1、地面磚、花崗巖鋪貼施工方案Construction Scheme of Floor tile and Granite tile InstallationPreparations彈水平線,確定室內(nèi)地磚完成面0.00The horizontal line, make sure indoor floor tile finish surface elevation of+ /-0.00.水電管線已安裝完畢。Water and electricity line already deployed.二、預(yù)備材料 Preparation of materials1. 425425 cement and med
2、ium sand and white cement.2. 800*800*25,600*600*25600*600*12800 * 800 * 25 granite, 600 * 600 * 25 granite, 600 * 600 * 12 floor tile.construction procedure1、工藝流程 construction process材料預(yù)備彈樓地面面層標(biāo)高把握線基層處理彈線找中找方鋪貼基準(zhǔn)把握標(biāo)筋鋪貼面層鋪貼踢腳板養(yǎng)護(hù)與成品保護(hù)Prepare materialsBomb the ground floor surface elevation control lin
3、eBase treatmentBomb line Lay up the benchmark control standardscreedlay up surface courseLay up the baseboardMaintenance andprotection for the final product2Tile installation order、大面積施工時(shí),應(yīng)用分段挨次鋪貼。Large area construction, segmented order paving。 For the entire building, first tile separate rooms, th
4、en passgeways or corridors.、對(duì)于一般房間承受退步法先由房間中部向兩側(cè)鋪貼。對(duì)于有獨(dú)立柱的大廳,要先鋪貼柱間局部,然后再向兩邊開(kāi)放。For General rooms, use regression method by laying up from the central to both sides. For the great hall with independent column, firsttile column section, then expand to both sides.、全部房間先鋪貼整塊板材,非整塊板材最終鋪貼。地面鋪貼完后再鋪貼踢腳板。All
5、 the rooms firstly paved with block plate ,or tile at last. Skirtingboard tiled after the ground .3、鋪貼方法:Tile installation method1好后可單邊掛線。Baseed on marking screed made before, the first row plate hang line onboth sides , after the first raw is tiled , it can be hang line on one side.、結(jié)合層與板材面層應(yīng)分段同時(shí)鋪砌
6、。先進(jìn)展試鋪,將干 平鋪到干硬性水泥砂漿上(干硬程度以手捏成團(tuán),落地即散為宜),用橡皮錘用力敲擊板面,使攤鋪的干硬性水泥砂漿結(jié)合層密2-5mm。Combined course and plate surface course should be tiled at the sametime. First trial laying, flat the rigid cement mortar to the paving part, andits thickness should be appropriated. Thentile the plank to dry, rigidcement morta
7、 (Advisable degree of dry is can be kneaded together, and scattered when dropped on land ). Use a rubber mallet hard strike theboard to make the pavingdry rigid cement mortar layer combination is close-grained, and make the surface 2-5 mm below the ground elevation control sheet.、試鋪適宜后,將板材揭起,在密實(shí)的干硬性
8、水泥砂漿結(jié)粘結(jié),然后將板材再原位置再次安放。After appropriate trial paving,lift up the plate.Spread a layer of dry cement to the dry, rigid close-grained cement mortar,and wet it once by the watering can, or water a layer of cement paste for mudbonding, then put the plate back at the position.線吻合便完成一塊板材鋪貼,再依次鋪貼下一塊。When p
9、laced again, four corners of the plank should be dropped at the same time. After layed down steadily ,use a rubber hammer to strike it to make it flat and bonded firmlywith the combined course .The plank paving is done when the plank surface is coincided with the elevation ofthe ground control, then
10、 pave the next one .鋪貼時(shí)要隨時(shí)找平找直,做到四角平坦,縱橫縫隙對(duì)齊。When paving ,be sure that it is flat and straight. Make sure the fourcorners flat, and vertical and horizontal crack aligned.Quality requirements1Marble, granite主控工程Dominant item面層與下一層應(yīng)結(jié)合結(jié)實(shí)無(wú)空鼓。Surface course should be combined firmly with the next one ,wi
11、thout any gaps.四角平坦,縱橫縫隙對(duì)齊、無(wú)色差。Four corners flat, vertical and horizontal crack aligned, colorlessdifference.一般工程 General item大理石,花崗石面層的外表應(yīng)干凈,平坦,無(wú)磨痕,且應(yīng)圖案清楚,色澤全都,接縫均勻,周邊順直,鑲嵌正確,板塊無(wú)裂、掉角、缺棱等缺陷。The surface of Marble and granite should be clean,flat, no grinding mark, and clear pattern , consistent color
12、, juncture uniform, straight surrounding,right Mosaic, plates without broken corners, no crack defects such as lackof edges.踢腳線外表干凈,高度全都,結(jié)合結(jié)實(shí),出墻厚度全都。The surface of the baseboard should be clean, and consistent inheight, firmly combined, and with consistent wall thickness.樓梯踏步和臺(tái)階板塊的縫隙寬度應(yīng)全都,齒角整齊,樓層10m
13、m。The stair tread and step plate should be consistent in gap width, andtidy tooth angles. The floor stage should be adjacent to the tread , ang the height difference should be no more than 10 mm.大理石和花崗石面層的允許偏差應(yīng)符合:The deviation of marble and granite surface layer should beallowed to meet:、外表平坦度:1.2mm
14、 、縫格平直:1.2mm。接縫凹凸差:0.8mm。踢腳線上口平直:1.2mm。板塊間隙寬度:1.2mm。 Surface evenness:1.2mm Seam case straight:1.2mm Junctureheight differenceSkirtingline flatside :1.2mm Plategap width:1.2mm2、地面磚 Floor tile主控工程:Dominant item面層與下一層的結(jié)合粘結(jié)應(yīng)結(jié)實(shí),無(wú)空鼓。Surface course should be combined firmly with the next one ,without any
15、gaps.四角平坦,縱橫縫隙對(duì)齊,無(wú)色差。Four corners flat, vertical and horizontal crack aligned, colorlessdifference.一般工程:General item磚面層的外表應(yīng)干凈,圖案清楚,色澤全都,接縫平坦,深淺全都,周邊順直,板塊無(wú)裂紋,掉角和缺損等缺陷。The surface ofbrick layer should be clean,flat, no grinding mark, and clear pattern , consistent color, juncture uniform, straight sur
16、rounding, right Mosaic, plates without broken corners, no crack defects such as lackof edges.面層鄰接處的鑲邊用料及尺寸應(yīng)符合設(shè)計(jì)要求,邊角整齊,光滑。The edge materials anddimensions of surface course adjacent sideshould meet the design requirement, with tidy corners and smooth.地板磚間隙寬度:1.2Floor brick gap width:less than 1.2 mm
17、.踢腳線外表應(yīng)干凈,高度全都,結(jié)合結(jié)實(shí),離墻厚度全都。The surface of the baseboard should be clean, and consistent inheight, firmly combined, and with consistent wall thickness.面層外表的坡度應(yīng)符合設(shè)計(jì)要求,不倒流水,無(wú)積水,與地漏,管道結(jié)合處應(yīng)嚴(yán)密結(jié)實(shí)無(wú)滲漏。Theslope of surface course should meet the design requirement, on inverse flow, no no stagnant water.The jun
18、ction with floor drain,and pipeshould be closely solid with no leakage.五、成品保護(hù)Maintenance and protection for the final product1.1.3The paved ground can be landed 3 days later.2. 鋪的房間應(yīng)臨時(shí)進(jìn)展封閉,操作人員和檢查人員進(jìn)入房間踩踏時(shí),要輕踏在一塊木板上。The new paved room should be closed temporarily,when operators andinspectors enter rooms, please step on a piece of wood lightly.3. 地面
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 常州工程職業(yè)技術(shù)學(xué)院《高級(jí)阿拉伯語(yǔ)二》2023-2024學(xué)年第二學(xué)期期末試卷
- 新疆科技學(xué)院《外國(guó)史學(xué)名著選讀》2023-2024學(xué)年第二學(xué)期期末試卷
- 淮北理工學(xué)院《社會(huì)學(xué)原理類》2023-2024學(xué)年第二學(xué)期期末試卷
- 重慶智能工程職業(yè)學(xué)院《生物統(tǒng)計(jì)與應(yīng)用》2023-2024學(xué)年第二學(xué)期期末試卷
- 赤峰學(xué)院《教育史專題研究》2023-2024學(xué)年第二學(xué)期期末試卷
- 梧州學(xué)院《現(xiàn)代舞創(chuàng)編》2023-2024學(xué)年第二學(xué)期期末試卷
- 東北林業(yè)大學(xué)《生物科學(xué)專業(yè)英語(yǔ)》2023-2024學(xué)年第二學(xué)期期末試卷
- 山西航空職業(yè)技術(shù)學(xué)院《攝影報(bào)道》2023-2024學(xué)年第二學(xué)期期末試卷
- 合肥共達(dá)職業(yè)技術(shù)學(xué)院《現(xiàn)代電子測(cè)量技術(shù)》2023-2024學(xué)年第二學(xué)期期末試卷
- 內(nèi)蒙古工業(yè)大學(xué)《概率論與數(shù)據(jù)統(tǒng)計(jì)》2023-2024學(xué)年第二學(xué)期期末試卷
- 地下室車庫(kù)綜合管線施工布置
- 月度及年度績(jī)效考核管理辦法
- 采購(gòu)訂單模板
- 畢業(yè)設(shè)計(jì)鋼筋彎曲機(jī)的結(jié)構(gòu)設(shè)計(jì)
- 工程結(jié)構(gòu)質(zhì)量特色介紹
- 清華大學(xué)MBA課程——運(yùn)籌學(xué)
- 濕法冶金浸出凈化和沉積PPT課件
- 生產(chǎn)現(xiàn)場(chǎng)作業(yè)十不干PPT課件
- 雨污水管網(wǎng)勞務(wù)施工分包合同
- 通信桿路工程施工
- 初中物理光學(xué)經(jīng)典題(共23頁(yè))
評(píng)論
0/150
提交評(píng)論