1、CONTENTS 目錄1. Reference drawings 參考圖紙-32. Installation procedure 安裝過(guò)程-4 2.1. Preparation before installation 安裝前準(zhǔn)備-4 2.2. Lifting procedure 吊裝過(guò)程- -5 2.3. Install Anchor Bracket 安裝支承架-6 2.4. Install Pressure Intensifier 安裝增壓器-6 2.5. Install block 安裝閥塊-7 2.6. Install Track Roller and Lifting Cylinder
2、安裝滾輪及頂升缸-7 2.7. Install Hydraulic Cylinder 安裝伸縮缸-8 2.8. Install Control Console 安裝控制臺(tái)-8 2.9. Hydraulic & Electric Connection 連接液壓&電氣管路-103. Attached Table 附表-101. Reference Drawings 參考圖紙Drawing No.Drawing nameTP10109-R-BM11-XD-0001DRILL FLOOR SKIDDING GENERAL ARRANGMENT DIAGRAMTP10109-R-BM11-XA-0001
3、DRILLFLOOR SKIDDING HYDRAULIC FLOW DIAGRAMTP10109-R-BM11-XT-0001DRILLFLOOR SKIDDING UNIT,WIRING DIAGRAMTP10109-R-BM11-XD-0201DRILLFLOOR SKIDDING UNIT FWD-PORT, GENERAL ARRANGMENTTP10109-R-BM11-XD-0101DRILLFLOOR SKIDDING UNIT CONSOLE, GENERAL ARRANGMENTTP10109-R-BM11-XX-0101DRILLFLOOR SKIDDING UNIT F
4、WD-PORT, LIFTING ARRANGMENTTP10109-R-BM11-XX-0102DRILLFLOOR SKIDDING UNIT CONSOLE, LIFTING RO331-402-401EquiEQUIPMENT INSTALLATION-CANTILEVER & DRILLFLOOR2. Installation procedure 安裝過(guò)程 Following major components should be installed during the procedure: 過(guò)程中主要安裝以下主要部件: -Anchor Bracket 支撐架 -Track roll
5、er 滾輪 -Lifting cylinder 頂升缸 -Hydraulic cylinder 伸縮缸 -Control Console 控制臺(tái) These components should be installed successively. 應(yīng)依次安裝上列組件。 2.1. Preparation before installation 安裝前準(zhǔn)備 Check the equipment components、installation bolt, etc. 清點(diǎn)各設(shè)備組件、安裝螺栓等。 Lifting equipments shall be prepared according to li
6、fting procedure. 根據(jù)吊裝工藝要求準(zhǔn)備好吊裝設(shè)備。 Ensure all lifting items are certified. 保證所有吊具合格。 Ensure sufficient lay down and access areas for all aspects of installation. 保證安裝位置各個(gè)方向均有足夠的下放及通道區(qū)域。 Move all obstacles from the area. 清除工作區(qū)域的障礙物。 Protect all unconnected electrical cable with suitable tape and label
7、. 用膠帶及標(biāo)簽固定好電纜。 Protect hydraulic pipe work with unconnected ends by sealing the ends to preventthe ingress of foreign contaminants. All temporarily disconnected cables and hoses to be tied back securely. Any cutting or removal of cable / hose supports should be re-instated after completion of instal
8、lation。 密封好液壓管路的端口,以防進(jìn)入臟物,所以臨時(shí)未固定的電纜及軟管應(yīng)固定好,直至設(shè)備安裝完畢才能解除固定。 Protect paintwork from scuffing of ropes, slings, etc, with padding.Use pad pieces,spreaders and packing as required。 保護(hù)設(shè)備表層油漆,防止與繩索等擦碰產(chǎn)生磨損。 A visual inspection of the equipment shall be performed prior to any installation. This inspection
9、will verify proper assembly and integrity of all equipment. All pieces of equipment installed above 6 feet (1.8 meters) in height shall also be inspected for proper secondary retention of all fasteners. 設(shè)備安裝前應(yīng)進(jìn)行外觀檢查,用以確認(rèn)設(shè)備裝配情況及完整性。所有安裝高度在6 feet (1.8m)以上的設(shè)備必須檢查2.2. Lifting procedure 吊裝過(guò)程 . Lifting Eq
10、uipment Required: 吊裝設(shè)備要求: Track roller minimum capacity: 540kg each Lift cylinders minimum capacity: 150 kg each Anchor bracket minimum capacity: 250 kg each Hydraulic cylinders minimum capacity: 100 kg each Console minimum capacity: 150 kg . Particular process of lifting see the lifting procedure.
11、具體的吊裝過(guò)程見(jiàn)吊裝工藝。2.3. Install Anchor Bracket 安裝支承架 Lift the Anchor bracket onto the rail the 4 corners, Make sure grease was bestrewed on the rail, And both side space between the side plate and rail is no more than 6mm.(see Figure A). 將支撐架吊到軌道的四個(gè)角上。保證軌道上涂好潤(rùn)滑油脂。安裝時(shí)保證支撐架兩側(cè)邊板與軌道的間距不大于6mm(見(jiàn)圖A)。 2.4. Instal
12、l Pressure Intensifier 安裝增壓器 Install the Pressure Intensifier on the Drill Floor Frame by 8-90U blot and 8-M12 nut, make sure the Pressure Intensifier without Throttle Valve side was the outside of the Drill Floor(see Figure A). 用8個(gè)M12螺栓、螺母將增壓器安裝到鉆臺(tái)結(jié)構(gòu)上,保證增壓器沒(méi)有節(jié)流閥的一側(cè)朝向鉆臺(tái)舷外(見(jiàn)圖A)。 Figure A 2.5. Install
13、 block 安裝閥塊 Install the block on the Drill Floor Frame by 20-M12x30 bolt and washer, make sure the block surface with hole was the outside of the Drill Floor, make sure the Pressure Intensifier without Throttle Valve side was the outside of the Drill Floor(see Figure B). 用20個(gè)M12x30的螺栓及M12墊片將閥塊安裝到鉆臺(tái)結(jié)
14、構(gòu)上,保證閥塊帶孔的一面朝向鉆臺(tái)舷外。保證增壓器沒(méi)有節(jié)流閥的一側(cè)朝向鉆臺(tái)舷外(見(jiàn)圖B)。 Figure B 2.6. Install Track Roller and Lifting Cylinder 安裝滾輪及頂升缸 Install the track roller and lifting cylinder on the anchor bracket. Make sure the central line of lifting cylinder was coincided with the rail central line in the vertical view. 將滾輪和頂升缸安裝到支
15、撐架上,保證頂升缸中心線與軌道中心線一致。 2.7. Install Hydraulic Cylinder 安裝伸縮缸 Connect the Bore side of horizontal hydraulic cylinder to the anchor bracket by the pin and keep plate, Then use substitute pin connect the ROD side to the fixed bracket(will provide by RO),then weld the bracket to the Drill Floor.Make sure
16、 the tolerance of parallelism for both pins no more than 0.05mm(see Figure C). And make sure the central line of the cylinder was parallel with the central line of drill floor,the tolerance no more than 1mm(see Figure D). 將水平伸縮液壓缸液壓缸側(cè)用銷(xiāo)子及擋板連接到支撐架上,然后用銷(xiāo)子將活塞端連接到固定的托架上,然后將該托架焊接到鉆臺(tái)上。保證兩銷(xiāo)子的平行度公差不大于0.05mm
17、(見(jiàn)圖C),保證液壓缸的中心線與鉆臺(tái)中心線平行,公差不大于1mm(見(jiàn)圖D) Figure C 2.8. Install Control Console 安裝控制臺(tái) Install the control console under the Drill Floor by 4-M12X40 bolt and washer. 安裝控制臺(tái),參考圖紙: RO331-402-401 Rev.1 Equipment Installation-Cantilever & Drill Floor Figure D 2.9. Hydraulic & Electric Connection 連接液壓&電氣管路 Ref
18、erence Drawings: TP10109-R-BM11-XA-0001 ;TP10109-R-BM11-XT-0001 Connect, route and secure all hydraulic piping, hoses and fittings per the above drawings and schematics.Make sure no leak of the pipework. 連接好所有液壓管路、軟管、配件等,確保管路無(wú)泄漏。 參考圖紙:TP10109-R-BM11-XA-0001 ;TP10109-R-BM11-XT-00013. Attached Table 附表ItemsFastenersFastenersBolt Grade Black FastenersHot Dipped SpunGalvanisedZinc PlatedXlan Coated8.810.98.810.98.810.98.810.9SizeTorque Load (Nm)M5NANANANA5.24.8NANAM6M8M10M12M14M16M20M24M27M30M36NANANA8714021842673610801464NANANANA123197306599103515192059NANANANA791261963836629721318NANANANA1111
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 樂(lè)山2025年四川樂(lè)山師范學(xué)院招聘28人筆試歷年參考題庫(kù)附帶答案詳解
- 臨沂2025年山東臨沂臨沭縣部分事業(yè)單位招聘綜合類(lèi)崗位26人筆試歷年參考題庫(kù)附帶答案詳解
- 燙房頂施工合同范本
- 重要采購(gòu)合同范本
- 科技與教育科室業(yè)務(wù)拓展的新路徑
- 知識(shí)產(chǎn)權(quán)法律實(shí)務(wù)與案例分析課程
- 科技與藝術(shù)的完美結(jié)合-產(chǎn)品設(shè)計(jì)案例
- 科技企業(yè)系統(tǒng)安全與維護(hù)策略探討
- 社交媒體大數(shù)據(jù)在市場(chǎng)分析中的應(yīng)用
- 委托展覽合同范本
- 智能財(cái)務(wù)共享在京東的應(yīng)用研究
- 衛(wèi)生和微生物基礎(chǔ)知識(shí)培訓(xùn)-
- 2023年鎮(zhèn)江市高等專(zhuān)科學(xué)校單招綜合素質(zhì)題庫(kù)及答案解析
- XX攔河堰工程施工組織設(shè)計(jì)
- GB/T 9787-1988熱軋等邊角鋼尺寸、外形、重量及允許偏差
- GB/T 7031-2005機(jī)械振動(dòng)道路路面譜測(cè)量數(shù)據(jù)報(bào)告
- 馬工程教材《公共財(cái)政概論》PPT-第十二章 財(cái)政體制
- GB/T 23457-2009預(yù)鋪/濕鋪防水卷材
- GB/T 17614.1-2015工業(yè)過(guò)程控制系統(tǒng)用變送器第1部分:性能評(píng)定方法
- 財(cái)務(wù)工作督導(dǎo)檢查記錄表
- 輿情大數(shù)據(jù)監(jiān)測(cè)平臺(tái)建設(shè)方案
評(píng)論
0/150
提交評(píng)論