




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、synchronous backup software does not respond to the rest of the data to be modified. in order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. offsite backups that must be supported across networ
2、k segments. in accordance with the above requirements for development our dedicated backup software. after development, wing that opened in salt on high speed test results meet the design requirementswith the passing of time, it is preparing source huan of hubei industrial investment company limited
3、 factory close to the planning of the day looks like, planning human ideals gradually into an entity, spread out before us. security plan enters the deployed state. after listening to your business objective for the leaders of security, i quickly people with loyalty to the cause of security, as well
4、 as previous security experience, combined with peer pioneers of success stories or experiences. border security on your business ideas and suggestions to make as follows: 1.1 after careful analysis of a blueprint of the enterprise, taking into account your enterprise factory boundary: 540.65m x 234
5、.24m rectangular site. 1.2 scope for such dachangqu, i recommend the solid border security deployment, for a range of reasons, whether we use infrared radiation, electronic fences, alarm had done there, where the response. because the factory could not spend a great deal of manpower cost to post thr
6、ee steps, five steps and a whistle. as we all know, under the current form of human resources costs much higher than the cost of all scientific and technological input. in order to better achieve the goal of planners, as well as for active solid border defense work. we recommend that you use infrare
7、d radiation or linkage of electronic fences with video security deployment to achieve security goals. 1.3 in accordance with the device on the wall of the compound properties and parameters to a reasonable plan to install the infrared radiation equipment or fences and electronic equipment as well as
8、 video surveillance equipment, the specific needs of the equipment and materials quantities we will detail later. 1.4 the programme according to your company's site to see and listen to the leadership proposal, and in accordance with the actual needs of the project, with reference to the relevan
9、t international standards and national standards, combined with the experience accumulated by the company engaged in multiple projects, prepare the technology package. if the contents or any other aspect of the programme has not detailed where we welcome your valuable comments. second, the design pr
10、inciples of the project design follows technology advanced, functional, stable and cost-saving principles. and considering construction, maintenance and operation, and for future development, expansion, reconstruction and other factors leave room for expansion. design elements of the system is the s
11、ystematic, integrated and comprehensive; design has the scientificity, reasonability and operability. its has following principles: 2.1, and advanced and applicability used currently most advanced of soft, and hardware and the network technology, errors rate low, compatible sex strong, upgrade easy,
12、 used module type structure, expansion convenient, no repeat construction investment, system of technology performance and quality index should reached international leading level; while, system of installation debugging, and software programming and operation using and should simple, easy master, f
13、or china conditions and this project of features. set the number of advanced technology in a the systems, reflects the current level of the latest development of computer and network technology, adapted to the requirements of the times. while the system is the system used for various management leve
14、ls, its functions are configured to provide the user with comfortable, safe, fast and convenient to3.1, the intelligent building design standards (gb/t 50314-2000) 3.2, the design standard for intelligent building systems engineering (db32/191-1998) 3.3, the code3.2.2打入鋼管樁施工1、施工準(zhǔn)備施工準(zhǔn)備內(nèi)容包括:三通一平;樁位放線;
15、樁機(jī)就位:試樁。西南交通大學(xué)碩士研究生學(xué)位論文第36頁(yè)2、打樁順序打樁順序即鋼管樁先、后打入的順序,亦稱樁機(jī)跑位順序。一般應(yīng)按下述原則安排鋼管樁先、后打入的順序:(1)樁的入土標(biāo)高有不同時(shí),應(yīng)先深后淺;(2)當(dāng)場(chǎng)地中有重要管道、電纜及其他地下公共設(shè)施時(shí),應(yīng)先打靠近這些設(shè)施的樁,使繼續(xù)打入的樁,逐漸遠(yuǎn)離己有的設(shè)施;(3)當(dāng)有臨近建筑物時(shí),為防止打樁過(guò)程中相鄰建筑物造成較大位移和變位,應(yīng)先打近臨建筑物的樁,后打的樁逐漸遠(yuǎn)離建筑物;(4)盡可能先打布樁密集區(qū)域的樁;(5)先打長(zhǎng)樁后打短樁,先打大直徑樁,后打小直徑樁的程序進(jìn)行;(6)在打樁機(jī)回轉(zhuǎn)半徑范圍內(nèi)的樁宜一次流水施打完畢;(7)業(yè)主或設(shè)計(jì)方的特
16、殊要求。確定打樁順序后,標(biāo)出樁心位置,并用石灰撒圈標(biāo)出樁徑大小和位置;標(biāo)出打樁順序和樁機(jī)走行路線,并在樁機(jī)走行路線上鋪墊碎石。3、樁的起吊吊鋼管樁多采用一點(diǎn)綁扎起吊,待吊到樁位進(jìn)行插樁,將鋼管樁對(duì)準(zhǔn)事先用石灰劃出的樣樁位置,作到樁位正,樁身直。一頭起吊后,要避免另一頭在地面被拖拉,這樣容易損傷端部,不利焊接。檢查出不符要求的鋼樁,要作修整后方可起吊打入。起吊后的樁,對(duì)準(zhǔn)石灰線插正。對(duì)h型樁,有方向性,應(yīng)注意不能插錯(cuò)。在樁機(jī)的正前方和側(cè)方呈直角方向用二臺(tái)經(jīng)緯儀觀測(cè)樁的垂直度,可藉控制導(dǎo)桿的仰俯、樁架的左右擺動(dòng),使樁錘、樁帽及樁成一直線,記錄員和樁錘操作員就位后,就可打樁。4、打樁鋼樁的打入精度與
17、下節(jié)樁的就位正確和垂直度密切相關(guān)。由于樁、樁帽及樁錘自重較大,一般情況下,下節(jié)樁不需錘擊(或少量錘擊)即會(huì)很快沉入土中,這一下沉過(guò)程應(yīng)控制其緩慢進(jìn)行,待穩(wěn)定后再行錘擊,最初階段宜使柴油錘處于不燃燒油料的空擊狀態(tài)(猶如自由落錘)。在此期間,要隨時(shí)跟蹤觀測(cè)沉樁質(zhì)量情況,發(fā)現(xiàn)問(wèn)題,立即設(shè)法糾正,必要時(shí)需把樁拔出重新插入,并采取強(qiáng)制措施按預(yù)定軌道下沉。待確認(rèn)下節(jié)樁的沉入質(zhì)量良好后,再轉(zhuǎn)入正常的連續(xù)錘擊,直至將鋼樁擊至其頂端高出西南交通大學(xué)碩士研究生學(xué)位論文第37頁(yè)地面約60一80cm時(shí)停止錘擊,準(zhǔn)備電焊接樁。為防止樁頭在錘擊時(shí)損壞,打樁前,要在樁頭頂部放置特制的樁帽。其上直接經(jīng)受錘擊應(yīng)力的部位,放置硬
18、木制減震木墊。打樁時(shí),先用兩臺(tái)經(jīng)緯儀,架設(shè)在樁架的正面及側(cè)面,校正樁架導(dǎo)向桿及樁的垂直度,并保持錘、樁帽與樁在同一縱軸線上,然后空打1一zm,再次校正垂直度后正式打樁。當(dāng)沉至某一深度并經(jīng)復(fù)核沉樁質(zhì)量良好時(shí),再行連續(xù)打擊,至樁頂高出地面60一socm時(shí),停止錘擊,進(jìn)行接樁,再同樣步驟至達(dá)到設(shè)計(jì)深度為止。若開始階段發(fā)現(xiàn)樁位不正或傾斜,應(yīng)調(diào)正或?qū)摴軜栋纬鲋匦虏宕颉?、接樁(1)鋼管樁每節(jié)長(zhǎng)15m,沉樁時(shí)需邊打入邊焊接接長(zhǎng),一般可采用日ym一sosn型半自動(dòng)無(wú)氣體保護(hù)焊機(jī)焊接,具有效率高,質(zhì)量好,焊接變形小,適應(yīng)全位置焊接,操作方便等優(yōu)點(diǎn)。(2)焊接前應(yīng)注意:檢查和修整下節(jié)樁頂因錘擊而產(chǎn)生變形的部位
19、;清除上節(jié)樁端泥砂、水或油污,用角向磨光機(jī)磨光鐵銹,并打磨出焊接剖口。將內(nèi)襯箍放置在下節(jié)樁內(nèi)側(cè)的擋塊上,緊貼樁管內(nèi)壁并分段點(diǎn)焊,然后吊接上節(jié)樁,使其坡口擱在焊道上,使上下節(jié)樁對(duì)口的間隙為24mm,再用經(jīng)緯儀校正垂直度。在接頭下端鋼管外圍安裝紫銅夾箍以防止融熔的金屬流淌。如上下節(jié)樁對(duì)準(zhǔn)后,局部縫隙過(guò)大而相對(duì)面又嫌小時(shí),可采用一定的強(qiáng)制措施,再行電焊。(3)施焊時(shí)應(yīng)注意:對(duì)稱進(jìn)行;管壁厚小于gmm的焊兩層,大于gmm的焊3層;焊完每層焊縫后,及時(shí)清除焊渣;每層焊縫的接頭應(yīng)錯(cuò)開;充分熔化內(nèi)襯箍,保證根部焊透;遇大風(fēng),要裝擋風(fēng)板;氣溫低于o,焊件上下各io0mm要預(yù)熱;焊接完畢后應(yīng)冷卻1一smin,再
20、行錘擊打樁。6、貫入深度控制鋼管樁一般都不設(shè)封口樁靴,直接開口打入。沉管時(shí),土體由樁口涌入樁管內(nèi),至一定高度(一般為l/3一1/2的樁體貫入深度)后,即閉塞封死,其效用與閉口樁相似。貫入深度一般按以下標(biāo)準(zhǔn)控制:(1)持力層較薄時(shí),打到持力層厚度的1/31/2;當(dāng)持力層厚時(shí),西南交通大學(xué)碩士研究生學(xué)位論文第38頁(yè)以最后十次錘擊每擊的貫入量s成zmm為限;當(dāng)持力層堅(jiān)固時(shí),打入12倍樁徑的深度;當(dāng)持力層不大堅(jiān)固時(shí),打入樁徑510倍的深度。寶鋼設(shè)計(jì)要求打入標(biāo)準(zhǔn)貫入阻力n值50以上的堅(jiān)實(shí)砂層,進(jìn)入深度(從持力層上表面算起)為樁徑的3一5倍,以滿足其土塞效應(yīng)。(2)錘擊樁頂時(shí),對(duì)樁產(chǎn)生的錘擊應(yīng)力應(yīng)不超過(guò)鋼
21、管樁材料的允許應(yīng)力(一般按80%考慮),一般限制最后10m的錘擊數(shù)在1500擊以下(總錘擊數(shù)不超過(guò)3000擊)。(3)以樁錘的容許負(fù)荷限制,避免樁錘的活塞受到過(guò)量沖擊而損壞,一般限制每次沖擊的最小貫入量不大于0.5一1.omm作為控制,以上停打標(biāo)準(zhǔn)系以貫入深度為主,并結(jié)合打樁時(shí)的貫入量最后1m錘擊數(shù)和每根樁的總錘擊數(shù)婷綜合判定。7、鋼管樁切割與拔出(1)為便于基坑機(jī)械化挖土,在沉樁時(shí),若采用接長(zhǎng)鋼管送樁,則需采用鋼管內(nèi)切割機(jī)將己打至設(shè)計(jì)標(biāo)高的鋼管樁上部的送樁鋼管割去。割下的鋼管可將其端部稍作修整,接長(zhǎng)后再用。(2)送樁鋼管的拔出。內(nèi)切割完成后,將鋼管樁拔出有三種方法:在樁頂下對(duì)稱開孔,穿卸甲及
22、鋼絲繩用吊機(jī)將鋼管樁頭子拔出;用振動(dòng)錘夾住鋼管樁,依靠振動(dòng)拔出;用內(nèi)脹式拔管器。上提錐形鐵陀,使兩側(cè)半圓形齒塊卡住鋼管樁內(nèi)壁,將鋼管樁拔出。這種方法能拔出地面以下15m深的鋼管。8、焊樁蓋為使鋼管樁與承臺(tái)共同工作,設(shè)計(jì)在每個(gè)鋼管樁加焊一個(gè)樁蓋,并在外壁加焊8一12根。20mm的錨固鋼筋,樁蓋形式有平樁蓋和凹面形兩種。當(dāng)挖土至設(shè)計(jì)標(biāo)高,使鋼管樁外露,取下臨時(shí)樁蓋,按設(shè)計(jì)標(biāo)高用氣焊進(jìn)行鋼管樁頂?shù)木睿椒ㄊ窍扔盟疁?zhǔn)儀在每根鋼管樁上按設(shè)計(jì)標(biāo)高定上三點(diǎn),然后按此水平標(biāo)高固定一環(huán)作為割框的支承點(diǎn),然后用氣焊切割,切割清理平整后打坡口,放上配套樁蓋。3.2,3施工質(zhì)量控制與標(biāo)準(zhǔn)樁基礎(chǔ)是地下隱蔽工程,又是建
23、筑物的重要部分,必須保證施工質(zhì)量,滿足設(shè)計(jì)要求。為此,加強(qiáng)施工過(guò)程中的質(zhì)量控制是很有必要的。鋼樁施工西南交通大學(xué)碩士研究生學(xué)位論文第39頁(yè)質(zhì)量控制有以下幾個(gè)方面:1、垂直度控制垂直度在沉樁過(guò)程中極為重要,樁成傾斜狀沉入土中,會(huì)影響樁的沉入深度,造成樁的平面位移,嚴(yán)重的有可能造成樁的局部變形,甚至焊縫處裂開而折斷。施工時(shí)的允許傾斜度是按樁長(zhǎng)的1/100來(lái)控制的,這個(gè)標(biāo)準(zhǔn)不算太高,15m長(zhǎng)的一節(jié)樁,按此要求,偏位達(dá)15omm,如再加上定位樣樁,插樁不正,打樁擠土,基坑開挖等造成的偏差,則偏位更大,甚至?xí)鲵?yàn)收規(guī)范。對(duì)一些重要工程,常要求提高傾斜度的控制要求,確保樁能垂直地沉入土中。按目前國(guó)內(nèi)經(jīng)驗(yàn)
24、,對(duì)于15米長(zhǎng)的一節(jié)鋼樁,垂直度可以控制在上下中心點(diǎn)差為zcm以內(nèi)。要做到高垂直度,首先要確保場(chǎng)地密實(shí)、平整,打樁架也應(yīng)有精確、靈便的垂直度控制系統(tǒng)。施工中則應(yīng)使第一節(jié)樁保持高度的垂直。插樁前,樁架的導(dǎo)桿調(diào)至垂直,樁進(jìn)檔后,要徐徐放下,如插入土中后,還可通過(guò)經(jīng)緯儀對(duì)垂直度作復(fù)核,直至挺直地全部進(jìn)入土中。在接樁過(guò)程中,盡量做到對(duì)稱焊接,減少因不均勻收縮造成的上節(jié)樁傾斜。錘擊過(guò)程中,要確保樁錘盡量準(zhǔn)確地?fù)粼跇兜闹行牟课弧?、焊接質(zhì)量控制焊接質(zhì)量是評(píng)定鋼樁施工總體質(zhì)量的重要組成部分。施工時(shí)應(yīng)選擇素質(zhì)良好、技術(shù)熟練、經(jīng)驗(yàn)豐富的焊工,嚴(yán)格按焊接規(guī)范進(jìn)行施工。焊接設(shè)備必須性能良好。焊接施工時(shí),要加強(qiáng)質(zhì)量監(jiān)
25、理。3、打入標(biāo)高控制設(shè)計(jì)人員根據(jù)試樁結(jié)果,確定了樁的終沉標(biāo)高。施工開始時(shí),只要地質(zhì)情況無(wú)異常變化,一般均能滿足設(shè)計(jì)要求。但是隨著一根根樁的沉入,土層被擠密,常有不能沉到設(shè)計(jì)標(biāo)高的情況發(fā)生。當(dāng)然,地層起伏較大,勘察資料不夠精確,硬土層面抬高,也會(huì)產(chǎn)生類似情況。此時(shí)就應(yīng)暫停施工,會(huì)同設(shè)計(jì)人員共同商榷。(1)根據(jù)地基和基礎(chǔ)工程施工和驗(yàn)收規(guī)范(gbj202一83)規(guī)定的控制原則是:樁尖位于堅(jiān)硬、硬塑的粘性土、碎石土、中密以上的砂土或風(fēng)化巖等土層時(shí),以貫入度控制為主,樁尖進(jìn)入持力層深度或樁尖標(biāo)高可作參考;貫入度已達(dá)到而樁尖標(biāo)高未達(dá)到時(shí),應(yīng)繼續(xù)錘擊3陣,其每陣10擊西南交通大學(xué)碩士研究生學(xué)位論文第40頁(yè)的
26、平均貫入度不應(yīng)大于規(guī)定的數(shù)值;樁尖位于其他軟土層時(shí),以樁尖設(shè)計(jì)標(biāo)高控制為主,貫入度可作參考;打樁時(shí),如控制指標(biāo)已符合要求,而其他的指標(biāo)與要求相差較大時(shí),應(yīng)會(huì)同有關(guān)單位研究處理;貫入度應(yīng)通過(guò)試樁確定,或做打樁試驗(yàn)與有關(guān)單位確定。上述規(guī)定既體現(xiàn)了樁基的性質(zhì),又充分考慮了持力層的起伏及打樁后土層的擠密影響。(2)對(duì)于以承載力為主的樁,可以按最終貫入度對(duì)照動(dòng)力公式,計(jì)算出承載力是否滿足要求。但是,這種公式局限性較大,不同地區(qū)又有不同的公式及參數(shù),設(shè)計(jì)人員對(duì)計(jì)算結(jié)果的可信程度是持保留意見的。目前,動(dòng)載試驗(yàn)(大應(yīng)變)己較成熟,而且一個(gè)地區(qū),多做幾次,選擇參數(shù)也能符合實(shí)情,不失為一種較為直觀的承載力檢驗(yàn)辦法
27、。當(dāng)發(fā)生沉樁困難,建議做動(dòng)載試驗(yàn),對(duì)鋼樁而言,試驗(yàn)也較簡(jiǎn)單,以此結(jié)果確定要否繼續(xù)錘擊。(3)對(duì)于以沉降控制為目標(biāo)的樁基工程,設(shè)計(jì)人員往往堅(jiān)持打到設(shè)計(jì)標(biāo)高,此時(shí)就應(yīng)共同協(xié)商。作為施工單位為避免樁頭擊壞或樁錘損壞,按經(jīng)驗(yàn),在適當(dāng)?shù)腻N重和落距的條件下,可參考下述標(biāo)準(zhǔn)停止錘擊。最后貫入度在34mm以內(nèi);最后1米的錘擊數(shù)大于250擊;總錘擊數(shù)(對(duì)鋼樁)要大于3000擊。上述標(biāo)準(zhǔn)僅作協(xié)商時(shí)參考,最終仍應(yīng)由設(shè)計(jì)人員決定是否繼續(xù)打至標(biāo)高或停錘。有些重要建筑物,沉降是首要的,哪怕是貫入度小于靦m,此時(shí)仍應(yīng)繼續(xù)錘擊。為使工程得以順利進(jìn)行,設(shè)備應(yīng)有充分準(zhǔn)備,尤其是備件、維修人員等應(yīng)適當(dāng)加強(qiáng)。在打樁措施上,也可作些考
28、慮。3.2.4鋼管樁施工常見問(wèn)題及對(duì)策1、打樁對(duì)環(huán)境的影響由于打樁造成對(duì)環(huán)境的影響,主要有擠土、噪音、振動(dòng)及油煙等。(1)擠土影響。鋼管樁如采用閉口樁則排土同預(yù)制方樁一樣,體積的100%土被排向樁體的周圍,對(duì)周圍影響是相當(dāng)大的。一般都選用開口鋼管樁,既基本不影響承載力又減少了擠土現(xiàn)象,鋼管樁直徑越大,擠土量越小。在選擇樁型時(shí)應(yīng)西南交通大學(xué)碩士研究生學(xué)位論文第41頁(yè)考慮此因素。但從表中也看出,不管哪類樁,仍有一定的擠土量,當(dāng)工程中樁位較密時(shí),盡管用了大直徑開口鋼管樁,也會(huì)產(chǎn)生大的土體水平位移和地面隆起,嚴(yán)重的會(huì)引起既沉樁的位移或地下管線等設(shè)施的損壞。對(duì)此,可采取以下措施:選擇合理的施工順序。對(duì)樁
29、數(shù)少的工程,可先打長(zhǎng)樁后短樁:先閉口樁(如有的話)后開口樁;先小直徑樁后大直徑樁。如樁數(shù)多的工程,除遵照上述原則外,尚應(yīng)做到:先打中間樁后向外圍擴(kuò)展,向后退打。增加輔助措施。鉆孔設(shè)置排水砂井或插入塑料排水板以減小超孔隙水壓力;在重要設(shè)施旁,挖溝槽后填以泥漿或松散料;或在其旁壓入板樁等,都有一定的保護(hù)效果。這些措施可在工程實(shí)例中找到。(2)噪音。鋼管樁均由柴油錘打入,錘與鋼樁頂?shù)淖矒舭l(fā)出的撞擊聲是無(wú)法避免的。例如采用mh一72柴油錘在錘打56508鋼管樁時(shí)實(shí)測(cè)噪音數(shù)值,即使在離樁機(jī)30m處,噪音也要達(dá)90多分貝。如果鋼管樁再粗,使用更大的樁錘,分貝值可能還要大。如在居民區(qū)施工,如此大的噪音,是難
30、以被接受的。目前,政府有關(guān)部門己有控制標(biāo)準(zhǔn),即控制在40分貝以內(nèi)。但是,如在深夜,如此大的噪音,還會(huì)引來(lái)不少麻煩。如果樁型只能是打人樁,則只能在白天施工。當(dāng)然,也有用防音罩的,其結(jié)果略有改善,約可降低30%左右,但分貝仍不小。而且柴油錘在密封空間內(nèi)工作,排煙、有效燃燒等均有不利之處??磥?lái)還是控制錘擊時(shí)間最為實(shí)用。(3)振動(dòng)影響。打樁引起的振動(dòng)可造成下面一些危害:地基變形(沉降、陷落、裂縫);構(gòu)筑物(房屋、管道、公共設(shè)施等)的損壞;設(shè)備及各種精密機(jī)械工作性能的損傷;居民生活受妨害。目前國(guó)內(nèi)尚未看到切實(shí)可行的振動(dòng)控制標(biāo)準(zhǔn),必要時(shí),可按表3一1和表3一2標(biāo)準(zhǔn)執(zhí)行。表3一1建筑物允許振幅參考值類別精密
31、測(cè)量實(shí)驗(yàn)室自動(dòng)電力操縱汽輪發(fā)電機(jī)精密車床和實(shí)驗(yàn)設(shè)備0.020.04鑄型和特殊車間民用住宅辦公樓參考值0.020.030.050.050.07西南交通大學(xué)碩士研究生學(xué)位論文第42頁(yè)類別l住宅,表3一2房屋和類似結(jié)構(gòu)振動(dòng)速度極限標(biāo)準(zhǔn)重型構(gòu)件和剛性骨架的建筑物30、n類以外和受保護(hù)的建筑物極限值工程中減小打樁引起的振動(dòng)有許多措施:從鋼管樁施工本身著眼,可以采用緩沖襯墊或緩沖器來(lái)沉樁;合理選用低振動(dòng)強(qiáng)度和高施工頻率的樁錘;還可用預(yù)鉆孔法、管內(nèi)取土法以加快施工速度,減少錘擊數(shù);改變施工順序,靠近建筑物或居民區(qū)先打,邊打邊退等都是行之有效的方法。設(shè)置減振壁。在需要保護(hù)設(shè)施附近設(shè)置減振壁,使地面?zhèn)鞑嫉恼駝?dòng)波
32、大部分被吸收或反射,從而減小影響范圍。一般減振壁為60socm,深度4一sm。當(dāng)?shù)鼗恋能浲翆虞^厚時(shí)宜深一些(10m以上),減振結(jié)果一般為減少l/31/10。壁的位置離打樁區(qū)510m。其型式有空溝型(較淺,為使壁體穩(wěn)定,可灌人泥漿或填充松散料)、瀝青壁型、發(fā)泡塑料壁型、混凝土壁型(地下連續(xù)墻)。有時(shí)減振壁可用有一定間距的鉆孔替代。對(duì)原有建筑物予以加固。在施工期間,對(duì)舊的建筑予以臨時(shí)托換加固,提高其抗振性能。當(dāng)影響很大時(shí),對(duì)一般危房采取臨時(shí)卸載或拆除部分危險(xiǎn)部件。對(duì)一些精密設(shè)備也可臨時(shí)停產(chǎn),短期施工結(jié)束后,再恢復(fù)生產(chǎn)。這些都是可行的辦法。(4)油、煙霧等污染。柴油錘在錘擊過(guò)程中常常有油向四處飛濺
33、。當(dāng)燃燒不充分時(shí),還有大量黑色煙霧冒出。行人或居民常常叫苦不迭。最好的辦法是加隔離罩擊樁,但往往不經(jīng)濟(jì);臨時(shí)搭塑料蓋棚,使行人在其下行走或高一些的塑料圍欄擋住飛散的油點(diǎn)等是較實(shí)用的措施。對(duì)煙霧,主要是選用帶有高壓噴霧裝置的樁錘,可減少大量煙霧。當(dāng)然操作人員,認(rèn)真負(fù)責(zé)工作也是減少煙霧的一個(gè)因素。2、鋼管樁被打損壞鋼管樁由于施工不當(dāng)而被打壞,常有下列幾種情況:(1)頂部失穩(wěn)。造成失穩(wěn)的原因很多:錘擊次數(shù)過(guò)多;鋼管樁壁厚太薄;錘擊力偏離樁的中心;樁錘落距過(guò)高。不管是何種原因,如果樁的貫人性能很好,也即貫入度很大,能較順利地達(dá)到標(biāo)高,一般是不會(huì)發(fā)生失穩(wěn)現(xiàn)象的。所以軟土中沉樁,只要樁長(zhǎng)不是太長(zhǎng)(4050
34、m),持力層n值不是太大(n毛西南交通大學(xué)碩士研究生學(xué)位論文第43頁(yè)30),是可以達(dá)到不失穩(wěn)。至于如何確保順利沉至標(biāo)高將在下面談到。這里就鋼樁本身及打樁操作上可作的改進(jìn)作一介紹。對(duì)鋼樁本身,可在錘擊頂部加一套箍,以增強(qiáng)抗錘擊的能力,也可適當(dāng)增加壁厚。在操作上,盡可能做到中心錘擊及調(diào)整合適的落距,這些都是改進(jìn)的措施。(2)閉口鋼管樁的斷面失穩(wěn)。除了采取措施確保鋼管樁能在正常情況下沉入標(biāo)高外,可適當(dāng)增加壁厚以提高斷面剛度,操作上做到上述要求,徹底清除障礙物,不使大的塊石或混凝土塊停留在樁尖下而被跟著打下,都是防止這類現(xiàn)象產(chǎn)生的對(duì)策。(3)開口樁尖的卷曲。主要是樁的壁厚過(guò)薄,當(dāng)樁尖進(jìn)入如粗砂、礫石或
35、堅(jiān)硬的粘土?xí)r,容易發(fā)生這種事例。解決的措施可以在鋼管樁底部加一鋼套箍,以彌補(bǔ)樁尖部分的剛度。地層表層如有大石塊、混凝土塊體也應(yīng)及時(shí)清除,不讓其跟入下層。(4)接頭部破壞。主要是電焊接樁質(zhì)量不好所致。必須嚴(yán)格按焊接規(guī)程施工。此外務(wù)必確保鋼樁能垂直地沉入。沉樁前調(diào)整好樁架,不產(chǎn)生偏心錘擊,都是較好的解決辦法。3、沉樁困難有兩種情況,一是在整個(gè)沉樁過(guò)程中,中間有硬土層需穿過(guò),而沉樁時(shí),往往不易穿過(guò)。二是樁尖快到持力層時(shí),貫人度過(guò)小,難到達(dá)設(shè)計(jì)標(biāo)高。(l)穿越中間硬土層。對(duì)一些重要建筑物,設(shè)計(jì)人員期望較小的沉降值、較高的承載力,把樁設(shè)計(jì)得很長(zhǎng),往往就發(fā)生需穿越原本可作為持力層的硬土層。這就需要對(duì)穿越中
36、間硬土層的可能性作判斷。根據(jù)目前打樁機(jī)械性能和鋼樁承受錘擊應(yīng)力的容許范圍,對(duì)鋼樁穿越中間硬層的可能性作如下判斷:中間硬土層在地表下20m左右時(shí),容易穿透;n值為50以上的砂層,厚度大于sm,穿透較困難;而n值小于30時(shí),穿透56m粘土硬層是可能的;中間硬層以下的下臥層為軟土層,則穿越硬層是容易的;為便于穿越中間硬土層,可在樁底端焊一加強(qiáng)箍,效果較好。其作用有二個(gè):一是減少部分摩阻力:二是樁尖加強(qiáng)后,經(jīng)得起錘擊,不易被擊壞。如有可能,先用鉆孔法在中間硬層內(nèi)鉆一孔,再進(jìn)行長(zhǎng)鋼樁沉樁施工。(2)貫入度小,難以達(dá)到標(biāo)高。西南交通大學(xué)碩士研究生學(xué)位論文第44頁(yè)首先要對(duì)選擇的樁錘作分析,其錘擊能量、錘的回
37、跳高度等是否足夠?樁是否垂直?如果設(shè)備均是正常而且設(shè)計(jì)方又不同意按前述建議的停錘條件停錘,堅(jiān)持要沉到標(biāo)高則建議采取下述措施:按上述4)要求,在后續(xù)的鋼樁底端都加上套箍,以減少摩阻且加強(qiáng)樁尖,有利達(dá)到標(biāo)高。樁進(jìn)入一部分土層后,在己入土的管樁內(nèi),取一部分土出來(lái)(對(duì)開口鋼管樁),減少部分阻力,以利沉樁。取土宜選用裝在同一樁架上的螺旋取土器,便于施工。采用預(yù)鉆孔工藝,先取土再插入樁,也可減少部分阻力。采用外射水,破壞部分外摩阻,將樁沉入??梢赃呭N擊邊射水,也可射一段時(shí)間,錘擊一段時(shí)間。盡量減少送樁長(zhǎng)度。使用送樁,能量損耗達(dá)30%。如有條件的工程,可先挖去一部分土,樁機(jī)下坑施工,也可采用內(nèi)切割法而不用送
38、樁。從施工順序上,先安排樁位較密區(qū)域施工,或先打中間的樁,再向四周擴(kuò)散。for engineering design of generic cabling system for city residential buildings (cecs/119-2000) 3.4, code for design of buildings and campus cable systems engineering (gb/t50311-2000) 3.5, the code for electrical design of civil buildings (jgj/ t16-92) 3.6, the co
39、de for civil closed circuit monitoring tv system engineering technology (gb/50198-94) 3.7, the types of system earthing and safety technical requirements (gb14050-93) 3.8, of the security engineering procedures and requirements (ga/t75-94) 3.9, the rules of security engineering acceptance (ga/t308-2
40、001) 3.10, the industrial design of tv system code (gbj 115) 3.11, the security checks prevention system pass for graphics symbol (ga/74-94) 3.12, and fire linkage control equipment general technology conditions (gb 16806-1997) four, and system function and features in system both advanced, and prac
41、tical, and mature, and reliable, and do system open, and can extended sex good, both investment reasonable, and benefits best of purpose, border security alarm system on site equipment for concentrated monitored, and control and management, makes these equipment to security, and reliable, and effici
42、ent to run, maximize intelligent management role to create a safe, healthy, comfortable and pleasant, and to improve the efficiency of a good environment and save energy, and reduce maintenance personnel. according to the project's environmental needs, and engagement functions to establish the p
43、roject boundary security alarm system, in a word, this boundary is a project of the security alarm system is highly automated and efficient hospitality for a comfortable, convenient, and highly secure environment. five, scheme design based on design principles, design specifications and according to
44、 international and domestic standards, and in accordance with user needs, as well as drawings and related information provided by, and joining the project's actual situation and future development trends, border security alarm systems for the project design. 5.1. principle of system and burglar
45、alarm system from detectors, regional directors, and the alarm control centre composed of three parts. its principles as in the following chart: detectors for burglar alarm system is inside and outside the building in key areas, important places, protection, when the probe to illegal invaders, the s
46、ignal transmitted to the alarm control: sound and light alarm, display address, about the person on duty after receiving the alarm, take measures according to the situation, to control the development of the situation. anti-theft alarm system alarm function in addition to the above, there is linkage function. such as: open the alarm light (incl
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 三農(nóng)村社群營(yíng)銷作業(yè)指導(dǎo)書
- 文化產(chǎn)業(yè)園區(qū)發(fā)展情況表
- 農(nóng)資化肥購(gòu)銷協(xié)議
- 2024年藥物運(yùn)載系統(tǒng)藥品項(xiàng)目資金申請(qǐng)報(bào)告
- 2025年上半年宣城市宣州區(qū)檢察院警示教育基地招考易考易錯(cuò)模擬試題(共500題)試卷后附參考答案
- 2025年上半年安徽銅陵學(xué)院招聘高層次人才77人易考易錯(cuò)模擬試題(共500題)試卷后附參考答案
- 2025年上半年安徽蚌埠市淮上區(qū)招聘編外人員考試筆試易考易錯(cuò)模擬試題(共500題)試卷后附參考答案
- 2025年上半年安徽省馬鞍山市含山縣人民政府辦公室招聘易考易錯(cuò)模擬試題(共500題)試卷后附參考答案
- 2025年上半年安徽省阜陽(yáng)市潁上縣住建(城管)局招聘300人易考易錯(cuò)模擬試題(共500題)試卷后附參考答案
- 2025年上半年安徽省渦陽(yáng)縣政府購(gòu)買治安輔助人員易考易錯(cuò)模擬試題(共500題)試卷后附參考答案
- 新疆省新疆生產(chǎn)建設(shè)兵團(tuán)2025屆小升初數(shù)學(xué)高頻考點(diǎn)檢測(cè)卷含解析
- 2025年安徽省合肥熱電集團(tuán)招聘50人歷年高頻重點(diǎn)模擬試卷提升(共500題附帶答案詳解)
- 第一次月考測(cè)試卷(試題)-2023-2024學(xué)年人教版六年級(jí)數(shù)學(xué)下冊(cè)
- 新人教版小學(xué)五年級(jí)數(shù)學(xué)下冊(cè)全冊(cè)同步課堂練習(xí)題
- A類業(yè)余無(wú)線電操作技術(shù)能力驗(yàn)證題目題庫(kù)1
- 民族宗教政策講座課件
- 幼兒園校車安全管理臺(tái)賬
- 人教版高中生物學(xué)選擇性必修教材簡(jiǎn)介及實(shí)施建議課件
- 湯姆·索亞歷險(xiǎn)記(節(jié)選)課件教學(xué)
- 古代漢語(yǔ)文選無(wú)標(biāo)點(diǎn)(第一冊(cè),第二冊(cè))
- 靜物素描玻璃器皿塑造
評(píng)論
0/150
提交評(píng)論