




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、Six Sigma helps to establish our course and to gauge our pace in the race for total customer satisfaction.Improved Sigma-Rating of ProcessImproved Product or Process QualityReduced Cost of OperationsGreater Customer SatisfactionTraditional Quality Costs(tangible)Lost OpportunityHidden FactoryAdditio
2、nal Costs of Poor Quality(intangible)(Difficult or impossible to measure)COPQ is a function of Sigma Capability InspectionWarrantyScrapReworkRejectsMore SetupsExpediting CostsLost salesLate DeliveryLost Customer LoyaltyExcess InventoryLong Cycle-TimesEngineering Change OrdersProfitTotal Cost to Manu
3、factureand DeliverProductsProfitTheoreticalCostsCost ofPoor QualityCOPQPrice ErosionTheoreticalCostsCost ofPoor QualityCOPQProfitTheoreticalCostsCOPQTimeReject RateHistorical Level ( 0)Natural Variation under 0 (30)Special VariationOptimum Level ( 1)Natural Variation under 1(31)Six Sigma is about im
4、proving profitability; improved quality and efficiency are immediate by-products.Sigma is a statistical unit of measure that reflects process capability. The sigma scale of measure is perfectly correlated to such characteristics as defects-per-unit, parts-per million defective, and the probability o
5、f a failure/error.2308,537366,80746,210523363.4 PPMProcessCapabilityDefects per Million Opp. Point of Inflection1 TUSLp(d)1234563 This is a 6 Sigma ProcessDeliveryPriceQualityCustomerSupplierNeedCycle TimeCostDefectsDoIdentify the Customers NeedCenter around the TargetReduce VariationReduce DefectsT
6、he output (Y) is perceived as a function of the input (X). What is the problem of our focus? Whats our goal? And by when? Whos the customer impacted? What are the CTXs in-concern? Whats the process under investigation?TimeReject RateBaseline NID( 0, 0)Natural Variation (30)Special VariationGoal NID(
7、 1, 1)Natural Variation (31)EntitlementOpportunity for Improvement ()0.7Internal Failure CostsExternal Failure Costs Scrap Cost to Customer Rework Warranty Cost Supplier Scrap & Rework Returned MaterialAppraisal CostsPrevention Costs Inspection Quality Planning Testing Process Planning Quality A
8、udits Process Control Initial & Maintenance Costs of Training Test & Inspection EquipmentOpportunity CostsHard Savings Potential Savings Soft Savings the focus and extent of the problem, based on measures of the process, the key data required to narrow the problem to its major factors or vit
9、al few root causes.Defect Rate = # Defects / # Units = 7 / 5 = 1.4 dpu1. Arm Height2. Arm thickness3. Bore hole Dia4. Swgae hole Dia5. Roughness6. Teardrop profile7. Roll8. PitchOpportunities per Unit = 8Number of Opportunities= Opportunities per Unit Number of Units= 8 5 = 40Defect Rate= # Defects
10、/ # Opportunities = (7 / 40 ) 106= 175,000 dpmo0.023.42336,21066,811308,770697,672-100,000200,000300,000400,000500,000600,000700,000800,00001234567Sigma CapabilityDefects Per Million OpportunityProcess968Accept32RejectFirst-Time Yield, Yft = 968 / 1000 = 0.9681,000InputProcess968Accept32Reject1,000I
11、nput(40 Defects)Throughput Yield, Ytp = e-(40/1000) = 0.961800ShipProcess A1,000Input50ScrapProcess B950Input25ScrapProcess C925Input125ScrapFinal Yield, Yf= Quantity Shipped / Quantity Built = 800 / 1,000 = 0.80A shortcoming of final yield is that it fails to consider the “hidden factory” or rework
12、.Hidden Factory : ad hoc systems and processes set up to correct errors made during the mainstream process.Rolled Throughput Yield= Ytp(A) Ytp(B) Ytp(C) = 0.7408 0.6393 0.5824= 0.2758675ShipProcess A1,000Input50ScrapRework200150Process B800Input (950)25ScrapRework300275Process C650Input(925)125Scrap
13、Rework250125Defects = 300 Ytp(A)= e300/1,000 = 0.7408Defects = 425 Ytp(B)= e425/950 = 0.6393Defects = 500 Ytp(C)= e500/925 = 0.5824Defects= 300Analyze Data/ProcessDevelop Causal HypothesisRefine or Reject HypothesisAnalyze Data/ProcessConfirm & Select Vital Few Causes What possible actions or id
14、eas required to address the root cause of the problem, and to achieve the goal? Which of the ideas are workable potential solutions? Which solution will most likely achieve the goal with the least cost or disruption? How can the chosen solution be tested for effectiveness, and then implemented perma
15、nentlyImplement ongoing measures and actions to sustain improvementDefine responsibility for process ownership and managementExecute “closed-loop” management and drive towards Six SigmaChampionManagementEmployeesFinanceTeamBlack BeltOptimized Process30 - 5010 - 154-8Key Process InputVariables (KPIVs)8 - 10KPIVsCritic
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 公司新產(chǎn)品下線節(jié)目策劃方案
- 公司效能提升年活動方案
- 公司氣球派對活動方案
- 公司新年開工活動方案
- 公司生日福利活動方案
- 公司組織避暑活動方案
- 公司搬新辦公室活動方案
- 公司節(jié)目展示策劃方案
- 公司活動燒烤策劃方案
- 公司盈利模式策劃方案
- (2025)發(fā)展對象考試試題附及答案
- 防性侵防溺水防校園欺凌主題班會課件
- 《水熱溶劑熱合成》課件
- 建筑安全玻璃管理規(guī)定
- 保險(xiǎn)學(xué)(第五版)習(xí)題庫答案
- 《重大火災(zāi)隱患判定方法》GB 35181-2017
- 奇瑞汽車售后服務(wù)藍(lán)圖
- 《農(nóng)藥經(jīng)營許可培訓(xùn)班》考試試卷
- 安徽省技能人才評價(jià)考評員考試題庫
- 網(wǎng)絡(luò)域名及域名解析PPT課件
- 浙江省2016年10月物理學(xué)業(yè)水平考試試題
評論
0/150
提交評論