1、1:擋土墻施工質(zhì)量砂漿灌縫不夠密實(shí),;已要求總包加強(qiáng)管理,對(duì)不監(jiān)理周報(bào)Jianli Weekly Report工程名稱:焊接器材(威海)有限公司廠房工程日期(Date:):2007.08、07Project n ame : EV project編號(hào)(Serial Number ) : 061, beam and slab formwork installation of office building level 3 was done. Steelbar fabrication and installation of beam was done as well.1:辦公樓三層樓面梁、板模板支設(shè)
2、,梁鋼筋制作、安裝;本周概況2, east side reta ining wall con struct ion was in progress.2:東面擋土墻毛石墻施工;3, backfill of warehouse foun dati on was done.Gen eral Situati on3:廠房基礎(chǔ)內(nèi)回填土方;of This Week4, wall and slab con crete pouri ng was done of water tank.4:消防水池墻板混凝土施工5, wall and slab steel bar installation and formwor
3、k installation ofwater tank were done.5:消防游水池墻板鋼筋安裝、模板安裝;1, column steel bar installation of office building level 3 was in progress. And formworkin stallati on was in progress.1:辦公樓進(jìn)入三層柱鋼筋安裝階段。模板支架搭設(shè)階段2, short column of warehouse foundation was almost done. Foun dati on本周進(jìn)度情況bolts in stallati on wa
4、s almost done.Progress of ThisWeek2:廠房基礎(chǔ)短基本結(jié)束,鋼構(gòu)地腳螺栓安裝基本結(jié)束;3, east side reta ining wall con struct ion was in progress.3:東側(cè)擋土墻正在施工中,4, wall and slab con crete pouri ng of water tank was done.4:消防水池墻板混凝土結(jié)束;5, backfill of warehouse foun dati on was done.1, mortar of reta ining did not meet requireme n
5、t and WJ was asked to redo.施工質(zhì)量情況Con struct ionQuality Situati on合格的地方要作返工處理;2, big area backfill was done by big equipme nt and corner should be paid more atte ntion.2:回填土大面積為機(jī)械回填,對(duì)角落及難點(diǎn)處人工回填,并采用打夯機(jī) 夯 實(shí),3, steel binding did not meet requireme nt and WJ has redo ne.3;水池鋼筋綁扎、鋼筋之間的間距不符合規(guī)范要求,總包已整改,符材料進(jìn)
6、場(chǎng)情況ArrivedMaterials合要求;4, con crete pouri ng of water tank met requireme nt.4:水池混凝土施工符合要求5, con crete after check was commercial con crete and inten sity level was C30 which complied withdesig n requireme nt.5:混凝土檢查為商品混凝土,強(qiáng)度等級(jí):C30,與設(shè)計(jì)要求 致;6, concrete curing was done after 24 hours of pouring.6:澆灌后24
7、小時(shí)進(jìn)行了澆水保養(yǎng);7, steel type, size, grade and qua ntity met desig n requireme nt.7:鋼筋安裝的品種、規(guī)格、級(jí)別、數(shù)量符合設(shè)計(jì)要求;8, appeara nee quality of steel was good.8:鋼筋外觀質(zhì)量較好;_Steel came in site and quality was ok which was agreed to used. Commercial con crete came in site andinten sity level was C30 after check.Con cret
8、e masonry came in site and was agreed to used for office foun dati on.鋼筋進(jìn)埸:質(zhì)量符合要求,同意用于本工程;商品混凝土進(jìn)埸,檢查強(qiáng)度等級(jí)C30 ;混凝土砌塊進(jìn)埸,用于辦公樓基礎(chǔ);見(jiàn)證取樣Sample testNo無(wú)材料使用情況Materials UsingCon crete quality met requireme nt and inten sity level was C30. Steel came in site and qualitywas ok.用于基礎(chǔ)商磴質(zhì)量合格。強(qiáng)度等級(jí):C30 ;鋼筋進(jìn)埸,質(zhì)量合格本周主要
9、工作情況This week s ma inwork1, dailty check on site mainly for daily procedure incluing con crete pouring, steel installationand formwork installation.1:現(xiàn)埸例行巡視檢查七個(gè)工作日;主要對(duì)當(dāng)日施工的工序進(jìn)行巡視檢查,巡視的工序:、混凝土施工、鋼筋安裝、模板支設(shè);2, check the elevationof formwork and check certificate ofcommercial con crete.2:檢查基礎(chǔ)模板支設(shè)的標(biāo)局,檢查了
10、冏品混凝土的合格證明文件;3, check foun dati on steel in stallati on and take note of bli nd work.3:對(duì)基礎(chǔ)鋼筋安裝進(jìn)行了檢查,并做好隱蔽驗(yàn)收記錄;4, sta nd by whe n con crete pouri ng of water tank.4:對(duì)水池混凝土施工作了旁站監(jiān)理;5,take part in weekly progress meeting held by UFO andrequireme nts of Jia nli were raised as below:5:參加UFO召開(kāi)的工程例會(huì)一次,并在會(huì)提
11、出了:監(jiān)理對(duì)施工工作的要求,主要為:1,next procedure can be done after steel installation of water tank was con firmed by Jia nli.1對(duì)水池的鋼筋安裝必須經(jīng)過(guò)監(jiān)理確認(rèn)后,方可進(jìn)入下道工序施工;要求做好前期使用材料的報(bào)審工作;2, safety plan should be provide of east side retaining wall con struct ion.2對(duì)東面擋土墻施工安全工作進(jìn)行了交底工作;6, organize and hold safety meeting and requi
12、rementsof Jinaliwere raised as below:6:組織召開(kāi)安全工程例會(huì),提出了監(jiān)理對(duì)施工工作的要求,主要為:1, safety of aerial work.1高空作業(yè)的施工安全。2, safety of temporary power usage2臨時(shí)用電的施工安全4, en sure that workers have the protective equipme nt.3工人勞保用品使用的安全檢查;隱蔽驗(yàn)收情況Con cealed workCheck wall steel work of water tankCheck wall formwork of wat
13、er tankCheck steel bli nd work of water tank水池墻板鋼筋檢驗(yàn)批驗(yàn)收.水池墻板模板施工檢驗(yàn)批驗(yàn)收;水池鋼筋隱蔽驗(yàn)收發(fā)文情況Outgoi ngDocume ntsOne Jia nli safety meeti ng minu tes and one Jia nli weekly report.;安全監(jiān)理例會(huì)紀(jì)要一份;監(jiān)理周報(bào)一份;收文情況Accept ingDocume ntsOne WJ weekly report6 copies of test application materials施工情報(bào)周報(bào)一份總包檢驗(yàn)批驗(yàn)收資料6份。安全情況SafetyN
14、o accide nt, detail please check safety meet ing minu tes沒(méi)發(fā)生安全事故;監(jiān)理會(huì)同UFO召開(kāi)了現(xiàn)埸安安全工作會(huì)議,:詳見(jiàn)會(huì)議紀(jì)要:下周工作要點(diǎn)Key point of next week1, quality con trol to water tank con struct ion1:水池施工的質(zhì)量控制;2, quality con trol to office foun datio n masonry2:辦公樓基礎(chǔ)砌體的質(zhì)量控制。3, quality con trol to con crete con struct ion mainly
15、 for quality reoirt of commercial con crete andcon struct ion codes and so on.3:混凝土施工的質(zhì)呈控制,主要檢杳商品混凝土的質(zhì)呈報(bào)告、施工-的規(guī)氾要求、標(biāo)局、振動(dòng)密頭、人工收面等質(zhì)量情況的控制;4, quality control to formwork of office bulding level 3, and steel bars installation. Stand by whenconcrete pouring.4:辦公樓三層的模板,鋼筋安裝質(zhì)量控制,混凝土施工的旁站監(jiān)理工作;5, quality con trol to reta ining wall con struct ion.5:擋土墻施工的質(zhì)量控制;6, quality control to steel fabrication and installation .6:鋼筋制作、安裝的質(zhì)量控制;天氣情況:Weather reportIt was mainly clear to overcast and normal te
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- GB/T 23595.1-2025LED用稀土熒光粉試驗(yàn)方法第1部分:光譜的測(cè)定
- 包裝回收合同范例
- 北京合伙合同范本培訓(xùn)
- 中介代辦合同范例
- 個(gè)人汽車置換合同范本
- 辦公住宿出租合同范本
- 出租鋪面合同范本
- 三方合伙范本合同范本
- 履約反擔(dān)保合同范本
- 單位職工租房合同范例
- 某小學(xué)申報(bào)廣州市義務(wù)教育規(guī)范化學(xué)校自評(píng)分說(shuō)明
- 面神經(jīng)炎課件完整版
- 根據(jù)銅價(jià)計(jì)算各種電纜參考價(jià)格
- 湘教版五年級(jí)下冊(cè)美術(shù)教學(xué)計(jì)劃
- WB/T 1066-2017貨架安裝及驗(yàn)收技術(shù)條件
- SB/T 10446-2007成品油批發(fā)企業(yè)管理技術(shù)規(guī)范
- 瀝青路面施工質(zhì)量控制要點(diǎn)課件
- 對(duì)建筑工程施工轉(zhuǎn)包違法分包等違法行為認(rèn)定查處管理課件
- 雀巢碘超標(biāo)危機(jī)公關(guān)分析
- 營(yíng)養(yǎng)性缺鐵性貧血患兒的護(hù)理 (兒童護(hù)理課件)
- 六年級(jí)奧數(shù)教材
評(píng)論
0/150
提交評(píng)論