教學(xué)單元 2 市政管道開槽施工 Teaching Unit 2 Municipal Pipeline Trenching Construction-2.4 溝槽支撐 2.4 Trench Suppor47課件講解_第1頁(yè)
教學(xué)單元 2 市政管道開槽施工 Teaching Unit 2 Municipal Pipeline Trenching Construction-2.4 溝槽支撐 2.4 Trench Suppor47課件講解_第2頁(yè)
教學(xué)單元 2 市政管道開槽施工 Teaching Unit 2 Municipal Pipeline Trenching Construction-2.4 溝槽支撐 2.4 Trench Suppor47課件講解_第3頁(yè)
教學(xué)單元 2 市政管道開槽施工 Teaching Unit 2 Municipal Pipeline Trenching Construction-2.4 溝槽支撐 2.4 Trench Suppor47課件講解_第4頁(yè)
教學(xué)單元 2 市政管道開槽施工 Teaching Unit 2 Municipal Pipeline Trenching Construction-2.4 溝槽支撐 2.4 Trench Suppor47課件講解_第5頁(yè)
已閱讀5頁(yè),還剩5頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

教學(xué)單元2市政管道開槽施工TeachingUnit2:MunicipalPipelineTrenchingConstruction2.4

溝槽支撐2.4TrenchSupport【教學(xué)目標(biāo)】[TeachingObjectives]通過(guò)本單元的學(xué)習(xí):Bystudyingthisunit,youwill:1.掌握開槽施工的工序;1.Mastertheproceduresoftrenchexcavation;2.開槽施工的技術(shù)措施;2.Learnthetechnicalmeasuresfortrenchexcavation;3.明溝排水方法;3.Understandopentrenchdrainagemethods;4.輕型井點(diǎn)降水設(shè)計(jì)方法與布置要求;4.Learnthedesignmethodsandlayoutrequirementsforlightwellpointdewatering;5.溝槽開挖土方量計(jì)算方法及開挖要求;5.Understandthemethodsforcalculatingtrenchexcavationearthworkvolumeandexcavationrequirements;6.溝槽支撐的支設(shè)與拆除方法;6.Learnthemethodsforinstallingandremovingtrenchsupports;7.管道鋪設(shè)與接口方法;7.Understandpipelinelayingandjointingmethods;8.管道檢驗(yàn)方法與要求;8.Learnthemethodsandrequirementsforpipelineinspection;9.溝槽土方回填的要求與方法;9.Understandtherequirementsandmethodsfortrenchbackfilling;10.熟悉柔性排水管道施工方法。10.Familiarizeyourselfwithflexibledrainagepipelineconstructionmethods.向前Forward結(jié)尾End向后Backward開端Beginning2.4溝槽支撐2.4TrenchSupport定義:

Definition:支撐是由木材或鋼材制成的防止溝槽土壁坍塌的一種臨時(shí)性擋土結(jié)構(gòu)。

Supportsaretemporaryretainingstructuresmadeofwoodorsteeltopreventtrenchwallcollapse.考慮因素:

Considerations:土質(zhì)、地下水情況、槽深、槽寬、開挖方法、排水方法、地面荷載等。

Soilquality,groundwaterconditions,trenchdepth,trenchwidth,excavationmethods,drainagemethods,surfaceloads,etc.結(jié)構(gòu)要求:

StructuralRequirements:牢固可靠,支撐材料的質(zhì)地和尺寸合格;

Sturdyandreliable,withsupportmaterialsmeetingqualityanddimensionalstandards;在保證安全的前提下,節(jié)約用料,宜采用工具式鋼支撐;

Economicaluseofmaterialswhileensuringsafety;tool-typesteelsupportsarepreferred;便于支設(shè)和拆除及后續(xù)工序的操作。

Easytoinstallandremove,andfacilitatessubsequentoperations.一、支撐種類及適用條件1.TypesofSupportsandApplicableConditions2.4溝槽支撐2.4TrenchSupport向前Forward結(jié)尾End向后Backward開端Beginning1、橫撐1.HorizontalBracing由撐板(擋土板)、立柱和撐杠組成。Composedofretainingboards(shoringboards),standcolumns,andstruts.擋土板放置位置PlacementofRetainingBoards{斷續(xù)式Intermittent連續(xù)式Continuous斷續(xù)式橫撐的適用場(chǎng)合:ApplicableConditionsforIntermittentHorizontalBracing:——適用于土質(zhì)較好,地下水含量較小的黏性土且挖土深度小于3m的溝槽或基坑?!猄uitableforcohesivesoilswithgoodqualityandlowgroundwatercontent,andtrenchorpitdepthslessthan3meters.橫撐圖HorizontalBracingDiagram1-撐板;2-立柱;3-工具式撐杠1-RetainingBoard;2-StandColumn;3-Tool-typeStrut連續(xù)式橫撐的適用場(chǎng)合:ApplicableConditionsforContinuousHorizontalBracing:——較潮濕的或散粒土及挖土深度不大于5m的溝槽。—Suitablefordamporgranularsoilsandtrencheswithexcavationdepthsnotexceeding5meters.一、支撐種類及適用條件1.TypesofSupportsandApplicableConditions2.4溝槽支撐2.4TrenchSupport挖槽到一定深度或接近地下水位時(shí),開始支設(shè),然后逐層開挖逐層支設(shè)。Begininstallationofsupportswhenthetrenchreachesacertaindepthorapproachesthegroundwaterlevel,thenproceedwithexcavationandsupportinstallationlayerbylayer.豎撐支設(shè)時(shí):先在溝槽兩側(cè)將撐板垂直打入土中,然后開始挖土。Forverticalbracinginstallation:first,drivetheretainingboardsverticallyintothesoilonbothsidesofthetrench,thenbeginexcavation.經(jīng)常檢查槽壁和支撐的情況,尤其在流砂地段或雨后。如支撐各部件有彎曲、傾斜、松動(dòng)時(shí),應(yīng)立即加固,拆換受損部件。如發(fā)現(xiàn)槽壁有塌方預(yù)兆,應(yīng)加設(shè)支撐,而不應(yīng)倒拆支撐。Frequentlycheckthetrenchwallsandsupports,especiallyinquicksandareasorafterrain.Ifanycomponentofthesupportisbent,tilted,orloose,reinforceimmediatelyandreplacedamagedparts.Ifsignsofwallcollapsearedetected,addsupportsinsteadofremovingthem.二、支撐的設(shè)置和拆除2.InstallationandRemovalofSupports2.4溝槽支撐2.4TrenchSupport橫撐HorizontalBracing豎撐VerticalBracing1、支撐的設(shè)置1.InstallationofSupports二、支撐的設(shè)置和拆除2.InstallationandRemovalofSupports倒撐:在施工過(guò)程中更換立柱和撐扛位置。ReverseSupport:Repositioningstandcolumnsandstrutsduringconstruction.使用場(chǎng)合:原支撐妨礙下一工序進(jìn)行;ApplicableConditions:Originalsupporthindersthenextprocess;原支撐不穩(wěn)定;Originalsupportisunstable;一次拆撐有危險(xiǎn);Removingsupportallatonceisdangerous;其他原因必須重新安設(shè)支撐。Otherreasonsrequirereinstallationofsupports.2、倒撐2.ReverseSupport2.4溝槽支撐2.4TrenchSupport支撐的拆除:RemovalofSupports:支撐拆除的基本要求:BasicRequirementsforRemovingSupports:檢查槽壁有無(wú)裂縫,有危險(xiǎn)時(shí)先還土;Inspectthetrenchwallsforcracks;backfillthesoilifthereisanydanger.多層支撐的溝槽,可自下而上逐層拆除;Fortrencheswithmultiplelayersofsupports,removethemlayerbylayerfromthebottomup.拆撐前要仔細(xì)檢查溝槽兩側(cè)的建筑物、電桿及其他外管道是否安全,必要時(shí)要加固后再拆撐;Beforeremovingsupports,carefullyinspectthebuildings,utilitypoles,andotherexternalpipelinesonbothsidesofthetrenchforsafety.Reinforceifnecessarybeforeremoval.溝槽內(nèi)工作全部完成后,才可將支撐拆除。拆撐與溝槽回填同時(shí)進(jìn)行,邊填邊拆。拆撐時(shí)必須注意安全,繼續(xù)排除地下水,避免材料損耗。遇撐板和立木較長(zhǎng)時(shí),可在還土后或倒撐后拆除。Supportsshouldonlyberemovedafterallworkwithinthetrenchiscompleted.Removalofsupportsandtrenchbackfillingshouldbedonesimultaneously,withfillingandremovaloccurr

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論