




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認(rèn)領(lǐng)
文檔簡介
ConceptionDesignSchemesofNewChangshaPassengerRailwayStation1ConceptionDesignSchemesofNewChangshaPassengerRailwayStation4一
項目分析
The
Project
Analysis·
城市概況
City
general
situation·
場地與環(huán)境概述
General
description
of
site
and
environment·
車站概況
General
situation
of
Station·
周邊交通狀況分析
Analysis
of
the
transportation
condition
around二
規(guī)劃設(shè)計
The
Planning
Design·
規(guī)劃設(shè)計理念
Conception
of
the
planning·
功能分區(qū)
Function
zoning·
交通規(guī)劃
Traffic
planning·
綜合經(jīng)濟指標(biāo)
Comprehensive
economic
indexes三.建筑設(shè)計
The
Architectural
Design·
建筑構(gòu)思理念
Conception
of
architectural
design·
平面功能
Functional
plan·
流線組織
Flow
organization·
無障礙設(shè)計
Obstacle?free
design·
車站建筑經(jīng)濟技術(shù)指標(biāo)
Economic
indexes
of
architectures
within
the
Station四.站房單體技術(shù)設(shè)計
Techical
Design·
結(jié)構(gòu)設(shè)計
Design
gist·
建筑給排水系統(tǒng)
The
draining
system
design
·
建筑電氣設(shè)計
The
electricity
design五.投資估算
The
Investment
Estimate·
編制依據(jù)
Basis
of
organization·
編制范周及單元
Scope
and
unit
of
organization·
各項工程費用編制
Organization
of
each
engineering
expensesC
ontentsEstimate
in
totalConceptionDesignSchemesofNewChangshaPassengerRailwayStation6Preface20200020501.2200
In
the
first
two
decades
of
this
century,
China
will
further
push
forward
its
all-rounded
development:
tripling
the
GDP
of
2000,
remarkably
enhancing
comprehensive
national
strengthen
and
international
competitiveness.
In
terms
of
passenger
transportation,
the
country
will
build
fast
passenger
paths
among
capital
cities
and
other
large
and
medium
cities.
A
“4
Vertical
and
4
Horizontal”
fast
passenger
transportation
railway
path
and
three
cross-city
fast
passengertransportation
systems
will
be
planned.
By
then,
a
total
of
more
than
12,000
kilometers
of
passenger
transportation
railway
will
have
been
built
with
the
desired
speed
of
passenger
train
being
over
200
kilometers
per
hour.
Being
an
essential
part
to
railway
network,
trans
stations
have
already
established
themselves
as
comprehensive
traffic
hubs
and
modern
passenger
transportation
center
on
urban
and
regional
levels.ConceptionDesignSchemesofNewChangshaPassengerRailwayStation7City
general
situation1)1)
Changsha
city
is
the
political,
economic,
scientific
and
educational
and
cultural
centre
of
Hunan
Province,
the
keycity
in
mid-south
China
region.
The
Chang-Zhu-Tan
economic
integration,
taking
Changsha
as
the
main
part
andZhuzhou
and
Xiangtan
as
two
wings,
through
continuous
exchange
and
mix
together,
will
be
the
main
core
area
ofeconomic
development
of
Hunan
province.
On
the
ever
heating
gold
travel
route
of
Hengshan,
Shaoshan,
Changsha.Zhangjiajie,
Changsha
is
located
in
its
center,
which
is
the
most
important
originating
and
terminating
area
and
gatheringand
dispersing
area
of
transit
of
passenger
flow
in
the
province.
Draw
on
the
experience
of
development
of
metropolisand
group
of
big
cities
in
the
world,
there
must
be
a
modernized
internationalized
infrastructure
network
and
then
thedeveloped
railway
network
of
big
capacity,
with
high
efficiency
and
environment
protection
will
be
no
doubt
theinevitable
selection.2)
Changsha
Zhuzhou
railway
hub
is
connecting
four
trunk
railway
lines
of
Jing~Guang,
Zhe~Gan,
Xiang~Qian
andShi~Chang,
is
one
of
the
main
railway
hubs
in
central
China,
and
also
the
main
component
part
of
Changsha
Citycommunications
infrastructure.
In
accordance
with
the
<Plan
of
Medium
and
Long
Term
Railway
Network>,
bybuilding
Wuhan~Guangzhou
Passenger
Special
Line
and
Hongzhou~Changsha
Passenger
Special
Line
in
Changsha,Zhuzhou
hub,
the
layout
of
“ross
type”
passenger
special
lines
will
be
formed
gradually
within
the
hub,
the
regionalpassenger
operation
center
with
Changsha
Station
and
the
New
Changsha
Station
as
the
main
passenger
stations
so
as
tomeet
the
requirement
of
increasing
passenger
volume
and
improving
service
quality.ConceptionDesignSchemesofNewChangshaPassengerRailwayStation82)
The
New
Changsha
Station
will
be
located
in
Lituo
Township
of
Yuehua
District
in
the
east
of
Changsha
City,
whichis
situated
in
the
southeast
of
the
interchangeable
flyover
of
Changsha
Avenue
and
Jingzhu
Expressway.
It
will
convergevarious
modes
of
communications
of
urban
rail
communications,
conventional
communications,
long
distance
bus,
taxiand
vehicles
of
the
community
to
the
hub
to
form
a
big
scale
of
comprehensive
passenger
communications
hub.
Thescope
of
conecption
design
will
be
the
area
surrounded
by
Laodong
East
Road,
Xiangzhang
Road,
Xin
Huahou
Road,Zhanqian
Road
on
the
east
side
of
Hongqi
Road.1)General
description
of
site
and
environment
9.5km
36.5m
The
New
Changsha
Station
will
be
located
in
Lituo
Township
of
Yuehua
District
in
the
east
of
city
proper,
9.5kmapart
from
‘May
the
First
Square’
of
Changsha
City.
It
is
neighboring
new
sports
city
in
the
west,
forest
botanical
gardenin
the
south,
Mapoling
High
Technology
Agriculture
Garden
in
the
north,
Jingzhu
Expressway
runs
through
on
the
westside,
airport
expressway
crosses
over
in
the
north,
round
the
city
line
passes
through
in
the
south.Apart
from
part
of
the
land
for
the
residence
of
village
and
township
people
and
for
some
institutions,
most
of
the
landis
for
vegetable
gardens,
farmland
and
fish
ponds.
The
land
for
residents
of
village
and
township
is
in
scattered
position,the
residence
for
the
villagers
are
mainly
of
flat
house
and
independent
buildings
mostly
of
1-3
stories.The
current
instiutions
mainly
include
township
firms,
offices
not
bleonging
to
municipal
government
and
middle
andprimary
schools.
The
township
firms
are
mainly
building
materials
factory
such
as
prefabricated
parts
and
warehouses(mainly
serving
Gaoqiao
Market);
offices
no
belonging
to
municipal
government
are
mainly,
village
committees
andLituo
Police
Station;
presently
there
are
two
primary
schools
of
Changtuo
Primary
School
and
Lituo
Primary
School,one
middle
school
of
Lituo
Middle
School.
Ground
elevation
(Hunghai
Elevation,
similarly
hereinafter)
is
about
36.5m.Site
situationZoning
analysis9.5kmConceptionDesignSchemesofNewChangshaPassengerRailwayStation9General
situation
of
Station1)1)
In
accordance
wity
thePlan
of
Medium
and
Long
Term
Railway
Network
,
by
building
Wuhan~GuangzhouPassenger
Special
Line
and
Hongzhou~
Changsha
Passenger
Special
Line
for
Changsha
Zhuzhou
hub,
the
layout
of“cross
type”
passenger
special
lines
will
be
formed
gradually
within
the
hub.
A
regional
passenger
operation
center
withChangsha
Station
and
the
New
Changsha
Station
as
the
main
passenger
stations
will
be
formed
so
as
to
meet
therequirement
of
increasing
passenger
volume
and
improving
service
quality.2)21024210541.50m2)
The
New
Changsha
Station
of
Passenger
Special
Line
will
conduct
operations
of
passenger
trains
fromWuhan~Guangzhou
Passenger
Special
Line
and
Hongzhou~Changsha
Passenger
Special
Line.
The
New
ChangshaStation
will
be
planned
and
designed
with
two
rolling-stocks
yards,
Wu~Guang
rolling-stocks
yard
for
the
operations
ofsouth-north
direction
Passenger
trains
and
Hu~Kun
rolling-stocks
yard
for
the
east-west
direction
Passenger
trains
resp[ectively.
Wu~Guang
rolling-stocks
yard
will
be
designed
with
2
mainlines,
10
arrival
and
departure
tracks,
2
basicplatforms
and
4
intermediate
platforms.
Xu~Kun
rolling-stocks
yard
will
be
a
reserved
yard,
which
will
be
establishedwith
2
mainlines,
10
arrival
and
departure
tracks,
5
intermediate
platforms.
The
reference
elevation
of
rail
top
in
therolling-stocks
yard
is
41.505m.ConceptionDesignSchemesofNewChangshaPassengerRailwayStation103)2018Dispatching
volume
of
passengers
2404
20283591It
is
forecasted
that
passenger
volume
to
be
dispatched
in
New
Changsha
Station
will
be
24.04
million
people
in
2018and
35.91
million
people
in
2028.See
the
following
table
for
daily
peak
hour
passenger
volume
for
the
designed
year:2018//The
year
of
2018
(unit:
persons/day,
persons/peak
hour)Down
trafficUp
trafficDaily
HourlyGet
off
board
33562
2349Get
on
board
35945
3235
2028Get
off
board
24164
2175
/Get
on
board
29918
2693/The
year
of
2028
(unit:
persons/day,
persons/peak
hour)Down
trafficUp
trafficGet
on
boardGet
off
boardGet
on
boardGet
off
boardDaily
Hourly350959
458626804242147425426860110420820182102028301The
New
Changsha
Station
will
run
210
pairs
of
trains
in
2018,
and
301
pairs
of
trains
in
2028.ConceptionDesignSchemesofNewChangshaPassengerRailwayStation11
Analysis
of
the
transportation
condition
around1)
Relying
on
Laodong
East
Road,
Xiangzhang
Road,
Xin
Huahou
Road,
and
Hongqi
Road
which
are
programmed
tobe
in
the
adjacent
areas,
the
Station
is
connected
to
the
outside
domain.
Xin
Huahou
Road
can
be
linked
with
theJingzhu
Expressway
which
is
on
the
east
and
the
Laodong
East
Road
will
be
stretched
westward
to
joint
the
newsports
city.2)23
The
planned
urban
rail
communications
network
of
Changsha
City
is
consisted
of
Six
routes.
Urban
rail
communica-tions
Line
No.2
and
No.3
will
pass
through
the
station
area
in
right
angle
with
railway
line.Analysis
of
the
transportation
conditionsT
he
P
lanning
D
esignConceptionDesignSchemesofNewChangshaPassengerRailwayStation141)Conception
of
the
planning
I
–shaped
layout
Since
in
the
plan,
Wu~Guang
Passenger
Special
Line
and
Hu~Kun
Passenger
Special
Line
are
arranged
in
paralleland
constructed
by
stage,
eventually
forming
an
“I”
shape
arrangement
in
the
New
Changsha
Station.
Station
room
ison
both
sides
of
the
parking
lot
and
in
the
middle,
there
is
a
cross-line
waiting
room,
enabling
two
parts
of
the
station
toconnect
on
the
ground
floor
and
the
second
floor
to
guarantee
that
people
can
pass
through
freely.2)Green
wall
Two
large
green
belts
are
designed
on
the
both
sides
of
the
lines,
constituting
a
ecological
“green
wall”
fromsouth
to
north.
The
green
wall
can
reduce
the
air,
noise,
vibrating,
and
visual
impact
that
moving
trains
may
have
on
thesurrounding
environment;
in
the
meantime,
it
can
create
a
comforting,
fresh,
beautiful
environment
which
is
reservedfor
future
utilization.3)Division
of
people
and
vehicles
T
he
square
in
front
of
the
station
comprises
of
two
parts:
one
part
is
located
at
the
two
sides
of
the
bus
station
onthe
ground
floor,
functioning
as
the
assembling
square
during
the
Spring
Festival
traffic
peak;
the
other
is
composed
ofthe
platform
on
the
first
floor
and
the
suspended
pedestrian
path
as
well.
One
side
connects
the
entrance
hall,
while
theother
spanning
the
roads
in
front
of
the
Station
and
stretching
towards
the
urban
green
belts
on
the
east
and
west
sides,joining
the
surrounding
hotels
and
other
transportation
hubs
to
open
a
pedestrian
system
where
pedestrians
and
ve-hicles
are
completely
separated.
As
the
eastward
and
westward
pedestrian
axial
lines,
the
east
pedestrian
path
candirectly
lead
to
Mopenzhou
in
Liuyanghe.Analysis
of
axesAnalysis
of
streamlineConceptionDesignSchemesofNewChangshaPassengerRailwayStation15
Function
zoningStation
room
ArchitectureIn
the
plan,
station
room
is
divided
into
two
parts:
one
is
the
part
that
faces
the
urban
roads,
including
exit,
entrance,ticket
selling,
transferring,
office,
directing
and
dispatching
sectors,
bus
station
and
business
services.
The
other
part
isthe
waiting
sector
which
is
spanning
over
the
elevated
platform.
The
two
parts
intersect
and
combine,
presenting
animpulsive
architectural
image
and
rich
interior
space.Square
in
front
of
the
Station
and
suspendedIn
organizing
the
stream
of
people,
the
division
of
people
and
vehicles
should
be
implemented
as
the
core
principle.
Theground
floor
in
front
of
station
room
shall
function
as
exit
square
where
taxis
and
the
waiting
vehicles
could
be
arrangedto
wait
in
order.
On
the
second
floor,
spaces
are
provided
so
that
taxis
and
sending
off
vehicles
to
arrive.
Platform
onthe
first
floor
is
a
pedestrian
one,
connected
to
the
bus
station
(on
the
ground
floor),
exit,
and
Square
in
front
of
theStation
by
elevators
and
stairs.
The
other
ends
is
linked
with
the
entrance
hall,
while
the
other
spanning
the
roads
infront
of
the
Station
and
stretching
towards
the
urban
green
belts
on
the
east
and
west
sides.Function
zoning
of
siteConceptionDesignSchemesofNewChangshaPassengerRailwayStation16Second
Phase2105Wu-Kun
rolling-stocks
yard
is
the
second
phase.
It
is
under
planning
and
covers
2
mainlines,
10
arrival
and
departuretracks,
and
5
intermediate
platforms.
Long-distance
station
zone
1In
general
urban
planning,
the
long-distance
station
planned
to
be
located
in
the
west
side
of
Xin
Huahou
Road
at
thejunction
of
Laodong
East
Road
which
is
approximately
one
kilometer
away
from
the
Station
to
avoid
the
crowdednessof
people
and
vehicles
brought
by
close
range
to
the
train
station.Green
wallAlong
the
railways,
the
north
and
south
sides
of
station
room
architecture
is
planned
to
be
part
of
the
green
beltsystem
and
a
large
amount
of
arbors
and
bushes
will
be
planted
there.
The
trees
which
are
mainly
local
species
willprovide
a
natural
green
ecological
screening
system
for
the
station,
reducing
the
air,
noise,
vibrating,
and
visual
impactthat
moving
trains
may
have
on
the
surrounding
environment;
in
the
meantime,
it
can
create
a
comforting,
fresh,beautiful
environment
which
is
reserved
for
future
utilization.Land
use
diagramConceptionDesignSchemesofNewChangshaPassengerRailwayStation17Traffic
planningIn
the
days
to
come,
the
Changsha
Station
will
serve
as
a
modernrailway
transportation
hub
which
combines
multiple
transportationmodes
together
to
achieve
the
fast
and
flexible
change
among
alltransportation
modes
and
give
full
play
to
the
huge
importance
ofthe
Station
in
the
modern
city.In
this
program,
distance-free
change
mode
is
the
focus.
Sinceelevated
platform
mode
is
adopted,
so
the
large
space
under
therolling-stocks
yard
can
still
be
applicable.
Entrance
and
exit,waiting
place
for
taxis
and
picking-up
vehicles,
accesses
to
subwayparking
lots
for
buses
and
private
vehicles
are
placed
on
theground
floor
to
enable
the
change
among
various
transportationmodes
—taxis,
private
automobiles,
buses
and
subway.
The
firstfloor
is
pedestrian
platform
whereas
the
second
floor
being
arrivingfloor
for
taxis
and
sending-off
vehicles
with
which
passengers
canenter
the
waiting
room
without
climbing
stairs.
On
each
floor,
thereis
elevator,
escalator
and
stairs
which
function
as
verticalconnection.
Division
of
people
and
vehiclesA
pedestrian
system
is
specially
designed
on
the
first
floor,
enablingthe
bus
passengers
to
enter
and
exit
by
foot
without
mingling
withvehicles.
In
the
meantime,
elevator,
escalator
and
stairs
will
be
set
upto
link
other
transportation
modes,
facilitating
changes.ConceptionDesignSchemesofNewChangshaPassengerRailwayStation18
Analysis
of
the
main
streamlineEntering
streamline
2
Sending-off
vehicles—vehicles
and
taxis
can
directly
arrive
at
the
second
floor,
enabling
passengers
to
go
inside
thecross-line
waiting
room
without
going
up
and
down
the
stairs.
Entering
streamline
of
pedestrians—through
the
platform
on
the
first
floor,
passengers
can
pass
the
railway
in
frontof
the
Station.
Streamline
of
people
entering
the
subway—subway
accesses
should
be
located
on
the
square
in
front
of
the
Stationand
within
the
Station.
Streamline
of
people
entering
bus
station—the
bus
station
is
situated
right
in
front
of
the
entrance
and
exit,
enablingpassengers
to
enter
the
station
at
ease
through
the
platform
on
first
floor.
Self-driving
streamline—as
to
self-driving
people,
they
can
park
their
private
park
on
the
social
parking
lot
on
thenorth
and
south
sides
and
climb
to
the
first
floor
platform
to
enter
the
Station.
Exiting
streamlineExiting
streamline
of
people
can
enter
the
exits
which
are
on
the
two
sides
and
in
the
middle
of
the
Station
through
awestward
and
eastward
spacious
exiting
passage.
Taxi
streamline—a
waiting
area
for
taxis
will
be
located
on
the
two
sides
of
the
exit
square.
Bus
streamline—When
out
of
the
Station,
passengers
will
climb
to
the
passenger
area
on
the
first
floor
byescalator.
Private
automobile
streamline—When
driven
out
of
the
Station,
these
automobile
can
enter
the
society
bygoing
northward
and
southward.
Subway
streamline—when
exit
the
Station,
passengers
can
go
down
to
the
subway
floor
through
the
subwaychange
access
on
both
sides
of
the
exit.
Long-distance
change—When
exit
the
Station,
the
stream
goes
north
along
the
road
to
long-distance
station.Entering
streamlineExiting
streamlineConceptionDesignSchemesofNewChangshaPassengerRailwayStation19Area
Land
use
FormationPlanned
total
areaArea
for
railway
stationArea
for
public
squareLandscaping
areaRoad
areaParking
lot
areastation
room
building
areaFloor
area
ratioLandscaping
ratio4.Comprehensive
economic
indexesT
he
A
rchitectural
D
esignConceptionDesignSchemesofNewChangshaPassengerRailwayStation23THE
ARCHITECTURAL
DESIGN1.Conception
of
architectural
design1)
“Floating
yarnFloating
yarnBoat
shadow
”
482)Boat
shadow
With
the
beautiful
XiangjiangRiver
in
a
distance
and
the
windingLiuyanghe
in
close
range,
the
land
isnourished
by
rivers
in
silence.
In
rivers,one
goes
fishing
and
boating,
leavingboat
shadows
behind.
In
designing
theroof
on
station
room,
designers
ech-oed
the
overlapping
of
boat
shadowsand
waving
of
lights
when
boating
onrivers.
The
roof
on
waiting
hall
is
de-signed
as
a
mixture
of
fantasy
andreality.
With
the
roof,
people
can
notonly
be
sheltered
from
wind
and
rainbut
also
observe
the
change
of
timethrough
it.
The
roof
of
the
whole
wait-ing
hall
stands
on
top
of
the
canopy,just
like
a
little
boat
floating
across
thewater.1.3Screen
Adding
a
city
screen
between
station
room
and
bus
station,
the
station
acquires
a
messenger
board
to
put
out
traininformation,
introduction
to
the
city,
and
commercial
advertisements.
Meanwhile,
the
screen
can
also
function
aseastward
and
westward
shelter
from
rain
and
wind.
From
exterior
to
interior
space,
the
Station
is
then
divided
into
openspace,
semi-open
space,
and
interior
space,
providing
enhanced
space
feeling
and
vision
impact.
Originated
from
the
“silk
gauze”
un-earthed
from
Western
Han
Dynastyat
Mawangdui
,
which
weights
only
48grams.
Its
extreme
thickness
reflectsthe
supreme
weaving
skill.
“Floatingyarn
”
refers
to
the
awning
atplatforms.
The
awning
is
light
andtransparent,
thus
can
provide
shelterfrom
the
sun
and
in
the
meantime
letin
sunlight.
It
is
through
the
awningthat
the
sunshine
spreads
on
theplatform,
creating
a
wonderful
fusionof
light
and
shadow.
There,
peoplefind
themselves
among
an
amazingworld
of
light
and
sound.
Viewingfrom
a
distance,
the
inclined
load-car-rying
members
assemble
a
splendidgathering
of
trees.
Once
getting
of
thetrain,
passengers
will
immediately
fallinto
an
vast
ocean
of
light
and
shadowthat
feels
like
silk
gauze
and
it
is
thenthe
beautiful
city
Changsha
is
imprintedon
their
minds.Silk
gauzeAwning
of
platformLiuyang
riverBoat
shadowScreenConceptionDesignSchemesofNewChangshaPassengerRailwayStation242.Functional
plan±
0.00Exiting
floor
plan±
0.00
elevationThe
plan
is
mainly
designed
for
exiting
service
to
passengers.
Therefore,
exit
passage,
picking-up
hall,
change
lounge,luggage
hall,
technical
operation,
administration
and
auxiliary
living
rooms
(dispatch,
telecommunication,
signal,
andelectric
power,
etc.).
In
addition,
access
to
subway,
taxi,
bus,
and
social
parking
lot
are
designed
to
be
on
this
floor
aswell.
a
passage
in
the
middle
and
ticket
checking
and
boarding
section
on
two
sides,
providing
shopping,
café,
lounge,catering
and
sanitary
fittings.
A
green
passage
is
designed
in
the
hall
to
offer
fast
and
convenient
direct
access
to
cross-city
expresses,
laying
the
foundation
for
the
Station
to
transform
into
a
“passing
station”.6.25Entering
square
floor
plan
(6.25
elevation)The
floor
plan
mainly
serves
as
platform
level.
Platform
is
located
on
one
side
of
the
station
room,
with
entering
squareon
the
other
side.
It
is
a
pedestrian
floor.
In
the
middle
of
the
station
room
architecture,
there
is
the
entering
hall.
Theticket
selling
hall
is
situated
on
one
side
of
the
entering
hall,
while
the
other
side
being
used
for
commercial,
presentationand
fast
food.
VIP
lounge
and
administrative
and
service
room
to
basic
platform
is
located
on
one
side
facing
basicplatform.The
grornd
floor
THE
ARCHITECTURAL
DESIGNThe
first
floorConceptionDesignSchemesofNewChangshaPassengerRailwayStation25THE
ARCHITECTURAL
DESIGN16.25Cross-line
waiting
hall
floor
plan
(16.25
Elevation)The
cross-line
waiting
hall
for
entering
passengers
is
located
on
the
floor.
Passengers
can
reach
the
platform
on
thesecond
floor
by
vehicle
and
enter
the
hall
without
climbing
up
stairs.
The
space
inside
the
hall
is
open
and
bright,
with3.Flow
organization
Train
stations
generally
feature
large
amount
of
passengers
and
complicating
streams
of
people
and
vehicles,
thusrequire
rational
organization
of
all
streams
of
people.Passenger
transportation
station
room
can
mainly
be
divided
into
passenger
and
administrative
sections.
In
the
design,administrative
part
of
the
Station
is
opposite
to
the
direction
of
passengers.
The
two
parts
are
designed
to
be
indepen-dent
to
avoid
interruption.
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 職業(yè)學(xué)院校舍建設(shè)內(nèi)容與范圍
- 職業(yè)學(xué)院項目目標(biāo)與任務(wù)
- 2022-2027年中國腌制海水產(chǎn)品行業(yè)市場深度分析及投資規(guī)劃建議報告
- 廠區(qū)勞工合同范本
- 評估機制與人才培養(yǎng)質(zhì)量的保障
- 臺式多功能電子詞典行業(yè)市場調(diào)查研究及投資前景預(yù)測報告
- 2023-2028年中國枳實提取物行業(yè)市場發(fā)展現(xiàn)狀及投資策略咨詢報告
- 2024-2025年中國認(rèn)證機構(gòu)行業(yè)市場前景預(yù)測及投資戰(zhàn)略研究報告
- 2025年摩托車五金行業(yè)深度研究分析報告
- 2025年進水管項目投資可行性研究分析報告
- 2024-2025學(xué)年山東省濰坊市高三上學(xué)期1月期末英語試題
- 2025-2030年中國青海省旅游行業(yè)市場現(xiàn)狀調(diào)查及發(fā)展趨向研判報告
- 人力資源部門2023年度招聘效果分析
- 八年級數(shù)學(xué)下冊 第1章 單元綜合測試卷(北師版 2025年春)
- 2025年春新外研版(三起)英語三年級下冊課件 Unit1第1課時Startup
- 2025年安徽碳鑫科技有限公司招聘筆試參考題庫含答案解析
- 2025廣東珠海高新區(qū)科技產(chǎn)業(yè)局招聘專員1人歷年高頻重點提升(共500題)附帶答案詳解
- 數(shù)學(xué)-福建省泉州市2024-2025學(xué)年高三上學(xué)期質(zhì)量監(jiān)測(二)試卷和答案(泉州二模)
- 員工行為守則及職業(yè)道德規(guī)范
- 3學(xué)會反思 第一課時 (說課稿) -2023-2024學(xué)年道德與法治六年級下冊統(tǒng)編版
- 2024年國土個人工作總結(jié)樣本(3篇)
評論
0/150
提交評論