![Management and Smart Grid_第1頁](http://file2.renrendoc.com/fileroot_temp3/2021-8/27/58472d17-883b-41e9-b257-32c8a624f7d2/58472d17-883b-41e9-b257-32c8a624f7d21.gif)
![Management and Smart Grid_第2頁](http://file2.renrendoc.com/fileroot_temp3/2021-8/27/58472d17-883b-41e9-b257-32c8a624f7d2/58472d17-883b-41e9-b257-32c8a624f7d22.gif)
![Management and Smart Grid_第3頁](http://file2.renrendoc.com/fileroot_temp3/2021-8/27/58472d17-883b-41e9-b257-32c8a624f7d2/58472d17-883b-41e9-b257-32c8a624f7d23.gif)
![Management and Smart Grid_第4頁](http://file2.renrendoc.com/fileroot_temp3/2021-8/27/58472d17-883b-41e9-b257-32c8a624f7d2/58472d17-883b-41e9-b257-32c8a624f7d24.gif)
![Management and Smart Grid_第5頁](http://file2.renrendoc.com/fileroot_temp3/2021-8/27/58472d17-883b-41e9-b257-32c8a624f7d2/58472d17-883b-41e9-b257-32c8a624f7d25.gif)
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認(rèn)領(lǐng)
文檔簡介
1、蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃
2、蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇
3、蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁
4、薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞
5、襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀
6、蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄
7、蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋
8、螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅
9、薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿
10、裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄
11、蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈
12、蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)
13、螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆
14、薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃
15、螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈
16、蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂
17、蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆
18、螂螆膈螞蚈螅芀蒄薄螄莃芇袂螃肂蒃螈螃膅芆蚄袂芇蒁薀袁羇芄蒆袀聿葿裊衿芁節(jié)螁袈莄薈蚇袇肅莀薃袇膆薆葿袆羋荿螇羅羈薄蚃羄肀莇蕿羃膂薃蒅羂莄蒞襖羈肄羋螀羈膆蒄蚆羀艿芆薂罿羈蒂蒈肈肁芅螇肇膃蒀蚃肆芅芃蕿肆肅蒈薅肅膇莁袃肄芀薇蝿肅莂莀蚅肂肂薅薁蝿膄莈蕆螈芆薃螆螇羆莆螂 smart grid1table of contentsteam members1executive summary2introduction2scope2working definitions2recommendation3answers to ec questions4introduction5working definitions6
19、findings7federal activity7state/province activity8regulatory10investor-owned utilities12northwest publicly-owned utilities17regional organizations and associations18other relevant information21opportunities for efficiency associated with lm/sg22opportunities associated with distributed generation an
20、d storage/sg22challenges/issues associated with lm/sg22other thoughts22distributed energy generation (der) and storage, in the smart grid of the future22potential policy recommendations under consideration24final recommendation26answers to ec questions2727team membersjeff hammarlundportland state un
21、iversityinder chawlaelcon associatespamela leshpge/nrdcjim abrahamson community action partnership of oregonroger reesoregon heatpatrick mazzaclimate solutionsmike weedall bonneville power administrationpam sporborgbonneville power administrationdave warrenwashington pud associationpete catchingener
22、gy trustken korumnwpccterry dillontacoma powerrandy karrtacoma powercyndi wikstromtacoma powerdave wardtacoma powerchairexecutive summaryintroductionthe load management/smart grid sub-workgroup (lm/sg swg) of workgroup #6 (wg6) was to focus on “rethinking governance and energy efficiency policies.”
23、the group agreed to meet weekly by conference call.the lm/sg swg was asked to identify what parts of the smart grid concept are in and out of the taskforce work.task 1: clarify scope of load management and smart grid topics appropriate to the exercise.task 2: review load management programs and dete
24、rmine best practices. determine customer reactions (good and bad) to load management programs. what has worked and what hasnt? define the objectives and characteristics of a smart grid system in the northwest (nw). make recommendations regarding current and future smart grid application.the lm/sg sw
25、g first established a work plan to place focus on key issues and to be able to provide a work product in a timely manner. the following were the key elements of the lm/sg swg work plan:scopethe subgroup will work collaboratively to:1. collect materials regarding the current state of load management
26、and smart grid efforts (including work regarding the cost effectiveness of each), with an emphasis on the nw, and prepare a brief description of that state;2. assess the contribution that load management and smart grid can make to significantly increasing the efficiency with which the nw uses energy
27、 to do work (in the physics sense);3. identify whether any policy barriers exist to achieving that contribution;4. make recommendations on actions the executive committee can endorse and/or take in pursuit of that contribution.working definitionsload management: technology and/or behaviors in use at
28、 a given customers premise that enable the customer, directly or indirectly through devices installed on his or her equipment and appliances, to reduce the use of electricity during peak times. examples include: rate designs: time-of-day, real-time pricing, critical peak pricing, demand buy-back beh
29、aviors: manual, semi-automated, or automated management of on-premise equipment and appliances in reaction to the various rate designs devices: utility-controlled management of equipment or appliances on the customers premise via communication by pre-arrangement with the customer, typically with com
30、pensation to the customer in the form of a bill credit. this can include devices producing site generation, storage, or loads.smart grid: the convergence of digital information technology and the electrical power grid to enhance communications and control capacities. a properly planned, designed, im
31、plemented, and operated smart grid will: enable active participation by consumers accommodate all generation and storage options, including distributed generation enable new products, services, and markets provide power quality for the range of needs in a digital economy optimize asset utilization a
32、nd operating efficiency anticipate and respond to system disturbances in a self-healing manner operate resiliently against physical and cyber attack and natural disastersthe first three characteristics relate directly to the efficiency of how the nw uses energy to achieve work. the fifth characteris
33、tic relates to the energy efficiency of the nw grid itself.these concepts are not mutually exclusive. with respect to “devices,” the difference between load management and the smart grid is one of degree and integration, rather than nature. load management behaviors will affect energy efficiency wit
34、h both types of technology choices.recommendationfoster regional load management/smart grid (lm/sg) cooperation/coordinationaction recommendedform a group of interested persons from the regions utilities, governance, and non-profit sectors to (1) share information and experience about emerging techn
35、ology and practices in the areas of load management and smart grid; (2) lead regional efforts on analysis and research value of capacity, reliability, and energy efficiency associated with lm/sg; (3) assess and monitor the state of applicable lm/sg regulations and legislations; and (4) assemble and
36、share information of the impacts that lm/sg technologies and applications will have on low and limited-income households.background and rationale more analysis and research is needed to evaluate the potential amount of energy efficiency that may be accomplished through lm/sg activities. the grid mus
37、t contain significantly more “intelligence” than currently as we transition to a two-way flow of power, support customers in developing strong energy management practices that enable them to reach their financial and environmental goals, and strive for the high reliability the system will require fo
38、r increasingly sensitive electrical applications. load management is already important in parts of the country that have faced capacity constraints far earlier than the northwest. as the northwest adds additional intermittent resources, however, and the hydroelectric system reaches the limit of its
39、ability to provide large amounts of on-demand and extended capacity, load management will become increasingly important in the northwest as well. individual utilities and personnel within various government agencies and non-profits are currently engaged in research, experiments, and projects pertain
40、ing to both lm/sg. significant activity is occurring at the federal level and in several national groups, the activities of all of which are time-consuming but important to follow. the residential sector cannot meet its full energy efficiency, demand management, and carbon reduction potential if suc
41、h a large proportion of the sector are living in energy inefficient dwellings and utilizing appliances that do not have the capability of effectively interfacing with the smart grid; effective evaluation and assessment needs to occur regionally. the energy independence and security act of 2007 alrea
42、dy requires that state commissions consider some smart grid. close monitoring of regulatory activity and effective communication to the region would be beneficial. it could also lead to coordinated lobbying activities. while the capability of the nw hydro system has not yet been exhausted, it seems
43、inevitable that the region will need new ways to cover peak loads and ancillary services in the foreseeable future. completion of the sixth power plan by the nwpcc is intended to give us a better understanding of this situation. the assessment of costs should include both the short-term and long-ter
44、m perspectives. more analysis and research is needed to evaluate the potential value of meeting these capacity needs with lm/sg activities.answers to ec questionswhat is the value added to the region of the recommendation? why is it important? more analysis and research is needed to evaluate the pot
45、ential amount of energy efficiency that may be accomplished through lm/sg activities. coordination and cooperation could significantly speed the regions realization of benefits/risks from load management and adoption of smart grid components, as well as lessen the chance of costly mistakes. such eff
46、orts depend on the continued willingness of regional entities to provide in-house resources and potentially funding. if managed effectively, this group could lead to more effective use of funds and may better position the region (through bpa) to secure grants.what is not occurring now that we should
47、 be doing? the region has no process or forum through which it can coordinate efforts, particularly with respect to research and experimentation, share learnings, or cooperatively design and fund major work that would advance the regions understanding of benefits, risks (e.g. impacts on low/limited-
48、income customers) and costs associated with both lm/sg.is there a way to do things more efficiently than what we are doing today? coordination and cooperation could significantly speed the regions realization of benefits from load management, impacts on low/limited-income customers and adoption of s
49、mart grid components, as well as lessen the chance of costly mistakes.how would you suggest that your recommendations be implemented? who and how?a group sponsored/supported by nwppc, neea and bpa, and having nwpcc act as facilitator, may be the best approach for this group, using an informal letter
50、 of intent to guide its formation and include a date certain by which the region will assess the effectiveness of the group. participation from regional iou utilities, publicly owned utilities, regional stakeholders (e.g. low/limited-income representatives), national labs, universities, large busine
51、ss, technology centers (e.g. ncat) to attend meetings and staff projects identified by the group would provide diverse viewpoints and broader acceptance. the group could agree on simple cost sharing for work beyond the time or experience capabilities of the in-house resources, such as detailed cost-
52、benefit studies. governing bodies, such as the state public utility commissions, public utility boards and member organizations, and other state government agencies should request that the group provide an annual report of its activities, findings, and plans for the following year.further, we sugges
53、t this group have a defined life (e.g. 3 years) and an obligation to poll whether it should continue thereafter before going further. in essence, the groups above would re-up to their roles.is there strong support within your workgroup for the priority recommendations?yes if managed effectively and
54、efficiently, with clear goals and purpose defined.introductionthe following is a summary of the load management/smart grid sub-workgroup (lm/sg swg) of workgroup#6 (wg6) which was to focus on “rethinking governance and energy efficiency policies.” the key question of wg6 ishow do we optimize the ali
55、gnment of regulatory practice with public policy goals?the following guideline was provided the lm/sg swg:load management/smart grid can involve many aspects of a utilitys interaction with customers load. this can range from automatic meter reading to real-time communication of electricity usage/pri
56、ce to the customer. typically, it includes the ability of the utility to control the timing of appliance use to control peak loads on the utility system. smart grid is a new, broad term that can encompass activities ranging from power generation to transmission to distribution to end-use customers.
57、for this exercise, the workgroup should identify what parts of the smart grid concept are in and out of the taskforce work.task 1: clarify scope of load management and smart grid topics appropriate to the exercise.task 2: review load management programs and determine best practices. determine custom
58、er reactions (good and bad) to load management programs. what has worked and what hasnt? define the objectives and characteristics of a smart grid system in the northwest. make recommendations regarding current and future smart grid application.the lm/sg swg first established a work plan to place focus on key issues and to be able to provide a work product in a timely
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年P(guān)A12項目提案報告模范
- 2025年光伏電站建設(shè)與運營管理合同
- 2025年微博平臺廣告投放合作合同
- 2025年會議場地使用租約協(xié)議參考
- 2025年獸藥購銷合同樣本
- 2025年企業(yè)借款擔(dān)保合同標(biāo)準(zhǔn)文本
- 2025年二手住宅居間合同樣本
- 2025年醫(yī)療美容公司股權(quán)融資協(xié)議
- 2025年企業(yè)文化建設(shè)合同樣本
- 2025年鄉(xiāng)村道路路基工程承包合同樣本
- 《反洗錢法》知識考試題庫150題(含答案)
- 2025年中國X線診斷設(shè)備行業(yè)市場發(fā)展前景及發(fā)展趨勢與投資戰(zhàn)略研究報告
- 2023-2024小學(xué)六年級上冊英語期末考試試卷質(zhì)量分析合集
- 第六章幾何圖形 初步數(shù)學(xué)活動 制作紙魔方和繪制五角星說課稿2024-2025學(xué)年人教版數(shù)學(xué)七年級上冊
- 武漢市2024-2025學(xué)年度高三元月調(diào)考歷史試題卷(含答案)
- 2025年金城出版社有限公司招聘筆試參考題庫含答案解析
- 醫(yī)院保安管理服務(wù)項目實施方案
- 《工程建設(shè)質(zhì)量信得過班組建設(shè)活動準(zhǔn)則》
- 2025-2025學(xué)年度第二學(xué)期七年級組工作計劃
- 妊娠期糖尿病指南2024
- 讀書心得《好老師征服后進生的14堂課》讀后感
評論
0/150
提交評論