1、 利雅得水泥廠石灰石預(yù)均化堆場施工方案Riyadh Cement CompanyLimestone Preblending Stockpile Construction Scheme說明: Instructions:該方案編制依據(jù): This Scheme is compiled according to:1 、 石灰石預(yù)均化堆場施工圖紙Drawings for limestone preblending stockpile2 、 總承包合同要求Requirements of General Contract3 、 施工現(xiàn)場環(huán)境、機(jī)具,施工經(jīng)驗(yàn)等Site environment, equipm

2、ents, and our construction experiences4 、 建筑施工手冊(cè)(第四版)Construction Manual (fourth edition)一、工程概況 Brief Introduction of the Project1、工程性質(zhì)和作用該工程為利雅得水泥廠石灰石預(yù)均化堆場,其功能是儲(chǔ)存和運(yùn)輸石灰石,建筑工期:土建部分計(jì)劃 92天。質(zhì)量要求:土建工程范圍是按照業(yè)主提供的文件所進(jìn)行的交鑰匙模式施工,在施工的每一步都要業(yè)主的質(zhì)量認(rèn)可,達(dá)到業(yè)主的滿意。Nature of the Project and its functionThe Project is the

3、 limestone preblending stockpile of Riyadh CementCompany whose function is to store and transport limestone, and the timelimit for the foundation is 92 days. Quality requirements: The Civil WorksScope is a Turnkey pattern executed as per the documentations offered by theOwner with each step to be ap

4、proved by and to the satisfaction of the Owner.2、建筑的結(jié)構(gòu)特征該工程主要由網(wǎng)架基礎(chǔ)、堆取料機(jī)軌道基礎(chǔ)和石灰石運(yùn)輸廊道組成,網(wǎng)架基礎(chǔ)由 40個(gè)鋼筋混凝土基礎(chǔ)組成的半徑為 56m的環(huán)形基礎(chǔ),基礎(chǔ)之間用基礎(chǔ)梁連接,供上部施工金屬網(wǎng)架。堆取料機(jī)軌道基礎(chǔ)是半徑為51m的環(huán)型鋼筋混凝土基礎(chǔ),基礎(chǔ)底寬 1.2m,高 1.3m,設(shè)置 8道混凝土后澆 帶以降低混凝土收縮應(yīng)力,基礎(chǔ)上部設(shè)計(jì)有預(yù)埋螺栓,用于堆取料機(jī)軌道的安裝。石灰石運(yùn)輸廊道為本工程施工的重點(diǎn),其主要部位是位于場內(nèi)的箱體結(jié)構(gòu)進(jìn)料倉,外部結(jié)構(gòu)尺寸;高 11m,寬 8m,長 40.5m,壁厚1m,底標(biāo)高

5、-11m,局部 -12m,因?yàn)槭堑叵鹿こ?,施工時(shí)要考慮防水,防潮措施。Structure Characteristic of the ConstructionThe Project consists of net frame foundation, stocking and reclaiming trackfoundation and limestone belt conveyor. The net frame foundation is made upof 40 reinforced concrete foundations. The foundations will be connecte

6、dwith beams. The foundation of stocking and reclaiming track is a round one ofa semidiametre 51 m. The width of foundation is 1.2 m, length 1.3 m. 8concrete rear casting belts are installed to reduce the contraction stress of theconcrete. Pre-embeddedanchor bolt is installed on the upper part of the

7、foundation. The limestone conveyor is the highlight of the project, with thebin as its main part, the dimension of which is as follows: height 11m, width8m length 40.5m, thickness 1m, bottom elevation 11m, part 12m . Waterproofing and moisture proofing should be taken into consideration since it isa

8、n underground project.二、施工目標(biāo) Objective of the Construction1、工期目標(biāo)計(jì)劃 2005年 8月 25日開工, 2005年 11月 25日結(jié)束,工期 92天。Time limit of the ConstructionThe Construction begins on Aug 25, 2005 and will finish on Nov 25,2005with the period of 92 days.2、質(zhì)量目標(biāo)確保優(yōu)質(zhì)工程,達(dá)到業(yè)主工程師滿意。Goals of QualityQuality is to be of superior

9、 and to the satisfaction of the Owners engineer.3、安全生產(chǎn)目標(biāo)堅(jiān)持:“安全第一,預(yù)防為主”的方針,保證一般事故率小于亡率為 0,在施工期間杜絕一切重大安全事故。Objective of Safety0.15%,工Safety and precaution from accidents will always be put in the first place.Common accident rate will be controlled within 0.15% and death rate 0%.Any major safety accide

10、nt will be shunned.4、文明施工和環(huán)保目標(biāo)強(qiáng)化施工現(xiàn)場科學(xué)管理,滿足現(xiàn)場環(huán)保要求,達(dá)到業(yè)主工程師滿意。Pursuit of order and environmental protectionIt is our goal to reinforce the scientific management of the site construction,to meet with the environmental protection requirements and to make ourOwner and Engineer satisfactory.5、服務(wù)目標(biāo) 建造業(yè)主滿意工

11、程。Target of our serviceA project to the satisfaction of the Owner三、管理組織機(jī)構(gòu)本工程根據(jù)其特點(diǎn),在現(xiàn)場成立項(xiàng)目經(jīng)理部,實(shí)施總承包管理模式,由項(xiàng)目經(jīng)理、項(xiàng)目總工程師、項(xiàng)目經(jīng)濟(jì)師組成,負(fù)責(zé)對(duì)工程的領(lǐng)導(dǎo)、決策、指揮、協(xié)調(diào)、控制等事宜,對(duì)工程的進(jìn)度、成本、質(zhì)量、安全和現(xiàn)場文明施工等負(fù)全部責(zé)任。AdministrationBy virtue of the characteristic of this project, the business pattern of GeneralContracting is brought into e

12、ffect and the Project Management Department is tobe establishedon the Site which is madeup of Project Manager, Project ChiefEngineer and Project Economist, who are responsible for the leading,decision-making, superintending, coordinating and controlling of the project, andwho are also in full charge

13、 of the procedure, cost, quality, safety and orderlyexecution of the project.四、施工方案1、土方工程1-1、室外自然地坪平整后 -0.2m,網(wǎng)架基礎(chǔ)土方挖深為 1.1m,堆取料機(jī)軌道基礎(chǔ)土方挖深 0.6m,采用機(jī)械破碎挖土,如遇回填土石方,需繼續(xù)挖至原土層,石灰石運(yùn)輸廊道基礎(chǔ)挖深 11m,土方開挖前,先爆破,后采用反鏟分兩層開挖,邊坡坡度根據(jù)巖石性質(zhì),層理特性和挖方深度確定,一般為 1:0.35 1:1.5,基底根據(jù)構(gòu)筑物尺寸每邊留置不少于 1m的工作面,挖出的土方用自卸汽車運(yùn)至場外,并平整好場地。Outdoor n

14、atural leveling -0.2m, net frame foundation excavation depth1.1m. stocking and reclaiming track foundation excavation depth 0.6m.adopt machinery crushing excavation. If meet refilling soil, should dig tothe original layer. Limestone conveyor foundation depth 11m, blastingbefore excavation, sloping i

15、s between1:0.35 1:1.5. 1m of workingplace is reserved. The excavated soil and rocks are removed by dumper tothe outside and leveling is done.1-2 、土方回填采用鏟運(yùn)機(jī)運(yùn)土分層回填,每層回填厚度不大于30cm,用蛙式打夯機(jī)夯實(shí),并夯實(shí)后達(dá)到干燥時(shí)的密度的確動(dòng)壓實(shí)機(jī)壓實(shí)地表。90%,上表面用振Refilling is done by carry scraper and the refilling is done by layers, eachlayer t

16、he thickness is less than 30cm. and the frog hammer is used fortamping. And the density when being dry is 90%, vibrating compactor isused to compact the soil surface.2、網(wǎng)架基礎(chǔ)和堆取料機(jī)基礎(chǔ)工程施工方法Net frame foundation and reclaimer foundation construction2-1 、基礎(chǔ)摸板利用多層膠合板、木支撐,棱角用小木方制成直角邊長 20mm,支撐方式如下圖:45度角,棱角Fou

17、ndation mould board will use ply-board, wood supporter, and angle will be filled with small wooden cube with 45 o, the length of angle is 20mmwhich is shown by the following diagram:2-2、堆取料機(jī)基礎(chǔ)螺栓可采用預(yù)留孔洞或溝槽,后栽螺栓的方式施工,保證螺栓的位置準(zhǔn)確,后灌注的混凝土摻加膨脹劑,膨脹劑的使用參照使用說明書,并經(jīng)業(yè)主工程師確認(rèn)后施工。The foundation bolts will be embedd

18、ed in the concrete to guarantee that itis installed at the appropriate place. The concrete will be added swellerwhose usage will follow instructions, and with the approval of engineer.3、石灰石運(yùn)輸廊道工程施工;Limestone conveyor corridor construction3-1 、施工步驟;從進(jìn)料倉開始以設(shè)計(jì)的變形縫劃分,分四個(gè)施工段,進(jìn)行流水施工。Process: four parts al

19、together from the entrance of the materials.3-2 、模板工程施工方法;模板采用 18mm厚木質(zhì)膠合板, 50100 mm松木方制作,木楞間距 300mm,用()483.5鋼管做支架固定,參見“墻體模板施工圖”施工,通廊內(nèi)側(cè)用 483.5鋼管架設(shè)滿堂腳手架,外側(cè)架設(shè)雙排腳手架,腳手架同時(shí)當(dāng)作鋼支架支撐模板,腳手架橫桿和立桿的間距均設(shè)為 600mm,保證模板支撐強(qiáng)度和剛度,雙排腳手架外側(cè)與基坑壁靠緊,使其不會(huì)因混凝土側(cè)壓力產(chǎn)生橫向變形,保證混凝土墻壁的截面尺寸,模板內(nèi)可用木方支撐,待混凝土澆注到此位置時(shí)將其取出。Mould board will be

20、18mm thick 50x100(mm) pine wook cubes, and thedistance between wooden cubes will be 300mm, and fixed with frame ofsteel tubes of483.5, see the “Drawings of Wall Mould Board ”.The inner place of corridor will be filled with scaffold, and theouter place will be installed with two roll scaffold, and th

21、escaffold will be used at the sametime as supporter to support theboard. Thedistance is 600mmto guarantee the strength and severity.The two roll scaffold will be close to the pit side to avoiddeformation.以上模板支撐方案適用于地下部分,有基坑壁支護(hù)的位置。地上部分廊道的墻體模板采用14對(duì)拉螺栓固定,間距 600mm,每側(cè)用兩根 50100 mm木方做橫楞,橫楞間距 600mm。()The ab

22、ove mould supporting plan is apt to underground part, with pit side supporter parts. The wall mould board above ground will be fixed withbolts of14, distance 600mm,two woodencubes of 50x100(mm)will be usedwith the distance of 600mm3-3、鋼筋工程施工 Reinforced bars、鋼筋加工,現(xiàn)場設(shè)置一臺(tái)鋼筋切斷機(jī),一臺(tái)鋼筋彎曲機(jī),二臺(tái)電焊機(jī),一臺(tái)鋼筋調(diào)直機(jī),一處鋼

23、筋制作棚。鋼筋質(zhì)量需經(jīng)業(yè)主工程師確認(rèn)合格后加工制做。One set of bar cutter, one set of bar bender, two sets of welder andone set of bar straighter.And erect a shed for the work. The qualitys approval.of the bars should require the Owner、鋼筋安裝:水平設(shè)置縱向鋼筋連接采用單面搭接焊,搭接長度10倍鋼筋直徑,豎向鋼筋采用電渣壓力焊,接槎相互錯(cuò)開,距離為鋼筋直徑的 35d以上,底板上排鋼筋用鐵馬登架起,間距 1.5m,

24、側(cè)壁雙排鋼筋間用10拉筋固定間距。側(cè)壁豎向鋼筋長度大于 6m的采取在底板處設(shè)置插筋,后焊接上部鋼筋的方式施工。插筋留設(shè)方式參見標(biāo)準(zhǔn)圖集,并經(jīng)業(yè)主工程師確認(rèn)后施工。Reinforcing bar :The level establishes lengthways reinforcing barconjunction adoption the one side takes to connect the welding, takingto connect the length 10 times reinforcing bar diameter, the upright facesreinforcin

25、g bar adoption electricity pressure , connect the to shuntmutually, distance of reinforcing bar the diametral 35 ds above, liningup the reinforcing bar to ascend with the iron on the scaleboard rises,is apart from 1.5 ms, side wall double row the reinforcing bar uses the 10 pullfix .The side wall up

26、right faces the over and above a way foradopting in the scaleboard establishing bar , behind welding upper partreinforcing bar construction in reinforcing bar length.Putting the barstays to establish the waypays to the standard diagram gathers, combiningafter owner engineer confirm start constructio

27、n.3-4、混凝土工程 Concrete Project、混凝土等級(jí) B25,提供混凝土用的砂、石、水泥試驗(yàn)后經(jīng)業(yè)主工程師認(rèn)可,由試驗(yàn)確定混凝土配合比,該工程混凝土采用罐車運(yùn)輸,混凝土泵送澆筑,要求混凝土初凝時(shí)間不少于 3小時(shí),保證連續(xù)澆筑。Concrete grade B25, the sand, stones, cement should be tested andapproved by Owners Engineer. Trial mix cube is to be tested. Theconcrete is transported by transport mixer, and co

28、nveyed by pump.Initial setting time is not less than 3 hours, and continuouscasting is required.混凝土澆筑施工縫的布置,該工程按設(shè)計(jì)變形縫分四個(gè)流水段施工,每一施工段底板與墻面之間設(shè)置一道施工縫,施工縫距底板上表面300mm高,施工縫制作成齒形防水帶,如圖所示,側(cè)壁與頂梁板澆注時(shí),在側(cè)壁澆筑完畢后 停歇 1-1.5小時(shí),使混凝土獲得初步沉實(shí)后在繼續(xù)澆筑,以防止接縫處出The concrete sprinkles to build the construction sews of arrange, t

29、hatengineering transforms to sewto divide four flowing waters a constructionaccording to the design, each a construction a scaleboard establishes withwall construction sews, starting construction to sew to be apart fromscaleboard top the surface 300 mmshigh.The construction stitches to makethe perma

30、nent teeth form watertightness,shown as diagram, the side wallsprinkles with crest beamplank to note, stop 1-1.5 hours after side wallsprinkle build to complete, make the concrete acquire the first step tosink solid the empress sprinkling to build continuously, in order toprevent joint.、混凝土澆筑順序,底板混凝

31、土澆筑應(yīng)從一側(cè)開始縱向連續(xù)澆筑,側(cè)壁混凝土分層連續(xù)澆筑每層 300-400高,并且在下層混凝土初凝之前澆筑上一層混凝土。Concrete casting order: it should be lengthwise and continuously,with 300-400 thickness, and the upper layer should be cast beforesolidification of the lower layer.4-4、混凝土養(yǎng)護(hù) concrete curing混凝土用混凝土養(yǎng)護(hù)液養(yǎng)護(hù)和澆水濕潤的方式進(jìn)行養(yǎng)護(hù)。 Theconcrete is cured with

32、 chemical liquid and water curing.五、施工準(zhǔn)備計(jì)劃 Preparation of construction1、供水和供電:現(xiàn)場施工用水主要考慮木模板濕潤、混凝土養(yǎng)護(hù)、土方壓實(shí)等工程施工使用,配備 60立方米水箱滿足施工用水。施工用電采用自備發(fā)電機(jī)組,供電量 450KW,滿足該工程的施工臨時(shí)用電。Power supply and water supply60 cubic meter water tank should be prepared for the use of wateron the site, mainly for moisture of woode

33、nboard, curing of concrete and compressing of soil.Power supply: generator, capacity 450KW, to meet with therequirement on the site.2、場內(nèi)道路 Road on the site現(xiàn)場臨時(shí)道路,場地平整已施工完,符合施工要求。Leveling and profiling of road has been finished.3、房屋設(shè)施 housing現(xiàn)場利用一間原有的房屋修建后作為現(xiàn)場辦公、休息、小型材料、機(jī)具儲(chǔ)備等用房。To use the existing ho

34、use for office,materials, and small equipments.rest, and storeroom of4、現(xiàn)場勞動(dòng)力組織 labour allocation4-1、以工程處為主,組建一個(gè)綜合性施工隊(duì)伍,在結(jié)構(gòu)施工階段,組成木模、鋼筋、混凝土三個(gè)專業(yè)班組,設(shè)木工工長兩人,鋼筋工長二人,混凝土工長兩人。Three groups will be established: wood moulding, reinforced bar andconcrete, with two chiefs for each group.4-2、現(xiàn)場勞動(dòng)組織需求量:結(jié)構(gòu)施工階段,木工凝

35、土工 12人,其他工種 5人。20人,鋼筋工 15人,混Labours needed: 20 carpenters, 15 bar labors, 12 concrete labors, and5 of other labors.六、施工進(jìn)度計(jì)劃 progress在保證施工質(zhì)量的前提下,實(shí)行快速流水作業(yè),做好本工程施工進(jìn)度計(jì)劃。1、廊道工程在平面上劃分為四個(gè)施工流水段,施工網(wǎng)絡(luò)計(jì)劃如圖:2、網(wǎng)架基礎(chǔ)和堆取料機(jī)軌道基礎(chǔ)施工計(jì)劃安排:首先施工網(wǎng)架基礎(chǔ),后施工堆取料機(jī)軌道基礎(chǔ)計(jì)劃工期 40天。施工進(jìn)度計(jì)劃見附表。Conveyor is divided into 4 parts.Net frame f

36、oundation and reclaimer track construction will be 40 days.七、施工質(zhì)量保證措施 Measures of Quality Guarantee1、加強(qiáng)技術(shù)管理,認(rèn)真貫徹各項(xiàng)技術(shù)管理制度,開工前要落實(shí)各級(jí)人員崗位責(zé)任制,做好技術(shù)交底,施工中要認(rèn)真檢查執(zhí)行情況,開展全面質(zhì)量管理活動(dòng),根據(jù)工序報(bào)驗(yàn)程序,及時(shí)報(bào)請(qǐng)咨詢工程師審核。We are to enhance the technicalmanagement, earnestly carry through eachtechnical and managementregulation. Expr

37、essly stipulate the responsibilityof eachposting and well managethe shift, examine thoroughly during theexecution and report to the Consultants for their approval.2、認(rèn)真進(jìn)行原材料檢驗(yàn),鋼材和水泥等材料,必須提供質(zhì)量保證書,并按規(guī)定做好抽驗(yàn),各種強(qiáng)度等級(jí)的混凝土,要認(rèn)真確定設(shè)計(jì)配合比,規(guī)定減水劑摻量,按規(guī)定制作試塊。Steels, cement and all other raw materials should be well t

38、ested before accessinto the site and their quality certificate and random test are required according to relevant stipulations. Trial mix cubes should be made for variousgrades of concrete.3、加強(qiáng)材料管理,建立工料消耗臺(tái)帳,實(shí)行“當(dāng)日記載,月底結(jié)帳”制度,鋼筋工程采用現(xiàn)場集中配料,冷拉和對(duì)焊措施,降低鋼材損耗。Establish accountbook for raw materials and claim

39、s for the same are to bejournalized every day .4、嚴(yán)格控制標(biāo)高和垂直度,用經(jīng)緯儀把軸線、邊線投到基礎(chǔ)底面,并做好控制點(diǎn),外模安裝必須用線錘和經(jīng)緯儀雙重檢查,模板安裝完畢后,須經(jīng)質(zhì)量檢驗(yàn)人員驗(yàn)收合格后,報(bào)業(yè)主工程師批準(zhǔn)后進(jìn)行下道工序施工。Strictly control elevation and vertical.5、加強(qiáng)工序間配合,在結(jié)構(gòu)施工中,水、電等工種,應(yīng)與其密切配合,設(shè)專人檢查預(yù)留孔洞,埋件等的位置。All the relevant sections should have good cooperation such as water

40、supplyand power supply.八、施工安全保證措施1、超過 3m深的基坑,土石方開挖完成后,距基坑 1.2m處和出入口設(shè)置一道高 0.9m的護(hù)欄,施工用機(jī)具材料不準(zhǔn)存放在護(hù)欄內(nèi),非本專業(yè)施工人員不準(zhǔn)隨便進(jìn)入工作區(qū)。A 0.9m railing is to be erected around pits which are more than 3m deep,and any tools or materials are forbidden within the railing, and only workersof the pit shall be permitted into t

41、he railing.2、加強(qiáng)放火工作,現(xiàn)場設(shè)置滅火裝置和滅火器具。Fire hydrant and fire extinguisher are to be placed on the site.3、做好安全生產(chǎn)教育和職工安全素質(zhì)培養(yǎng),做好分部分項(xiàng)作業(yè)時(shí)的安全交底工作,施工班組每天召開班前會(huì),對(duì)工人進(jìn)行針對(duì)性安全教育,新工人未經(jīng)教育不得上崗。Do the safety training, hold a short meeting about safety every morning,discuss and solve existing safety problems. New workers

42、must have a safetytraining before working on the site.專業(yè)工長在分項(xiàng)工程施工前,以書面形式向班長交底,在涉及重大安全問題時(shí),召集全體操作人員現(xiàn)場交底,并且全員簽字。Written delivery receipt is a must in shifting, and signatures of all arerequired for safety cases.4、加強(qiáng)機(jī)械設(shè)備接地,建筑物及設(shè)備的避雷裝置和其他安全限位的管理和整改。Earthing of equipment is strictly requested.And lighteni

43、ng conductor is alsorequired.5、機(jī)械操作人員,特殊工種必須經(jīng)過培訓(xùn),持證上崗上班,非操作人員不準(zhǔn)動(dòng)用機(jī)電設(shè)備。Machine operators must have a training before operating.九、文明施工管理措施orderly execution of the construction 1、現(xiàn)場成立文明施工領(lǐng)導(dǎo)小組,由項(xiàng)目經(jīng)理負(fù)責(zé)現(xiàn)場文明施工,以創(chuàng)文明施工樣板工程為奮斗目標(biāo)。Specific department is to be established for the orderly execution and it isour t

44、enet to establish the system to keep a orderly and proper execution forthe construction.2、現(xiàn)場布置按計(jì)劃安排,建筑材料堆放整齊,構(gòu)件材料分門別類,道路通暢,臨時(shí)設(shè)施整齊有序,垃圾及時(shí)清掃,做到隨做隨清,現(xiàn)場內(nèi)無施工垃圾,文明整潔。Keep the site clean and tidy, categorize all the materials and spare parts.Make the roads always accessible,temporary buildings neat, constr

45、uctionwaste cleared in time.十、施工資源計(jì)劃 construction plans1、主要施工機(jī)具需用量計(jì)劃表Equipments and machines needed序號(hào)1機(jī)具名稱鋼筋切斷機(jī)鋼筋彎曲機(jī)鋼筋調(diào)直機(jī)電焊機(jī)型號(hào)及規(guī)格單位臺(tái)臺(tái)臺(tái)臺(tái)套臺(tái)臺(tái)臺(tái)臺(tái)數(shù)量1氣短直徑 32mm彎曲直徑 32mm21314BX-30025氣割工具木工圓盤鋸平刨機(jī)262728自動(dòng)壓刨機(jī)混凝土運(yùn)輸車、輸送泵攪拌機(jī)192101112臺(tái)臺(tái)套124切割機(jī)電渣壓力焊機(jī)具1314151617汽車吊20T輛輛臺(tái)臺(tái)條11運(yùn)輸汽車蛙式打夯機(jī)震動(dòng)器26震動(dòng)棒20ItemNameof Specificatio

46、nsunitQuantityequipmentsBar cutter12Dia 32mmBending32mmset11Bar benderdia Set3BarSet1 straighteningmachine4WeldingBX-300set2machine56Gas cutterCarpentersrotary sawTrying planeAutomaticThicknessingmachineset22Set78setset219Concrete mixerand conveyingpumpSet21011mixerSetset12Cuttingmachine12Electrosla

47、gpress welderTruck cranecarrierSet4131415161720tSetsetSetSetbar11Frog rammerjolter26vibrator20 2、施工工具需用量計(jì)劃表序號(hào)工具名稱型號(hào)及規(guī)格單位臺(tái)數(shù)量102123雙輪推車打氣筒個(gè)修補(bǔ)工具、材料套145羊角錘手鋸把把把個(gè)把把把把M2020102056斧子7釘袋尖鎬89尖鍬2020101002010020101112131415平板鍬鐵挫綜繩手板葫蘆對(duì)拉螺絲眼鏡扳子套個(gè)個(gè)Tools neededItem1Name of tools specifications unitquantityTwowheels

48、et10trolleyinflatorTools23pieceSet21andmaterials forrepair4NailhammerHand sawaxepiecepiecepiecepiecePiecepiecepiecePieceM202010205567Nail bagAcute hammerAcute shovelFlat shovelfile892020101002010111213cordHandpullingblockset1415screwpiecepiece10020spanner 主要施工材料計(jì)劃表序號(hào)材料名稱型號(hào)及規(guī)格單位數(shù)量305430015012070123鋼筋

49、混凝土T3m3模板木材50100木方18厚膠合板483.5管直角扣件m3m4腳手工具TTTt17對(duì)接扣件7旋轉(zhuǎn)扣件2底座個(gè)1500Materials neededItem Name ofspecifications unitquantitymaterial123Reinforced barconcretetm3m3m33054300150120Mould board50x100cubic18 thicknessplywood483.5tube t701774ScaffoldfacilitiesRight anglefastenerttAbutting jointfastenerRotary b

50、uckle t2basepeice1500 十一、施工平面布置圖 Construction layout 模板結(jié)構(gòu)設(shè)計(jì)1)混凝土側(cè)壓力值: concrete side pressure混凝土自重 concrete self weight24 KN/m 2強(qiáng)度等級(jí)strength grade B25tc o1v 21/2F=0.22F= .Hc其中 :F -新澆筑對(duì)模板最大側(cè)壓力maximum pressure to the mould board ( KN/m 2) -混凝土的重力密度cgravity of concrete( KN/m 2)to -混凝土初凝時(shí)間表time of initial solidarity of concrete (h)實(shí)測或to=200/(T+15)T為混凝土溫度 temperature of concrete:取 20度. 20V -混凝土澆筑速度 casting speed of concrete(m/h):取 1.2(m/h)H -混凝土側(cè)壓力位置處至混凝土頂面的總高度 concrete pressureand total height. (m):取 8m -修正系數(shù) corrected modulo塌落度 slump 1

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論