了計(jì)算,并對(duì)RPN值高的采取了建議措施?,,,,,,,,,,

,arethereRPNcalculationsforeachfailuremodeandrecommendedactionsforhighRPNs?,,,,,,,,,,

,PFMEA,,,,,,,,,,

2.4,PFMEA是否按圖紙的規(guī)定包括了所有顧客和內(nèi)部要求的特殊特性和安全要求?,,,,,,,,,,

,doesthePFMEAincludeallcustomerandinteralScsandSafetyRequirementsasdefinedbycustomerdrawingsandinteralrequirements?,,,,,,,,,,

2.5,是否對(duì)每個(gè)失效模式的RPN都進(jìn)行了計(jì)算,并對(duì)RPN值高的采取了建議措施?,,,,,,,,,,

,arethereRPNcalculationsforeachfailuremodeandrecommendedactionsforhighRPNs?,,,,,,,,,,

2.6,PFMEA是否與流程圖一致?,,,,,,,,,,

,DoesthePFMEAfollowtheprocessflow?,,,,,,,,,,

3、控制計(jì)劃/ControlPlan,,,,,,,,,,,

NO.,文件要求/documentquestions,,,,,,評(píng)價(jià)evaluate,記錄/comments,,,

3.1,控制計(jì)劃是否有正確的產(chǎn)品編號(hào)、修訂號(hào)、原始日期和修訂日期?,,,,,,,,,,

,"DoestheControlPlanhavethecorrectPart#,RevisionLevel,Orig.DateandRev.Date?",,,,,,,,,,

3.2,控制計(jì)劃是否是否與流程圖一致?,,,,,,,,,,

,Doesthecontrolplanfollowtheprocessflowchart?,,,,,,,,,,

3.3,控制計(jì)劃內(nèi)是否包括了:進(jìn)料檢驗(yàn)、過程檢驗(yàn)和控制、出廠檢驗(yàn)以及返工/返修要求?,,,,,,,,,,

,"DoestheControlPlanincludethefollowing:IncomingInspection,In-processInspection&Controls,Finalinspectionandrework/repairRequirements?",,,,,,,,,,

3.4,控制計(jì)劃是否按顧客圖紙的要求包括了所有顧客的特殊特性和產(chǎn)品安全要求?,,,,,,,,,,

,DoestheControlPlanincludeallthecustomerSCsandSafetyRequirementsasdefinedbycustomerdrawings?,,,,,,,,,,

3.5,PFMEA中視別的潛在失效模式是否通過控制計(jì)劃進(jìn)行得到控制?,,,,,,,,,,

,"Areappropriatepotentialfailuremodes,asidentifiedinthePFMEA,addressedthroughthecontrolplan?",,,,,,,,,,

3.6,控制計(jì)劃中是否包括了檢驗(yàn)和試驗(yàn)的要求?(包括數(shù)量、頻次、以及規(guī)范要求),,,,,,,,,,

,"DoesControlPlanincludebothgageandtestrequirements?

(includingquantity,frequency,andrequiredspecifications?)",,,,,,,,,,

,操作要求/implementation/processquestions,,,,,,,,,,

3.7,所有控制計(jì)劃中要求的控制(包括SPC)是否在生產(chǎn)過程中得到實(shí)施?,,,,,,,,,,

,"Areallcontrols(includingSPC),identifiedontheControlPlan,beingusedintheproductionprocess?",,,,,,,,,,

3.8,所有控制是否得到定期驗(yàn)證以確保達(dá)到預(yù)期的結(jié)果?,,,,,,,,,,

,Areallcontrolsverifiedonaperiodicbasistoensuredesiredresults?,,,,,,,,,,

4、檢驗(yàn)和試驗(yàn)/InspectionandTesting,,,,,,,,,,,

NO.,文件要求/documentquestions,,,,,,評(píng)價(jià)evaluate,記錄/comments,,,

4.1,接受準(zhǔn)則不是零缺陷的計(jì)數(shù)數(shù)據(jù),供方是否將接受準(zhǔn)則形成文件并由顧客批準(zhǔn)?,,,,,,,,,,

,"forattributedatawithacceptancecriteriaotherthanzerodefects,doesthesupplierdocumentacceptancecriteriaandhavecustomerapproval?",,,,,,,,,,

4.2,是否只有被檢查和驗(yàn)證過的產(chǎn)品才能夠被投入生產(chǎn)?,,,,,,,,,,

,"howdoesthesupplierassurethatincomingproducthasbeeninspectedorotherwiseverifiedtomeetrequirements,priortoreleaseforproduction?",,,,,,,,,,

4.3,沒有驗(yàn)證而用于生產(chǎn)的的原材料是否被明確標(biāo)識(shí)并作好記錄?,,,,,,,,,,

,ispositiveidentificationprovidedandrecordedformaterialusedinproductionbutnotverified?,,,,,,,,,,

4.4,檢驗(yàn)指導(dǎo)書中是否包括抽樣計(jì)劃、檢驗(yàn)頻次以及檢測(cè)內(nèi)容和規(guī)范要求(包括進(jìn)料、過程、最終),,,,,,,,,,

,"doestheinspectioninstructionsincludesamlingquantity,frequency,inspectionitemsandrequiredspecifications(incoming\process\out-going).",,,,,,,,,,

4.5,來料接受計(jì)劃必須包括以下一種或多種方法:1、進(jìn)行統(tǒng)計(jì)數(shù)據(jù)接收與評(píng)價(jià);2、進(jìn)貨檢驗(yàn)和/或試驗(yàn)(根據(jù)性能的抽樣);3、當(dāng)有可接收質(zhì)量性能的記錄時(shí),由第二方或第三方評(píng)審或?qū)徍恕?,,,,,,,,,

,theacceptanceplanmustincludeoneormoreofthefollowing:1、receiptandevaluationofstatisticaldata;2、receivinginspectionand/ortesting(samplingbasedonperformance);3、2ndor3rdpartyassessmentsorauditsofcoupledwithrecordsofacceptablequalityperformance;4、partevaluationbyaccreditedlaboratory.,,,,,,,,,,

4.6,在所有要求的檢驗(yàn)和試驗(yàn)完成或必要的報(bào)告收到和驗(yàn)證前,不得將產(chǎn)品放行,除非有可靠追回程序時(shí)才可放行?,,,,,,,,,,

,"doesthesupplierholdproductuntiltherequiredinspectionsandtestshavebeencompletedornecessaryreportshavebeenreceivedandverified,exceptforreleaseunderpositiverecall?",,,,,,,,,,

4.7,供方是否只在文件或控制計(jì)劃中所有要求的各項(xiàng)活動(dòng)已圓滿完成后,產(chǎn)品才發(fā)出?,,,,,,,,,,

,doesthesupplierassurethatnoproductisdispatcheduntilallactivitiesspecifiedinthedocumentand/orcontrolplanhavebeensatisfactorilycompleted?,,,,,,,,,,

4.8,在控制計(jì)劃和/或文件化程序中是否具體規(guī)定了標(biāo)識(shí)(如:蓋章、標(biāo)簽、貯存位置等)?,,,,,,,,,,

,"istheidentificationspecifiedinthecontrolplanand/ordocumentedprocedures(e.g.stampmarks,tags,storagelocation.)",,,,,,,,,,

4.9,在生產(chǎn)過程中是否提供文件表明:只有通過了檢驗(yàn)和/或試驗(yàn)的材料才能提供給顧客?,,,,,,,,,,

,arethereprovisionsintheprocessthatonlymaterialthathaspassedtheinspectionsand/ortestcanbeprovidedtothecustomer?,,,,,,,,,,

,操作要求/implementation/processquestions,,,,,,,,,,

4.10,是否在整個(gè)生產(chǎn)過程中都保持了產(chǎn)品適當(dāng)?shù)臋z驗(yàn)和/或試驗(yàn)狀態(tài)的標(biāo)識(shí)?,,,,,,,,,,

,isinspectionand/orteststatussuitablyidentifiedthroughouttheproductionprocess?,,,,,,,,,,

4.11,是否按文件和/或控制計(jì)劃的要求對(duì)產(chǎn)品進(jìn)行檢驗(yàn)/試驗(yàn)?,,,,,,,,,,

,isproductinspected/testedasrequiredbydocumentedproceduresand/orthecontrolplan?,,,,,,,,,,

4.12,最終檢驗(yàn)和試驗(yàn)是否根據(jù)文件和/或控制計(jì)劃的要求進(jìn)行?,,,,,,,,,,

,isfinalinspectionandtestingconductedinaccordancewithdocumentedproceduresand/orthecontrolplan?,,,,,,,,,,

4.13,對(duì)返工和返修品是否重新進(jìn)行了檢查?,,,,,,,,,,

,istheproceduretore-qualifyallreworked/repairedmaterialbeingfollowed?,,,,,,,,,,

4.14,是否進(jìn)行了作業(yè)準(zhǔn)備驗(yàn)證,使用的是哪一種(末件比較/首件檢查)?,,,,,,,,,,

,arejobsetupsverifiedwheneverasetupisperformed?Whichisused(Last-offpartcomparisonorfirstpartcheck)?,,,,,,,,,,

4.15,供方是否保存了所有檢驗(yàn)和試驗(yàn)的記錄?,,,,,,,,,,

,doesthesuppliermaintainadequaterecordsofallinspectionsandtests?,,,,,,,,,,

4.16,檢驗(yàn)和試驗(yàn)記錄是否清楚的表明產(chǎn)品是否已通過了檢驗(yàn)和/或試驗(yàn)?,,,,,,,,,,

,doinspectionandtestrecordsclearlyshowwhethertheproducthaspassedorfailedtheinspectionand/ortest?,,,,,,,,,,

4.17,記錄是否標(biāo)明負(fù)責(zé)合格產(chǎn)品放行的授權(quán)檢驗(yàn)者?,,,,,,,,,,

,dotherecordsidentifytheinspectionauthorityresponsibleforthereleaseoftheproduct?,,,,,,,,,,

4.18,必須按要求的頻次對(duì)所有產(chǎn)品進(jìn)行全忙于檢驗(yàn)和功能驗(yàn)證(按顧客的工程材料及性能標(biāo)準(zhǔn)),其結(jié)果必須可供顧客評(píng)審。,,,,,,,,,,

,"Alayoutinspectionandafunctionalverification(toapplicablecustomerengineeringmateralandperformancestandards)shallbeperformedforallproductsataestablishedfrequency,resultsshallbeavailableforcustomerreview.",,,,,,,,,,

5、產(chǎn)品規(guī)范與圖紙/ProductSpecifications&Drawings,,,,,,,,,,,

NO.,文件要求/documentquestions,,,,,,評(píng)價(jià)evaluate,記錄/comments,,,

5.1,是否有顧客規(guī)范的最新修訂版?,,,,,,,,,,

,Isthecurrentrevisionofthecustomerspecification(s)onhand?,,,,,,,,,,

5.2,產(chǎn)品規(guī)范是否正確地反映在供應(yīng)商的圖紙和相關(guān)文件上(如:控制計(jì)劃、操作指導(dǎo)書、檢驗(yàn)指導(dǎo)書)?,,,,,,,,,,

,"Arespecificationsreflectedonsupplierdrawingsandrelevantdocumentscorrectly(eg:controlplan,inspectioninstruction,operationinstruction)?",,,,,,,,,,

5.3,供方是否保存了工程更改在生產(chǎn)中實(shí)施日期的記錄?,,,,,,,,,,

,doesthesuppliermaintainarecordofthedateonwhicheachchangeisimplementedinproduction.,,,,,,,,,,

5.4,對(duì)新/舊規(guī)范生產(chǎn)的產(chǎn)品如何控制?,,,,,,,,,,

,howtocontroltheproductsbetweenthenew/oldspecifications.,,,,,,,,,,

,操作要求/implementation/processquestions——無/none,,,,,,,,,,

6、過程監(jiān)控與操作指導(dǎo)書/ProcessMonitoring&OperatorInstructions,,,,,,,,,,,

NO.,文件要求/documentquestions,,,,,,評(píng)價(jià)evaluate,記錄/comments,,,

6.1,每一個(gè)生產(chǎn)崗位是否有有效的工作空間和足夠的照明,以達(dá)到有效的工作環(huán)境?,,,,,,,,,,

,doeseachworkstationprovideadequatelightingandsufficientspacetopromoteeffectiveworkingconditions?,,,,,,,,,,

6.2,是否有一個(gè)用以查證操作工已進(jìn)行了可視樣品、量具和操作指導(dǎo)書等的培訓(xùn)的系統(tǒng)?,,,,,,,,,,

,"Isasysteminplacetoverifyoperatortrainingongages,visualaids,andoperatorinstructions?",,,,,,,,,,

6.3,新進(jìn)員工(包括轉(zhuǎn)崗員工)是否進(jìn)行培訓(xùn),有無記錄。,,,,,,,,,,

,doestheorganizationprovideon-the-jobtrainingforpersonnelinanynewormodifiedjobaffectingproductquality.Arerecordsoftrainingmaintained?,,,,,,,,,,

6.4,操作指導(dǎo)書、結(jié)構(gòu)圖、檢驗(yàn)指導(dǎo)書是否受控并且能追趕溯到生產(chǎn)零件的級(jí)別?,,,,,,,,,,

,"OperatorInstructions,Set-upSheetsandInspectioninstructionsarecontrolledandtraceabletothelevelpartsbeingproduced",,,,,,,,,,

6.5,操作和過程監(jiān)控指導(dǎo)書是否滿足QS4.9.1,,,,,,,,,,

,OperatorandprocessmonitoringinstructionscomplywithQS4.9.1,,,,,,,,,,

6.6,過程控制中是否使用了統(tǒng)計(jì)技術(shù)(控制圖)?,,,,,,,,,,

,arethestatisticaltechniquesusedintheprocesscontrolling(eg.Controlchart)?,,,,,,,,,,

6.7,所有超出控制和不良趨勢(shì)是否都被備注和采取糾正措施?,,,,,,,,,,

,Aretrendsandoutofcontrolsituationsbeingnotedandcorrected?,,,,,,,,,,

6.8,是否按規(guī)定的方法確保所有現(xiàn)場(chǎng)的工程文件都為正確的修訂版本(規(guī)范、PFMEA、控制計(jì)劃、結(jié)構(gòu)圖、操作指導(dǎo)書、可視輔具)?,,,,,,,,,,

,"Isthesystembeingfollowedtoensurethecorrectrevisionlevelisinplaceforallengineeringdocuments?(Specifications,PFMEA,ControlPlans,SetupSheets,OperatorInstructions,VisualAids)",,,,,,,,,,

6.9,試生產(chǎn)的資料是否被收集和保存?,,,,,,,,,,

,Haspilotbuilddatabeencollectedandstored?,,,,,,,,,,

6.10,是否有文件化程序規(guī)定對(duì)返工/返修的材料進(jìn)行重新檢查?,,,,,,,,,,

,Isthereaproceduretore-qualifyallreworked/repairedmaterial?,,,,,,,,,,

6.11,是否有一個(gè)書面的詳細(xì)的批次管理系統(tǒng)存在,管理系統(tǒng)涉及原材料從進(jìn)料到發(fā)運(yùn)包括離線、返工/返修的操作。,,,,,,,,,,

,"Awrittendetailedlottracebilitysystemexiststhroughallstagesofmaterialflowfromincomingtoshipping,includingoff-lineandrework/repairoperations.",,,,,,,,,,

,操作要求/implementation/processquestions,,,,,,,,,,

6.12,是否在生產(chǎn)、交付的所有階段都有保持了產(chǎn)品的標(biāo)識(shí)?,,,,,,,,,,

,"aretheidentificationsmaintainedduringallstagesofproduction,delivery?",,,,,,,,,,

6.13,在每個(gè)工作崗位,操作工是否能很容易地得到可視輔具(包括合適的臨界樣品)和操作指導(dǎo)書,并按其進(jìn)行操作?,,,,,,,,,,

,Arevisualaids(includingappropriateboundarysamples)andoperatorinstructionsreadilyaccessiblebytheoperatorsateachstationandbeingfollowed?,,,,,,,,,,

6.14,在生產(chǎn)線上是否都可得到好的樣品/不良樣品?它們是否都有狀態(tài)標(biāo)識(shí)?,,,,,,,,,,

,"Areall""MasterGood/MasterBad""samplesavailableonline?Aretheysigned?",,,,,,,,,,

6.15,操作指導(dǎo)書是否清晰、易讀、能看得見的?,,,,,,,,,,

,Theinstructionsarelegibleandvisibletotheoperator.,,,,,,,,,,

6.16,現(xiàn)場(chǎng)是否有返工和返修指導(dǎo)書并按其實(shí)施?,,,,,,,,,,

,Arereworkandrepairproceduresinplaceandbeingfollowed?,,,,,,,,,,

6.17,在生產(chǎn)現(xiàn)場(chǎng)是否劃分出合格品、不合格品、待檢品的區(qū)域,并加以標(biāo)識(shí)。,,,,,,,,,,

,"isthereanidentifiedareaforconforming\nonconforming\awaitinginspectingmaterial/product,segregatedfromthemanufacturingarea?",,,,,,,,,,

6.18,類似產(chǎn)品是否針對(duì)防止混入采取措施。,,,,,,,,,,

,isthereactiontopreventthesimilarproductsfrommixing.,,,,,,,,,,

6.19,檢測(cè)點(diǎn)的設(shè)置是否能有效地阻止不合格品的發(fā)運(yùn)?,,,,,,,,,,

,areinspectionpointlocationseffectiveinpreventingshipmentofnonconformingproducts?,,,,,,,,,,

6.20,批次可追溯性管理已被證明在使用并有效。,,,,,,,,,,

,Thelottraceabilityisdemonstratedtobeinplaceandeffective.,,,,,,,,,,

6.21,零件標(biāo)識(shí)是否存在,并至少包括供應(yīng)商編號(hào),產(chǎn)品編號(hào)和生產(chǎn)日期。,,,,,,,,,,

,"PartidentificationisbasedonPS-4480with,ataminumum,includesSupplierCode,p/nandrundate.",,,,,,,,,,

6.22,批次數(shù)量大小不超過8小時(shí)或一天的生產(chǎn)產(chǎn)量中的較小者,,,,,,,,,,

,"Lotsizeisdesignatedasnottoexceed8hoursor1day'sproduction,whicheverissmaller.",,,,,,,,,,

6.23,在工作現(xiàn)場(chǎng),可追溯性標(biāo)識(shí)是否得到維持并進(jìn)行記錄?,,,,,,,,,,

,aretheidentificationoftraceabilitymaitainedandrecordedonthesite?,,,,,,,,,,

7、Handlingandstorage,,,,,,,,,,,

NO.,文件要求/documentquestions,,,,,,評(píng)價(jià)evaluate,記錄/comments,,,

7.1,材料包括精密的零部件的搬運(yùn)和貯存要求是否被評(píng)審?,,,,,,,,,,

,"Havethehandlingandstoragerequirementsofmaterial,includingdelicatecomponents,beenreviewed?",,,,,,,,,,

7.2,當(dāng)零件或材料有特殊的搬運(yùn)要求時(shí),程序或作業(yè)指導(dǎo)書中是否清楚地說明了搬運(yùn)的方法?,,,,,,,,,,

,"Whenspecialhandlingofpartsormaterialisrequired,theproceduresorworkinstructionsclearlyindicatethehandlingmethod.",,,,,,,,,,

7.3,供方是否使用合適的貯存場(chǎng)地以防止產(chǎn)品損壞或變質(zhì)?,,,,,,,,,,

,arestorageareasappropriateforpreventingdamageordeteriorationoftheproduct?,,,,,,,,,,

7.4,供方是否以適宜的時(shí)間間隔檢查庫存品狀況,以便及時(shí)發(fā)現(xiàn)變質(zhì)情況?,,,,,,,,,,

,istheconditionofproductinstockassessedatappropriateintervalstodetectdeterioration?,,,,,,,,,,

,操作要求/implementation/processquestions,,,,,,,,,,

7.5,材料的貯存是否充分地避免了環(huán)境的影響?,,,,,,,,,,

,Isthestorageofmaterialadequatetoprotectitfromenvironmentalfactors?,,,,,,,,,,

7.6,零部件的貯存地點(diǎn)是否得到管理和監(jiān)控?,,,,,,,,,,

,Isthestoragelocationforcomponentsorganized&monitored?,,,,,,,,,,

7.7,是否建立了一些控制方法以消除產(chǎn)品被污染或相似的產(chǎn)品被混合?,,,,,,,,,,

,Havecontrolsbeenestablishedtoeliminatethepotentialforanoperationtocontaminateormixsimilarproducts?,,,,,,,,,,

8、包裝與發(fā)運(yùn)規(guī)范/PartsPackaging/ShippingSpecifications,,,,,,,,,,,

NO.,文件要求/documentquestions,,,,,,評(píng)價(jià)evaluate,記錄/comments,,,

8.1,下列文件是否存在?,,,,,,,,,,

,Thefollowingdocumentationexistsandisincludedintheplan:,,,,,,,,,,

,Packagingrequirements/instructions/包裝指導(dǎo)書,,,,,,,,,,

,Labelingrequirements/instructions/標(biāo)簽指導(dǎo)書,,,,,,,,,,

,Shippingrequirements/instructions/發(fā)運(yùn)指導(dǎo)書,,,,,,,,,,

8.2,包裝是否按顧客要求已進(jìn)行了測(cè)試,包括按實(shí)際或模擬路線和條件發(fā)運(yùn)后的包裝進(jìn)行測(cè)試?,,,,,,,,,,

,Evidenceexiststhatthepackaginghasbeentested(asrequiredbytheusingplant)includingtestpacksshippedoveractualorsimulatedshippingrouteandconditions,,,,,,,,,,

8.3,在最終檢驗(yàn)和試驗(yàn)后,供方是否采取保護(hù)產(chǎn)品質(zhì)量的措施,合同要求時(shí),這種保護(hù)應(yīng)延續(xù)到交付的目的地?,,,,,,,,,,

,"doesthesupplierarrangefortheprotectionofthequalityofproductafterfinalinspectionandtest,andwhencontractuallyspecifieddoesitextendtoincludedeliverytodestination?",,,,,,,,,,

8.4,供方是否建立支持百分之百按期裝運(yùn)的系統(tǒng)以滿足顧客生產(chǎn)的要求?,,,,,,,,,,

,hasthesupplierestablishedasystemtosupport100%on-timeshipmentstomeetcustomerproductionrequirements?,,,,,,,,,,

8.5,如果未能保持百分之百按期裝運(yùn),供方是否實(shí)施糾正措施以改進(jìn)交付能力并與顧客就交付問題進(jìn)行信息溝通?,,,,,,,,,,

,"ifthesupplier’sdeliveryperformqnceisnot100%toschedule,isthereevidenceofimplementedcorrectiveactions,andofcommunicatinregardingdeliveryprobleminformationtothecustomer?",,,,,,,,,,

8.6,是否有含有第二條路線以及承運(yùn)商的應(yīng)急計(jì)劃。,,,,,,,,,,

,"Acontingencyplanexistswhichincludessecondaryroutesandcarriers,aswellas,logisticsforexpitedshipments",,,,,,,,,,

,操作要求/implementation/processquestions,,,,,,,,,,

8.7,包裝和標(biāo)簽是否符合顧客的最新要求?,,,,,,,,,,

,Packagingandlabelingconformstothelatestcustomerstandard,,,,,,,,,,

8.8,檢查包裝損壞或被污染的檢查計(jì)劃,,,,,,,,,,

,Inspectionplanwhichidentifiesdamagedorcontaminatedcontainersforremovalfromservice,,,,,,,,,,

8.9,所有運(yùn)輸容器、方法和標(biāo)準(zhǔn)包裝已經(jīng)過顧客材料部門主管的批準(zhǔn)。,,,,,,,,,,

,"Allshippingcontainers,methodsandstandardpackshavebeenapprovedbytheusingplant'sMaterialsMgr.",,,,,,,,,,

8.10,發(fā)運(yùn)必須遵守先進(jìn)先出的庫存管理系統(tǒng)。,,,,,,,,,,

,ShipmentsmustconformtoFIFOinventorycontrolsystem,,,,,,,,,,

9、異常處理,,,,,,,,,,,

NO.,文件要求/documentquestions,,,,,,評(píng)價(jià)evaluate,記錄/comments,,,

9.1,如果發(fā)生顧客抱怨,是否有一個(gè)保護(hù)顧客利益的程序文件?,,,,,,,,,,

,Arethereproceduresinplacetoprotectcustomerintheeventof'CustomerComplaint'?,,,,,,,,,,

9.2,那些文件是否能確保完全隔離所有可疑品:包括顧客處的、公司內(nèi)的、在運(yùn)輸途中的或在倉(cāng)庫中的?,,,,,,,,,,

,"Dotheseproceduresensurecompleteisolationofsuspectmaterial,atbothcustomerandsupplierlocations?Attransportationandstoragelocations?",,,,,,,,,,

9.3,問題的解決辦法是否采用8D或其它方法(如:顧客的要求方法、7-步法、5-步法),,,,,,,,,,

,"Doestheproblemsolvingsystemincorporatethe8-D,orlikeprocesses(I.E.Customerspecificmethods;7-Step,5Phase,etc.)?",,,,,,,,,,

9.4,是否建立并實(shí)施了關(guān)于不合格/可疑的材料/產(chǎn)品的標(biāo)識(shí)、記錄、評(píng)價(jià)、隔離和處置的程序文件?,,,,,,,,,,

,"areproceduresestablishedandimplementedtoaddressnonconforming/suspectmaterialorproductregarding:identification,documentation,evaluation,segregation(whenpractical),disposition?",,,,,,,,,,

9.5,是否對(duì)所有不合格的、可疑的材料或產(chǎn)品和隔離區(qū)提供可視標(biāo)識(shí)?,,,,,,,,,,

,isvisualidentificationofanynonconformingmaterialorproductandquarantineareasevident?,,,,,,,,,,

9.6,是否清楚地定義出評(píng)審和處置不合格/可疑產(chǎn)品的職責(zé)與權(quán)限?,,,,,,,,,,

,aretherecleardefinitionsforresponsibilitiesforreviewanddispositionofnonconformingandsuspectproduct?,,,,,,,,,,

9.7,是否對(duì)不合格品進(jìn)行量化和分析,建立優(yōu)先減少計(jì)劃并跟蹤計(jì)劃的實(shí)施進(jìn)展情況?,,,,,,,,,,

,isnonconformingproductquantifiedandanalyzedandisaprioritizedreductionplaninplace?,,,,,,,,,,

9.8,是否所有不合格都被記錄并進(jìn)行收集和缺陷分析?,,,,,,,,,,

,"areallnonconformancesproductsrecorded,collectedanddefectanalyzed?",,,,,,,,,,

9.9,在工作場(chǎng)所是否易于得到返工指導(dǎo)書,并為相關(guān)人員所使用?,,,,,,,,,,

,aretherepair/reworkinstructionsaccessibleandutilizedbytheappropriatepersonnel?,,,,,,,,,,

9.10,是否記錄了讓步接受和返修產(chǎn)品的實(shí)際狀況?,,,,,,,,,,

,areacceptednonconformitiesandrepairsdocumentedtorecordtheactualconditionoftheproduct?,,,,,,,,,,

9.11,供方是否確保在收到顧客授權(quán)之后才發(fā)運(yùn)不合格的材料?,,,,,,,,,,

,doesthesupplierensurethatcustomerauthorizationisreceivedpriortoshippingnonconformingmaterial?,,,,,,,,,,

9.12,發(fā)運(yùn)的經(jīng)授權(quán)的不合格材料是否在每個(gè)包裝箱上都有適當(dāng)?shù)挠涗洠?,,,,,,,,,

,ismaterialshippedonanauthorizationproperlyidentifiedoneachshippingcontainer?,,,,,,,,,,

10、預(yù)防性維護(hù)計(jì)劃/PreventiveMaintenancePlans,,,,,,,,,,,

NO.,文件要求/documentquestions,,,,,,評(píng)價(jià)evaluate,記錄/comments,,,

10.1,生產(chǎn)的設(shè)備、工裝、量具,是否有清單?,,,,,,,,,,

,"Istherealistoftooling,equipmentandfixturesusedforproduct?",,,,,,,,,,

10.2,所有工裝、量具和主要設(shè)備是否都有包括在預(yù)防性維護(hù)計(jì)劃中。,,,,,,,,,,

,"Alltooling,gages,andcapitalequipmentareincludedinthePMprograms",,,,,,,,,,

10.3,所有設(shè)備、工裝和量具是否與清單相一致?,,,,,,,,,,

,"Isallequipment,gaugingandtoolingthesameaswillbeusedinproduction?",,,,,,,,,,

10.4,所有工裝、量具和主要設(shè)備是否都被清晰地標(biāo)識(shí)?,,,,,,,,,,

,"Arealltools,equipmentandfixturesclearlyidentified?",,,,,,,,,,

10.5,所有設(shè)備和工裝都存在文件化的預(yù)防維護(hù)計(jì)劃?,,,,,,,,,,

,AdocumentedPreventiveMaintenanceplanexistsforallequipmentandtooling,,,,,,,,,,

10.6,ThePMplanincludes:/預(yù)防性維護(hù)計(jì)劃包括:,,,,,,,,,,

,"Setupthemaintenanceitemsformachines,toolsandotherequipment/制定機(jī)器、工裝和其它設(shè)備的維護(hù)項(xiàng)目。",,,,,,,,,,

,Ascheduleofplannedmaintenanceincludingmaintainingperiod/包括時(shí)間周期的維護(hù)計(jì)劃表。,,,,,,,,,,

,Ascheduleofplannedmaintenanceincludingresponsibleparty/維護(hù)計(jì)劃表包括責(zé)任部門。,,,,,,,,,,

,Maintenanceinstructionsbasedonmanufacturersrecommendationorpartperformance/建立在制造商的建議和零件性能基礎(chǔ)上的維護(hù)指導(dǎo)書,,,,,,,,,,

10.7,標(biāo)識(shí)關(guān)鍵設(shè)備并制定應(yīng)急計(jì)劃以防止由于設(shè)備的故障對(duì)顧客造成損失。,,,,,,,,,,

,Keyequipmenthasbeenidentifiedandcontingencyplansareinplacethatwillprotectthecustomerformlossofproductionduetofailureofthisequipment,,,,,,,,,,

10.8,是否有關(guān)鍵設(shè)備備件清單,是否存有關(guān)鍵生產(chǎn)設(shè)備的零配件。,,,,,,,,,,

,isthereakeyequipmentreplacementpartslistandisthereplacementpartsforkeyequipmentisavailable?,,,,,,,,,,

,操作要求/implementation/processquestions,,,,,,,,,,

10.9,預(yù)防性維護(hù)系統(tǒng)是否得到實(shí)施?,,,,,,,,,,

,Isthepreventivemaintenancesystembeingfollowed?,,,,,,,,,,

10.10,是否能對(duì)易損件充分保證其可得性?,,,,,,,,,,

,Isthereanadequatesupplyofperishabletoolingavailableinhouse?,,,,,,,,,,

10.11,所有好的樣品和壞的樣品是否都被列入了預(yù)防維護(hù)計(jì)劃?,,,,,,,,,,

,"Areall""MasterGood/MasterBad""samplesonthePreventativeMaintenanceschedule?",,,,,,,,,,

11、檢測(cè)量具的評(píng)價(jià)/Gage&CheckFixtureEvaluation,,,,,,,,,,,

NO.,文件要求/documentquestions,,,,,,評(píng)價(jià)evaluate,記錄/comments,,,

11.1,所有用于計(jì)量性數(shù)據(jù)測(cè)量的檢測(cè)設(shè)備是否都進(jìn)行了R&R分析并是可接受的(<30%)?,,,,,,,,,,

,WeregageR&R'sperformedandacceptable(<30%)onallvariabledatameasuringinstruments?,,,,,,,,,,

11.2,所有用于計(jì)數(shù)性數(shù)據(jù)測(cè)量的檢測(cè)設(shè)備是否都進(jìn)行了R&R分析并是可接受的(按AIAG測(cè)量系統(tǒng)分析手冊(cè))?,,,,,,,,,,

,"WeregageR&R'sperformedandacceptable(ref.AIAG""MeasurementSystemsAnalysis""manual)onallattributemeasuringinstruments?",,,,,,,,,,

11.3,"是否存在一個(gè)系統(tǒng),用以確保所有檢測(cè)量量具和設(shè)備都得到校正和標(biāo)識(shí)?",,,,,,,,,,

,Isasysteminplacetoensureallgagesandtestequipmentsareidentifiedandcalibrated?,,,,,,,,,,

11.4,是否有檢驗(yàn)測(cè)量和試驗(yàn)設(shè)備的清單,以及其校正計(jì)劃?,,,,,,,,,,

,"aretherealistofallgagesandtestequipments,aplanaboutthecalibration?",,,,,,,,,,

,操作要求/implementation/processquestions,,,,,,,,,,

11.5,對(duì)所有樣件是否有一個(gè)管理系統(tǒng)?,,,,,,,,,,

,arethereamanagementsystemtoallmasters?,,,,,,,,,,

11.6,是否所有的檢測(cè)量具和設(shè)備都得到了適宜的校正并可追溯到一個(gè)已知的標(biāo)準(zhǔn)?,,,,,,,,,,

,Areallgagesandtestequipmentsproperlycalibratedandtraceabletoaknownstandard?,,,,,,,,,,

11.7,是否所有的檢測(cè)量具和設(shè)備都有正確的標(biāo)識(shí)?,,,,,,,,,,

,areallgagesandtestequipmentscorrectlyidentified?,,,,,,,,,,

11.8,從校正記錄上是否顯示出上下兩次校正日期?,,,,,,,,,,

,Thecalibrationrecordsindicatelast/nextcalirationdate?,,,,,,,,,,

12、產(chǎn)能驗(yàn)證/LineSpeed&CapacityVerified,,,,,,,,,,,

NO.,文件要求/documentquestions,,,,,,評(píng)價(jià)evaluate,記錄/comments,,,

12.1,

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論