




已閱讀5頁,還剩3頁未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
鉆孔灌注樁塌孔及鋼護(hù)筒下沉事故處理摘要:鉆孔灌注樁由于造價(jià)成本低、承載力高、施工簡單,在橋梁工程中運(yùn)用的越來越多。由于鉆孔灌注樁施工工序繁多,在施工過程中經(jīng)常出現(xiàn)塌孔及鋼護(hù)筒下沉事故,本文基于崇靖路左江特大橋32#B3終孔后出現(xiàn)塌孔及鋼護(hù)筒下沉事故,分析其事故原因,并提出了處理措施,結(jié)果表明十分有效??梢詫︻愃乒こ淌鹿侍幚砭哂薪梃b和指導(dǎo)作用。關(guān)鍵詞:鉆孔灌注樁;塌孔;鋼護(hù)筒下沉;原因;處理Down hole bored piles and steel tube sinking accident treatmentAbstract: bored piles due to low cost, high bearing capacity, simple construction, cost of more and more used in bridge engineering. Due to the construction process of bored piles, hole collapse often occurs in the process of construction and steel tube sinking accident, this article is based on tang jing lu jiang bridge # 32 - B3 appears after the final hole hole collapse and steel tube sinking accident, analysis the cause of the accident, and puts forward the treatment measures, the results show that very effective. Can accident treatment has a reference and guide for similar projects.Keywords: bored pile;hole collapse;steelsinkcasing;cause;treatment隨著我國經(jīng)濟(jì)高速的發(fā)展,我國交通運(yùn)輸事業(yè)也得到大力的改善,特別是西部開發(fā)的實(shí)施,我國西南地區(qū)修建的橋梁越來越多。鉆孔灌注樁由于穩(wěn)定性好、承載力高、沉降量小及沉降均勻,在施工過程中噪音低,對周邊建筑及環(huán)境影響不大等優(yōu)點(diǎn),被廣泛用于橋梁工程的樁基工程中。但由于施工中鉆孔灌注樁工序繁瑣,包括整平場地、放線測量、埋設(shè)護(hù)筒、鉆機(jī)就位、成孔、鋼筋籠下放、導(dǎo)管下放、灌注混凝土等一系列施工工序。在這些施工過程中,不可避免會出現(xiàn)擴(kuò)頸、沉淀層厚度過大、縮頸、塌孔等工程事故,這些工程事故會不同程度影響樁的質(zhì)量,問題嚴(yán)重使樁的承載力達(dá)不到設(shè)計(jì)和施工要求,因此,對鉆孔灌注樁施工事故處理的研究十分有必要。本文通過崇左至靖西高速公路左江特大橋樁基32號B3終孔后出現(xiàn)塌孔及護(hù)筒下沉工程事故為例進(jìn)行研究,希望能對類似工程具有指導(dǎo)和借鑒作用。1工程概況崇左至靖西高速公路左江特大橋位于廣西崇左市太平鎮(zhèn),跨越左江干流,南岸崇左端屬大村三北屯,北岸靖西端屬公益村婆利屯,橋軸線走向方位角約313。橋梁中心樁號為K12+320,橋梁全長456m。橋梁上部構(gòu)造擬采用預(yù)應(yīng)力混凝土連續(xù)剛構(gòu)和預(yù)應(yīng)力混凝土連續(xù)小箱梁預(yù)應(yīng)力混凝土連續(xù)剛構(gòu),下部構(gòu)造擬采用肋板臺、薄壁墩,墩臺均采用樁基礎(chǔ)。樁基礎(chǔ)采用群樁,樁基礎(chǔ)深度從3070米不等,下部結(jié)構(gòu)采用承臺單柱,上部結(jié)構(gòu)采用現(xiàn)澆斜腹式簡支箱梁。根據(jù)地質(zhì)勘探的資料顯示:在樁基的地質(zhì)剖面圖上,樁基地質(zhì)分為十二層,歸分以下五類類:淤泥、粘土、亞粘土、粗砂、中砂,其中樁基鋼護(hù)筒腳處于粗砂層,變截面處于中砂層,底端部位于中砂層。2鉆孔灌注樁施工事故經(jīng)過及原因分析2.1鉆孔灌注樁施工事故經(jīng)過(1)第一次事故經(jīng)過2014年4月27日在樁基32號B3終孔后,終孔時(shí):標(biāo)高-50.12m,泥漿密度為1.13,含砂率為2.3%,粘度為18S。4月28日上午10:30開始拆除鉆桿, 22點(diǎn)拆桿移機(jī)完畢,23點(diǎn)下放檢孔器到位后,并沒有發(fā)生異?,F(xiàn)象,就開始下放鋼筋籠。在下放鋼筋籠的過程中,一切正常,鋼筋籠于4月30日4:10下放到位。在鋼筋籠下放到位后則立即檢測聲測管,發(fā)現(xiàn)四根管在標(biāo)高為-42m左右的位置均不能通暢,此時(shí)量測孔底標(biāo)高為-46.6m,反復(fù)量測均不能到終孔時(shí)的孔底標(biāo)高。(2)第二次施工經(jīng)過通過對收起測錘后發(fā)現(xiàn)測錘底部粘有灰色的亞粘土,質(zhì)地比較堅(jiān)硬,判斷出并不是普通沉淀所造成;樁基成孔于粗砂層,在粗砂層上為粘土層,粘土層的顏色為紅色,可以判斷出并不是孔底附近的砂層發(fā)生塌孔的現(xiàn)象,亞粘土的分布最底層的標(biāo)高約在-35m左右,孔底多出的約30方的泥和砂是由上部塌方造成的,因此,坍塌最有可能發(fā)生在護(hù)筒腳部分。4月30日早上7:30開始提升拆除鋼筋籠,到12:15突然發(fā)現(xiàn)鋼護(hù)筒下沉,下沉的速度不是很快,前后鋼護(hù)筒下沉入水時(shí)間持續(xù)6分鐘,鋼護(hù)筒下沉后量測孔底標(biāo)高為-44.6m,比下沉前又淺了2m,用測錘反復(fù)量測鋼護(hù)筒的位置,下沉后鋼護(hù)筒的頂面標(biāo)高大約為-5.5m,鋼護(hù)筒下沉約有10m深度,下沉后護(hù)筒入土約21m。此鋼護(hù)筒總長為24.85m,自重為38.7噸,如下圖1所示。圖1 護(hù)筒標(biāo)高變化圖在拆除完鋼筋籠后立即對32號墩B3樁進(jìn)行了回填土處理,并加強(qiáng)觀測,至回填土到護(hù)筒腳以上3m停止回填時(shí),均未再發(fā)現(xiàn)48-B3樁護(hù)筒有再變化的現(xiàn)象。因此,判斷鋼護(hù)筒已停止下沉,趨于穩(wěn)定。2.2原因分析32號墩B3樁發(fā)生塌孔和鋼護(hù)筒下沉事故后,通過現(xiàn)場調(diào)查分析發(fā)生本次樁基事故主要原因有以下兩方面:(1)B3樁終孔后驗(yàn)孔時(shí)泥漿各項(xiàng)性能指標(biāo)均滿足規(guī)范要求,52m長鋼筋籠分4節(jié),采用直螺紋連接接長下放,鋼筋籠下放時(shí)間和鉆機(jī)拆桿移機(jī)時(shí)間總共需要18h。由于,鋼筋籠下放時(shí)間過長,造成泥漿膠體率下降多,泥漿各個(gè)指標(biāo)不理想致使泥漿護(hù)壁效果不行,這是造成鉆孔坍塌原因之一。(2)根據(jù)地質(zhì)情況及塌孔深度可知,B3樁原鋼護(hù)筒入土深15.8m,鋼護(hù)筒持力層在粘土上,鋼護(hù)筒只要入土深度達(dá)到5m,它摩阻力足夠支撐其自重,對于塌孔深10m,還不能讓鋼護(hù)筒發(fā)生下沉事故,因此鋼護(hù)筒發(fā)生下沉事故是由于鉆機(jī)鉆孔過程中發(fā)生塌方致使鋼護(hù)筒腳附近掏空過多造成的。3處理方案3.1鋼護(hù)筒垂直度和偏位情況在確定B3樁鋼護(hù)筒回填土穩(wěn)定后,為確定鋼護(hù)筒垂直度及偏位情況是否滿足設(shè)計(jì)要求,需要對其垂直度及偏位情況進(jìn)行檢查。用13米長280cm的鋼筋籠探孔器下到回填土頂面;用250cm的鉆頭能順利穿過護(hù)筒腳并提起,經(jīng)探測其垂直度為0.8%,平面位置偏差7cm,鋼護(hù)筒垂直度和偏位情況滿足設(shè)計(jì)樁基要求。3.2 B3樁和鋼護(hù)筒的處理方法根據(jù)檢測結(jié)果,鋼護(hù)筒垂直度和偏位情況滿足規(guī)范要求,因此對樁基塌孔和鋼護(hù)筒下沉做出以下處治措施:(1)用330cm、=18mm的鋼護(hù)筒套住原310cm的鋼護(hù)筒后,用120T的振動錘振動下沉330cm的鋼護(hù)筒,其入土深度為330cm以上;(2)在330cm鋼護(hù)筒和310cm鋼護(hù)筒之間重疊部分的孔隙間用C30水泥漿進(jìn)行水下壓漿密實(shí),完成330cm鋼護(hù)筒和310cm鋼護(hù)筒之間的連接;(3)壓漿砼等強(qiáng)待其穩(wěn)定后,鉆機(jī)就位,按正常樁要求采用回旋鉆機(jī)反循環(huán)成孔,成孔過程中加強(qiáng)護(hù)壁泥漿的控制,成孔后按正常樁基施工要求澆灌樁基混凝土;(4)成樁后樁徑情況:在標(biāo)高-5.5m以下部分符合原設(shè)計(jì)要求,在標(biāo)高-5.5m以上部分樁徑為330cm;(5)外套330cm鋼護(hù)筒嵌入承臺部分作防腐處理,其加工要求仍按原主墩樁基鋼護(hù)筒加工工藝要求執(zhí)行,(如圖2)。圖2 樁基礎(chǔ)處理示意圖4預(yù)防措施及處理效果4.1預(yù)防措施為了保證B3樁及其它未完成樁基的施工質(zhì)量,并結(jié)合質(zhì)量保證體系的要求,現(xiàn)場又制定了以下預(yù)防措施:(1)樁基在鉆孔過程中、下鋼筋籠過程中及灌注水下樁基混凝土未過鋼護(hù)筒腳之前,均應(yīng)保持孔內(nèi)水位比外面高出2.5m以上;(2)鉆到鋼護(hù)筒腳的松散粗砂層時(shí),要加袋裝水泥反復(fù)攪拌造漿護(hù)壁,護(hù)好壁后再鉆過鋼護(hù)筒腳的粗砂層,同時(shí)控制進(jìn)尺速度;(3)鉆孔過程中應(yīng)加強(qiáng)護(hù)壁泥漿質(zhì)量的控制,造漿材料所需的PHP、CMC、膨潤土、石灰等,嚴(yán)格按要求添加;泥漿的各項(xiàng)性能指標(biāo)為,相對密度達(dá)到1.101.15、粘度2428s、砂量3%、pH值:79;(4)加強(qiáng)協(xié)調(diào)安排,以保證樁基成孔后拆鉆桿、移鉆機(jī)、下鋼筋籠、清孔、灌注水下混凝土等作業(yè)的連續(xù)性,盡量縮短樁基成孔后至灌完樁基混凝土的時(shí)間。4.2處理效果32號墩B3樁按既定的處理方案進(jìn)行了回填、外套鋼護(hù)筒、壓漿聯(lián)接、靜止穩(wěn)定;35d后,鉆機(jī)重新就位,按正常樁基要求采用回旋鉆機(jī)反循環(huán)成孔,成孔過程中嚴(yán)格按工藝要求執(zhí)行,同時(shí)加強(qiáng)了泥漿各項(xiàng)性能指標(biāo)的控制,保證泥漿的護(hù)壁質(zhì)量;成孔后按正常施工要求盡快澆注了樁基混凝土。在11 d的時(shí)間內(nèi),順利完成了從再次成孔到澆注混凝土的施工,成樁后經(jīng)檢測,該樁的質(zhì)量等級為類優(yōu)良樁。5結(jié)束語橋梁工程中,樁基施工是基礎(chǔ),樁基的施工是否順利,決定了工程的成本和工期,本文在樁基塌孔和鋼護(hù)筒下沉事故處理中,首先對發(fā)生事故原因進(jìn)行分析研究,并采取相應(yīng)施工措施,通過處治措施對塌孔進(jìn)行回填、外套鋼護(hù)筒、壓漿聯(lián)接、靜止穩(wěn)定的處理方法,避免了更加嚴(yán)重的質(zhì)量事故發(fā)生,獲得了良好的效果,希望對類似工程事故提供借鑒和參考作用。參考文獻(xiàn)1 汝鑫,簡析地基在建筑施工中的重要性J.科技風(fēng),2013.01期:171 2 王曉亮,淺析泥漿護(hù)壁灌注樁J.企業(yè)技術(shù)開發(fā),2012.07 第31卷第20期:151-152 3 鮑紅雷,芻議監(jiān)理人員如何控制樁基礎(chǔ)工程的質(zhì)量J.現(xiàn)代裝飾(理論),2013.01期:116-117 4 劉海旋,淺析鋼筋混凝土灌注樁施工工藝J.水泥與混凝土,廣東建材 2005年第9期:40-42 5 喬振峰,淺談鉆孔灌注樁施工中成孔成樁質(zhì)量控制J.交通建設(shè),2013.02:2956 公路施工手冊(橋涵)人民交通出版社7 中華人民共和國行業(yè)標(biāo)準(zhǔn)編寫組.JTJ041-2011公路橋涵施工技術(shù)規(guī)范S.北京:人民交通出版社,2011.8 中華人民共和國行業(yè)標(biāo)準(zhǔn)編寫組.JTJ076-2012公路工程施工安全技術(shù)規(guī)程S.北京:人民交通出版社,2012.窗體頂端鉆孔灌注樁塌孔及鋼護(hù)筒下沉事故處理摘要:鉆孔灌注樁由于造價(jià)成本低、承載力高、施工簡單,在橋梁工程中運(yùn)用的越來越多。由于鉆孔灌注樁施工工序繁多,在施工過程中經(jīng)常出現(xiàn)塌孔及鋼護(hù)筒下沉事故,本文基于崇靖路左江特大橋32#B3終孔后出現(xiàn)塌孔及鋼護(hù)筒下沉事故,分析其事故原因,并提出了處理措施,結(jié)果表明十分有效??梢詫︻愃乒こ淌鹿侍幚砭哂薪梃b和指導(dǎo)作用。關(guān)鍵詞:鉆孔灌注樁;塌孔;鋼護(hù)筒下沉;原因;處理Down hole bored piles and steel tube sinking accident treatmentAbstract: bored piles due to low cost, high bearing capacity, simple construction, cost of more and more used in bridge engineering. Due to the construction process of bored piles, hole collapse often occurs in the process of construction and steel tube sinking accident, this article is based on tang jing lu jiang bridge # 32 - B3 appears after the final hole hole collapse and steel tube sinking accident, analysis the cause of the accident, and puts forward the treatment measures, the results show that very effective. Can accident treatment has a reference and guide for similar projects.Keywords: bored pile; hole collapse; steel sink casing; cause; treatment隨著我國經(jīng)濟(jì)高速的發(fā)展,我國交通運(yùn)輸事業(yè)也得到大力的改善,特別是西部開發(fā)的實(shí)施,我國西南地區(qū)修建的橋梁越來越多。鉆孔灌注樁由于穩(wěn)定性好、承載力高、沉降量小及沉降均勻,在施工過程中噪音低,對周邊建筑及環(huán)境影響不大等優(yōu)點(diǎn),被廣泛用于橋梁工程的樁基工程中。但由于施工中鉆孔灌注樁工序繁瑣,包括整平場地、放線測量、埋設(shè)護(hù)筒、鉆機(jī)就位、成孔、鋼筋籠下放、導(dǎo)管下放、灌注混凝土等一系列施工工序。在這些施工過程中,不可避免會出現(xiàn)擴(kuò)頸、沉淀層厚度過大、縮頸、塌孔等工程事故,這些工程事故會不同程度影響樁的質(zhì)量,問題嚴(yán)重使樁的承載力達(dá)不到設(shè)計(jì)和施工要求,因此,對鉆孔灌注樁施工事故處理的研究十分有必要。本文通過崇左至靖西高速公路左江特大橋樁基32號B3終孔后出現(xiàn)塌孔及護(hù)筒下沉工程事故為例進(jìn)行研究,希望能對類似工程具有指導(dǎo)和借鑒作用。1工程概況崇左至靖西高速公路左江特大橋位于廣西崇左市太平鎮(zhèn),跨越左江干流,南岸崇左端屬大村三北屯,北岸靖西端屬公益村婆利屯,橋軸線走向方位角約313。橋梁中心樁號為K12+320,橋梁全長456m。橋梁上部構(gòu)造擬采用預(yù)應(yīng)力混凝土連續(xù)剛構(gòu)和預(yù)應(yīng)力混凝土連續(xù)小箱梁預(yù)應(yīng)力混凝土連續(xù)剛構(gòu),下部構(gòu)造擬采用肋板臺、薄壁墩,墩臺均采用樁基礎(chǔ)。樁基礎(chǔ)采用群樁,樁基礎(chǔ)深度從3070米不等,下部結(jié)構(gòu)采用承臺單柱,上部結(jié)構(gòu)采用現(xiàn)澆斜腹式簡支箱梁。從地質(zhì)勘探中可以看出:根據(jù)樁基地質(zhì)的剖面圖能夠看出,樁基的地質(zhì)一共有12層,可以分為淤泥、粘土、亞粘土、粗砂、中砂五中類型,樁基的鋼護(hù)筒腳在粗砂層中,它的變截面在中砂層中,低端處在中砂層。2鉆孔灌注樁施工事故經(jīng)過及原因分析2.1鉆孔灌注樁施工事故經(jīng)過(1)第一次事故經(jīng)過2014年4月27日在樁基32號B3終孔后,終孔時(shí):標(biāo)高-50.12m,泥漿密度為1.13,含砂率為2.3%,粘度為18S。4月28日上午10:30開始拆除鉆桿, 22點(diǎn)拆桿移機(jī)完畢,23點(diǎn)下放檢孔器到位后,并沒有發(fā)生異?,F(xiàn)象,就開始下放鋼筋籠。在下放鋼筋籠的過程中,一切正常,鋼筋籠于4月30日4:10下放到位。在鋼筋籠下放到位后則立即檢測聲測管,發(fā)現(xiàn)四根管在標(biāo)高為-42m左右的位置均不能通暢,此時(shí)量測孔底標(biāo)高為-46.6m,反復(fù)量測均不能到終孔時(shí)的孔底標(biāo)高。(2)第二次施工經(jīng)過通過對收起測錘后發(fā)現(xiàn)測錘底部粘有灰色的亞粘土,質(zhì)地比較堅(jiān)硬,判斷出并不是普通沉淀所造成;樁基成孔于粗砂層,在粗砂層上為粘土層,粘土層的顏色為紅色,可以判斷出并不是孔底附近的砂層發(fā)生塌孔的現(xiàn)象,亞粘土的分布最底層的標(biāo)高約在-35m左右,孔底多出的約30方的泥和砂是由上部塌方造成的,因此,坍塌最有可能發(fā)生在護(hù)筒腳部分。4月30日早上7:30開始提升拆除鋼筋籠,到12:15突然發(fā)現(xiàn)鋼護(hù)筒下沉,下沉的速度不是很快,前后鋼護(hù)筒下沉入水時(shí)間持續(xù)6分鐘,鋼護(hù)筒下沉后量測孔底標(biāo)高為-44.6m,比下沉前又淺了2m,用測錘反復(fù)量測鋼護(hù)筒的位置,下沉后鋼護(hù)筒的頂面標(biāo)高大約為-5.5m,鋼護(hù)筒下沉約有10m深度,下沉后護(hù)筒入土約21m。此鋼護(hù)筒總長為24.85m,自重為38.7噸,如下圖1所示。圖1 護(hù)筒標(biāo)高變化圖在拆除完鋼筋籠后立即對32號墩B3樁進(jìn)行了回填土處理,并加強(qiáng)觀測,至回填土到護(hù)筒腳以上3m停止回填時(shí),均未再發(fā)現(xiàn)48-B3樁護(hù)筒有再變化的現(xiàn)象。因此,判斷鋼護(hù)筒已停止下沉,趨于穩(wěn)定。2.2原因分析32號墩B3樁發(fā)生塌孔和鋼護(hù)筒下沉事故后,通過現(xiàn)場調(diào)查分析發(fā)生本次樁基事故主要原因有以下兩方面:(1)B3樁終孔后檢查孔的時(shí)候泥漿的各個(gè)方面都是符合要求的,五十二米長的剛筋籠分為四段,使用直螺紋的連接方式下投,鋼筋籠的下投時(shí)間與鉆機(jī)拆桿移機(jī)時(shí)間總共需要18h。由于,鋼筋籠下放時(shí)間過長,造成泥漿膠體率下降多,泥漿各個(gè)指標(biāo)不理想致使泥漿護(hù)壁效果不行,這是造成鉆孔坍塌原因之一。(2)根據(jù)地質(zhì)的實(shí)際和塌陷孔的深度可以得出,B3樁的原鋼護(hù)筒進(jìn)到土的深度是15.8米,護(hù)筒的持力層處于粘土上,所以鋼護(hù)筒進(jìn)到土的深度只需要五米,那么它的摩擦力就能夠承擔(dān)它自身的重量,針對塌孔深10m,還不能讓鋼護(hù)筒發(fā)生下沉事故,因此鉆機(jī)鉆孔的中間出現(xiàn)了塌方導(dǎo)致鋼護(hù)筒腳周圍被掏空,最終引起了鋼護(hù)筒下沉事故的出現(xiàn)。3解決方法3.1鋼護(hù)筒垂直度和偏位情況在確定B3樁鋼護(hù)筒回填土穩(wěn)定后,為確定鋼護(hù)筒垂直度及偏位情況是否滿足設(shè)計(jì)要求,需要對其垂直度及偏位情況進(jìn)行檢查。用13米長280cm的鋼筋籠探孔器下到回填土頂面;為了使鉆頭能夠通過護(hù)筒腳并可以提起,鉆頭直徑選用250cm,檢測出垂直度是0.8%,平面所處位置的偏差為7cm,鋼護(hù)筒垂直度和偏位情況滿足設(shè)計(jì)樁基要求。3.2 B3樁和鋼護(hù)筒的解決方案從檢測中可以得出,鋼護(hù)筒的偏位和垂直度都是符合規(guī)定的要求,因此對樁基塌孔和鋼護(hù)筒下沉做出以下處治措施:(1) 鋼護(hù)筒采用的是330cm、=18mm,再把原310cm的鋼護(hù)筒套住,使用120T的振動錘使330cm的鋼護(hù)筒下沉,進(jìn)入土的深度至少330cm。 (2)在330cm和310cm兩個(gè)鋼護(hù)筒中間重疊的地方存在的孔縫隙要使用C30的水泥漿,然后在水下用水泥漿把縫隙緊密壓住,這樣就使330cm和310cm兩個(gè)鋼護(hù)筒中間的連接完成;(3)在等壓漿砼趨于穩(wěn)定之后,準(zhǔn)備好鉆機(jī)位置,按照樁的正常規(guī)范要求使鉆機(jī)正反回旋,最后重復(fù)變成孔即可,在做孔的中間要控制好護(hù)壁的泥漿,做好孔后對樁基澆灌混凝土?xí)r可以按照平常樁基的要求施工;(4)做好樁之后直徑的要求:在標(biāo)準(zhǔn)高度-5.5米之下的樁滿足原來的要求,其余的樁直徑設(shè)計(jì)為330cm;(5)外套330cm鋼護(hù)筒嵌入承臺部分作防腐處理,加工的工藝要求可以根據(jù)原先主墩的鋼護(hù)筒來進(jìn)行,圖2為示意圖。圖2 樁基處理示意圖4預(yù)防方法及解決效果4.1預(yù)防方法為了確保所有樁基的質(zhì)量,施工地做出了一些預(yù)防的方法:(1) 對樁基進(jìn)行鉆孔的中間、向下放鋼筋籠時(shí)以及對樁基進(jìn)行灌注混凝土沒有達(dá)到筒腳的時(shí)候,孔外的水位都要比孔內(nèi)的至少低兩米半;(2) 等鉆到達(dá)筒腳所處的粗砂層,應(yīng)該至少加袋水泥做成泥漿保護(hù)其外壁,然后再讓鉆穿過粗砂層,在這個(gè)時(shí)候要特別注意進(jìn)尺的快慢要控制好;(3) 在進(jìn)行鉆孔的時(shí)候要做好要護(hù)壁
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 健康管理專業(yè)教學(xué)標(biāo)準(zhǔn)(高等職業(yè)教育專科)2025修訂
- 視覺訓(xùn)練與康復(fù)專業(yè)教學(xué)標(biāo)準(zhǔn)(高等職業(yè)教育專科)2025修訂
- 期末復(fù)習(xí)《第7-8章》選擇題??紵狳c(diǎn)專題訓(xùn)練 2024-2025學(xué)年魯教版(五四制)八年級數(shù)學(xué)下冊
- 垃圾分類調(diào)研報(bào)告7
- 2023-2029年中國壓合板行業(yè)市場調(diào)查研究及發(fā)展戰(zhàn)略規(guī)劃報(bào)告
- 2025年中國雄安新區(qū)建設(shè)行業(yè)市場運(yùn)行現(xiàn)狀及投資規(guī)劃建議報(bào)告
- 2025年中國油炸面食行業(yè)發(fā)展趨勢預(yù)測及投資戰(zhàn)略咨詢報(bào)告
- 2022-2027年中國SLG頁游市場前景預(yù)測及行業(yè)投資潛力預(yù)測報(bào)告
- 中國汽車外飾行業(yè)發(fā)展?jié)摿Ψ治黾巴顿Y方向研究報(bào)告
- 2024-2030年中國金摩卡薄板行業(yè)市場發(fā)展監(jiān)測及投資潛力預(yù)測報(bào)告
- 餐飲連鎖企業(yè)品牌授權(quán)與經(jīng)營管理協(xié)議
- 北京市2024年高招本科普通批錄取投檔線
- DB32-T 5088-2025 廢活性炭綜合利用污染控制技術(shù)規(guī)范
- 2024-2025學(xué)年人教版數(shù)學(xué)八年級下冊期末復(fù)習(xí)卷(含解析)
- 城市通信基站建設(shè)對周邊居民影響風(fēng)險(xiǎn)評估報(bào)告
- 美容院洗滌協(xié)議書
- 學(xué)習(xí)解讀《水利水電建設(shè)工程驗(yàn)收規(guī)程》SLT223-2025課件
- 肥胖癥診療指南(2024年版)解讀
- 2025甘肅省農(nóng)墾集團(tuán)有限責(zé)任公司招聘生產(chǎn)技術(shù)人員145人筆試參考題庫附帶答案詳解
- 2025屆蕪湖市重點(diǎn)中學(xué)七年級生物第二學(xué)期期末學(xué)業(yè)水平測試模擬試題含解析
- 煙草行業(yè)大數(shù)據(jù)應(yīng)用建設(shè)方案
評論
0/150
提交評論