烏拉山發(fā)電廠燃煤空冷發(fā)電機(jī)組茶化鍋爐方案_第1頁(yè)
烏拉山發(fā)電廠燃煤空冷發(fā)電機(jī)組茶化鍋爐方案_第2頁(yè)
烏拉山發(fā)電廠燃煤空冷發(fā)電機(jī)組茶化鍋爐方案_第3頁(yè)
烏拉山發(fā)電廠燃煤空冷發(fā)電機(jī)組茶化鍋爐方案_第4頁(yè)
烏拉山發(fā)電廠燃煤空冷發(fā)電機(jī)組茶化鍋爐方案_第5頁(yè)
已閱讀5頁(yè),還剩64頁(yè)未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、tired so they pet out the fire and crept into their tent. their sleeping-bags were warm and comfortable, so they all slept soundly. in the middle of the night, two boys woke up and began shouting. the tent was full of water! they all leapt out of their sleeping-bags and hurried outside. it was raini

2、ng heavily and they found that a stream had formed in the field. the stream wound its way across the field and then flowed right under their tent!lesson28 no parking 禁止停車jasper white is one of those rare people who believes in ancient myths. he has just bought a new house in the city, but ever since

3、 he moved in, he has had trouble with motorists. when he returns home at night, he always finds that someone has parked a car outside his gate. because of this, he has not been able to get his own car into his garage even once. jasper has put up no parking signs outside his gate, but these have not

4、had any effect. now he has put an ugly stone head over the gate. it is one of the ugliest faces i have ever seen. i asked him what it was and he told me that it was medusa, the gorgon. jasper hopes that she will turn motorists to stone. but none of them has been turned to stone yet!lesson29 taxi! 出租

5、汽車!captain ben fawcett has bought an unusual taxi and has begun a new service. the taxi is a small swiss aeroplane called a pilatus porter. this wonderful plane can carry seven passengers. the most surprising thing about it, however, is that it can land anywhere: on snow, water, or even on a ploughe

6、d field. captain fawcetts first passenger was a doctor who flew from birmingham to a lonely village in the welsh mountains. since then, captain fawcett has flown passengers to many unusual places. once he landed on the roof of a block of flats and on another occasion, he landed in a deserted car par

7、k. captain fawcett has just refused a strange request from a businessman. the man wanted to fly to rockall, a lonely island in the atlantic ocean, but captain fawcett did not take him because the trip was too dangerous.lesson30 football or polo? 足球還是水球?the wayle is a small river that cuts across the

8、 park near my home. i like sitting by the wayle on fine afternoons. it was warm last sunday, so i went and sat on the river bank as usual. some children were playing games on the bank and there were some people rowing on the river. suddenly, one of the children kicked a ball very hard and it went to

9、wards a passing boat. some people on the bank called out to the man in the boat, but he did not hear them. the ball struck him so hard that he nearly fell into the water. i turned to look at the children, but there werent any in sight: they had all run away! the man laughed when he realized what had

10、 happened. he called out to the children and threw the ball back to the bank. lesson31 success story 成功者的故事yesterday afternoon frank hawkins was telling me about his experiences as a young man. frank is now the head of a very large business company, but as a boy he used to work in a small shop. it w

11、as his job to repair bicycles and at that time he used to work fourteen hours a day. he saved money for years and in 1938 he bought a small work-shop of his own. during the war frank used to make spare parts for aeroplanes. at that time he had two helpers. by the end of the war, the small work-shop

12、had become a large factory which employed seven hundred and twenty-eight people. frank smiled when he remembered his hard early years and the long road to success. he was still smiling when the door opened and his wife came in. she wanted him to repair their sons bicycle! lesson32 shopping made easy

13、 購(gòu)物變得很方便people are not so honest as they once were. the temptation to steal is greater than ever before-especially in large shops. a detective recently watched a well-dressed woman who always went into a large store on monday mornings. one monday, there were fewer people in the shop than usual when

14、the woman came in, so it was easier for the detective to watch her. the woman first bought a few small articles. after a little time, she chose one of the most expensive dresses in the shop and handed it to an assistant who wrapped it up for her as quickly as possible. then the woman simply took the

15、 parcel and walked out of the shop without paying. when she was arrested, the detective found out that the shop-assistant was her daughter. the girl gave her mother a free dress once a week !lesson33 out of the darkness 沖出黑暗nearly a week passed before the girl was able to explain what had happened t

16、o her. one afternoon she set out from the coast in a small boat and was caught in a storm. towards evening, the boat struck a rock and the girl jumped into the sea. then she swam to the shore after spending the whole night in the water. during that time she covered a distance of eight miles. early n

17、ext morning, she saw a light ahead. she knew she was near the shore because the light was high up on the cliffs. on arriving at the shore, the girl struggled up the cliff towards the light she had seen. that was all she remembered. when she woke up a day later, she found herself in hospital.lesson34

18、 quick work 破案“神速”ted robinson has been worried all the week. last tuesday he received a letter from the local police. in the letter he was asked to call at the station. ted wondered why he was wanted by the police, but he went to the station yesterday and now he is not worried any more. at the stat

19、ion, he was told by a smiling policeman that his bicycle had been found. five days ago, the policeman told him, the bicycle was picked up in a small village four hundred miles away. it is now being sent to his home by train. ted was most surprised when he heard the news. he was amused too, because h

20、e never expected the bicycle to be found. it was stolen twenty years ago when ted was a boy of fifteen !lesson35 stop thief! 捉賊!rov trenton used to drive a taxi. a short while ago, however, he became a bus-driver and he was not regretted it. he is finding his new work far more exciting. when he was

21、driving along catford street recently, he saw two thieves rush out of a shop and run towards a waiting car. one of them was carrying a bag full of money. roy acted quickly and drove the bus straight at the thieves. the one with the money got such a fright that he dropped the bag. as the thieves were

22、 trying to get away in their car, roy drove his bus into the back of it. while the battered car was moving away, roy stopped his bus and telephoned the police. the thieves car was badly damaged and easy to recognize. shortly afterwards, the police stopped the car and both men were arrested. lesson36

23、 across the channel 橫渡海峽erna hart is going to swim across the english channel tomorrow. she is going to set out from the french coast at five oclock in the morning. erna is only fourteen years old and she hopes lo set up a new world record. she is a strong swimmer and many people feel that she is su

24、re to succeed. ernas father will set out with her in a small boat. mr hart has trained his daughter for years. tomorrow he will be watching her anxiously as she swims the long distance to england. erna intends to take short rests every two hours. she will have something to drink but she will not eat

25、 any solid food. most of ernas school friends will be waiting for her on the english coast. among them will be ernas mother, who swam the channel herself when she was a girl.lesson37 the olympic games 奧林匹克運(yùn)動(dòng)會(huì)the olympic games will be held in our country in four years time. as a great many people wil

26、l be visiting the country, the government will be building new hotels, an immense stadium, and a fine new swimming pool. they will also be building new roads and a special railway-line. the games will be held just outside the capital and the whole area will be called olympic city. workers will have

27、completed the new roads by the end of this year. by the end of next year, they will have finished work on the new stadium. the fine modern buildings have been designed by kurt gunter. everybody will be watching anxiously as the new buildings go up. we are all very excited and are looking forward to

28、the olympic games because they have never been held before in this country.lesson38 everything except the weather 惟獨(dú)沒(méi)有考慮到天氣my old friend, harrison, had lived in the mediterranean for many years before he returned to england. he had often dreamed of retiring in england and had planned to settle down

29、in the country. he had no sooner returned than he bought a fine house and went to live there. almost immediately he began to complain about the weather, for even though it was still summer, it rained continually and it was often bitterly cold. after so many years of sunshine, harrison got a shock. h

30、e acted as if he had never lived in england before. in the end, it was more than he could bear. he had hardly had time to settle down when he sold the house and left the country. the dream he had had for so many years ended there. harrison had thought of everything except the weather.lesson39 am i a

31、ll right? 我是否痊愈?while john gilbert was in hospital, he asked his doctor to tell him whether his operation had been successful, but the doctor refused to do so. the following day, the patient asked for a bedside telephone. when he was alone, he telephoned the hospital exchange and asked for doctor mi

32、llington. when the doctor answered the phone, mr gilbert said he was inquiring about a certain patient, a mr john gilbert. he asked if mr gilberts operation had been successful and the doctor told him that it had been. he then asked when mr gilbert would be allowed to go home and the doctor told him

33、 that he would have to stay in hospital for another two weeks. then dr millington asked the caller if he was a relative of the patient. no, the patient answered, i am mr john gilbert. lesson40 food and talk 進(jìn)餐與交談last week at a dinner-party, the hostess asked me to sit next to mrs rumbold. mrs rumbol

34、d was a large, unsmiling lady in a tight black dress. she did not even look up when i took my seat beside her. her eyes were fixed on her plate and in a short time, she was busy eating. i tried to make烏拉山發(fā)電廠燃煤空冷發(fā)電機(jī)組茶化鍋爐方案目 錄1. 鍋爐施工方案概述7-2-32. 鍋爐鋼結(jié)構(gòu)安裝方案7-2-33. 受熱面設(shè)備安裝7-2-143.1. 施工吊裝機(jī)械、機(jī)具選用和場(chǎng)地布置7-2-14

35、3.2. 汽包吊裝方案7-2-153.3. 水冷壁施工方案7-2-183.4. 過(guò)熱器施工方案7-2-203.5. 再熱器安裝方案7-2-223.6. 省煤器安裝方案7-2-223.7. 主要質(zhì)量標(biāo)準(zhǔn)、工藝要求和安全技術(shù)措施7-2-224. 轉(zhuǎn)動(dòng)機(jī)械安裝方案7-2-244.1. 空氣預(yù)熱器安裝方案7-2-244.2. 鋼球磨煤機(jī)安裝方案7-2-294.3. 風(fēng)機(jī)安裝方案7-2-345. 鍋爐水壓試驗(yàn)方案7-2-406. 鍋爐電除塵器方案7-2-487. 主要施工措施7-2-617.1. 鍋爐鋼架安裝施工措施7-2-617.2. “六道”安裝方案7-2-617.3. 平臺(tái)扶梯安裝施工措施7-2-

36、627.4. 輔機(jī)安裝施工措施7-2-627.5. 受熱面安裝施工措施7-2-637.6. 工藝管道安裝措施7-2-651. 鍋爐安裝方案概述在火力發(fā)電機(jī)組的整個(gè)安裝工程中,鍋爐專業(yè)以其工程量大、施工工期長(zhǎng)、高空作業(yè)多、作業(yè)環(huán)境惡劣等原因成為安裝工程的重點(diǎn)、難點(diǎn),同時(shí)作為整個(gè)安裝工程的排頭兵,其安裝工程直接影響到整個(gè)工程的網(wǎng)絡(luò)計(jì)劃能否正點(diǎn)運(yùn)行。鍋爐鋼架安裝采用分段吊裝法,即每安裝完一層鋼架,就進(jìn)行找正,高強(qiáng)螺栓終緊,質(zhì)量驗(yàn)收,然后安裝上一層鋼架。相應(yīng)的平臺(tái)、樓梯隨即安裝。汽包在卸貨線用頂升滑移法裝特型平板車,水平運(yùn)輸?shù)桨惭b位置后,用m250t履帶吊直接卸車,并放在z1柱和z2柱之間臨時(shí)鋪設(shè)的滑

37、道上,然后用2套200t汽包起吊裝置安裝就位。根據(jù)現(xiàn)場(chǎng)布置情況和鍋爐結(jié)構(gòu)特點(diǎn),鍋爐受熱面設(shè)備如水冷壁采取地面預(yù)組合、小組件安裝就位施工方案,高溫過(guò)熱器、屏式過(guò)熱器、包墻過(guò)熱器、高溫再熱器均采取散裝方式。低溫過(guò)熱器、低溫再熱器的蛇行管組合成單片,然后在爐后臨時(shí)大平臺(tái)上通過(guò)臨時(shí)布置在尾部豎井上方的電動(dòng)葫蘆安裝就位。鍋爐“六道”要及時(shí)穿插到位存放,并采取加固措施;各轉(zhuǎn)動(dòng)機(jī)械要認(rèn)真進(jìn)行檢修,按照安裝說(shuō)明書(shū)的安裝程序施工,做到轉(zhuǎn)動(dòng)靈活、振動(dòng)小、噪音低。2. 鍋爐鋼結(jié)構(gòu)安裝方案2.1. 概況及特點(diǎn)鍋爐鋼架分上部柱梁、中部柱梁和下部柱梁三大部分、共計(jì)四層(上部二層),整個(gè)立柱間距寬34.0米,深37.3米,

38、柱頂標(biāo)高69.9米,對(duì)稱布置,柱段之間、柱段與梁、垂直支撐與梁、柱之間采用了高強(qiáng)度螺栓聯(lián)接。頂板大梁由5根主梁,43根次梁和若干小梁、格條、水平支撐等組成,最重件dl-4大板梁,長(zhǎng)22米,高3.7米,重達(dá)85.0噸,主梁與次梁之間采用了高強(qiáng)度螺栓聯(lián)接方式,其它連接采用焊接。鋼結(jié)構(gòu)主要承重部件如立柱、橫梁、頂板主、次梁的材質(zhì)為19mn5和16mn ,高強(qiáng)度螺栓材質(zhì)為20mntib。平臺(tái)梯子、平臺(tái)的布置方便運(yùn)行和檢修需要。經(jīng)常操作和檢修地點(diǎn)的平臺(tái)、司水小室平臺(tái)和簡(jiǎn)易防雨設(shè)施的頂部采用花紋鋼板平臺(tái),其余采用剛性格柵板平臺(tái)。鍋爐主要扶梯采用爐前兩側(cè)集中布置。2.2. 施工機(jī)械的選用鍋爐鋼結(jié)構(gòu)的吊裝采用

39、一臺(tái)fzq1250型附臂吊、一臺(tái)dbq3000tm塔式起重機(jī)和一臺(tái)m250履帶式起重機(jī)作為主要施工機(jī)械,dbq3000tm布置在鍋爐擴(kuò)建側(cè)(完成本標(biāo)段鍋爐大板梁吊裝后,退出集控室,交建筑開(kāi)始集中控制室土建施工,時(shí)間在2004年11月), m250履帶吊移動(dòng)靈活,可布置在鍋爐后部??紤]到設(shè)備的地面運(yùn)輸和二次搬運(yùn),施工現(xiàn)場(chǎng)還布置了一些移動(dòng)式履帶吊和汽車吊,滿足施工需要。施工機(jī)械和機(jī)具選用具體見(jiàn)下表。表7.5 主要施工機(jī)械、機(jī)具表序號(hào)吊機(jī)名稱型號(hào)單位數(shù)量工 況最大起重量(t)垂直運(yùn)輸機(jī)械1dbq3000tm臺(tái)11002fzq1250型附臂吊臺(tái)1503manitowac250型履帶吊臺(tái)12504ckt

40、631型履帶吊臺(tái)1635lq6342型龍門(mén)吊臺(tái)1跨度42米636lq4042型龍門(mén)吊臺(tái)1407136型汽車吊臺(tái)11368qy50型汽車吊臺(tái)2509qy20型汽車吊臺(tái)12010qy12型汽車吊臺(tái)11211qy-8型汽車吊臺(tái)1812kato輪胎吊臺(tái)22513施工電梯部11.5水平運(yùn)輸機(jī)械1340噸汽車平板車輛11425噸低架平板車輛215載重汽車20t輛216載重汽車10t輛417載重汽車8t輛418載重汽車5t輛2焊接設(shè)備、機(jī)具19直流電焊機(jī)臺(tái)4020交流電焊機(jī)臺(tái)821電焊條烘干箱臺(tái)1其他小型工器具225噸卷?yè)P(yáng)機(jī)臺(tái)5233噸卷?yè)P(yáng)機(jī)臺(tái)4242噸卷?yè)P(yáng)機(jī)臺(tái)425空氣壓縮機(jī)臺(tái)18m3/min26臺(tái)鉆臺(tái)2

41、27落地砂輪機(jī)臺(tái)2 28砂輪鋸臺(tái)229拖拉機(jī)臺(tái)230角向磨光機(jī)185臺(tái)231角向磨光機(jī)125臺(tái)1032角向磨光機(jī)100臺(tái)1533電磨光機(jī)臺(tái)3038光學(xué)經(jīng)緯儀j3臺(tái)239精密水平儀臺(tái)240測(cè)振儀臺(tái)241電動(dòng)力矩板手m24臺(tái)642電動(dòng)力矩板手m22臺(tái)643手動(dòng)力矩板手750nm個(gè)244手動(dòng)力矩板手1000nm臺(tái)245倒鏈5噸臺(tái)1046倒鏈3噸臺(tái)1047倒鏈2噸臺(tái)848對(duì)講機(jī)對(duì)102.3. 鋼架安裝施工工藝流程和主要施工方法2.3.1. 鋼架安裝流程圖(見(jiàn)圖7.1)2.3.2. 鋼架吊裝方案. 鋼結(jié)構(gòu)第一段吊裝鍋爐基礎(chǔ)復(fù)查劃線(是否安裝墊鐵待我公司中標(biāo)后,根據(jù)鍋爐設(shè)備廠的技術(shù)文件要求具

42、體實(shí)施)后,按從前向后、從左到右吊裝的順序,吊裝相應(yīng)立柱、橫梁、拉條,包括回轉(zhuǎn)式空氣預(yù)熱器支撐立柱。鋼結(jié)構(gòu)整體找正,高強(qiáng)螺栓終緊,經(jīng)四級(jí)檢驗(yàn)合格后進(jìn)行柱腳二次灌漿,灌漿強(qiáng)度合格后再進(jìn)行第二段吊裝。同時(shí)盡快將第一段鋼結(jié)構(gòu)連接節(jié)點(diǎn)做好防腐工作。. 鋼結(jié)構(gòu)第二段吊裝鋼結(jié)構(gòu)構(gòu)第二段吊裝,同第一段相似,從前向后吊裝,隨著柱子的吊裝同時(shí)安裝橫梁、拉條、平臺(tái)和梯子。對(duì)第二段進(jìn)行驗(yàn)收,特別是立柱垂直度的測(cè)量要對(duì)第一、二段的垂直度同時(shí)驗(yàn)收,驗(yàn)收合格后再進(jìn)行上一段的吊裝。. 鋼結(jié)構(gòu)第三、四段吊裝鋼結(jié)構(gòu)三、四段吊裝與一、二段相同,同時(shí)檢驗(yàn)和修正立柱整體垂直度,保證整體誤差控制在允許值以內(nèi)

43、。第四段鋼架安裝結(jié)束后進(jìn)行頂板梁安裝的爐頂劃線工作。2.3.3. 與鋼結(jié)構(gòu)同步吊裝存放的設(shè)備l 在鍋爐k5頂板梁吊裝完成前,將空氣預(yù)熱器的主體設(shè)備吊裝完,以及其上方的熱風(fēng)道、空預(yù)器入口煙道、省煤器灰斗的主要部件存放到安裝位置附近。l 預(yù)熱器主梁、承重結(jié)構(gòu)主支承柱隨鋼結(jié)構(gòu)第一、二段立柱吊裝,從前往后吊裝相關(guān)連梁。當(dāng)預(yù)熱器的大件吊裝完畢后再吊裝預(yù)熱器上部的支撐鋼結(jié)構(gòu)。l 在鋼結(jié)構(gòu)吊裝過(guò)程中,平臺(tái)的支撐應(yīng)預(yù)先于地面焊接在相應(yīng)的柱子上,以減少高空作業(yè)工作量。由下向上隨鋼架的吊裝同時(shí)安裝存放相應(yīng)標(biāo)高的梯子平臺(tái)。l 平臺(tái)、梯子安裝:平臺(tái)在地面組合時(shí),將格柵部分焊接好,格柵與平臺(tái)架構(gòu)采用間斷焊連接,焊接長(zhǎng)度

44、不少于50mm。平臺(tái)與梁、支撐等以焊接連接型式進(jìn)行固定就位。設(shè)備檢查、接合面清理基礎(chǔ)放線及墊鐵安裝摩擦塊檢驗(yàn)設(shè)備缺陷處理第一層鋼結(jié)構(gòu)吊裝測(cè)量與檢查找 正高強(qiáng)度螺栓初緊w復(fù)測(cè)及偏差糾正高強(qiáng)度螺栓終緊h高強(qiáng)度螺栓扭矩值檢查水平支撐安裝檢查驗(yàn)收h下一層鋼架安裝圖7.1 鋼架安裝程序圖 2.3.4. 部分構(gòu)件預(yù)留l 鍋爐右側(cè)長(zhǎng)吹灰器緩裝,以防履帶吊抬吊大板梁時(shí)卡桿,待大板梁和受熱面大組件安裝后補(bǔ)裝;l k5排鋼架主柱內(nèi)標(biāo)高25.77m至40m之間左側(cè)內(nèi)斜撐(梁與斜撐各一根)緩裝,待水平低溫過(guò)熱器、低溫再熱器和省煤器管排等部件從爐后25.77m臨時(shí)平臺(tái)吊入后再恢復(fù);l 考慮汽包傾斜吊裝就位,z1-z2左

45、側(cè)標(biāo)高12.6米的連梁和z1-z2右側(cè)標(biāo)高63米連梁緩裝。2.3.5. 主要施工方法. 鍋爐基礎(chǔ)復(fù)查、劃線鍋爐基礎(chǔ)采取了地腳螺栓框架固定鋼架柱腳地腳螺栓的方式,因此地腳螺栓框架安裝的質(zhì)量,直接關(guān)系到對(duì)鍋爐基礎(chǔ)的放線正確性和鋼架安裝質(zhì)量的準(zhǔn)確性。鋼架安裝前,首先要對(duì)鍋爐中心線、各基礎(chǔ)地腳螺栓放線進(jìn)行復(fù)檢, 圖7.2 鋼架安裝圖檢查內(nèi)容包括基礎(chǔ)軸線是否正確且相互垂直;各基礎(chǔ)中心相互距離、相對(duì)應(yīng)的對(duì)角線尺寸是否相等;各基礎(chǔ)地腳螺栓的幾何尺寸、垂直度,地腳螺栓相互間的幾何尺寸、對(duì)角線尺寸是否相等,并和圖紙相符;各地腳螺栓的承力螺母應(yīng)按照?qǐng)D紙要求基本調(diào)好。. 鋼架安裝的具體方

46、法l 在鋼架第一段吊裝前,先復(fù)查廠家給定立柱1m標(biāo)高線的準(zhǔn)確性,(如果沒(méi)有給定,在現(xiàn)場(chǎng)要根據(jù)立柱柱接頭標(biāo)高畫(huà)定)并檢查立柱的彎曲、扭曲情況,無(wú)誤后,帶上所有附屬設(shè)施如抱卡、臨時(shí)爬梯等。臨時(shí)設(shè)施不能直接點(diǎn)焊在柱子上,先用抱卡和柱子固定,再把梯子焊在抱卡上,為保證爬梯在施工人員上下時(shí)不晃動(dòng),相鄰兩固定點(diǎn)之間距不能大于兩2.5m;為保證施工人員使用方便,爬梯不能緊貼柱子側(cè)面,以臨時(shí)爬梯距離柱子側(cè)面150mm為宜。抱卡用角鐵制作,用螺桿固定在立柱上,角鐵和柱子之間加墊膠皮(56mm)以防抱卡脫落、滑動(dòng)。在抱卡制作中要求角鐵,圓鋼用無(wú)齒鋸切割,扁鐵用機(jī)械打孔,不準(zhǔn)用割把開(kāi)孔,焊接的焊縫高度不能低于6mm

47、 ,所選用的螺桿和緊力必須經(jīng)校核計(jì)算。抱卡上的腳手板與抱箍必須牢固可靠,接觸不滑動(dòng),抱卡上的臨時(shí)平臺(tái)、護(hù)欄齊全牢固且制作要求統(tǒng)一、美觀。(選一張鋼架吊裝圖片)l 起吊立柱第一段,待地腳螺栓穿好后,檢查立柱1米標(biāo)高線和鋼架立柱垂直度并用墊鐵調(diào)整。1m標(biāo)高線用水平儀測(cè)量,垂直度由兩臺(tái)經(jīng)緯儀從相互垂直的角度同時(shí)測(cè)量。當(dāng)標(biāo)高和垂直度調(diào)整合格后,將地腳螺栓緊固,栓好拖拉繩,確認(rèn)穩(wěn)定后摘鉤。第一段鋼結(jié)構(gòu)其它立柱待標(biāo)高、垂直度按上述要求找正合格后,連接橫梁的高強(qiáng)螺栓全部預(yù)緊完,才可安裝其他結(jié)構(gòu),待第一段鋼結(jié)構(gòu)的主柱、主梁、拉條等安裝完,所有螺栓終緊完,即可對(duì)第一段鋼結(jié)構(gòu)驗(yàn)收,合格后方可安裝第二段鋼結(jié)構(gòu)。l

48、立柱和橫梁之間的連接板盡可能和橫梁、立柱一起吊裝,具體方法是:起吊前在地面上每根橫梁兩端的上側(cè)、右側(cè)各帶一塊連接板,每根立柱的卡頭下側(cè)、左側(cè)各帶一塊連接板一起吊裝。l 立柱第二層吊裝時(shí),工作內(nèi)容與第一段相同,但還要準(zhǔn)備一些各種尺寸的薄形墊鐵、材質(zhì)接近主柱材質(zhì)。如果柱與柱之間平整度不夠或柱子垂直度不符合要求,均需用這些墊鐵調(diào)整,墊鐵加完后把四周飛邊打磨干凈,每根立柱就位后,其連接梁應(yīng)相應(yīng)就位,以免受力不均造成設(shè)備和人身事故。絕對(duì)不允許下段鋼柱連梁沒(méi)有安裝完就吊上段立柱。三、四層鋼架吊裝與第二層的吊裝基本相同。l 鋼架結(jié)構(gòu)應(yīng)安裝一件找正一件,上一工序未完成嚴(yán)禁進(jìn)行下一工序的安裝工作。l 高強(qiáng)螺栓在

49、安裝時(shí),先用撬棍和過(guò)眼沖將各件之間的螺栓螺孔對(duì)齊,再穿螺栓,當(dāng)柱、梁就位后如發(fā)現(xiàn)螺栓孔有問(wèn)題應(yīng)及時(shí)同技術(shù)人員、廠家現(xiàn)場(chǎng)代表、甲方、監(jiān)理部門(mén)等聯(lián)系解決,絕對(duì)不允許隨意切割、打孔等。l 高強(qiáng)螺栓在初緊、復(fù)緊時(shí),連接處的螺栓應(yīng)按一定的順序施擰,一般應(yīng)由螺栓群中央依次向外擰緊,高強(qiáng)螺栓的初緊和復(fù)緊應(yīng)在同一天完成,待鋼結(jié)構(gòu)找正后終緊高強(qiáng)螺栓(扭剪型高強(qiáng)螺栓終緊時(shí)擰掉梅花頭即可),驗(yàn)收后盡快做好節(jié)點(diǎn)防腐。2.4. 頂板梁安裝2.4.1. 頂板梁安裝工藝流程爐頂劃線-弧形支座安裝-大板梁安裝-次梁安裝-找正-高強(qiáng)螺栓安裝并初緊-質(zhì)量復(fù)查-高強(qiáng)螺栓終緊-防腐2.4.2. 頂板梁吊裝方案. 頂板大

50、梁吊裝采取出廠件安裝,吊裝順序?yàn)閐l3-dl2-dl1-dl4-dl5,大板梁吊裝前,需要搭設(shè)相應(yīng)吊欄和布置相應(yīng)爬梯。根據(jù)加熱面吊裝方案,部分次梁須與受熱面組件交叉安裝,設(shè)備吊裝就位后,安裝完善頂板次梁、小梁。dl4頂板梁的吊裝工作由dbq3000tm塔吊和m250履帶吊共同抬吊完成,dl1、dl2、dl3、dl5大板梁、次梁和小梁的安裝工作由dbq3000tm塔吊單獨(dú)完成。大板梁吊裝前和就位后應(yīng)及時(shí)其檢查撓度值,鍋爐受熱面安裝結(jié)束后,水壓試驗(yàn)前、后進(jìn)行復(fù)查,并做好記錄。. 頂大板梁吊裝具體方法dl1、dl2、dl3、dl5三根頂板大梁的吊裝方案:由dbq3000tm塔吊直接吊放

51、在柱頂,落正后穿定位螺栓固定。2.5. 高強(qiáng)度螺栓連接副安裝2.5.1. 高強(qiáng)度螺栓應(yīng)按批次存放在倉(cāng)庫(kù)內(nèi),并有防潮措施,領(lǐng)用時(shí),盡量以滿足當(dāng)天使用為準(zhǔn),領(lǐng)用前應(yīng)對(duì)高強(qiáng)度螺栓進(jìn)行外觀和有關(guān)力學(xué)性能檢查。2.5.2. 領(lǐng)用時(shí)應(yīng)先填寫(xiě)領(lǐng)料跟蹤記錄卡,用完后剩余部分如數(shù)退給保管員。2.5.3. 工藝流程:普通螺栓穿裝 構(gòu)架找正穿入高強(qiáng)度螺栓(節(jié)點(diǎn)數(shù)70%)初緊復(fù)測(cè)取出普通螺栓換上高強(qiáng)度螺栓并初緊高強(qiáng)度螺栓終緊檢查刷防護(hù)油漆 2.5.4. 連接及固定l 臨時(shí)螺栓插入:安裝用的臨時(shí)螺栓和沖釘,在每個(gè)接頭上應(yīng)穿入的數(shù)量必須由計(jì)算來(lái)決定,不得少于節(jié)點(diǎn)孔總數(shù)的1/5,至少穿2個(gè)臨時(shí)螺栓,穿入沖釘?shù)臄?shù)量不宜多于臨

52、時(shí)螺栓的30%,擴(kuò)孔后的螺栓孔不得使用沖釘。l 高強(qiáng)度螺栓須在主要構(gòu)件位置找正合格后穿入,且應(yīng)順暢穿入孔內(nèi),不準(zhǔn)強(qiáng)行敲打,穿入方向一致以便擰緊作業(yè)。l 擴(kuò)孔:當(dāng)高強(qiáng)度螺栓不能自由穿入時(shí),必須進(jìn)行擴(kuò)孔或修孔,擴(kuò)孔后須將孔周圍的鐵悄清除干凈。l 有油污或生銹的高強(qiáng)度螺栓連接副應(yīng)煤油清洗干凈后,再涂黃油方能使用。l 在擰緊過(guò)程中,不允許撞擊高強(qiáng)度螺栓以免損壞其螺紋,有螺紋損壞的高強(qiáng)度螺栓不能使用.l 高強(qiáng)度螺栓的擰緊。 預(yù)擰:高強(qiáng)度螺栓穿入后,即進(jìn)行初擰,由電動(dòng)力矩扳手來(lái)完成,一般力矩要求為終擰力矩的60-80%。終擰:預(yù)擰結(jié)束后,檢查各開(kāi)擋對(duì)角線和立柱垂直度,無(wú)誤后用電動(dòng)扳手完成終擰,擰掉螺栓尾部

53、的梅花卡頭即告終擰結(jié)束。擰緊順序:無(wú)論初擰或終擰都應(yīng)從接點(diǎn)中心依次向邊緣進(jìn)行。l 擰緊質(zhì)量檢查每層高強(qiáng)度螺栓終緊后,應(yīng)用經(jīng)過(guò)標(biāo)定的扭矩扳手進(jìn)行扭矩檢查,對(duì)扭剪型螺栓的抽查數(shù)量為該層螺栓的1%.被抽查的螺栓位置應(yīng)均勻布置,如發(fā)現(xiàn)不合格應(yīng)加倍抽查,如仍不合格則全面檢查處理。2.5.5. 安裝注意事項(xiàng)l 高強(qiáng)度螺栓連接副由一個(gè)螺栓,一個(gè)螺母和一個(gè)墊圈組成.必須在同一包裝箱中配套使用。l 禁止在雨雪天氣中使用和穿裝高強(qiáng)度螺栓,如已進(jìn)行應(yīng)采取防潮措施,保證摩擦面的干燥。l 高強(qiáng)度螺栓不得作臨時(shí)螺栓使用。2.6. 主要質(zhì)量標(biāo)準(zhǔn)、工藝要求和安全措施2.6.1. 鋼結(jié)構(gòu)安裝控制點(diǎn)的設(shè)置l 鋼架基礎(chǔ)放線,進(jìn)行四級(jí)驗(yàn)收。l 鋼架的第一層安裝后為一控制點(diǎn),及時(shí)找正驗(yàn)收。然后鋼架柱腳二次澆灌(如果制造廠家有明確要求,可根據(jù)具體要求執(zhí)行)。l 在安裝完一層,找正驗(yàn)收之

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論