版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、第三章 鉆 進(jìn)一. 常用單詞及短語(yǔ)drill鉆進(jìn)make hole鉆進(jìn)bottoms up 遲到時(shí)間bit鉆頭drill collar鉆鋌drill pipe鉆桿drill out鉆水泥塞survey測(cè)斜deviation 井斜azimuth 方位MWD=measure while drilling 隨鉆測(cè)量LWD=logging while drilling 隨鉆測(cè)井MD=measure depth 測(cè)量井深TVD=true vertical depth 垂深pump slug(pill)壓水眼circulate循環(huán)trip起下鉆bit change 換鉆頭wiper trip短起下鉆、拉井
2、壁open擴(kuò)眼ROP=rate of penetration 機(jī)械鉆速WOB=weight on bit鉆壓RPM=revolutions per minute轉(zhuǎn)速SPM=stroke per minute沖數(shù)hook weight 大鉤載荷run mud over shaker 振動(dòng)篩跑泥漿drilling parameter鉆井參數(shù)1 m=3.281 feet1 in= 2.54 cm1 pound= 0.4536 kg1 psi=6.8948 kPa1 ft·lbf=0.1356 daN·m1 hp=0.746 kW二. 閱讀練習(xí) 1. 表層鉆進(jìn)指令WELL: WIZ
3、EEN NORTH-2井號(hào):維壬 北-2DRILLERS & CREWS 司鉆和班組 SURFACE HOLE 表層 375 mm TO 600 mKB· Mark in tour book size & number of dp, dc, hwdp, etc. That is on location. 在班報(bào)表中記錄井場(chǎng)鉆桿、鉆鋌、加重鉆桿等尺寸和數(shù)量等。· Hold prespud safety meeting & mark in tour book 召開(kāi)開(kāi)鉆前安全會(huì)并且記錄在班報(bào)表中。· Strap casing & floa
4、t shoe/collar asap. Let me have tally to determine surf. T.d. 盡快丈量套管、浮箍、浮鞋。給我測(cè)量數(shù)據(jù)以決定表層井深。· Follow mud reports spud with spud mud, mud up ( follow mud mans instructions ) 遵循泥漿設(shè)計(jì)用開(kāi)鉆泥漿開(kāi)鉆,配泥漿(遵循泥漿工程師的指令)。· Pump with both 115 spm wth 160 x305 mm liners. Note: pumps maximum spm to clean hole. 雙泵
5、115沖分鐘,缸套尺寸160mm X 305mm沖程。注意:循環(huán)清洗井眼時(shí)應(yīng)開(kāi)到最大泵沖。· Drill with 2-30 tons wob & 60-180 rpm to maximize penetration rate ( use only 80 rpm and one pump until 2 dc below conductor shoe; then use 2 pumps always ) (drill out cement using 2 pumps) 以鉆壓230噸、60180轉(zhuǎn)分鐘來(lái)獲得最佳機(jī)械鉆速(在前2根鉆鋌出套管鞋前應(yīng)用80轉(zhuǎn)分鐘、單泵,然后一直用雙
6、泵)(鉆水泥塞用雙泵)。· Survey every 30 m. Keep below 2° 每30米測(cè)一次斜,保持井斜低于2度。· Anytime circulating work pipe regularly and slowly 任何時(shí)間循環(huán)時(shí),應(yīng)保持有規(guī)律的緩慢的活動(dòng)鉆具。· Follow trip procedures and fill out trip sheets completely and accurately. 按照起下鉆程序操作,準(zhǔn)確完整填寫(xiě)起下鉆灌漿記錄。· Mark flow check depths in tour
7、book. Keep hole full during flow checks. 在班記錄中記錄溢流檢查井深,溢流檢查時(shí)保持井眼灌滿泥漿。 · Trip at speed so as to not swab or surge hole. Be careful for mud rings & hole packoff. 起下鉆控制速度以便不拔活塞或壓力激動(dòng)。小心井壁泥餅和井眼堵塞。· Rop maximum 30 m/hour to prevent hole packoff or flowline plug 為了不堵塞井眼和出水管,控制最高機(jī)械鉆速為30米小時(shí)。
8、83; Drill to 10 m before surf. t.d. / Be sure viscosity is up for rih casing 鉆到表層井深10米前,確保提高泥漿粘度以便下套管。· Circulate & work pipe for 1/2 hour to clean hole ( more if hole not cleaning ) 循環(huán)、活動(dòng)鉆具半小時(shí)以便清洗井眼(如果井眼不干凈應(yīng)延長(zhǎng)循環(huán)時(shí)間)。· Pooh for wiper trip ; strap out, check slm=tally before rih ,strap i
9、n if different 短起下時(shí),邊起邊測(cè)量起出鉆具,下鉆以前檢查是否和鉆具表一致,如不同邊下鉆邊測(cè)量。· Rih & drill to surface t.d. 下鉆并鉆到表層井深。· Work pipe & circulate for 1/2 hour to clean hole ; be sure viscosity is still high for rih casing 循環(huán)、活動(dòng)鉆具半小時(shí)以便清洗井眼,確保泥漿粘度仍然足夠高以便下套管· Pooh to run surface casing 起鉆下表層套管。CHECK &
10、MARK IN TOUR BOOK: 檢查并且記錄在班報(bào)表中l(wèi) All mud volumes (m3) lost to formation & depth (mkb) 所有漏失到地層中的泥漿量(方)及井深l All mud volume (m3) dumped 所有放掉的泥漿量(方)l PVT, mud tank volume (m3) PVT ,泥漿罐泥漿量l Mud checks & material added 泥漿測(cè)量記錄和加入的泥漿藥品l Shaker screen sizes 振動(dòng)篩篩布尺寸l BHA item OD & ID / BHA weight /
11、 weight below jars 井下鉆具組合內(nèi)、外徑/重量/震擊器以下重量l Drag up / drag down 上提、下放阻力l Torque. 扭矩l Centrifuges OF& UF WT., litres/min, hrs ( if ran ) 離心機(jī)上水密度、排水密度,升分鐘、時(shí)間(如果運(yùn)轉(zhuǎn))。l Depth (mkb) of any problem spots ( boulders, tight hole, mud rings etc) 任何復(fù)雜點(diǎn)的井深(臺(tái)階、遇阻井眼、泥餅等)u Use garbage bin for all garbage ; keep
12、lease & roads clean 所有垃圾應(yīng)放入垃圾箱,保持井場(chǎng)和公路清潔。u Know where mud product safety books are and use as needed 知道泥漿產(chǎn)品安全說(shuō)明書(shū)在哪,如需要就使用。u Smoke only if necessary at edge of lease 需要時(shí)只能在井場(chǎng)邊上吸煙u Keep all vehicles at least 25 m from wellbore (unless they have emergency shutdown) 保持所有車輛離井眼25米遠(yuǎn)(除非緊急停車)u Follow gov
13、ernment,contractor, & oil company safety policies and regulations 遵守政府、承包商、油公司的安全政策和制度。u If any accidents (no matter how small) report to toolpush and write in tour book 任何事故(無(wú)論其多么?。﹫?bào)告給隊(duì)長(zhǎng)并記在班報(bào)表中。u Keep mud material neat; use up broken bags first 保持泥漿藥品的整潔;首先使用那些袋子破了的。u Used oil (from engines, et
14、c.) Stored in drums 用過(guò)的機(jī)油(柴油機(jī)的等)必須保存在桶中。u Use wash gun to clean floor & scrubbing - do not run water hoses that just fill up the sump 用水槍清洗或擦洗地面,不要用水管線,那樣只會(huì)灌滿污水坑。If any problems or questions anytime - call me 如果任何時(shí)間有任何問(wèn)題-找我THANKS, ROY WIELER2. 油層井眼鉆進(jìn)指令WELL: WIZEEN NORTH-2 DRILLERS & CREWSMAI
15、N HOLE 主井眼 251 mm TO APPROX 至大約. 2301 mKB- Drill out cement and to all dcs below csg shoe with rpm 80, wob 5-10 用80轉(zhuǎn)分鐘、鉆壓5到10打水泥塞,直到所有鉆鋌出套管鞋- Drill ahead w/ maximum wob 5 20 ton and maximum 140 rpm unless instructed different 在指令沒(méi)有變化以前,用5到20噸鉆壓、轉(zhuǎn)速最大用140鉆進(jìn)。- Follow mud reports ( derrickmen check with
16、 mudman at start of each tour ) 遵循泥漿設(shè)計(jì),井架工每班接班時(shí)問(wèn)一下泥漿工程師。- Survey at 475 mkb, then every 150 meters.( keep deviation under 3 deg. ) Mark down all surveys in tour sheets. 475米處測(cè)斜,之后每150米一測(cè)(井斜控制在3度以下);在班報(bào)表中記錄下測(cè)斜數(shù)據(jù)。- Maintain mud tank volume - do not lose any mud to sump over shakers, or pumps leaking 保
17、持罐中泥漿量,振動(dòng)篩上不能跑泥漿,也不允許泵漏泥漿。- Pump 110 spm using single pump, ( liners 160 x 302_ mm) (1.9 m3/min) 單泵時(shí)泵沖為110沖分(缸套尺寸160mm x 沖程302mm)(1.9方分)- Anytime circulating work pipe regularly and slowly . 任何時(shí)間循環(huán)時(shí),應(yīng)有規(guī)律的緩慢的活動(dòng)鉆具。- Follow trip procedures and fill out trip sheets completely and accurately. 按照起下鉆程序操作,準(zhǔn)
18、確的、完全的填寫(xiě)起下鉆灌漿記錄。 - Mark flow check depths in tour book. Keep hole full during flow checks while pooh or rih. 在班記錄中記錄溢流檢查井深,溢流檢查時(shí)保持井眼灌滿泥漿。- On strap out trip; check SLM vs tally before RIH; strap in if difference over 1.0 meter 起鉆丈量立柱,核實(shí)測(cè)量立柱長(zhǎng)度和鉆具表,如果誤差超過(guò)1米則邊下邊測(cè)量。- Trip at speed so as to not swab or s
19、urge hole起下鉆控制速度以便不拔活塞或壓力激動(dòng)。小心井壁泥餅和井眼堵塞。- Record in tour book any depth(mkb) of trouble spots (tight hole, lost circ, kicks & volumes) 在班報(bào)表中記下任何復(fù)雜點(diǎn)的井深(遇阻點(diǎn)、漏失、井涌和泥漿量)- Be sure macp sheet is posted at choke manifold and remote choke panel. Keep track of mud wt. Each tour - be sure manifold valves
20、lined up correctly. 保證最大允許關(guān)井套壓張貼在節(jié)流管匯和節(jié)流遠(yuǎn)控臺(tái)上,每班記錄泥漿比重,確保節(jié)流管匯閘門排列正確。- Be sure dp pressure gauges are working accurately at all locations. Be sure gauges all correspond with each other. 確保各處的鉆桿壓力表都工作準(zhǔn)確;確保所有儀表相互對(duì)應(yīng)。-Each tour check & mark in book: - reduced speed pump pressures 在班紀(jì)錄中每班測(cè)試并記錄低泵沖壓力。- B
21、OP function checks & times: close annular, P rams, (function blind rams every time out of hole)封井器功能測(cè)試和次數(shù):關(guān)閉萬(wàn)能、半封(每次起完鉆時(shí)測(cè)試全封)- All mud volumes (m3) lost to formation & depth (mkb) 所有泥漿漏失井深和漏失量。- All mud volume (m3) dumped 所有放掉的泥漿量- Mud tank volume (m3) 泥漿罐中泥漿量- 3 mud checks 3次的泥漿測(cè)量結(jié)果- Shaker
22、 screen sizes & if new screen installed 篩布尺寸目數(shù)和是否換新篩布。- BHA item OD & ID / BHA weight / weight below jars if ran 井下鉆具組合內(nèi)、外徑/重量/如果下了震擊器,震擊器以下重量。- Drag up (overpull ) / drag down 上提、下放阻力- Torque 扭矩- Centrifuge checks: uf, of, litres/min., hrs ran 離心機(jī)的檢查:上水密度、排水密度、排量、運(yùn)轉(zhuǎn)時(shí)間。- Desilter & desan
23、der checks: UF wt., OF wt., litres/min., hrs ran 除泥器和除砂器的檢查:上水密度、排水密度、排量、運(yùn)轉(zhuǎn)時(shí)間。Weekly: - Hold & mark in book BOP drill and safety meeting 每周進(jìn)行并記錄防噴演習(xí)、安全會(huì) -Check all bop bolts for tightness, check choke & flare & degasser unions.檢查封井器螺絲松緊,檢查節(jié)流、放燃和除氣管線連接。- Function hcr / check motor kills/
24、check fire extinguishers 功能測(cè)試液動(dòng)放噴閥/檢查馬達(dá)停車/檢查滅火器。- Use garbage pit for all garbage; keep lease & roads clean 所有垃圾應(yīng)放入垃圾箱,保持租地和公路清潔。- Smoke if necessary or any fires or welding at edge of lease 如果需要只能在租地邊吸煙、點(diǎn)火或焊接。- Keep all vehicles at least 25 m from rig / park at edge of lease 保持所有車輛離井至少25米遠(yuǎn)、車輛停在
25、租地邊上。三. 擴(kuò)展詞匯-鉆井日?qǐng)?bào)表工作內(nèi)容摘錄Make up 12 1/4" bit , 8" DCs, & tag top of cement 17.5mkb組合12-1/4”鉆頭,8鉆鋌,探水泥塞:17.5米Drill out cement to 29 mkb鉆水泥塞到29米Drill 12 1/4" hole to 46 mkb鉆12-1/4井眼到46米Pump Hi-Vis sweep泵入高粘清掃漿Survey 45 mkb 1/4 deg 45米處測(cè)斜 1/4度Wiper trip 10 stands ( hole in good condit
26、ion) 拉井壁10柱(井下正常)Circulate hole clean , Pump 6m3 Hi-Vis &spot on bottom循環(huán)井底干凈,打6方高粘并滯留在井底R(shí)eam fr. 711 to 732 m, Pump 8m3 Hi-Vis sweep從711米到732米劃眼,打8方高粘Circulate hole clean , Pump 8m3 Hi-Vis &spot on bottom循環(huán)井底干凈,打8方高粘并滯留在井底Open 12 1/4" hole to 17 1/2" fr 38m to 136mkb從38米到136米將12-1
27、/4“井眼擴(kuò)眼到17-1/2 ”Circulate hole clean & pump pill循環(huán)干凈,壓水眼Ream tight hole fr 1223 to 1329m 1223米到1329米劃眼遇阻段Continue running in to 1518 m繼續(xù)下鉆到1518米R(shí)eam tight & undergauge hole from 1518 to 1686 1518-1686米遇阻段和欠尺寸井段劃眼Pull out of hole to core 起鉆取芯Make up 40' core barrel & Run in hole to 77
28、1 mkb 組合40英尺取心筒并下鉆到771米Wash & ream fr. 771 to 798 mkb, Circulate & drop ball 從771到798米沖洗并劃眼,循環(huán)并投球Cut Core # 1 fr. 798 to 808.55 mkb 割1#巖心,從798 到 808.55 米R(shí)ecover 2.6m core, Lay down & load out core bbl.收獲2.6米巖芯,甩取心筒四. 補(bǔ)充材料-甲方要求整改的指令Sudan Project Joint Operation Committee蘇丹項(xiàng)目合作委員會(huì)Repairs W
29、hile Drilling & Requisites for Modifications鉆進(jìn)時(shí)修理和整改要求1. Repair Electrical Elevator 修理電梯2. Accumulator and Manifold guages, Stripping guage installed on BOP Panel in Doghouse 儲(chǔ)能器和節(jié)流管匯儀表,連接鉆臺(tái)偏房?jī)?nèi)封井器控制臺(tái)面板氣壓表。3. Geolograph fully Functional 地質(zhì)錄井儀功能完整。4. 2” valve above 4” standpipe valve on rig floor
30、鉆臺(tái)4寸立管閘門上面的2”閘門。5. Mudcan cable and clamps ( need new Mudcan ) 防噴盒的繩子和卡子(需要新防噴盒)。6. Need centrifuge working 需要離心機(jī)能工作7. Safety Clamps on 4” high pressure standpipe on ground 地面4”高壓管線上的安全卡子。8. Need pressure relife valves on air tanks in substructure 底座中氣瓶上需要安全閥。9. Move Flow Sensor 把流量傳感器移走10. 1” eye w
31、elded in substructure for BOP stabilizers 底座上焊1”封井器固定點(diǎn)11. Repair Trolley Track in substructure for BOP nipple up, also order 2 piece of 20 ton chain hoists for nipple up BOP 修理底座下用于安裝封井器滾輪車軌道,并購(gòu)買兩個(gè)20噸倒鏈用于封井器的安裝。12. Install equalizers in Mud tank components. 在泥漿罐分隔間安裝泥漿量平衡管13. Mud tank gates 泥漿罐擋板14.
32、 Need 2 more 6 x 8 inches mission pumps 75 HP (refer to contract). 需要另2個(gè)75馬力6x8寸Mission 泵(參見(jiàn)合同)15. Need eye wash station in Mixing Shack. 在混合室中需要洗眼站16. Need to move mixing hopper or install hopper outside. 需要把混合漏斗移出來(lái)或在外面安裝一個(gè)新混合漏斗。17. Need New Poorboy Degasser W/ wearplate installed. *需要有耐磨板的新油水分離器18
33、. Either get centrifuge working or remove F/ mud tank and adjust Dayrate Accordingly. 或使離心機(jī)工作或把其從罐上移走并相應(yīng)調(diào)整日費(fèi)。19. Conduct 3rd party API sch 8 or Dynaplet Hook. * 進(jìn)行第三方API sch檢驗(yàn)或Dynaplet大鉤20. Before spudding next well conduct Wet Magnetic Particle inspection on Brake Bands, Linkage also inspect bridle
34、 lines as well as LB400 swivel Quill, Kelly Spinner Sub. * 在下口井打?qū)Ч芮?,?yīng)對(duì)剎帶、剎帶連接、起架大繩、LB400水龍頭提環(huán)、方鉆桿旋扣器接頭進(jìn)行磁性微粒濕性探傷。21. All personal will start wearing hard hats, steel toed Boots around rig area no matter what his position is. 不管是什么崗位,所有人在井場(chǎng)周圍必須戴安全帽、穿鋼頭工鞋。22. All Crews will Hold BOPs Drills Maximum 1
35、per week or more often if crews are obviously weak at performing Drills and record if necessary. Great Wall Upper Management will be involved in observing Drills and training of Rig Crews. This will be ongoing process. 所有人員將每周進(jìn)行1次防噴演習(xí),如人員在演習(xí)中明顯弱項(xiàng),增加演習(xí)次數(shù),如果必要給以記錄。長(zhǎng)城的高層項(xiàng)目部將視察演習(xí)并對(duì)井隊(duì)培訓(xùn)。這些措施就要實(shí)行。23. Need pick up elevators, Stabbing board in derrick. * 需要單根吊卡、井架的(套管)扶正臺(tái)。24. Accumulator Installed in Generator Room. * 儲(chǔ)能器安裝在發(fā)電機(jī)房中。25. SIDPP gauge installed Manifold 250 kPa Increments. *安裝在節(jié)流管匯上的關(guān)井立壓表,刻度為250千帕。26. 2”standpipe, Circulating Hose Installed in Derrick for Casing. *
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 《單證管理流程》課件
- 《少兒青春期教育》課件
- 單位管理制度集粹選集人員管理
- 《電化學(xué)局部腐蝕》課件
- 單位管理制度合并匯編【員工管理篇】
- 單位管理制度分享合集職工管理篇
- 單位管理制度范例匯編員工管理篇
- 單位管理制度呈現(xiàn)匯編【人力資源管理篇】十篇
- 單位管理制度呈現(xiàn)大全員工管理篇十篇
- 2024班級(jí)安全教育工作總結(jié)范文(30篇)
- 2024年考研(英語(yǔ)一)真題及參考答案
- 《簡(jiǎn)·愛(ài)》-2022年中考一輪復(fù)習(xí)之必讀名著對(duì)比閱讀訓(xùn)練
- 交通燈課程設(shè)計(jì)交通燈控制器
- 單層鋼結(jié)構(gòu)工業(yè)廠房縱向定位軸線的定位
- 腫瘤科常見(jiàn)急重癥
- 03SG715-1蒸壓輕質(zhì)加氣混凝土板(NACL)構(gòu)造詳圖
- 粉體工程第六章粉碎過(guò)程及設(shè)備
- 盡職調(diào)查工作底稿1_公司業(yè)務(wù)調(diào)查
- 洪水計(jì)算(推理公式法)
- 集裝箱碼頭堆場(chǎng)項(xiàng)目可行性研究報(bào)告寫(xiě)作范文
- 醫(yī)保藥店一體化信息管理系統(tǒng)操作手冊(cè)
評(píng)論
0/150
提交評(píng)論