七顆鉆石流程(PPT 38頁)_第1頁
七顆鉆石流程(PPT 38頁)_第2頁
七顆鉆石流程(PPT 38頁)_第3頁
七顆鉆石流程(PPT 38頁)_第4頁
七顆鉆石流程(PPT 38頁)_第5頁
已閱讀5頁,還剩33頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、17 Diamond Process七顆鉆石流程Developed by: GMTG-ArlingtonL. ONeal / C. Kessler Aug 2000Revised: 8 Aug 20002What is the 7 Diamond Process?七顆鉆石的流程是什么?The 7 Diamond Process is one of many tools that can be used in the problem solving process.七顆鉆石流程是可以用來解決質(zhì)量問題的工具之一。This tool is used to investigate discrepanc

2、ies discovered by the following: 它可以用來調(diào)查以下方面發(fā)現(xiàn)的差異 Global Customer Audit System (GCAS) 全球顧客評(píng)審 Yard Walk Audits 生產(chǎn)線上巡檢 Verification Stations 檢驗(yàn)工位3 Purpose of the 7 Diamond Process 7顆鉆石流程的目的 The 7 Diamond Process is a structured way of assessing our manufacturing process to determine whether of not it

3、has failed to meet the quality standard demanded by our customers.7顆鉆石流程是一個(gè)構(gòu)建好的評(píng)價(jià)我們的制造流程是否滿足了顧客所要求的質(zhì)量標(biāo)準(zhǔn)的一個(gè)方法47 Diamond Process 流程Responsibility責(zé)任責(zé)任Production第一步第一步 1Production第二步第二步2Production第三步第三步3Rel. Engineer/SQA/Supplier負(fù)責(zé)的負(fù)責(zé)的SQDE工程工程師師/供應(yīng)商供應(yīng)商 4CorrectProcess?正確的工藝CorrectTool?正確的工具正確的工具CorrectP

4、art?正確的零件正確的零件Parts Quality?零件質(zhì)量零件質(zhì)量Responsibility責(zé)任責(zé)任Process ControlManagers工藝控制負(fù)責(zé)人工藝控制負(fù)責(zé)人5aIs Engineering support required?是否需要工程方面的支持是否需要工程方面的支持Problem IdentifiedBegin Interrogation問題定義問題定義(開始調(diào)查開始調(diào)查)Responsibility責(zé)任責(zé)任QET PST (Lead)5bSMTRGM (Lead)6Statistical Engineering(Red X Strategies)統(tǒng)計(jì)工程統(tǒng)計(jì)工程(

5、紅紅-X方法方法)7Will Process ChangeResolve?工藝更改能解決問題嗎工藝更改能解決問題嗎Product ChangeRequired?產(chǎn)品更改需要嗎?產(chǎn)品更改需要嗎?Hardy Perennial or Extremely ComplexProblem非常復(fù)雜的問題非常復(fù)雜的問題SQA - Supplier Quality AssuranceQET - Quality Engineering TeamPST - Plant Support TeamSMT- Systems Management TeamRGM - Reliability Growth Manageme

6、nt5Review of Responsibility職責(zé)回顧 Diamonds 1-4Production & Reliability鉆石1-4 生產(chǎn)&可靠性 Filter 5aProcess Control Manager (PCM)5a 過濾 工藝控制負(fù)責(zé)人 Diamond 5b-7Product Engineering鉆石5b-7 產(chǎn)品工程6Insert Sample CountermeasureCard Here此處插入對(duì)策卡樣卡77 Diamond Process Stages流程的各步驟Stages 1 & 2 of the process are use

7、d to determine if the Production organization is running the assembly process to design intent. 1 1、2 2步是用來確定生產(chǎn)部門運(yùn)行的裝配流程滿足設(shè)計(jì)內(nèi)容。步是用來確定生產(chǎn)部門運(yùn)行的裝配流程滿足設(shè)計(jì)內(nèi)容。 The initial investigation (Stage 1) is done where the defect was identified.最初的調(diào)查最初的調(diào)查(第一步第一步)應(yīng)在發(fā)現(xiàn)缺陷的地方開始應(yīng)在發(fā)現(xiàn)缺陷的地方開始Stage 2 is only used when the in

8、vestigation in Stage 1 determined that the cause of the problem was from an upstream source. 第第2步只能當(dāng)?shù)谝徊降恼{(diào)查步只能當(dāng)?shù)谝徊降恼{(diào)查,確定問題是來源其他方面時(shí)確定問題是來源其他方面時(shí),才可開始才可開始If the process isnt being managed to design intent, then it must be corrected and validated, prior to asking for Engineering assistance.如果工藝沒有滿足設(shè)計(jì)內(nèi)容,當(dāng)

9、需要工程方面的協(xié)助前,必須進(jìn)行糾正并要有效。如果工藝沒有滿足設(shè)計(jì)內(nèi)容,當(dāng)需要工程方面的協(xié)助前,必須進(jìn)行糾正并要有效。Engineering referral (Stage 3) occurs when the manufacturing process does meet design intent and the problem still exists.當(dāng)制造過程滿足設(shè)計(jì)內(nèi)容并且問題依然存在時(shí),第當(dāng)制造過程滿足設(shè)計(jì)內(nèi)容并且問題依然存在時(shí),第3步開始。步開始。81 - Correct Process正確的過程 Are the correct Best People Practice shee

10、ts posted?是否有正確的操作指導(dǎo)文件? Are the Best People Practices being followed?是否執(zhí)行操作文件? Is the operators Key Point Chart being followed?是否滿足關(guān)鍵操作點(diǎn)控制圖 Are the correct documents posted on the operation certification board? 是否在操作示板上有正確的文件 Is the job being performed to the PADs?是否按照PAD操作 Can any of these cause th

11、e problem?以下的問題有可能產(chǎn)生問題嗎?以下的問題有可能產(chǎn)生問題嗎?Stages 1&2ProductionCorrects正確的生產(chǎn)正確的生產(chǎn)Production2Production3Rel. Engineer/SQA/Supplier 4CorrectProcess?正確的工藝過程正確的工藝過程CorrectTool?正確的工具正確的工具CorrectPart?正確的零件正確的零件Parts Quality?零件的質(zhì)量零件的質(zhì)量81 - Correct Process正確的過程 Has a mandatory sequence been identified? Is it

12、 being followed? 是否強(qiáng)制的操作序列號(hào)已識(shí)別,是否執(zhí)行了 Is the job being done the same on both shifts?在各班次中操作工作是否一致 Does the operator understand what the product standards are?操作者是否理解產(chǎn)品標(biāo)準(zhǔn) Is it the regular operator? Has there been a lot of turnover on the job? 是否為固定操作工?是否此操作有很多輪換人員 Has the operator been properly train

13、ed?操作者是否正確培訓(xùn)過 Are the visual aids current? 目前是否有目視化的輔助措施 Does the operator understand the quality outcomes of her/his job?操作者是否知道他/她的崗位的產(chǎn)品的輸出質(zhì)量 Does the operator know how to communicate when he/she has a problem?操作者是否知道當(dāng)他/她的崗位出現(xiàn)質(zhì)量問題時(shí)如何傳遞溝通信息?Can any of these cause the problem?以下的問題有可能產(chǎn)生問題嗎?以下的問題有可能產(chǎn)

14、生問題嗎?Stages 1&2ProductionCorrects正確的生產(chǎn)正確的生產(chǎn)Production2Production3Rel. Engineer/SQA/Supplier 4CorrectProcess?正確的工藝過程正確的工藝過程CorrectTool?正確的工具正確的工具CorrectPart?正確的零件正確的零件Parts Quality?零件質(zhì)量零件質(zhì)量9 Are the correct tools & fixtures being used? (both shifts) 是否使用正確的工具/夾具(各班次) Are the tools set to the

15、specified torque? 工具是否設(shè)置成規(guī)定的扭矩 Are they properly calibrated?是否進(jìn)行適當(dāng)?shù)男?zhǔn) Are both shifts using the same tool? 是否各班次用同樣的工具 Are the bits or sockets worn?是否螺絲刀或套筒已磨損 Has an extra air hose been attached to the tool? 是否在工具上有多余的空氣管 Is the tool tied to the Andon system?工具是否與暗燈相連 Has the tool been put on Bypas

16、s?是否工具被旁路 Do the tools & fixtures have mutilation protection?是否工具/夾具有損毀保護(hù) Has the workstation been error proofed? 工位是否有防錯(cuò)設(shè)施 Does the workstation layout allow the operator to work effectively? 是否工位的布置適合操作者有效的工作 Has the Preventive Maintenance been done? (check log) 是否進(jìn)行了預(yù)防性維修(檢查表) Are tools functi

17、oning correctly? 工具功能是否正確Stages 1&2ProductionCorrectsProduction1Production3Rel. Engineer/SQA/Supplier 4CorrectProcess?正確的工藝過程正確的工藝過程CorrectTool?正確的工具正確的工具CorrectPart?正確的零件正確的零件Parts Quality?零件質(zhì)量零件質(zhì)量2 - Correct Tool正確的工具Can any of these cause the problem?10 Is the Parts Routing current?零件的路徑是否正確

18、Are the correct part numbers identified on the material racks?是否在料架上標(biāo)識(shí)有正確的零件號(hào) Are parts stocked in correct location on the rack?在料架上擺放位置是否正確 Do the part numbers on the boxes agree with the rack?包裝盒上零件號(hào)與料架上是否一致 Are all pull cards available?拉動(dòng)卡是否有效 Has a PAA been issued changing part usage?是否有零件用途改變的P

19、AA Has the PAA expired?PAA是否過期 Is error proofing needed?是否需要防錯(cuò)措施 Is existing error proofing device working correctly? 是否已有的防錯(cuò)設(shè)備運(yùn)行正確Stages 1&2Production1Rel. Engineer/SQA/Supplier 4CorrectProcess?正確的工藝過程正確的工藝過程ProductionCorrectsCorrectPart?正確的零件正確的零件Production2CorrectTool?正確的工具正確的工具Parts Quality?

20、零件質(zhì)量零件質(zhì)量3 - Correct Part正確的零件Can any of these cause the problem?11The Reliability Engineer is responsible for determining if parts have changed and overall part quality. If parts quality (out of specification) is determined to be the problems root cause, then the RE will: write PR&Rs to notify t

21、he supplier that there is a problem.可靠性工程師確定零件是否更改過并對(duì)產(chǎn)品全部質(zhì)量負(fù)責(zé)。如果由于零件質(zhì)量(超差)是根本原因,那么應(yīng):填寫PR&R通知供應(yīng)商: work with Supplier Quality to validate the corrections.同供應(yīng)商共同確認(rèn)糾正措施set up sorting operations and production will support sorting of material at the operation.采取篩選措施,制造應(yīng)支持在工位上的物料篩選 work with Group Lea

22、ders to validate countermeasures or containment.同工段長(zhǎng)共同確認(rèn)對(duì)策和遏制措施If part variation within specification is the root cause, then the RE will:如果確認(rèn)零件在規(guī)范內(nèi),那么RE應(yīng):work with the supplier and SQA to move the part back to the needed range within the specification同供應(yīng)商共同工作,SQA將零件返回到規(guī)范內(nèi)需要的范圍work with Quality Engi

23、neering to determine if an Engineering Change is required to provide irreversible corrective action同質(zhì)量工程師合作,確定是否需要工程更改這種不能消除的糾正措施Stages 1&2Production1CorrectProcess?正確的工藝流程正確的工藝流程Rel. Engineer/SQA/SupplierPartsQuality?零件質(zhì)量零件質(zhì)量Production2CorrectTool?正確的工具正確的工具CorrectPart?正確的零件正確的零件Production34 -

24、Part Quality零件質(zhì)量12Diamonds 1-4 in Review鉆石1-4步回顧Diamonds 1-4 are for evaluating the stability of the process. 1-4步用來評(píng)價(jià)工藝過程的穩(wěn)定性O(shè)nce a problem has been identified, the automatic response must be to immediately step thru diamonds 1-4.當(dāng)問題被定義后,1-4步的負(fù)責(zé)人員就自動(dòng)確定下來It must become inherent in our problem solvin

25、g thought process.這些步驟是問題解決過程中固定的流程Responsibility職責(zé)職責(zé)Process ControlManagers過程控制負(fù)責(zé)人過程控制負(fù)責(zé)人5aIs Engineering support required?是否需要工程的支持是否需要工程的支持135a - Engineering Filter 5a-工程過濾Is Engineering support required? 需要工程方面的支持嗎5a is a step to filter out and resolve less-complex issues before seeking help fro

26、m Quality Engineering.5a是一步過濾出并將不復(fù)雜的問題在尋求質(zhì)量工程幫助前解決The Process Control Manager is responsible for conducting initial studies prior to escalating the issue.過程控制負(fù)責(zé)人負(fù)責(zé)在提升問題前指導(dǎo)初始研究These studies may include but are not limited to:這些研究應(yīng)包括但不局限在:Problem Definition Tree 問題定義樹 5 Whys 5個(gè)為什么 Statistical Process

27、Control 統(tǒng)計(jì)過程控制 Design of Experiment (DOE) 試驗(yàn)設(shè)計(jì)Shainin Techniques (quick & dirty) 技術(shù)(快速& 臟) If after the initial studies the cause of variation has not been determined, the issue is referred to Product Engineering. The problem definition tree is the minimum exit criteria to go from Diamond 5a

28、 to 5b. 如果經(jīng)過初始研究,變差的產(chǎn)生原因還沒有確定,就需要產(chǎn)品工程的支持。問題定義樹是從5a-5b的基本方法。QualityEngineering質(zhì)量工程5aProblem Solving Toolbox 問題解決工問題解決工具箱具箱Project title: Poor adjustment of RR door panel 805-830Leader: Pedro Aranda AlfaroSponsor:Juan Carlos LiceaArea: VAETCoach: Leonardo Chvez salcedoInitial date: oct-04-2002Final da

29、te: oct-29-2002Problem description:This month it was reported by the shipping lot in USA a problem of quality existed in the 805/830 vehicles. The problem is the poor adjustment in RR door panel.Projects statement:Find and improve the Red X that produce the poor adjustment in the RR door panel for t

30、he model 805/830 in Silao Assembly plant.Strategy:We initiated this project using the model to model strategy, because there was a good contrast and good leverage based on multi-vari see pag 6.Measurement system:As measurement system a Force gage was used.This measurement system passed the isoplot w

31、ith DR=13.6, DM=1.0 lbs, and DP=13.6 lbs (see page 4)Clue generation:Stage 1 shows that the Red X doesnt live in the process. The stage 2 shows that the Red X lives in the door panel. The pair comparison shows that the door molding is the part with the best contrast.Statistical confirmation:Once we

32、detected the Red X candidate, I decided to do a B vs C six pack trial, in order to confirm the door molding is the influence to make the customer satisfaction. The six pack passed with 95% of confidence and end count of 6.Irreversible corrective action:To modified the flange 1.5 mm in length to keep

33、 a better position and avoid that the door panel take out of position.Improvements:Reduce warranty cost to repair the door panel caused by poor fit (loose) and eliminate the condition in 100% in vehicles 805/830 models. The amount of money from jul 01 to jul 02 was 11,084.77 USD.Lessons learned:We l

34、earned that is necessary looking other alternatives using other strategy when is not possible invest money but always focus to guarantee the customer enthusiasm, therefore this project is an example of this.Executive Summary 執(zhí)行總結(jié)項(xiàng)目題目項(xiàng)目題目:右后門板調(diào)整不好(805/830車型)。領(lǐng)導(dǎo)領(lǐng)導(dǎo); Pedro Adranda Alfaro發(fā)起人發(fā)起人: Juan Car

35、los Licea區(qū)域區(qū)域: VAET教練教練: Leonardo Chavez salcedo起使日起使日: 2002年10月4日截止日截止日:2002年10月29日問題描述問題描述: 本月收到報(bào)告,在美國有關(guān)于門飾板的質(zhì)量問題,右后門飾板調(diào)整不好。(805/830型)項(xiàng)目綜述項(xiàng)目綜述: 針對(duì)Lilao裝配廠805/830車型的右后門飾板,發(fā)現(xiàn)并解決其配合不好的問題。策略策略: 我們起初應(yīng)用車型對(duì)車型策略,因?yàn)槎嘬囍g有很好的對(duì)比度和平衡關(guān)系。(見見第6頁)測(cè)量系統(tǒng)測(cè)量系統(tǒng):用測(cè)力計(jì)作為測(cè)量系統(tǒng)。這種測(cè)量系統(tǒng)通過等量圖。 (DR=13.6, M=1.0lbs, P=13.6lbs見第4頁 線

36、索產(chǎn)生線索產(chǎn)生: 階段1表明紅X不在過程中。階段2表明紅X產(chǎn)生在門飾板處。成對(duì)比較表明門型是成對(duì)比較點(diǎn)。統(tǒng)計(jì)確認(rèn)統(tǒng)計(jì)確認(rèn):一旦我們查到了候選的紅X,我們決定做B vs C六組數(shù)據(jù)比較,這是為了確認(rèn)門型影響客戶滿意度。用6對(duì)數(shù)據(jù)進(jìn)行比較具有95%的可信度和最大累加值為6.不可撤銷的糾正措施不可撤銷的糾正措施:為使門邊緣加長(zhǎng)1.5mm以保證正確的位置不偏離。改進(jìn)措施改進(jìn)措施:減少保修費(fèi)用來修復(fù)由于配合不好產(chǎn)生的門飾板問題,并且100%消除803/805車型的缺陷。學(xué)到的經(jīng)驗(yàn)學(xué)到的經(jīng)驗(yàn): 我們學(xué)到了 當(dāng)投資不會(huì)太多的情況下,用其它策略以尋求可選擇的方法解決問題。但始終要關(guān)注顧客熱忱。此項(xiàng)目便是一個(gè)這

37、樣的例子。Project Definition Tree/項(xiàng)目定義樹項(xiàng)目定義樹G e o m e tric/幾 何 特 性R H /右 側(cè)5 0 %F in d a n d e lim in a te th e R e d X th a t ca u se sp o o r a d ju stm e n t in th e R R d o o r p a n e l a t8 0 5 /8 3 0 m o d e ls/發(fā) 現(xiàn) 和 消 除 8 0 5 /8 3 0 車 型上 出 現(xiàn) 的 引 起 后 側(cè) 門 飾 板 調(diào) 整 困 難 的 紅 XB o th H /兩 側(cè)L H /左 側(cè)5 0 %R

38、 e a r d o o r/后 門1 0 0 %F ro n t d o o r/前 門0 %B o th /都 有E ffo rt to re le a se th e d o o r p a n e l(lb s)車 門 飾 板 拆 卸 力 (磅 )O th e r/其 它E v e n t/事 件D e fe ct/缺 陷P h y sic/物 理 特 性D o o r p a n e l lo o se /車 門 飾 板 松 動(dòng)8 0 5 /8 3 0 m o d e ls車 型Problem characterization問題描述Warranty condition/保修條件Th

39、e problem is presented only in the rear door問題只是在后側(cè)車門出現(xiàn)BASEDBASED: DISTRIBUTON LOT CAMPAINGCURRENTCURRENT: 100 % door panel 805830 models loose目前狀態(tài):805/830型車門飾板100%松動(dòng)。GOALGOAL: eliminate 100% the poor fit.目標(biāo):100%消除不良的配合Project statement項(xiàng)目綜述Need energy to release the trim door panel需要用力才能卸下門飾板Custome

40、r is calling the problem in both sides客戶現(xiàn)在對(duì)兩側(cè)都在抱怨Effort to release (lbs)/Effort to release (lbs)/釋放力釋放力( (磅磅) )Frequency頻率頻率051015202530354006121824303642CURRENT現(xiàn)有現(xiàn)有DESIRED希望希望DM=1.19 lbs/磅Prosess過程Rest of vehicle車輛其它部分Modified the flange 1.5 mm in length將法蘭在長(zhǎng)度上修改1.5厘米The Red X is the door moding th

41、atis being installed in the trim panel紅X是被安裝在車門飾板內(nèi)的車門飾板飾件Molding door panel車門飾板飾件Rest of door車門其它部分Trim door panel車門飾板Parts零件Model 車型to 對(duì)Model 車型Other strategy其它策略DP= 29 lbs磅Solution tree項(xiàng)目解決樹項(xiàng)目解決樹TARGET: Eliminate condition 100%目標(biāo):目標(biāo): 100%100%消除現(xiàn)有問題消除現(xiàn)有問題PASSED ISOPLOT DR=15.2 SEE PAG 4通過等量圖驗(yàn)證 DR=1

42、5.2 參見第4頁P(yáng)ASSED STAGE 1 SO THE RED X DOESNT LIVE IN THE PROCESS SEE PAG # 7.通 過 第 一 階 段 驗(yàn) 證 , 因 此 紅 X 不 在 裝 配 過 程 中 , 參 見 第 7 頁 。THE COMPONENT SEARCH STAGE 2 SHOWS THAT THE RED X DOES NOT LIVE IN THE TRIM DOOR PANEL SO LIVES IN THE REST OF THE DOOR PANEL. SEE PAG # 7./零部件分析階段2顯示紅X不是由車門內(nèi)飾板造成的,所以應(yīng)是由車門

43、板的其余部分引起的,見7頁.PAIR COMPARISON SHOWS THAT THE DOOR PANEL MOLDING HAS THE CHARACTERISTIC THAT PRODUCE THE DIFFERENCE SEE PAG 9/ 配對(duì)對(duì)比顯示車門飾板飾件有造成差異的特征,參見第9頁THIS IS THE BEST STRATEGY BASED ON MULTIVARI SEE PAG 5.這是基于多重變換比較得出的最佳策略,參見第5頁。PASSED B vs C WHERE IT SHOWS THAT THE DOOR MOLDING KEEP IN POSITION T

44、HE DOOR PANEL SEE PAG 10, BUT WE CHOICE OTHER CHARACTERISTIC THAT KEEP IN POSITION THE DOOR PANEL AND WITOUT INVEST MONEY SEE PAG 11 & 13.通過BC對(duì)比試驗(yàn),顯示車門飾板飾件能夠使車門飾板保持正確位置,見第10頁。但是我們選擇能夠保證車門飾板位置并且不用增加投資的其它特性,參見第11和13頁。Frequency頻率頻率GREEN Y RUN CHART SEE PAG 17/綠Y字流程圖參見第17頁。05101520253035400612182430

45、3642DESIRED希望希望CURRENT現(xiàn)有現(xiàn)有BASED: DISTRIBUTON LOT CAMPAINGEffort to release (lbs)Effort to release (lbs)釋放力釋放力( (磅磅) )D DM = 1.0 lbsD DP = 13.6 lbsDR = 13.6Passed Isoplot IsoplotA Force gage was usedas the measurement system拉力計(jì)作為測(cè)量工具拉力計(jì)作為測(cè)量工具通過ISOPLOT評(píng)估POINT TOPOINTThere are no contrast in this strat

46、egy there are no difference.There is a good contrast but the leverage is not enough because we dont have tools to measure it.This strategy provide good contrast and the best leverage based on multi-vari chart see pag 6There are no contrast through the timeStrategy diagram PLANT TOPLANTMODEL TOMODELT

47、RUCK TOTRUCKSIDE TOSIDESAME PANELSAME PLANTSAME MODELSAME TRUCKThere is a contrast between truck to truck and good leverage but the contrast is not enough based on multi-vari see page 6.EVENT TOEVENTSAME POINTThere are no contrast in this strategy there are no difference event to event.策略圖事件對(duì)事件同一個(gè)點(diǎn)點(diǎn)

48、對(duì)點(diǎn)同一塊扳同一側(cè)對(duì)同一側(cè)同一臺(tái)車車對(duì)車同一型號(hào)型號(hào)對(duì)型號(hào)同一個(gè)工廠工廠對(duì)工廠在這個(gè)對(duì)比中,無差異.在這個(gè)對(duì)比中,無差異.在這個(gè)對(duì)比中,有差異.但無測(cè)量工具.在車與車的對(duì)比中,有差異.但不能滿足MULTI-VARI的要求.在這個(gè)對(duì)比中,有差異.且能滿足MULTI-VARI的要求.在這個(gè)對(duì)比中,無差異.510152025303540455014710131619222528313437404346495255586164677073767982858891Multi - variNOTE: This graphic shows that the best contrast is model to

49、 model.SideTruck1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31EFFORT TO TAKE OFF (lbs)R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R L R LCustomer satisfaction limitBOBWOWModelC C C C A A A A

50、A A A A A A A S S S S S S S S S S S S S S S SNOTE: S: SUBURBAN 830 MODEL A: AVALANCHE 805 MODEL C: CADILLAC 806 MODEL注:SAC三種車型最好最壞顧客的滿意底線注:此圖顯示出在型號(hào)與型號(hào)的對(duì)比中有最大的差異.松脫力(磅)Component searchNOTE: This graphic shows that the Red X suspect does not live in the process because it passed the stage #1. The stag

51、e 2 shows that the Red X suspect does not live in the seal window. So the Red X suspect lives in the molding door panel.48.416.27.54746.348.246.647.58.58.30102030405060OriginalR1 & R1 (Door Panel)R2 & R2 (Door Panel)R3 & R3 (Door Panel)Seal WindowDoor PanelMolding doo

52、r panelHomeEffort (lbs)BOBWOWSTAGE 1STAGE 2第一階段第二階段最好最壞原狀態(tài)第一次拆裝第二次拆裝第三次拆裝門窗密封條門飾板門飾板飾條鉸鏈注:這個(gè)圖顯示因?yàn)橥ㄟ^了第一階段的試驗(yàn),所以RED X不是由操作造成.第二階段的試驗(yàn)顯示門窗密封條不是RED X,門飾板飾條是RED X要素查找規(guī)則規(guī)則Rule 1.Rule 1.There are complete separation between the BOB and There are complete separation between the BOB and WOW values.WOW values.

53、將最好和最壞的值完全分開將最好和最壞的值完全分開規(guī)則規(guī)則Rule 2. Rule 2. DYV1RDYV1R設(shè)設(shè)Where: Where: R= R= R RBOB BOB + R + RWOWWOW 2 2那么那么thenthenR RBOBBOB=1.9=1.9R RWOWWOW=1.2=1.2R= R= 1.9 + 1.2 1.9 + 1.2 = = 3.13.1 = 1.55. = 1.55. 2 2 2 2DY = YDY = YBOBBOB - Y - YWOWWOW = 46.8 - 8.1 = 38.7 = 46.8 - 8.1 = 38.7 如果如果ififDY V1RDY

54、V1R那么那么thenthen 38.7 (0.89) (1.55)38.7 (0.89) (1.55)所以所以soso 38.7 1.38 38.7 1.38 所以滿足規(guī)則所以滿足規(guī)則1 1和規(guī)則和規(guī)則2 2的要求的要求so passed Rule 1 and Rule 2通過問題為每個(gè)單元設(shè)定判定極限通過問題為每個(gè)單元設(shè)定判定極限Set decision limits for each unit by using the questions:Set decision limits for each unit by using the questions:DLDLBOBBOB= Y= YBO

55、BBOB + V2R + V2RDLDLWOWWOW= Y= YWOWWOW + V2R + V2R那么那么Then Then udludl = 48.83 = 48.83 DL DLBOBBOB = 46.8 + 1.31 (1.55) = = 46.8 + 1.31 (1.55) = ldlldl = 44.77 = 44.77 udludl = 10.13 = 10.13 DL DLWOWWOW = 8.1 + 1.31 (1.55) = = 8.1 + 1.31 (1.55) = ldlldl = 6.07 = 6.07 結(jié)果結(jié)果ResultsCARACTERISTICABOB(144

56、794)WOW(145644)BOB(145190)WOW(145687)BOB(144542)WOW(145688)BOB(144721)WOW(144934)BOB(144614)WOW(144966)Gree Y34.59.746.343.49.730.512.1門飾件門飾件Door moldingYESNOYESNOYESNOYESNOYESNOPaired Comparison備注備注NOTE: We consider that the door panel molding is the Red X candidate in the pair NOTE: We

57、consider that the door panel molding is the Red X candidate in the pair comparison because is the only difference between panel to panel. In 805/830 comparison because is the only difference between panel to panel. In 805/830 vsvs 806 806 models.models.我們認(rèn)為門板裝飾件是可能的我們認(rèn)為門板裝飾件是可能的Red X, Red X, 因?yàn)樵谲囆鸵驗(yàn)?/p>

58、在車型805/830805/830 和和 車型車型806806對(duì)比后只有門板有差對(duì)比后只有門板有差異。異。WOWWOWBOBBOBDOOR MOLDINGRED X CANDIDATEPassed B Passed B vsvs C with 95% of confidence that the molding door panel is C with 95% of confidence that the molding door panel is the Red X with complete separation and end count of 6.the Red X with comp

59、lete separation and end count of 6.在在 完全分離,完全分離,End End count count 為為5 5的情況下,的情況下, 以以95%95%的置信度通過的置信度通過B v S B v S 表明門板裝飾件是表明門板裝飾件是Red XRed XB vs C Six packB = 有門飾件的有門飾件的車車Vehicles with door molding.C = 沒有飾件的車沒有飾件的車Vehicles without door molding. Req: 置信置信度度confidence = 95%次序次序OrderGreen Y (lbs)B25.

60、9yesB50yesC8.6noB28.6yesC16.3noB25.9yesB50yesC16.3noC13.3noC13.3noB28.6yesC8.6noRed X 門飾件門飾件doormoldingRed X 門飾件門飾件doormolding試驗(yàn)試驗(yàn)Test排序排序Ranked orderGreen Y (lbs)Once confirmed that the RED X is living in the door panel molding, we decided to change our Once confirmed that the RED X is living in the door panel molding, we decided to change our strategy from “mod

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論