




已閱讀5頁,還剩18頁未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
AnautomatedweldingoperationplanningsystemforblockassemblyinshipbuildingKyu-KabCho*,Jung-GuySun,Jung-SooOhAbstractTheblockassemblyprocessisoneofthemostimportantmanufacturingprocessesforshipbuilding.Sinceblockiscomposedofseveralsteelplatesandsteelsectionswithpredeterminedshapesaccordingtoshipdesign,theweldingoperationplanningtoconstructablockisacriticalactivityforshipbuilding,butthisactivityhastraditionallybeenexperiencebased.Thus,itisrequiredtodevelopanautomatedweldingoperationplanningsystemtoassembleblocks.Thispaperdescribesthedevelopmentofanautomatedweldingoperationplanningsystemforblockassemblyinshipbuilding.Basedontheinformationaboutparts,topologicalrelationshipbetweenpartsandassemblysequencesforblock,thedevelopedsystemperformsthedeterminationofweldingpostures,weldingmethods,weldingequipmentandweldingmaterials.Thedevelopedsystemimplementedsuccessfullyforrealblocksconstructedinshipyard.Keywords:Blockassembly;Expertsystem;Operationplanning;Weldingprocess1.IntroductionShipbuildingistraditionallyalabor-intensiveassemblyindustrythatemploystheweldingprocessasabasicproductiontechnology.Inshipbuilding,thereareseveraltypesofmanufacturingprocessplanningforcuttingandbending,assembly,out-fitting,anderection.Amongtheseprocessplanningactivities,theassemblyprocessplanningisbyfarthemostimportant,sincetheconstructionprocessforahullblockcomprisesapproximately4850%ofthetotalshipbuildingprocess1,2.Themainoperationforblockassemblyistheweldingoperation.Theweldingoperationplanningproblemsinblockassemblyareverydifficulttosolvebecauseallblocksaredifferentinsize,type,andconstitutingsub-assembliesthatdependonthetypesofships.Also,sincethisactivityhastraditionallybeenexperienced-based,weldingoperationplanninginshipbuildinghasbeenperformedmanually.Thus,itisveryimportanttodevelopanautomatedweldingoperationplanningsystemforshipbuilding.Thereisrelativelyverylittleliteratureavailableonautomatedweldingoperationplanningsystemsforshipbuilding3,4.Thispaperdealswiththedevelopmentofanautomatedweldingoperationplanningsystemforblockassemblyinshipbuilding.Therule-basedexpertsystemforweldingoperationshasbeendevelopedusingSmartElementsasanexpertsystemtool.Thedevelopedsystemisdemonstratedandverifiedbyusingactualblocksintheshipyard.2.Developmentofanautomatedweldingoperationplanningsystem2.1.SystemframeworkTheautomatedweldingoperationplanningsystemdevelopedinthispaperconsistsoffourmodules:weldingposturesmodule,weldingmethodsmodule,weldingequipmentmodule,andweldingmaterialsmodule.TheframeworkofthissystemisshowninFig.1.2.2.DeterminationofweldingposturesThismoduledeterminesthepostureoftheweldingoperator.Weldingpostureisreasonedbyconsideringconnectiontypesandpositionaldirectionbetweentwoconnectedparts,directioninformationofassemblybasepart,existenceofturnover,andassemblylevel.Connectiontypesareclassifiedintobutttype(B)andfillettype(T),asshowninFig.2.Thefourtypesofweldingpostures,downposture(D),overheadposture(O),horizontalposture(H),andverticalposture(V),areconsideredinthispaper,asshowninFig.25,6.Themoststableandeasiestweldingpostureisthedownweldingposture,andthemostdifficultoneistheoverheadweldingposture.Theweldingoperatordeterminesanefficientweldingpostureaccordingtotheworkingconditions.Forrelationshipofconnectionbetweentwopartsthatarewelded,onepartisconsideredasthebaseandtheotherisconnectedtothebase.ThepartthatisconsideredasabaseisrepresentedasPartFromandtheotherthatisconnectedtothebaseisrepresentedasPartTo.Thelevelsofblockassemblytoassemblesteelplatesandsectionsintothefinalblockareclassifiedintosubassembly(SA)level,unitblockassembly(UBA)level,andfinalblockassembly(FBA)level.Subassemblylevelsmaybedividedintosmallsubassembly(SSA)levelsandintermediatesubassembly(ISA)levelsaccordingtothesizeandweightofthesubassemblyasshowninFig.3.Fordeterminingweldingpostures,theblockassemblylevelsareclassifiedintotwogroups.Thefirstgroupisthesmallsubassemblylevel;thesecondgroupconsistsoftheintermediatesubassembly,theunitblockassembly,andthefinalblockassemblylevels.Thereasonforthisgroupingisthatthereisnoturnoverprocessinthesmallsubassemblylevel,buttheassemblylevelsbelongingtothesecondgroupmayhaveturnoverprocesses.Turnoverprocessescausethechangeofweldingposturesthataredeterminedbeforetheturnoverprocess.2.2.1.DeterminingweldingposturesinthefirstgrouplevelThefollowingareexamplesofrulestodeterminetheweldingpostureforasmallsubassemblylevel.Theconnectiontypesofweldingjoint
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年智能家居產(chǎn)品在智能家居產(chǎn)品專賣店銷售渠道的渠道管理路徑研究報(bào)告
- 無土栽培蔬菜產(chǎn)業(yè)化項(xiàng)目在2025年農(nóng)業(yè)品牌國際化中的應(yīng)用報(bào)告
- 2025年房地產(chǎn)中介行業(yè)服務(wù)質(zhì)量提升與行業(yè)規(guī)范研究報(bào)告
- 工業(yè)互聯(lián)網(wǎng)平臺(tái)網(wǎng)絡(luò)安全態(tài)勢(shì)感知技術(shù)大數(shù)據(jù)安全分析與預(yù)測(cè)報(bào)告
- 數(shù)字化教材在智能教育系統(tǒng)中的應(yīng)用與集成報(bào)告
- 新型金融衍生品在2025年的市場應(yīng)用與風(fēng)險(xiǎn)防控策略報(bào)告
- 老字號(hào)餐飲品牌如何提升餐飲服務(wù)質(zhì)量與顧客滿意度研究報(bào)告
- 聽評(píng)課優(yōu)缺點(diǎn)及建議16篇
- 公司工程部工具管理制度
- 化工企業(yè)知識(shí)庫管理制度
- DB15T 2763-2022一般工業(yè)固體廢物用于礦山采坑回填和生態(tài)恢復(fù)技術(shù)規(guī)范
- 產(chǎn)能驗(yàn)證分析報(bào)告
- Unit2Thestoneintheroad讀寫課件-高中英語人教版必修第三冊(cè)
- 繞圓柱無環(huán)量流動(dòng)和有環(huán)量流動(dòng)流線分布圖
- 委外加工流程
- DB32∕T 2914-2016 危險(xiǎn)場所電氣防爆安全檢測(cè)作業(yè)規(guī)范
- 中國海洋大學(xué)論文封面模板
- 遵義會(huì)議-(演示)(課堂PPT)
- HY∕T 122-2009 海洋傾倒區(qū)選劃技術(shù)導(dǎo)則
- 企業(yè)項(xiàng)目計(jì)劃書和研究開發(fā)項(xiàng)目目立項(xiàng)決議文件參考格式.docx
- 真空加熱爐的結(jié)構(gòu)與原理及操作
評(píng)論
0/150
提交評(píng)論