




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
陜西原點(diǎn)古鎮(zhèn)燈都城工程施工組織設(shè)計(jì)陜西原點(diǎn)古鎮(zhèn)燈都城工程施工組織設(shè)計(jì)編制:審核:批準(zhǔn):陜西建工第七建設(shè)集團(tuán)有限公司陜西原點(diǎn)古鎮(zhèn)燈都城工程二O一四年九月目錄編制說(shuō)明·······················1工程概況和特點(diǎn)·················5項(xiàng)目部施工組織機(jī)構(gòu)············10管理目標(biāo)··························10實(shí)施手段··························10施工組織機(jī)構(gòu)························18施工組織機(jī)構(gòu)的運(yùn)作····················18項(xiàng)目管理措施························19施工管理特點(diǎn)························20施工部署·······················22施工總體安排························22施工準(zhǔn)備的內(nèi)容·······················23施工順序及施工段的劃分··················24基礎(chǔ)及主體施工階段具體施工安排·············26機(jī)械設(shè)備的選擇·······················27主要?jiǎng)趧?dòng)力需用計(jì)劃····················32施工現(xiàn)場(chǎng)平面布置················34施工方案······················40施工測(cè)量·························41土方工程·························43基礎(chǔ)工程·························45主體工程施工方案····················48腳手架工程························67屋面及防水工程·····················78裝飾裝修工程······················84給排水工程·······················107采暖及通風(fēng)·······················114電氣工程························125消防工程························139季節(jié)性施工措施··············150夏季施工措施質(zhì)量保證措施·············150冬季施工措施·····················150雨季施工措施·····················155確保工程質(zhì)量的技術(shù)組織措施···157確保施工進(jìn)度計(jì)劃及工期保證措施··175確保安全生產(chǎn)施工方案········178安全管理目標(biāo)及重點(diǎn)部位··············178消防安全措施·····················178安全管理體系及制度················179施工現(xiàn)場(chǎng)安全管理措施···············181施工過(guò)程的安全管理措施··············182機(jī)械設(shè)備施工安全管理措施·············184確保文明施工及環(huán)境保護(hù)措施····186文明施工管理目標(biāo)及重點(diǎn)··············186文明施工管理機(jī)構(gòu)··················186文明施工管理制度··················188文明施工措施·····················188第十二章施工協(xié)調(diào)配合措施···········197施工組織設(shè)計(jì)前言在編制過(guò)程中,公司人員充分熟悉和了解了工程招標(biāo)文件、設(shè)計(jì)圖紙、相關(guān)技術(shù)文件及合同,編制出能夠切實(shí)指導(dǎo)施工的施工組織設(shè)計(jì)。同時(shí),我們將聯(lián)合材料、設(shè)備供應(yīng)商盡所能發(fā)揮在市政工程建設(shè)方面的資源和優(yōu)勢(shì),包括人才、技術(shù)、資金、經(jīng)驗(yàn)等方面優(yōu)勢(shì),盡最大的努力滿足施工需求。本施工組織設(shè)計(jì)的內(nèi)容結(jié)合本工程的特點(diǎn),從施工組織及部署的科學(xué)性;施工工序安排的合理性;施工方法選用的技術(shù)性、經(jīng)濟(jì)性和實(shí)現(xiàn)的可能性進(jìn)行了科學(xué)的論證和詳細(xì)的闡述。針對(duì)一些技術(shù)難點(diǎn)提出了解決問(wèn)題的方法。對(duì)工期、質(zhì)量、安全及文明施工管理提出了工作目標(biāo),并制定了相應(yīng)的管理措施,同時(shí)從業(yè)主方利益及工程順利進(jìn)行的角度上考慮制定了與業(yè)主方及其他合作單位的配合措施。陜西建工第七建設(shè)集團(tuán)有限公司陜西原點(diǎn)古鎮(zhèn)燈都城項(xiàng)目部2014年9月第一章編制說(shuō)明第一節(jié)編制依據(jù)1.1陜西原點(diǎn)古鎮(zhèn)燈都城工程施工圖紙。1.2陜西原點(diǎn)古鎮(zhèn)燈都城工程招標(biāo)文件、答疑文件、等。1.3現(xiàn)行國(guó)家及地方有關(guān)施工規(guī)范、規(guī)程及驗(yàn)收標(biāo)準(zhǔn),以及有關(guān)工程施工管理的規(guī)定。1.4本公司質(zhì)量管理體系文件要求及類(lèi)似工程施工經(jīng)驗(yàn),以及本公司項(xiàng)目部人員配備和施工設(shè)備裝備能力。1.5有關(guān)施工驗(yàn)收規(guī)范、技術(shù)標(biāo)準(zhǔn)、規(guī)程:《中華人民共和國(guó)建筑法》、《建設(shè)工程質(zhì)量管理?xiàng)l例》:1.《建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)》GB50300—20012.《建筑施工高處作業(yè)安全技術(shù)規(guī)范》JGJ80-913.《混凝土結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范》GB50204—20024.《建筑地面工程施工質(zhì)量驗(yàn)收規(guī)范》GB50209—20025.《砌體工程施工質(zhì)量驗(yàn)收規(guī)范》GB50203—20026.《建筑工程冬季施工措施》JGJ104-977.《建筑施工安全檢查標(biāo)準(zhǔn)》JGJ59—998.《施工現(xiàn)場(chǎng)臨時(shí)用電安全技術(shù)規(guī)范》JGJ46—20059.《建筑裝飾工程施工及驗(yàn)收規(guī)范》JGJ73-9110.《給排水管道工程施工及驗(yàn)收規(guī)范》(GB50268—2008)11.《建筑施工現(xiàn)場(chǎng)環(huán)境與衛(wèi)生標(biāo)準(zhǔn)》(JGJ146-2004)12、《工程測(cè)量規(guī)范》(GB50026-2007)13、《建筑地基基礎(chǔ)工程施工質(zhì)量驗(yàn)收規(guī)范》(GB50202-2002)14、《鋼筋焊接及驗(yàn)收規(guī)范》(JGJ18-2003)15、《鋼筋機(jī)械連接通用技術(shù)規(guī)程》JGJ107-200316、《鐓粗直螺紋鋼筋接頭》JG/T3057-199917、《建筑裝飾裝修工程質(zhì)量驗(yàn)收規(guī)范》(GB50210-2001)18、《屋面工程質(zhì)量驗(yàn)收規(guī)范》(GB50207-2002)19、《砌筑砂漿配合比設(shè)計(jì)規(guī)程》(JGJ98-2000)20、《普通砼配合比設(shè)計(jì)規(guī)程》(JGJ55-2000)21、《混凝土強(qiáng)度檢驗(yàn)評(píng)定標(biāo)準(zhǔn)》GBJ107-8722、《建筑變形測(cè)量規(guī)程》JG/T88-9723、《建筑工程施工現(xiàn)場(chǎng)供用電安全規(guī)范》(GB50194-93)24、《建筑機(jī)械使用安全技術(shù)規(guī)程》(JGJ33-2001)25、《建筑施工碗扣式鋼管腳手架安全技術(shù)規(guī)范》(JGJ130-2001)26、《建筑工程施工現(xiàn)場(chǎng)管理規(guī)定》27、《房屋建筑工程質(zhì)量保修辦法》28、《建設(shè)工程項(xiàng)目管理規(guī)范》GB/T50236-200129、《工程網(wǎng)絡(luò)計(jì)劃技術(shù)規(guī)程》JGJ/T121-9930、《咸陽(yáng)市建設(shè)工程安全生產(chǎn)管理辦法》1.6公司質(zhì)量體系文件、技術(shù)標(biāo)準(zhǔn)、工法等有關(guān)建筑工程各項(xiàng)規(guī)章制度。本工程施工組織設(shè)計(jì)的編制是按照建設(shè)單位招標(biāo)及答疑文件等的要求和現(xiàn)場(chǎng)周邊環(huán)境進(jìn)行了認(rèn)真而詳細(xì)的編制,未提之處均按照施工圖紙?jiān)O(shè)計(jì)、國(guó)家現(xiàn)行技術(shù)規(guī)范、規(guī)程、質(zhì)量評(píng)定標(biāo)準(zhǔn)以及有關(guān)文件等要求的具體規(guī)定進(jìn)行施工。第二節(jié)編制內(nèi)容2.1根據(jù)我公司多年類(lèi)似建筑施工經(jīng)驗(yàn),結(jié)合本工程的具體情況,對(duì)該工程的特點(diǎn)、重點(diǎn)、難點(diǎn)進(jìn)行反復(fù)研究和方案論證比較,使施工組織設(shè)計(jì)科學(xué)、合理、詳盡、具有很強(qiáng)的可操作性和針對(duì)性。2.2對(duì)各專(zhuān)業(yè)施工隊(duì)的管理和協(xié)調(diào),與業(yè)主、設(shè)計(jì)、監(jiān)理和相關(guān)主管部門(mén)的配合協(xié)作等工程重點(diǎn)和難點(diǎn);由于本工程施工作業(yè)面積大,安全文明施工將是本施工組織設(shè)計(jì)的重點(diǎn)內(nèi)容之一。2.3我公司承建過(guò)許多類(lèi)似框架結(jié)構(gòu)工程項(xiàng)目,我們將結(jié)合本工程的特點(diǎn),針對(duì)上述重點(diǎn)和難點(diǎn)制定專(zhuān)項(xiàng)施工方案和保證措施。2.4本工程《施工組織設(shè)計(jì)》中未注明的計(jì)量單位均為“mm”。第三節(jié)編制原則3.1堅(jiān)持以質(zhì)量為重點(diǎn)的原則。針對(duì)工程質(zhì)量目標(biāo),在落實(shí)各級(jí)質(zhì)量管理職責(zé)的基礎(chǔ)上,重點(diǎn)制定施工質(zhì)量保證措施和有針對(duì)性工程施工質(zhì)量控制措施。以抓工序質(zhì)量為重點(diǎn),把好施工工藝、材料及設(shè)備的驗(yàn)收和質(zhì)量關(guān),確保工程施工質(zhì)量達(dá)到設(shè)計(jì)圖紙及規(guī)范的要求。3.2堅(jiān)持集中力量保重點(diǎn)工期的原則。根據(jù)本公司人員、設(shè)備裝備能力,類(lèi)似工程施工管理經(jīng)驗(yàn),編制符合本工程實(shí)際的施工進(jìn)度計(jì)劃安排,以確保工程順利進(jìn)行,保證工程優(yōu)質(zhì)和按期完工。3.3堅(jiān)持安全及文明施工的原則。結(jié)合工程施工的規(guī)定,編制嚴(yán)格、可行的安全及文明施工措施、制度和各級(jí)人員的安全及文明施工職責(zé)。同時(shí),根據(jù)施工現(xiàn)場(chǎng)具體情況和咸陽(yáng)市政府機(jī)關(guān)有關(guān)文明施工的具體要求,認(rèn)真規(guī)劃施工現(xiàn)場(chǎng)平面布置。3.4堅(jiān)持配合作業(yè),互創(chuàng)條件的原則。在組織好安裝工程預(yù)留預(yù)埋工作的同時(shí),根據(jù)情況隨時(shí)插入安裝施工。合理組織平行作業(yè),流水交叉作業(yè)和重點(diǎn)部位搶工。3.5推廣應(yīng)用先進(jìn)的施工工藝和材料的原則。施工中采用:鋼筋電渣壓力焊、直螺紋連接、新型防水劑、計(jì)算機(jī)應(yīng)用技術(shù)等。第二章工程概況和特點(diǎn)第一節(jié)工程概況1.1建筑概述1.1.1本工程位于陜西省咸陽(yáng)市涇陽(yáng)縣高莊鎮(zhèn),結(jié)構(gòu)形式為框架結(jié)構(gòu)。1#樓建筑層數(shù)為5層,一~二層為商業(yè)網(wǎng)點(diǎn),三~五層為辦公層,建筑高度23.85米,建筑面積為11939.88平方米。2#樓建筑層數(shù)為4層,一~二層為商業(yè)網(wǎng)點(diǎn),三~四層為辦公層,建筑高度21.4米,建筑面積為6968.73平方米。3#樓建筑層數(shù)為4層,一~二層為商業(yè)網(wǎng)點(diǎn),三~四層為辦公層,建筑高度21.4米,建筑面積為8471.89平方米(其中地上建筑面積6968.73平方米,地下建筑面積1503.16平方米)。4~5#樓兩棟建筑層數(shù)為4層,一~二層為商業(yè)網(wǎng)點(diǎn),三~四層為辦公層,建筑高度21.4米,單棟建筑面積為11583.69平方米。9#樓建筑層數(shù)為4層,一~二層為商業(yè)網(wǎng)點(diǎn),三~四層為辦公層,建筑高度21.4米,建筑面積為18109.76平方米。11#樓建筑層數(shù)為4層,一~二層為商業(yè)網(wǎng)點(diǎn),三~四層為辦公層,建筑高度21.4米,建筑面積為12626.72平方米。本工程總建筑面積為81284.36㎡本工程包括施工圖設(shè)計(jì)范圍內(nèi)及招標(biāo)文件要求的內(nèi)容,包括土建。1.1.2本工程為框架結(jié)構(gòu),設(shè)計(jì)使用年限50年,抗震設(shè)防烈度為7度,建筑耐火等級(jí)一級(jí)。1.2設(shè)計(jì)概況結(jié)構(gòu)類(lèi)型框架結(jié)構(gòu)基礎(chǔ)類(lèi)型柱下條形基礎(chǔ)抗震設(shè)防烈度7度墻體外墻體為240厚非承重空心磚、內(nèi)墻體為180厚非承重空心磚、基礎(chǔ)MU10實(shí)心粘土磚,防水1、地下室外墻:聚合物改性瀝青防水層3厚。2.變配電室:3厚SAM920自粘橡膠瀝青防水卷材。屋面屋面卷材防水:1、1.5厚SAM920自粘橡膠瀝青防水卷材+2厚SAM980自粘聚合物改性瀝青聚酯胎卷材。2、55厚擠塑聚苯保溫板B2級(jí)。3、25厚1:3水泥砂漿找平層。4、1:6水泥陶?;蚪乖移伦畋√?0(或結(jié)構(gòu)找坡)。5、鋼筋混凝土屋面板。室內(nèi)裝修本工程地面為40厚C20細(xì)石混凝土地面、室外花崗巖面層、花崗巖臺(tái)階。墻面為白色乳膠漆外墻保溫1、65厚膨脹聚苯保溫板B1級(jí)。2、沿樓板位置每?jī)蓪釉O(shè)置寬度300mm的巖棉板防火隔離帶。防火隔離帶與墻面應(yīng)進(jìn)行全面積粘貼。第二節(jié)工程施工特點(diǎn)2.1本工程建設(shè)地點(diǎn)位于陜西省咸陽(yáng)市涇陽(yáng)縣高莊鎮(zhèn),其工程質(zhì)量、施工進(jìn)度、現(xiàn)場(chǎng)文明、安全生產(chǎn)都將產(chǎn)生影響,施工時(shí)必須按“標(biāo)準(zhǔn)化施工現(xiàn)場(chǎng)”及“綠色環(huán)保工地”的要求,搞好施工現(xiàn)場(chǎng)的規(guī)范化管理,確保安全文明施工,以良好的場(chǎng)容場(chǎng)貌、優(yōu)良的施工環(huán)境作保證,根據(jù)要求爭(zhēng)創(chuàng)造“優(yōu)質(zhì)結(jié)構(gòu)工程”。2.2施工現(xiàn)場(chǎng)較為寬闊,場(chǎng)內(nèi)“三通一平”已基本具備,交通方便。2.3本工程施工時(shí)應(yīng)嚴(yán)格遵循有關(guān)法律法規(guī)、國(guó)家或地方規(guī)范、標(biāo)準(zhǔn)圖集等的要求,精心施工,保證工程施工質(zhì)量和設(shè)計(jì)效果。2.4本工程施工場(chǎng)地較寬,合理、緊湊的布置施工平面,有效規(guī)劃施工用地及施工臨時(shí)道路,有序組織人、機(jī)、料的入場(chǎng),避免因施工總平布置不良而造成人、機(jī)、料的施工組織混亂,從而影響施工進(jìn)度計(jì)劃及工程施工質(zhì)量,是本工程施工組織管理的關(guān)鍵。2.5本工程鋼筋、商品混凝土、水泥、砂石等原材料和鋼管、模板等周轉(zhuǎn)材料的供應(yīng)對(duì)于工程施工有較大影響。施工過(guò)程中必須充分作好原材料及周轉(zhuǎn)材料的需用計(jì)劃,保證工程施工的需要。2.6同時(shí),本工程3#樓建筑層數(shù)為地下1層,地上4層;1#樓建筑層數(shù)為地上5層,其余為地上4層且無(wú)地下層。如何保證工程施工的垂直運(yùn)輸,包括鋼筋、混凝土、周轉(zhuǎn)材料及施工作業(yè)人員的垂直運(yùn)輸,直接關(guān)系到工程施工的正常進(jìn)行,因此,施工布置及安排充分考慮垂直運(yùn)輸機(jī)械的選用,采用塔吊進(jìn)行垂直運(yùn)輸,以滿足工程施工需要。2.7要求的總工期為10個(gè)月。施工中應(yīng)合理安排施工工序,并考慮好工序之間的穿插搭接,有序組織材料、機(jī)械、人員、設(shè)備的進(jìn)場(chǎng),避免窩工,確保工期。2.8由于本工程為框架結(jié)構(gòu),施工時(shí)應(yīng)注意準(zhǔn)確的定位放線以及標(biāo)高(層高)的控制與傳遞。2.9本工程地下室、屋面等防水部位較多;樓面部分的穿墻管、砌體加固筋、孔口等特殊部位的細(xì)部構(gòu)造多;施工時(shí)保證它們的質(zhì)量也是本工程的關(guān)鍵內(nèi)容之一。2.10由于本工程為框架結(jié)構(gòu),砼現(xiàn)澆量較大,施工采用的模板尺寸應(yīng)精確,支撐體系應(yīng)保證穩(wěn)固、安全和保證施工進(jìn)度的需要,保證砼澆注質(zhì)量。2.11本工程的工程量大,體量也大,這給文明施工,達(dá)標(biāo)化工地的投入加大,設(shè)備、周轉(zhuǎn)架料、模板和臨設(shè)等項(xiàng)的投入也相應(yīng)加大;必須進(jìn)行嚴(yán)謹(jǐn)、科學(xué)的現(xiàn)場(chǎng)平面布置和施工組織設(shè)計(jì)、合理地最佳優(yōu)化地制定工期計(jì)劃、工程施工順序和總控制進(jìn)度網(wǎng)絡(luò)計(jì)劃等各項(xiàng)施工準(zhǔn)備工作是本工程十分重要的任務(wù)。2.12本工程施工時(shí)應(yīng)密切配合給水、排水、電氣、消防、通風(fēng)、采暖等各工種的設(shè)計(jì)說(shuō)明及圖紙,預(yù)留出設(shè)備管線的穿墻洞、預(yù)埋件等;做好預(yù)埋件的防銹處理,不得事后隨意打洞和返工。第三章項(xiàng)目部施工組織機(jī)構(gòu)第一節(jié)管理目標(biāo)1.1工期目標(biāo):10個(gè)月1.2質(zhì)量目標(biāo):合格1.3安全文明施工目標(biāo):杜絕重傷事故。輕傷頻率在1‰以內(nèi),創(chuàng)建《咸陽(yáng)市安全文明施工標(biāo)準(zhǔn)化工地》及綠色環(huán)保工地。評(píng)定為咸陽(yáng)安全文明工地,獲得咸陽(yáng)安全文明工地稱(chēng)號(hào)。1.4技術(shù)管理目標(biāo):建立準(zhǔn)確、及時(shí)、完整的技術(shù)檔案和職責(zé)明確的技術(shù)管理體系。第二節(jié)實(shí)施手段遵照GB/T19001-ISO9001:2000標(biāo)準(zhǔn)執(zhí)行,我公司派出優(yōu)秀項(xiàng)目經(jīng)理部進(jìn)行施工。擬配備項(xiàng)目經(jīng)理一名、項(xiàng)目副經(jīng)理一名、工程師一名、技術(shù)員二名、資料員一名及各工種各部門(mén)需要的其他人員。第三節(jié)施工組織機(jī)構(gòu)針對(duì)本工程施工特點(diǎn)和業(yè)主的有關(guān)要求,結(jié)合本公司在類(lèi)似工程施工中的成功經(jīng)驗(yàn),我公司從成立和組建公司及項(xiàng)目部二級(jí)施工組織管理機(jī)構(gòu)入手,明確施工管理目標(biāo)和各級(jí)人員管理職責(zé),制定各項(xiàng)管理制度和施工管理重點(diǎn),建立健全質(zhì)量保證體系和施工技術(shù)保證措施。從而建立一套完整的、符合本工程施工的、行之有效的施工組織措施,以保證工程施工的順利進(jìn)行。3.1項(xiàng)目部組織管理機(jī)構(gòu)的組建根據(jù)本工程的特點(diǎn),項(xiàng)目管理機(jī)構(gòu)由三個(gè)層次組成:3.1.1指揮決策層――工程總指揮部工程總指揮部是項(xiàng)目施工決策和保障機(jī)構(gòu),在公司整個(gè)范圍內(nèi),對(duì)項(xiàng)目施工所需要的人員、機(jī)械、材料、資金等進(jìn)行統(tǒng)一協(xié)調(diào)調(diào)配,為項(xiàng)目施工提供可靠的保障。3.1.2項(xiàng)目管理層――工程項(xiàng)目經(jīng)理部按照“項(xiàng)目法”施工組成的項(xiàng)目經(jīng)理負(fù)責(zé)制,對(duì)工程進(jìn)度、質(zhì)量、安全、文明施工、合同履約全面協(xié)同,并協(xié)調(diào)各專(zhuān)業(yè)分包之間的工序搭接和進(jìn)度、場(chǎng)地、交叉作業(yè)的相互配合。確保工程按照既定質(zhì)量、進(jìn)度目標(biāo)交付使用。3.1.3施工作業(yè)層――直接參與施工的作業(yè)班組精選曾施工過(guò)多項(xiàng)優(yōu)質(zhì)工程并有過(guò)施工同類(lèi)型工程經(jīng)驗(yàn)的各專(zhuān)業(yè)班組。3.2項(xiàng)目部施工組織管理機(jī)構(gòu)網(wǎng)絡(luò)圖組織管理機(jī)構(gòu)網(wǎng)絡(luò)圖3.3土建項(xiàng)目部人員配備及成員職責(zé)3.3.1項(xiàng)目經(jīng)理主要工作內(nèi)容:1、遵守國(guó)家有關(guān)工程建設(shè)和城市建筑管理的政策法規(guī),執(zhí)行施工及管理規(guī)范和企業(yè)規(guī)章制度,履行承包合同。2、負(fù)責(zé)本工程項(xiàng)目部的全面工作,并保證施工合同標(biāo)的在本工程項(xiàng)目的全面實(shí)現(xiàn)。3、根據(jù)工程合同規(guī)定,組織單位工程或?qū)I(yè)部分分包工作,協(xié)調(diào)總分包單位間的關(guān)系。4、主持項(xiàng)目經(jīng)濟(jì)成本分析,負(fù)責(zé)項(xiàng)目上的資金合理使用,負(fù)責(zé)工程成本責(zé)任目標(biāo)的實(shí)現(xiàn)和項(xiàng)目經(jīng)營(yíng)合同的各項(xiàng)目管理工作。5、參加建設(shè)單位組織的協(xié)調(diào)會(huì)議,并組織工程項(xiàng)目?jī)?nèi)部的各項(xiàng)協(xié)調(diào)會(huì)議。6、組織編制和實(shí)施施工組織設(shè)計(jì)、施工計(jì)劃及技術(shù)管理,降低成本,安全生產(chǎn),堅(jiān)持文明施工。制定本項(xiàng)目管理規(guī)章制度,加強(qiáng)項(xiàng)目管理和班組建設(shè)。3.3.2項(xiàng)目副經(jīng)理主要工作內(nèi)容:1、在項(xiàng)目經(jīng)理領(lǐng)導(dǎo)下,分管項(xiàng)目材料設(shè)備,并直接負(fù)責(zé)本工程施工計(jì)劃落實(shí),并在質(zhì)量、工期、安全、成本等方面負(fù)責(zé)接受上級(jí)主管部門(mén)的監(jiān)督、檢查,使生產(chǎn)順利進(jìn)行。2、認(rèn)真熟悉圖紙,嚴(yán)格按照設(shè)計(jì)圖要求,施工組織設(shè)計(jì)和規(guī)范、規(guī)程組織工程施工,搞好勞動(dòng)力、材料、機(jī)具設(shè)備的合理安排和使用,杜絕返工、浪費(fèi),保證工程質(zhì)量、合同工期的實(shí)現(xiàn),提高工程綜合經(jīng)濟(jì)效益。3、搞好安全生產(chǎn)現(xiàn)場(chǎng)管理,爭(zhēng)創(chuàng)標(biāo)準(zhǔn)化文明工地,堅(jiān)持安全生產(chǎn),杜絕重大傷亡、火災(zāi)及設(shè)備事故的發(fā)生。4、領(lǐng)導(dǎo)并參加工程項(xiàng)目施工進(jìn)度、安全和創(chuàng)標(biāo)準(zhǔn)化文明工地的檢查,并主持各項(xiàng)評(píng)比工作,負(fù)責(zé)組織制定相關(guān)獎(jiǎng)罰制度,確保工程項(xiàng)目按期一次性交驗(yàn)合格達(dá)優(yōu),確保工程項(xiàng)目創(chuàng)標(biāo)準(zhǔn)化文明工地及綠色環(huán)保工地。3.3.3技術(shù)負(fù)責(zé)人主要工作內(nèi)容:1、在項(xiàng)目經(jīng)理和上級(jí)部門(mén)指導(dǎo)下對(duì)工程技術(shù)質(zhì)量管理全面負(fù)責(zé),是工程質(zhì)量的直接責(zé)任人。2、認(rèn)真貫徹國(guó)家技術(shù)標(biāo)準(zhǔn)、規(guī)范、規(guī)程,執(zhí)行公司及項(xiàng)目有關(guān)的技術(shù)管理規(guī)章制度,接受上級(jí)部門(mén)的監(jiān)督檢查。3、建立健全項(xiàng)目技術(shù)質(zhì)量管理制度、責(zé)任制和質(zhì)量保證體現(xiàn)以及例會(huì)制度,負(fù)責(zé)全面工程質(zhì)量管理和計(jì)量管理工作,處理各種技術(shù)質(zhì)量問(wèn)題。4、主持編制項(xiàng)目工程的施工組織設(shè)計(jì),主持圖紙會(huì)審,做好工程技術(shù)交底及安全措施的制定工作。5、制定推廣“四新”計(jì)劃和降低成本的技術(shù)措施,參加項(xiàng)目經(jīng)濟(jì)活動(dòng)分析,提高技術(shù)管理水平。6、負(fù)責(zé)指導(dǎo)項(xiàng)目?jī)?nèi)業(yè)技術(shù)管理及質(zhì)量、安全、試驗(yàn)、計(jì)量、測(cè)量部門(mén)的工作,確保項(xiàng)目技術(shù)、質(zhì)量、效益指標(biāo)的完成。7、組織參加工程項(xiàng)目的施工進(jìn)度、施工質(zhì)量、施工安全和創(chuàng)標(biāo)準(zhǔn)化文明工地的檢查,確保本工程項(xiàng)目達(dá)到工程驗(yàn)收一次性合格成優(yōu)。8、認(rèn)真熟悉圖紙,嚴(yán)格按照設(shè)計(jì)圖、施工組織設(shè)計(jì)和規(guī)范、規(guī)程,負(fù)責(zé)各單位工程和分部工程的技術(shù)交底工作。9、負(fù)責(zé)組織編寫(xiě)特殊項(xiàng)目、特殊部位的施工方案。10、負(fù)責(zé)各自專(zhuān)業(yè)工程項(xiàng)目的施工資料、交工資料的收集整理和歸檔工作,確保工程順利交工。11、參加圖紙會(huì)審,參加項(xiàng)目經(jīng)理部組織的施工進(jìn)度、質(zhì)量、安全和創(chuàng)標(biāo)準(zhǔn)化工地和綠色環(huán)保工地的檢查和評(píng)比活動(dòng)。3.3.4責(zé)任工長(zhǎng)主要工作內(nèi)容:1、在項(xiàng)目經(jīng)理的領(lǐng)導(dǎo)下直接負(fù)責(zé)本工程施工計(jì)劃的落實(shí),并在質(zhì)量、工期、安全、成本等方面負(fù)責(zé)接受上級(jí)主管部門(mén)的監(jiān)督、檢查,使生產(chǎn)順利進(jìn)行。2、認(rèn)真熟悉圖紙,參加設(shè)計(jì)交底和圖紙會(huì)審,嚴(yán)格按照設(shè)計(jì)圖要求、施工組織設(shè)計(jì)和規(guī)范、規(guī)程組織施工,做好勞動(dòng)力、材料機(jī)具設(shè)備的合理安排和使用,杜絕返工、浪費(fèi),保證工程質(zhì)量、合同工期的實(shí)現(xiàn),提高工程綜合經(jīng)濟(jì)效益。3、做好技術(shù)交底工作,負(fù)責(zé)督促檢查班組施工前的準(zhǔn)備工作,檢查施工質(zhì)量,保證施工順利進(jìn)行。4、搞好安全生產(chǎn)現(xiàn)場(chǎng)管理,爭(zhēng)創(chuàng)標(biāo)準(zhǔn)化文明工地。堅(jiān)持安全生產(chǎn),杜絕重大傷亡、火災(zāi)及設(shè)備事故的的發(fā)生。5、開(kāi)展全面質(zhì)量管理,堅(jiān)持三檢制,嚴(yán)格計(jì)量工作,負(fù)責(zé)測(cè)量放線的復(fù)核工作,堅(jiān)持按ISO9002要求填寫(xiě)施工日志。3.3.5鋼筋工長(zhǎng)主要工作內(nèi)容:1、認(rèn)真熟悉圖紙,嚴(yán)格按照規(guī)范規(guī)程組織施工。2、結(jié)合施工圖紙進(jìn)行不同部位的安全技術(shù)交底,并辦好交接手續(xù)。3、保管好鋼筋工程經(jīng)濟(jì)技術(shù)資料送內(nèi)業(yè)歸檔。4、搞好鋼筋工程的施工管理,保證生產(chǎn)順利進(jìn)行。3.3.6模板工長(zhǎng)主要工作內(nèi)容:1、熟悉圖紙,參加設(shè)計(jì)交底和圖紙會(huì)審,參與編制有關(guān)方案,了解設(shè)計(jì)要求,做到按圖施工,不出差錯(cuò)。2、向班組作質(zhì)量、安全節(jié)約工序的安排和操作規(guī)程的交底工作,負(fù)責(zé)督促檢查班組施工前的準(zhǔn)備工作,檢查工序施工質(zhì)量,保證施工順利進(jìn)行。3、負(fù)責(zé)模板制、安、拆施工,督促班組按操作規(guī)程和工藝要求施工。4、做好原始資料積累。3.3.7砼工長(zhǎng)主要工作內(nèi)容:1、負(fù)責(zé)本工程砼的施工并對(duì)砼施工的質(zhì)量、安全、進(jìn)度負(fù)責(zé)。2、參與砼方案的編制,嚴(yán)格按方案施工。3、對(duì)各班組進(jìn)行分段分層的技術(shù)安全交底,督促班組實(shí)施工作計(jì)劃。4、負(fù)責(zé)辦好砼澆筑許可證,并交內(nèi)業(yè)存檔。5、加強(qiáng)對(duì)班組的管理工作,保證不出質(zhì)量事故,如出現(xiàn)質(zhì)量事故應(yīng)追查、總結(jié)并及時(shí)報(bào)項(xiàng)目經(jīng)理部。3.3.8裝修工長(zhǎng)主要工作內(nèi)容:1、認(rèn)真熟悉圖紙,嚴(yán)格按照本工種有關(guān)的規(guī)程進(jìn)行施工。2、參與本工種施工方案或作業(yè)指導(dǎo)書(shū)的編制工作并負(fù)責(zé)實(shí)施。3、對(duì)操作人員進(jìn)行安全教育,結(jié)合施工圖進(jìn)行不同部位的安全、技術(shù)交底,并辦好交接手續(xù)。4、每天按計(jì)劃組織人員進(jìn)行施工,并對(duì)質(zhì)量、進(jìn)度進(jìn)行監(jiān)督檢查,并加強(qiáng)對(duì)施工過(guò)程的管理,不留任何質(zhì)量隱患,確保生產(chǎn)順利進(jìn)行。5、加強(qiáng)對(duì)班組的管理工作,盡量不出現(xiàn)質(zhì)量事故。如出現(xiàn)質(zhì)量事故應(yīng)追查,總結(jié)并及時(shí)處理。6、作好本工種施工記錄及有關(guān)的經(jīng)濟(jì)技術(shù)資料,整理好送交內(nèi)業(yè)歸檔。3.3.9主要工作內(nèi)容1、測(cè)量員主要工作內(nèi)容:負(fù)責(zé)建筑物及樓層的測(cè)量放線、定位抄平工作。2、質(zhì)檢員主要工作內(nèi)容:落實(shí)各項(xiàng)質(zhì)量控制措施,負(fù)責(zé)工程施工質(zhì)量的監(jiān)督和檢查。3、安全員主要工作內(nèi)容落實(shí)各項(xiàng)安全生產(chǎn)措施,負(fù)責(zé)工程施工安全的監(jiān)督和檢查4、內(nèi)業(yè)技術(shù)員主要工作內(nèi)容:在技術(shù)負(fù)責(zé)人主持下編制工程施工方案;負(fù)責(zé)工程技術(shù)檔案理;負(fù)責(zé)技術(shù)核定、設(shè)計(jì)變更;負(fù)責(zé)編制施工作業(yè)計(jì)劃、月度完成情況報(bào)告。5、計(jì)劃統(tǒng)計(jì)員主要工作內(nèi)容:每月工程完成量的統(tǒng)計(jì)、上報(bào)。6、材料員主要工作內(nèi)容:負(fù)責(zé)工程材料的供應(yīng)、采購(gòu)、材料驗(yàn)收;現(xiàn)場(chǎng)材料管理、發(fā)料、發(fā)料;工護(hù)具保管。第四節(jié)施工組織機(jī)構(gòu)的運(yùn)作4.1根據(jù)本工程具體情況及特點(diǎn),進(jìn)行組建工程項(xiàng)目經(jīng)理部,經(jīng)公司選擇并確認(rèn)后,即進(jìn)入施工準(zhǔn)備階段。根據(jù)工程設(shè)計(jì)要求積極做好開(kāi)工前的準(zhǔn)備工作(材料、機(jī)械、技術(shù)等準(zhǔn)備工作與策劃工作),并且公司將無(wú)條件的支持和滿足本工程開(kāi)工需要,項(xiàng)目經(jīng)理部確定后,未經(jīng)業(yè)主同意中途變換人選,我公司愿受業(yè)主的處罰。4.2項(xiàng)目經(jīng)理部的各個(gè)職能人員,明確各自的責(zé)、權(quán)、利,使全體管理人員各司其職地開(kāi)展工作。提高項(xiàng)目經(jīng)理的工作效率,促進(jìn)管理的強(qiáng)化。使項(xiàng)目經(jīng)理部整個(gè)管理體系堅(jiān)持有序地按程序運(yùn)作,加快工程施工準(zhǔn)備,盡早地開(kāi)工,爭(zhēng)取前期時(shí)間。4.3按照公司的項(xiàng)目經(jīng)理部管理制度來(lái)規(guī)范和約束每個(gè)管理人員,使其提高工作質(zhì)量和工作效率。按照公司獎(jiǎng)懲制度,做到獎(jiǎng)罰分明,促進(jìn)每個(gè)管理人員有高度的責(zé)任感和自信心。4.4公司對(duì)項(xiàng)目管理應(yīng)抓好工程成本核算工作提高經(jīng)濟(jì)效益,但不能只講效益,不講社會(huì)效益。將項(xiàng)目施工管理水平、對(duì)業(yè)主服務(wù)質(zhì)量作為專(zhuān)項(xiàng)考核制度,爭(zhēng)取贏得業(yè)主、監(jiān)理及社會(huì)的贊揚(yáng)。第五節(jié)項(xiàng)目管理措施5.1組織強(qiáng)有力的項(xiàng)目班子,選派思想好、業(yè)務(wù)精、能力強(qiáng)、善合作、服務(wù)好的管理人員承擔(dān)項(xiàng)目工作。5.2建立健全項(xiàng)目經(jīng)理、工長(zhǎng)、內(nèi)業(yè)、材料、機(jī)械、勞資等崗位責(zé)任制,由工程領(lǐng)導(dǎo)小組定期對(duì)各專(zhuān)業(yè)人員進(jìn)行考核。5.3強(qiáng)化激勵(lì)與約束機(jī)制,制定業(yè)績(jī)?cè)u(píng)比、獎(jiǎng)勵(lì)辦法,定期組織項(xiàng)目經(jīng)理部管理人員會(huì)議,檢查工作質(zhì)量,對(duì)第一次檢查不合格者批評(píng),第二次檢查不合格者警告,第三次檢查不合格者立即調(diào)離本工作崗位。5.4建立工程領(lǐng)導(dǎo)小組現(xiàn)場(chǎng)辦公制,每周召開(kāi)一次現(xiàn)場(chǎng)辦公會(huì),重點(diǎn)解決項(xiàng)目的施工機(jī)具、勞動(dòng)力、技術(shù)、資金、質(zhì)量、進(jìn)度及總分包協(xié)調(diào)等問(wèn)題,確保項(xiàng)目各項(xiàng)工作高效運(yùn)轉(zhuǎn)。5.5每天下午由項(xiàng)目經(jīng)理召開(kāi)碰頭會(huì),對(duì)次日的工作進(jìn)行協(xié)調(diào)安排。5.6建立定期例會(huì)制,例會(huì)重點(diǎn)解決質(zhì)量、進(jìn)度、施工技術(shù)等難點(diǎn),明確各項(xiàng)問(wèn)題的解決辦法及時(shí)間,并形成會(huì)議紀(jì)要。5.7實(shí)行勞動(dòng)用工管理,選派組織能力強(qiáng)、技術(shù)水平高、能打硬仗的作業(yè)隊(duì)伍,樹(shù)立連續(xù)作戰(zhàn)的精神,確保工期按時(shí)完成。第六節(jié)施工管理重點(diǎn)6.1前期施工準(zhǔn)備作好工程施工的各項(xiàng)準(zhǔn)備工作,包括項(xiàng)目管理機(jī)構(gòu)的組建,施工作業(yè)人員、施工機(jī)械設(shè)備、材料等人、機(jī)、料的落實(shí),以及施工進(jìn)度計(jì)劃和施工技術(shù)方案的研究和優(yōu)選等工作。從而保證工程立即展開(kāi)工程施工的各項(xiàng)工作。6.2施工順序及進(jìn)度計(jì)劃施工工期緊張是本工程施工的一個(gè)特點(diǎn),施工順序的確定、進(jìn)度計(jì)劃的安排和實(shí)施以及分包工程的插入時(shí)間和施工工期,關(guān)系到整個(gè)工程合同工期的實(shí)現(xiàn)。施工過(guò)程中必須注意在保證整個(gè)工程進(jìn)度計(jì)劃的同時(shí),加強(qiáng)同分包項(xiàng)目的聯(lián)系與配合,避免相互之間的影響。6.3施工的配合工作本工程施工的配合工作,包括與設(shè)備安裝、水電安裝、通風(fēng)安裝、采暖管道安裝施工的配合,直接關(guān)系到整個(gè)工程的施工質(zhì)量和工期。因此,應(yīng)根據(jù)本工程施工的實(shí)際情況,制定周密的土建與安裝工程施工配合措施,包括施工管理人員的組成,相互交底、相互聯(lián)系、檢查督促方法,以及工期安排。保證整個(gè)工程施工的順利進(jìn)行。6.4質(zhì)量與安全工作工程施工質(zhì)量和安全工作,關(guān)系到企業(yè)的生存和社會(huì)形象。認(rèn)真執(zhí)行公司的質(zhì)量方針和有關(guān)質(zhì)量、安全制度,制定科學(xué)嚴(yán)格的管理方法和控制措施,是本工程施工管理工作的重點(diǎn)之一。6.5施工隊(duì)伍自身管理加強(qiáng)施工隊(duì)伍自身管理,提高施工人員素質(zhì),落實(shí)各項(xiàng)管理制度,關(guān)系到本工程各項(xiàng)施工管理目標(biāo)的實(shí)現(xiàn)。在本工程的施工建設(shè)中,應(yīng)做到“制度健全、責(zé)任落實(shí)、管理到位、獎(jiǎng)罰分明”,重點(diǎn)抓制度的健全和落實(shí),促進(jìn)管理明確和到位。從而保證整個(gè)工程施工的順利進(jìn)行。第四章施工部署、材料機(jī)械投入計(jì)劃及勞動(dòng)力安排精心組織、精心施工、用戶滿意、營(yíng)造建筑精品是該項(xiàng)目部施工指導(dǎo)思想。針對(duì)本工程施工工作量大、施工工期緊張、質(zhì)量要求高的特點(diǎn),以質(zhì)量、工期、安全、文明生產(chǎn)為目標(biāo),通過(guò)加強(qiáng)施工準(zhǔn)備和過(guò)程管理,努力做好協(xié)調(diào)工作,圍繞滿足合同工期,工程質(zhì)量達(dá)到優(yōu)良的目的采取各種施工技術(shù)措施,嚴(yán)格監(jiān)督、檢查、驗(yàn)收各工序施工質(zhì)量,自覺(jué)接受業(yè)主、監(jiān)理、設(shè)計(jì)、質(zhì)檢站等單位的監(jiān)督和檢查,以順利實(shí)現(xiàn)各項(xiàng)施工管理預(yù)期目標(biāo)。同時(shí),公司將本工程列為年度的重點(diǎn)工程,成立施工領(lǐng)導(dǎo)小組,在人力、物力、資金外給予全面支持。全力協(xié)助項(xiàng)目部做好施工準(zhǔn)備工作和施工過(guò)程中的管理工作,履行公司“質(zhì)量第一,服務(wù)第一”的質(zhì)量方針,以科學(xué)、求實(shí)、嚴(yán)格的施工管理完成本工程的施工建設(shè)。第一節(jié)施工總體安排1.1混凝土按照有關(guān)規(guī)定,本工程施工所需混凝土采用商品砼、采用泵送的方式澆筑?,F(xiàn)場(chǎng)指定固定的區(qū)域,安設(shè)2臺(tái)混凝土輸送泵,保證混凝土澆筑及時(shí)。1.2鋼筋的加工制作本工程鋼筋的加工制作考慮在現(xiàn)場(chǎng)設(shè)置鋼筋加工房,全部鋼筋的加工制作均在現(xiàn)場(chǎng)進(jìn)行。1.3砌塊本工程砌筑所用砌塊沿建筑物外圍在指定區(qū)域堆放,減少二次搬運(yùn),保證施工用量。第二節(jié)施工準(zhǔn)備的內(nèi)容序號(hào)項(xiàng)目?jī)?nèi)容完成時(shí)間1技術(shù)準(zhǔn)備1、施工圖紙預(yù)審、會(huì)審2、結(jié)合工程實(shí)際,編制有針對(duì)性的施工方案開(kāi)工前3、攪拌站對(duì)所用砂石、水泥取樣,試配。開(kāi)工前2物資準(zhǔn)備材料準(zhǔn)備、構(gòu)(配)件和制品加工準(zhǔn)備、建筑施工機(jī)具準(zhǔn)備開(kāi)工前2、編制各種物資需要量計(jì)劃,與合格分供方簽訂物資供應(yīng)合同,確定物資運(yùn)輸方案和計(jì)劃,組織物質(zhì)按計(jì)劃進(jìn)場(chǎng)和保管基礎(chǔ)工程開(kāi)工后半個(gè)月第一批鋼材水泥進(jìn)場(chǎng)3勞動(dòng)力組織準(zhǔn)備1、優(yōu)選勞動(dòng)力隊(duì)伍開(kāi)工前半月2、集結(jié)施工力量、組織勞動(dòng)力進(jìn)場(chǎng)開(kāi)工前3、做好工人入場(chǎng)三級(jí)教育開(kāi)工前4現(xiàn)場(chǎng)準(zhǔn)備1、施工現(xiàn)場(chǎng)控制網(wǎng)測(cè)量,復(fù)核各控制網(wǎng)點(diǎn)。2、做好“三通一平”3、臨時(shí)設(shè)施搭設(shè)4、組織施工機(jī)具進(jìn)場(chǎng)5、組織建筑材料進(jìn)場(chǎng)6、擬定有關(guān)試驗(yàn)、測(cè)試項(xiàng)目計(jì)劃開(kāi)工前5施工場(chǎng)外協(xié)調(diào)1、辦理施工許可證及其他相關(guān)手續(xù)2、材料加工和訂貨3、簽訂分包和勞務(wù)合同開(kāi)工前第三節(jié)施工順序及施工段劃分施工順序和施工流水段的合理劃分是保證工程施工質(zhì)量和進(jìn)度的前提條件。同時(shí)也關(guān)系到整個(gè)工程施工的現(xiàn)場(chǎng)組織管理及高效率運(yùn)行和人、機(jī)、料的合理配置。通過(guò)合理的施工順序安排及流水段劃分,能夠確保各個(gè)施工階段勞動(dòng)力各工種(鋼筋工、混凝土工、模板工、架子工、磚工、抹灰工)的不間斷流水作業(yè)、材料(鋼筋、混凝土、模板、架料)的合理流水供應(yīng)、機(jī)械設(shè)備(塔吊、鋼筋加工設(shè)備等)的高效合理使用,從而便于現(xiàn)場(chǎng)組織、管理和調(diào)度,加快工程進(jìn)度,有效控制質(zhì)量。避免勞動(dòng)力和機(jī)械設(shè)備的重置浪費(fèi),有效地控制工程成本。3.1施工流水段劃分結(jié)合工程設(shè)計(jì)和施工特點(diǎn),從保證施工進(jìn)度、均衡人員安排、提高機(jī)械使用效率的角度考慮,計(jì)劃將本工程基礎(chǔ)及主體施工階段作如下施工流水安排:1、總體施工:本工程在水平上分為三個(gè)流水段,5#、9#樓為第一水平段,1~4#樓為第二水平段,11#樓為第三水平段。2、基礎(chǔ)施工階段,在水平方向分為兩個(gè)施工段,每段按順序進(jìn)行流水施工作業(yè)。3、主體施工階段,整個(gè)工程綜合考慮分段流水,以層考慮施工流水段劃分,各工種(鋼筋工、模板工、混凝土)整個(gè)現(xiàn)場(chǎng)統(tǒng)籌安排。4、主體工程以后的裝飾等分部工程,各施工作業(yè)面已完全具備,因此安排為全面進(jìn)行。3.2施工順序1、分部分項(xiàng)工程施工順序2、基礎(chǔ)工程施工順序測(cè)量定位→挖土方→鉆探及回填孔→基礎(chǔ)下土方回填→基礎(chǔ)檢測(cè)→基礎(chǔ)鋼筋、模板、砼→砌磚基礎(chǔ)→地溝→土方回填。3、主體結(jié)構(gòu)工程施工順序軸線、標(biāo)高復(fù)核→柱鋼筋綁扎→柱模板安裝→柱混凝土澆灌→框架梁、板底模安裝→框架梁、板鋼筋綁扎—→框梁、板側(cè)模安裝→框架梁、板砼澆灌—→重復(fù)上述工序至主體框架工程施工完成。第四節(jié)基礎(chǔ)及主體施工階段具體施工安排基礎(chǔ)施工階段,經(jīng)施工現(xiàn)場(chǎng)實(shí)地勘測(cè),結(jié)合具體施工內(nèi)容和施工順序作以下具體的、有針對(duì)性的施工安排:4.1根據(jù)施工段的劃分,采取流水方式進(jìn)行施工。4.2各施工段的基礎(chǔ)施工柱施工、頂板施工錯(cuò)開(kāi)一個(gè)流水節(jié)拍,即按從下到上的施工順序,在后一個(gè)施工段基礎(chǔ)施工時(shí),同時(shí)進(jìn)行前一個(gè)施工柱(頂板)施工。4.3鋼筋原材料、模板及周轉(zhuǎn)材料根據(jù)施工進(jìn)度計(jì)劃組織進(jìn)場(chǎng),并在擬建樓前有序地設(shè)置材料臨時(shí)堆放點(diǎn),同時(shí)采用塔吊二次轉(zhuǎn)運(yùn)至各堆放點(diǎn)。4.4基礎(chǔ)及主體施工階段,場(chǎng)內(nèi)施工人員總計(jì)約100人,在場(chǎng)內(nèi)修建管理人員辦公室和其它配套的生產(chǎn)設(shè)施,但不修建工人宿舍。4.5混凝土采用商品砼,采用輸送泵送至澆筑位置。第五節(jié)機(jī)械設(shè)備的選擇5.1機(jī)械設(shè)備的配備原則施工機(jī)械設(shè)備的選擇配備,以工程具體的平面布置、施工特點(diǎn)為前提,以能充分、合理地發(fā)揮機(jī)械性能,滿足工程施工需要,保證工程施工進(jìn)度,同時(shí)避免施工機(jī)械的重置浪費(fèi)或不足為原則進(jìn)行。根據(jù)本工程平面形狀、鋼筋、混凝土施工工作量較大等特點(diǎn),機(jī)械設(shè)備的選擇主要以鋼筋加工機(jī)械、砼攪拌、運(yùn)輸設(shè)備、垂直運(yùn)輸設(shè)備為主要內(nèi)容,同時(shí),配備木工機(jī)具及測(cè)量、計(jì)量器具,以滿足工程施工的需要,為施工創(chuàng)造良好的條件,保證施工質(zhì)量、工期的順利完成。5.2鋼筋加工機(jī)械整個(gè)工程鋼筋加工量較大,為保證施工需要,現(xiàn)場(chǎng)鋼筋加工制作機(jī)具擬選用電焊機(jī)2臺(tái)、鋼筋彎曲機(jī)、斷料機(jī)、調(diào)直機(jī)各1臺(tái),用于鋼筋的加工和焊接;同時(shí),選用TG4-14型鋼筋電渣壓力焊機(jī)1臺(tái),直螺紋連接機(jī)2臺(tái),用于鋼筋連接。5.3垂直運(yùn)輸設(shè)備垂直運(yùn)輸設(shè)備主要擬采用四臺(tái)QTZ5310塔吊,一臺(tái)QTZ6010塔吊,用于保證基礎(chǔ)施工階段、主體施工階段及裝飾施工階段的垂直運(yùn)輸。QTZ5310、QTZ6010塔吊的技術(shù)性能型號(hào)QTZ63(5310)QTZ80(6010)額定起重力矩(KN.m)600800最大起重量(t)68最大工作幅度(m)2.5∽452.5∽55最大幅度額定起重量(t)1.01.0獨(dú)立式起升高度(m)4545附著式起升高度(m)150150起升速度m/mina=210/40/8010/40/80起升速度m/min
a=45/20/405/20/40變幅速度
m/min22/4422/44回轉(zhuǎn)速度(r/min)0.620.60頂升速度(m/min)0.40.4結(jié)構(gòu)自重(t)4545裝機(jī)總?cè)萘浚╧w)48.654.3平衡重(t)10.3516.12標(biāo)準(zhǔn)節(jié)尺寸(m)1.6×1.6×2.51.8×1.8×2.5塔身主肢材料
1起重臂64.20×3.00×2.40110.12動(dòng)力包4.25×2.60×2.25113.53鋼絲繩110m左右12.9具體位置詳見(jiàn)施工現(xiàn)場(chǎng)平面布置圖(詳見(jiàn)附圖)。5.4混凝土運(yùn)輸機(jī)械為保證混凝土的澆灌速度,混凝土澆灌期間,加強(qiáng)與商品混凝土廠家的聯(lián)系,保證混凝土澆灌時(shí)運(yùn)輸車(chē)和輸送泵的使用。5.6施工機(jī)械設(shè)備的合理使用1、定人定機(jī),實(shí)行機(jī)械使用、保養(yǎng)責(zé)任制,將機(jī)械設(shè)備的使用效益與個(gè)人經(jīng)濟(jì)利益聯(lián)系起來(lái)。2、實(shí)行機(jī)操人員持證上崗制度。特種設(shè)備的機(jī)操人員必須持有效的特種設(shè)備操作證作業(yè)。3、現(xiàn)場(chǎng)環(huán)境、施工現(xiàn)場(chǎng)平面布置圖應(yīng)滿足機(jī)械作業(yè)的要求,交通道路暢通無(wú)障礙,夜間施工照明良好。5.7施工機(jī)械設(shè)備的保養(yǎng)與維護(hù)1、機(jī)操人員要嚴(yán)格執(zhí)行機(jī)械設(shè)備操作規(guī)程和機(jī)械設(shè)備維護(hù)保養(yǎng)制度,按時(shí)進(jìn)行設(shè)備維護(hù)保養(yǎng)。2、機(jī)操工要堅(jiān)持“清潔、緊固、調(diào)整、潤(rùn)濕、防腐”、“十字”作業(yè),填寫(xiě)運(yùn)轉(zhuǎn)和日常檢查記錄。運(yùn)轉(zhuǎn)中發(fā)生異常,要及時(shí)停機(jī)檢修,不得帶病運(yùn)轉(zhuǎn)作業(yè)。3、機(jī)械設(shè)備要杜絕“三違”(違章操作、違章指揮、違反勞動(dòng)紀(jì)律)現(xiàn)象,確保機(jī)械設(shè)備按規(guī)程和使用說(shuō)明書(shū)要求作業(yè)。5.8機(jī)械設(shè)備施工安全管理措施1、所有機(jī)械操作人員必須持證上崗,堅(jiān)持上下班,班前班后檢查機(jī)械設(shè)備,并經(jīng)常進(jìn)行維修保養(yǎng)。2、設(shè)置專(zhuān)職機(jī)械管理員,對(duì)機(jī)械設(shè)備堅(jiān)持三定制度,定期維護(hù)保養(yǎng),安全裝置齊全有效,杜絕安全事故的發(fā)生,一經(jīng)發(fā)現(xiàn)機(jī)械故障,及時(shí)更換零配件,保持機(jī)械使用的正常運(yùn)轉(zhuǎn),機(jī)操工必須持證上崗,按時(shí)準(zhǔn)確填寫(xiě)臺(tái)班記錄、維修保養(yǎng)記錄、交接班記錄,掌握機(jī)械磨損規(guī)律。3、施工現(xiàn)場(chǎng)設(shè)機(jī)械員負(fù)責(zé)機(jī)械的進(jìn)出場(chǎng),中途移動(dòng)的指揮工作,督促機(jī)操工進(jìn)行日常的檢查、保養(yǎng)、清潔、緊固、調(diào)整工作,督促機(jī)操工認(rèn)真填寫(xiě)軟件資料,負(fù)責(zé)安全技術(shù)交底。4、塔吊必須有安裝、拆卸方案,驗(yàn)收合格證書(shū)。軟件資料(運(yùn)行記錄、交接班記錄、日常檢查記錄、月檢查記錄、保養(yǎng)記錄、維修記錄、油料領(lǐng)取記錄等)必須真實(shí)、準(zhǔn)時(shí)、齊全。5、彎鋼機(jī)、斷鋼機(jī)、直螺紋連接機(jī)等機(jī)具的操作工應(yīng)認(rèn)真按操作規(guī)程操作,保證鋼筋加工質(zhì)量和砼質(zhì)量。6、嚴(yán)禁拆除機(jī)械設(shè)備上的自動(dòng)控制機(jī)構(gòu)、力矩限位器等安全裝置,及監(jiān)測(cè)、指示、儀表、警報(bào)器等自動(dòng)報(bào)警、信號(hào)裝置。其調(diào)試和故障的排除應(yīng)由專(zhuān)業(yè)人員負(fù)責(zé)進(jìn)行。7、處在運(yùn)行和運(yùn)轉(zhuǎn)中的機(jī)械嚴(yán)禁對(duì)其進(jìn)行維修、保養(yǎng)或調(diào)整等作業(yè)。8、機(jī)械設(shè)備應(yīng)按時(shí)進(jìn)行保養(yǎng),當(dāng)發(fā)現(xiàn)有漏保、失修或超載帶病運(yùn)轉(zhuǎn)等情況時(shí),有關(guān)部門(mén)應(yīng)責(zé)令其停止使用。9、機(jī)械設(shè)備的操作人員必須身體健康,并經(jīng)過(guò)專(zhuān)業(yè)培訓(xùn)考試合格,在取得有關(guān)部門(mén)頒發(fā)的操作證、特殊工種操作證后,方可獨(dú)立操作。學(xué)員必須在師傅的指導(dǎo)下進(jìn)行操作。10、違反安全操作規(guī)程的命令,操作人員有權(quán)拒絕執(zhí)行。由于發(fā)令人強(qiáng)制違章作業(yè)造成事故者,應(yīng)追究發(fā)令人的責(zé)任,直至追究刑事責(zé)任。11、機(jī)械作業(yè)時(shí),操作人員不得擅自離開(kāi)工作崗位或?qū)C(jī)械交給非本機(jī)操作人員操作,嚴(yán)禁酒后操作。12、機(jī)械操作人員和配合作業(yè)人員,都必須按規(guī)定穿戴勞動(dòng)保護(hù)用品,長(zhǎng)發(fā)不得外露。高空作業(yè)必須系安全帶,不得穿硬底鞋。嚴(yán)禁從高處往下投擲物件。13、機(jī)械進(jìn)入作業(yè)地點(diǎn)后,施工技術(shù)人員應(yīng)向機(jī)械操作人員進(jìn)行施工任務(wù)及安全技術(shù)措施交底。操作人員應(yīng)熟悉作業(yè)環(huán)境和施工條件,聽(tīng)從指揮,遵守現(xiàn)場(chǎng)安全規(guī)則。14、現(xiàn)場(chǎng)施工負(fù)責(zé)人應(yīng)為機(jī)械作業(yè)提供道路、水電、臨時(shí)機(jī)棚或停機(jī)場(chǎng)地等必須的條件,并消除對(duì)機(jī)械作業(yè)有妨礙或不安全的因素。夜間作業(yè)必須設(shè)置有充足的照明。15、當(dāng)機(jī)械設(shè)備發(fā)生事故或未遂惡性事故時(shí),必須及時(shí)搶救,保護(hù)現(xiàn)場(chǎng),同時(shí)立即報(bào)告有關(guān)部門(mén)。并按“四不放過(guò)”的原則進(jìn)行處理。第六節(jié)主要?jiǎng)趧?dòng)力需用計(jì)劃6.1勞動(dòng)力安排原則1、結(jié)合整個(gè)工程施工的特點(diǎn),確保施工總體安排和工期目標(biāo)的順利實(shí)現(xiàn)。2、勞動(dòng)力來(lái)源使用長(zhǎng)期與公司合作,并與公司簽訂了勞務(wù)協(xié)議的勞務(wù)公司人員,特殊工種人員需持證上崗。3、本工程主要?jiǎng)趧?dòng)力需用計(jì)劃,按分部分項(xiàng)工程工作量大小、施工進(jìn)度計(jì)劃為依據(jù)進(jìn)行安排。4、根據(jù)施工進(jìn)度計(jì)劃安排的施工內(nèi)容,分工種、分批次按需用人員組織進(jìn)出場(chǎng)。針對(duì)本工程施工此特點(diǎn),為了便于統(tǒng)籌調(diào)配及管理,勞動(dòng)力需用計(jì)劃分別按基礎(chǔ)施工階段、主體施工階段、裝飾施工階段及安裝施工階段進(jìn)行計(jì)劃安排。6.2勞動(dòng)力需用計(jì)劃見(jiàn)附表三:勞動(dòng)力計(jì)劃表6.3勞動(dòng)力的組織和管理1、對(duì)進(jìn)入施工現(xiàn)場(chǎng)的作業(yè)班組進(jìn)行嚴(yán)格的資格審查和技術(shù)考核,施工作業(yè)班組必須配備兼職質(zhì)檢員和安全員。2、對(duì)已入場(chǎng)的施工作業(yè)班組實(shí)施動(dòng)態(tài)管理,勞動(dòng)力由項(xiàng)目部統(tǒng)一安排,現(xiàn)場(chǎng)責(zé)任工長(zhǎng)綜合指揮,不允許任何人擅自擴(kuò)充和隨意抽調(diào),以確保作業(yè)班組的素質(zhì)和人員相對(duì)穩(wěn)定。3、未經(jīng)項(xiàng)目部質(zhì)量、安全培訓(xùn)的操作工人,一律不允許上崗。4、加強(qiáng)施工作業(yè)人員需用量的控制,提前計(jì)劃各階段人員需用量,做到心中有數(shù),減少盲目性。同時(shí),對(duì)合理安排施工作業(yè)人員的進(jìn)出場(chǎng)時(shí)間,以免造成不應(yīng)有的人員緊缺或浪費(fèi)現(xiàn)象。第五章施工現(xiàn)場(chǎng)平面布置5.1施工現(xiàn)場(chǎng)平面布置原則5.1.1本工程施工總平面布置以設(shè)計(jì)總平面圖為依據(jù),結(jié)合現(xiàn)場(chǎng)勘察情況,業(yè)主確定的施工現(xiàn)場(chǎng)平面布置范圍、臨時(shí)水電接入口和排污口方向,以及標(biāo)準(zhǔn)化施工現(xiàn)場(chǎng)規(guī)定為依據(jù),本著滿足工程施工和管理需要,達(dá)到“標(biāo)準(zhǔn)化施工現(xiàn)場(chǎng)”要求的原則進(jìn)行布置。5.1.2施工現(xiàn)場(chǎng)平面布置在盡量滿足施工生產(chǎn)、生活基本需要的同時(shí),做到分區(qū)、合理、緊湊、有序的布置。3、職工宿舍在場(chǎng)內(nèi)統(tǒng)一修建完成。5.2施工現(xiàn)場(chǎng)平面布置內(nèi)容及位置5.2.1施工現(xiàn)場(chǎng)平面布置內(nèi)容1、根據(jù)該工程施工需要及施工現(xiàn)場(chǎng)條件,施工現(xiàn)場(chǎng)平面布置內(nèi)容考慮了施工圍墻、臨時(shí)設(shè)施、臨時(shí)道路、材料堆放場(chǎng)地等,同時(shí)布置了機(jī)械位置、臨時(shí)水、電及場(chǎng)內(nèi)排水線路及方向。2、臨時(shí)設(shè)施考慮了業(yè)主及監(jiān)理辦公室、項(xiàng)目經(jīng)理辦公室、施工辦公室、技術(shù)辦公室、質(zhì)安辦公室、材料辦公室、計(jì)劃統(tǒng)計(jì)室、安裝辦公室、會(huì)議室、水泥庫(kù)房、材料庫(kù)房、鋼筋及木工加工房、配電房、廁所等內(nèi)容。5.2.2施工現(xiàn)場(chǎng)平面布置位置1、施工現(xiàn)場(chǎng)形成封閉圍墻。2、生產(chǎn)區(qū)域主要為鋼筋、模板加工棚、水泥庫(kù)房、鋼筋、砂石等材料堆場(chǎng)。3、辦公區(qū)域(臨時(shí)辦公室)布置在1#樓北邊。采用二層活動(dòng)房搭設(shè),一層為施工技術(shù)、質(zhì)安、材料、項(xiàng)目經(jīng)理辦公室、監(jiān)理辦公室;二層現(xiàn)場(chǎng)管理人員臨時(shí)住房。4、施工時(shí)的主要垂直運(yùn)輸機(jī)械為塔吊,塔吊基礎(chǔ)放置于樓角處,具體定位詳塔吊專(zhuān)項(xiàng)方案。5、在場(chǎng)內(nèi)設(shè)置一個(gè)一級(jí)配電間,供塔吊和樓層施工用電;另外在鋼筋加工棚和攪拌設(shè)備處形成一個(gè)二級(jí)配電箱。6、施工用水從業(yè)主指定的施工用水接口引入,現(xiàn)場(chǎng)內(nèi)用水管線埋地敷設(shè)。7、生活區(qū)域包括職工活動(dòng)室、職工臨時(shí)住房、浴室、廁所及盥洗臺(tái)等均設(shè)置在場(chǎng)內(nèi)。8、在進(jìn)入本工程的道路入口和場(chǎng)內(nèi)道路還需硬化處理。5.3臨時(shí)設(shè)施用地表1、圍墻、大門(mén):圍墻已形成,進(jìn)場(chǎng)后,在大門(mén)入口側(cè)設(shè)置燈箱式施工公告牌(包括工程概況牌、管理人員名單及監(jiān)督電話牌、消防保衛(wèi)牌、安全生產(chǎn)牌、文明施工牌、施工現(xiàn)場(chǎng)平面圖)。2、辦公用房:采用二層彩鋼板成品臨時(shí)活動(dòng)房搭建。3、材料庫(kù)房、水泥庫(kù)房、配電房:采用240標(biāo)磚,M5混合砂漿砌筑,石棉瓦單坡屋面。水泥庫(kù)房地面高于場(chǎng)內(nèi)300,加墊二層油氈隔潮。其中,水泥庫(kù)房、材料庫(kù)房寬度為4.0m,配電房寬度為3.0m。4、鋼筋加工棚、模板加工棚:采用Ф48鋼管搭設(shè),寬度5.0m。5.4場(chǎng)地、道路5.4.1場(chǎng)地做法場(chǎng)內(nèi)地面包括大門(mén)入口兩側(cè)、辦公區(qū)域、砂、石堆場(chǎng)及鋼筋、模板、周轉(zhuǎn)材料堆放范圍內(nèi)地面需在夯實(shí)后作100厚C20混凝土的硬化處理。5.4.2道路做法場(chǎng)內(nèi)車(chē)輛行走道路作150厚C15混凝土面層,道路基層需碾壓密實(shí)后,干鋪300mm厚的片石層和100mm厚的碎石層。大門(mén)入口處道路寬度為5.0m,其余道路寬度為3.50m。5.5場(chǎng)內(nèi)排水場(chǎng)內(nèi)排水設(shè)施主要考慮了排水暗管及排水明溝兩種形式,生活、生產(chǎn)廢、污水通過(guò)沉淀池處理沉淀后才能排放。5.5.1生活廢水的排放場(chǎng)內(nèi)設(shè)置臨時(shí)廁所。生活廢、污水經(jīng)化糞池處理后,通過(guò)暗埋的Ф200混凝土管排入業(yè)主指定排水管網(wǎng)。5.5.2生產(chǎn)廢水的排放生產(chǎn)廢水的處理主要通過(guò)二級(jí)沉淀,沉淀池設(shè)置在大門(mén)入口處,生產(chǎn)廢水經(jīng)沉淀處理后才能排放。5.5.3場(chǎng)地水排放場(chǎng)內(nèi)沿臨時(shí)道路布置排水明溝,場(chǎng)地水通過(guò)排水明溝有組織排放。5.6施工用電5.6.1用電量確定由于場(chǎng)內(nèi)已設(shè)置箱變配電間,每個(gè)施工段單獨(dú)配置,根據(jù)各施工段施工機(jī)械高峰期用電量統(tǒng)計(jì)。1、電動(dòng)機(jī)額定功率:ΣP1=103.7(KW),其中:塔吊:30×1=30kw插入式振動(dòng)棒:1.10×4=4.40kw平板式振動(dòng)器:1.50×2=3.0kw鋼筋調(diào)直機(jī):9.00×1=9.00kw鋼筋切斷機(jī):5.50×1=5.50kw鋼筋彎曲機(jī):2.80×1=2.80kw電渣壓力焊機(jī):45.0×3=135.0kw2、電焊機(jī)額定功率:ΣP2=148.00KVA,其中:交流電焊機(jī):24×2=48.00KVA鋼筋對(duì)焊機(jī):100.0×1=100.00KVA3、總用電量:P動(dòng)=0.7×103.7∕0.75+0.65×148=192.99(KVA)P照=P動(dòng)×10%=19.30(KVA)P總=192.99+19.30=212.89(KVA)5.6.2用電線路布置施工現(xiàn)場(chǎng)設(shè)置配電房,從箱變配電間引入,動(dòng)力照明線路采用380/220伏三相五線制分色配線,其截面選擇根據(jù)BLA持續(xù)允許電流表確定。動(dòng)力供電和照明線路分回路布置,分別用于塔吊、鋼筋加工房、木工加工房、生活及施工照明用電。電源進(jìn)線中間及末端至少三處作重復(fù)接地保護(hù),電阻小于10Ω,配電箱開(kāi)關(guān)帶漏電保護(hù)裝置。動(dòng)力線路采用暗敷,照明線路穿管明設(shè)。5.7安全文明施工布置5.7.1在圍墻外側(cè)及大門(mén)處設(shè)置安全警示牌。場(chǎng)內(nèi)設(shè)吸煙室、宣傳欄、建筑垃圾堆放場(chǎng)、綠化帶,同時(shí)在大門(mén)入口處設(shè)車(chē)輛沖洗臺(tái)。5.7.2現(xiàn)場(chǎng)綠化良好的現(xiàn)場(chǎng)綠化不僅可以提高現(xiàn)場(chǎng)安全文明施工水平,降低施工人員疲勞感覺(jué),而且可以有效降低施工噪音及粉塵對(duì)周?chē)?、生產(chǎn)環(huán)境的影響,因此,施工現(xiàn)場(chǎng)的綠化是現(xiàn)場(chǎng)管理的一個(gè)重要組成部分。1、大門(mén)及辦公、生活區(qū)域前的綠化;現(xiàn)場(chǎng)道路兩側(cè)的綠化;建筑物四周立面采用綠色環(huán)保安全網(wǎng)密封。2、現(xiàn)場(chǎng)設(shè)專(zhuān)職保衛(wèi)人員,實(shí)行出入證制度,現(xiàn)場(chǎng)大門(mén)專(zhuān)人24小時(shí)值守,工地內(nèi)部24小時(shí)進(jìn)行巡邏,現(xiàn)場(chǎng)內(nèi)嚴(yán)禁任何形式的打架斗毆及其他違法亂紀(jì)的擾民現(xiàn)象發(fā)生。第六章施工方案第一節(jié)施工測(cè)量1.1施工測(cè)量的準(zhǔn)備工作:1、熟悉、校核施工圖軸線尺寸、結(jié)構(gòu)尺寸和各層各部位的標(biāo)高變化及其相互間的關(guān)系。2、對(duì)照總圖,現(xiàn)場(chǎng)勘察、校測(cè)建筑用地紅線樁點(diǎn)、坐標(biāo)、高程及相鄰建筑物關(guān)系。3、測(cè)量?jī)x器準(zhǔn)備:光學(xué)經(jīng)緯儀(DJ2)一臺(tái)帶彎管目鏡;自動(dòng)安平水準(zhǔn)儀(DS1)一臺(tái);50m鋼卷尺3個(gè)。以上測(cè)量?jī)x器均應(yīng)在施工前檢定合格,確保測(cè)量數(shù)據(jù)的準(zhǔn)確。4、測(cè)量人員配備:測(cè)量工3~4人,驗(yàn)線員1人,上述人員均持有咸陽(yáng)市市建委頒發(fā)的上崗證書(shū)。1.2建筑物定位放線:1、因本工程在進(jìn)行土方開(kāi)挖施工時(shí)需要進(jìn)行定位放線及高程控制樁的建立,進(jìn)場(chǎng)后應(yīng)認(rèn)真進(jìn)行復(fù)核,做好原始記錄,驗(yàn)線人復(fù)查合格后報(bào)工程監(jiān)理查驗(yàn)。2、依據(jù)本工程定位和高程點(diǎn),建立本工程軸線控制網(wǎng)和相對(duì)高程控制網(wǎng)。鋼板上十字凹槽表示軸線與相關(guān)尺寸交叉點(diǎn)。為防止控制樁遭受意外破壞,要進(jìn)行保護(hù)并做好標(biāo)志。3、經(jīng)緯儀觀測(cè)采用正倒鏡取中定點(diǎn),水準(zhǔn)儀測(cè)量采用往返閉合測(cè)量方法,誤差小于等于1.5mm。距離丈量采用同一把鋼尺往返丈量一次,拉力為50N丈量結(jié)果當(dāng)中應(yīng)加入尺寸、溫度、拉力、傾斜等改正數(shù)。4、軸線控制網(wǎng)的精度要求。根據(jù)規(guī)定本工程布網(wǎng)精度為二級(jí),其中測(cè)角中誤差±12,邊長(zhǎng)相對(duì)中誤差1/15000。5、軸線控制網(wǎng)和高程控制網(wǎng)建立后,驗(yàn)線員進(jìn)行復(fù)核合格后報(bào)工程監(jiān)理查驗(yàn)。1.3基礎(chǔ)施工測(cè)量:1、進(jìn)場(chǎng)后,要立即將相對(duì)標(biāo)高返至基坑的側(cè)壁上,在基坑側(cè)壁釘設(shè)標(biāo)高控制樁,間距3~5m,并以此做為清底、墊層等施工的控制依據(jù),其高程傳遞允許誤差為±10mm。2、墊層施工前,以坑底軸線控制樁為依據(jù)兩側(cè)掛小線,用線坐標(biāo)將各軸線點(diǎn)吊至坑底,全長(zhǎng)復(fù)核后,放出墊層外邊線及集水坑邊坡線。3、墊層上測(cè)量:墊層上測(cè)量放線前,首先對(duì)軸線控制網(wǎng)進(jìn)行校測(cè),然后架經(jīng)緯儀(DJ2)于坑邊軸線樁上,依次用正、倒鏡方法向下投測(cè)軸線點(diǎn)投測(cè)允許誤差3mm。投測(cè)后,架經(jīng)緯儀于墊層上,盤(pán)左、盤(pán)右轉(zhuǎn)角校核角度,大鋼尺往返丈量閉合尺寸。彈出所有柱邊線、洞口線位置線等,并將各軸線點(diǎn)返至底板防水護(hù)上,重點(diǎn)部位用紅“▲”做上標(biāo)記。4、頂板測(cè)量放線方法同上述,但增加了柱邊控制線,樓梯間控制線,以確保框架柱、框架梁等位置準(zhǔn)確。5、地下室高程控制:在柱合模后,架水準(zhǔn)儀(DS1)于自然地面上(或臨時(shí)平臺(tái)上),后視臨時(shí)高程控制點(diǎn),返出該層+50線讀數(shù),抄測(cè)在柱主筋上,用紅漆做標(biāo)記,做為打混凝土找平用的依據(jù)。頂板模板鋪完后,再對(duì)模板的平整度進(jìn)行抄測(cè),跨度大的梁、板中間應(yīng)起拱。1.4主體施工測(cè)量:1、地下室頂板封頂后主體施工前,要先對(duì)建筑物的控制網(wǎng)進(jìn)行全面校驗(yàn),合格后再進(jìn)行首層定位放線。2、首層定位放線:利用建筑物四周及中間軸線控制樁,架設(shè)經(jīng)緯儀向首層地面投測(cè)軸線,用鋼尺復(fù)核建筑物軸線尺寸,誤差在允許范圍內(nèi)(±10mm),中間軸線整尺分出。依軸線放出柱邊線、樓梯間邊線及控制線。3、樓層測(cè)量:(1)樓層豎向投測(cè):首層柱拆模后將各軸線彈在柱身上,逐層向上投測(cè),起始點(diǎn)始終以首層軸線為后視,柱身軸線彈至頂層。(2)樓層高程傳遞:以首層柱身+50cm線向上排尺,依次得出各層標(biāo)高,每流水段不少于2個(gè)樓層高程點(diǎn).高程豎向傳遞允許誤差每層為±3mm,全高為±5mm。(3)樓梯放線時(shí),要先復(fù)核樓梯間尺寸,然后依據(jù)上下樓層+50cm線,確定中間平臺(tái)上下標(biāo)高和平臺(tái)長(zhǎng)度,梁位置在兩側(cè)彈出墨線(注意應(yīng)扣除建筑做法的厚度),依上下平臺(tái)標(biāo)高及踏步高寬彈出各個(gè)踏步。1.6裝飾施工測(cè)量:圍護(hù)砌筑過(guò)程中,隨時(shí)將+50cm線抄測(cè)彈上墨線,以此做為地面面層施工,門(mén)窗框安裝施工的標(biāo)高控制線。建筑四大角吊鉛垂鋼絲用以控制大角及墻面垂直,平整度。第二節(jié)土方工程2.1土方工程施工工藝確定挖土順序和坡度→放線(沿灰線開(kāi)挖土方)→分層作業(yè)(開(kāi)挖土方)→修整邊坡→清底2.2土方開(kāi)挖1、土方施工過(guò)程中,應(yīng)經(jīng)常測(cè)量和校核其平面位置、標(biāo)高和邊坡坡度等是否符合設(shè)計(jì)要求。平面控制樁和水準(zhǔn)點(diǎn)也應(yīng)定期復(fù)測(cè)和檢查是否正確,并應(yīng)在施工中注意附近的建(構(gòu))筑物、管線等發(fā)生沉降和變形,對(duì)其進(jìn)行沉降和位移的觀測(cè)。2、采用機(jī)械施工時(shí),對(duì)邊坡修整和場(chǎng)地邊角、小型溝槽的開(kāi)挖或填土等,以人工配合進(jìn)行。3、坑槽和管溝底部應(yīng)留有一定工作面,其每側(cè)工作面寬度在350~500mm。2.3土方回填1、施工工藝:(1)施工準(zhǔn)備:①材料A、回填土:宜優(yōu)先利用基槽中挖出的優(yōu)質(zhì)土。回填土內(nèi)不得含有有機(jī)雜質(zhì),粒徑不應(yīng)大于50mm,含水量應(yīng)符合壓實(shí)要求。B、填土材料如無(wú)設(shè)計(jì)要求,應(yīng)符合下列規(guī)定:a.碎石、砂土(使用細(xì)、粉砂時(shí)應(yīng)取得設(shè)計(jì)單位同意)和爆破石碴,可作表層以下地填料。b.含水量符合壓實(shí)要求的粘性土,可作各層地填料。c.碎塊草皮和有機(jī)含量大于8%的土,僅用于無(wú)壓實(shí)要求的填方。d.淤泥和淤泥質(zhì)土不能用作填料。②作業(yè)條件A、土方回填前應(yīng)根據(jù)工程特點(diǎn)、填料種類(lèi)、設(shè)計(jì)壓實(shí)系數(shù)、施工條件和壓實(shí)工藝等合理確定填料含水量、每層填土厚度和壓實(shí)工藝等合理確定填料含水量、每層填土厚度和壓實(shí)遍數(shù)等施工參數(shù)。B、填土前,應(yīng)做好水平高程的測(cè)設(shè)。基坑(槽)或溝坡邊上按需要的間距打入水平樁,室內(nèi)和散水的墻邊應(yīng)有水平標(biāo)記。(2)操作工藝①當(dāng)填方基底為積土或耕植土?xí)r,如設(shè)計(jì)無(wú)要求,可采用小型壓路機(jī)和人工夯實(shí)相結(jié)合的方法保證密實(shí)度。②遇淤泥時(shí),應(yīng)先排水疏干,挖除淤泥,換填砂礫或拋填塊石等方法處理后再行填土。③填筑粘性土,應(yīng)在填土前檢驗(yàn)填料的含水率。含水量偏高時(shí),可采用翻松晾曬,均勻摻入干土等措施;含水量偏低,可預(yù)先曬水濕潤(rùn),增加太實(shí)遍數(shù)或使用大功率壓實(shí)機(jī)械等措施。④填料為砂土或碎石類(lèi)土(充填物為砂土)時(shí),回填前宜充分灑水濕潤(rùn),可用較重的平板振動(dòng)器分層振實(shí),每層振實(shí)不少于三遍。⑤回填土應(yīng)水平分層找平夯實(shí),分層厚度和壓實(shí)遍數(shù)應(yīng)根據(jù)土質(zhì)、壓實(shí)系數(shù)和機(jī)具的性能選定。⑥分段分層填土,交接處應(yīng)填成階梯形,每層互相搭接,其搭接長(zhǎng)度就不少于每層填土厚度的兩倍,上下層錯(cuò)縫距離不少于1.0m。⑦在夯實(shí)或輾壓時(shí),如出現(xiàn)彈性變形的土(俗稱(chēng)像皮土),應(yīng)將該部分土方挖除,另用砂土或含砂石較大的土回填。⑧采用機(jī)械壓實(shí)的填土,在角隅用人工加以夯實(shí)。人工填土,每層填土厚度為150mm,夯重應(yīng)為30—40kg,每層厚度為200mm,夯重應(yīng)為60—70kg.打夯要領(lǐng)為“夯高過(guò)膝,一夯壓半夯,夯排三次”。夯實(shí)基坑(槽)、地坪,行夯路線由四邊開(kāi)始,夯向中間。第三節(jié)基礎(chǔ)工程3.1工程概況:本工程基礎(chǔ)為滿堂基礎(chǔ)、條基及部分磚基,基礎(chǔ)開(kāi)挖應(yīng)按勘察資料進(jìn)行放坡,無(wú)條件放坡時(shí)應(yīng)進(jìn)行基坑支護(hù)的專(zhuān)項(xiàng)設(shè)計(jì),確保周?chē)ㄖ锖褪┕と藛T的安全。地下水位較高時(shí),應(yīng)先將地下水水位降低至施工地面以下一定深度后再開(kāi)挖。3.2施工準(zhǔn)備:審查設(shè)計(jì)圖紙,核對(duì)平面尺寸和坑底標(biāo)高,摸清地下構(gòu)筑物及地下管線分布情況,與甲方確認(rèn)。3.3素砼墊層基槽驗(yàn)收合格后,立即進(jìn)行素砼墊層施工,砼標(biāo)號(hào)為C15。施工時(shí)用平板振動(dòng)器振密實(shí),木蟹搓平,并適當(dāng)養(yǎng)護(hù)。3.4基礎(chǔ)鋼筋(1)基礎(chǔ)底板鋼筋分為上下兩層時(shí),必須設(shè)鋼筋支架,鋼筋支架采用Ф16筋馬凳,間距1m,梅花型布置,支架與上下層鋼筋焊牢。(2)基礎(chǔ)底板鋼筋與柱h方向平行的鋼筋放在下層。(3)基礎(chǔ)底板鋼筋保護(hù)層厚度均為35mm,墊塊采用高標(biāo)號(hào)細(xì)石混凝土方塊,規(guī)格為50×50×40㎜。(4)預(yù)埋管件、鐵件、柱梁預(yù)留筋位置和標(biāo)高必須符合設(shè)計(jì)要求,不得漏埋、位移,必要時(shí)用電焊將預(yù)埋件與基礎(chǔ)鋼筋焊固。3.5基礎(chǔ)模板(1)滿堂基礎(chǔ)及條基側(cè)模、梁柱模板均采用酚醛木膠合板,鋼管扣件支撐固定,模板及支撐必須具備足夠的強(qiáng)度和穩(wěn)定性,施工前模板支撐詳圖及施工步驟須經(jīng)現(xiàn)場(chǎng)主任工程師復(fù)核認(rèn)可。(2)模板幾何尺寸必須符合設(shè)計(jì)要求,模板表面平整,接縫緊密,以確保砼的成形質(zhì)量。3.6砼澆搗(1)混凝土全部采用商品混凝土,配料時(shí)在其中加入適量的外加劑,以提高砼的性能。(2)混凝土澆筑時(shí)采用斜面分層法,順著長(zhǎng)方向,由一端向另一端一次性澆搗完畢,插入式振動(dòng)振動(dòng)密實(shí),木蟹拍實(shí)搓平。嚴(yán)格控制上前后混凝土澆筑的時(shí)間,防止出現(xiàn)冷縫?;炷撂涠瓤刂圃?~6㎝,采用塔吊運(yùn)輸。(3)滿堂基礎(chǔ)砼澆搗1小時(shí)后,按標(biāo)高用木制長(zhǎng)括尺括平表面,初凝前用滾筒滾壓數(shù)道,木蟹打平,待砼收水后,再用木蟹揉搓,以閉合收水裂縫。(4)混凝土澆筑后12小時(shí)開(kāi)始澆水養(yǎng)護(hù)。(5)根據(jù)規(guī)范要求,每臺(tái)班及100m3混凝土留置試塊一組,進(jìn)行標(biāo)準(zhǔn)養(yǎng)護(hù),28天送試驗(yàn)室試壓。3.7回填土基礎(chǔ)施工完畢后,經(jīng)業(yè)主及有關(guān)部門(mén)驗(yàn)收合格并簽證后,方可進(jìn)行回填土施工。施工前先清除基坑內(nèi)的垃圾,回填土應(yīng)選用粘性土、砂土或其它有效填料,不得使用過(guò)濕土腐植土、淤泥土及有機(jī)物含量大于8%的土?;靥顟?yīng)分層夯實(shí),每層虛鋪厚度不超過(guò)30㎝,并掌握好土的最佳含水率,控制最大干密度。按規(guī)定做好土的密實(shí)度試驗(yàn),填土的壓實(shí)系數(shù)不小于0.97。3.8注意事項(xiàng):(1)挖土過(guò)程中應(yīng)由測(cè)量工及時(shí)將標(biāo)高引測(cè)至控制樁上,并挖至基底標(biāo)高,避免超挖。(2)基坑邊1米內(nèi)嚴(yán)禁堆料或載重車(chē)輛穿行,設(shè)專(zhuān)人進(jìn)行觀測(cè),發(fā)現(xiàn)異常情況及時(shí)報(bào)告并立即處理。(3)坑內(nèi)施工中,應(yīng)派專(zhuān)人負(fù)責(zé)巡視,一旦出現(xiàn)危險(xiǎn)預(yù)兆應(yīng)及時(shí)通知撤離。第四節(jié)主體工程施工方案4.1主體結(jié)構(gòu)施工順序主體施工順序:框架柱鋼筋加工及綁扎→框架柱模支設(shè)→柱混凝土施工至梁下口50mm處→框架梁板模板支設(shè)→梁板鋼筋加工及綁扎→梁板混凝土施工→重復(fù)以上工序直至主體結(jié)構(gòu)施工完畢→填充墻施工。4.2主體模板施工支撐架應(yīng)滿足強(qiáng)度、剛度和穩(wěn)定性的要求。支撐架底部設(shè)通長(zhǎng)墊板使之支撐在可靠的基層上,保證其在混凝土澆筑過(guò)程中不下沉。模板支撐按《建筑施工碗扣鋼管腳手架安全技術(shù)規(guī)范》的要求進(jìn)行計(jì)算。4.2.1模板種類(lèi)選擇1、柱、梁模板等均采用組合木模進(jìn)行拼裝。2、根據(jù)我公司多年的施工經(jīng)驗(yàn),雙面覆膜竹膠板模板既具有良好的剛度和強(qiáng)度,又具有表面平整、易拼裝、易拆卸、接縫嚴(yán)密、澆筑后混凝土表面光滑等優(yōu)點(diǎn),故在本工程中現(xiàn)澆板模板采用雙面覆膜竹膠板模板,板縫平接,對(duì)拼縫用不干膠帶貼縫,以防漏漿。3、現(xiàn)澆樓梯板底底模采用10mm厚酚醛樹(shù)脂覆模板,利用雙排鋼筋支撐;踏步板齒形側(cè)模采用50mm厚木板制作。施工前先利用電腦繪圖按1:1的比例繪制樓梯大樣,測(cè)算出轉(zhuǎn)角以及各交接點(diǎn)等關(guān)鍵尺寸,然后再實(shí)地制作。4.2.2現(xiàn)澆混凝土矩形柱的模板及其支撐架1、本工程現(xiàn)澆混凝土矩形柱的模板采用木模縱向拼裝。正方形柱截面尺寸為≤500×500mm時(shí),柱箍采用ф48×3.5鋼管承受混凝土側(cè)向壓力,柱箍間距可設(shè)置為450mm。2、正方形柱截面尺寸為≥600mm時(shí),平面設(shè)置ф12mm鋼筋拉桿與柱箍共同支撐模板,鋼筋拉桿豎向間距與柱箍間距同,為由下至上400~600mm,柱腳箍離地≤150mm。詳見(jiàn)下圖。3、截面尺寸長(zhǎng)邊≥700的長(zhǎng)方形柱,平面設(shè)置≤300@ф12mm鋼筋拉桿與柱箍共同支撐模板,鋼筋拉桿豎向間距與柱箍間距同,為由下至上400~600mm,柱腳箍離地≤150mm。4.2.4現(xiàn)澆框架梁板模板及其支撐架1、施工時(shí)采用ф48×3.5鋼管搭設(shè)滿堂腳手架做樓板的支撐架,樓板底立桿縱距、橫距相等,即la=lb=1m,設(shè)三根橫向水平桿,步距h=1.25m。掃地桿距地面200mm,板底采用50×100mm木枋作板模擱柵,間距小于等于300mm。梁模支撐立桿橫距l(xiāng)b1=0.8m,立桿縱距為la=0.8m,模板支撐架立桿伸出最上層橫向水平桿的中心a=0.1m,梁板支撐架詳見(jiàn)下圖。2、截面尺寸較高時(shí)的梁模板梁截面尺寸高度較高時(shí),施工時(shí)采用覆合模拼裝,ф48×3.5雙鋼管支撐,并增設(shè)扁鋼拉片和對(duì)拉螺桿,梁截面高度≤700時(shí),設(shè)置一根對(duì)拉螺桿,梁截面高度≥700時(shí),設(shè)置兩根對(duì)拉螺桿。如下圖4.2.5樓梯支模4.2.6模板的安裝施工1、所有結(jié)構(gòu)支模前均應(yīng)由專(zhuān)人進(jìn)行配板設(shè)計(jì)和畫(huà)出配板放樣圖并考慮一定留量調(diào)整。2、模板及其支撐均應(yīng)落在實(shí)處,不得有“虛”腳出現(xiàn),安拆均設(shè)專(zhuān)人負(fù)責(zé)。柱腳模板應(yīng)加墊木和砂漿封閉,防止砼漿流失造成爛根。3、模板的支設(shè)必須保證結(jié)構(gòu)的幾何尺寸及軸線位置準(zhǔn)確,拼縫嚴(yán)密,做好截面控制。4、梁板跨度≥4m時(shí),其中部應(yīng)起拱,起拱高度應(yīng)為梁板跨度的0.2%。起拱不得削減梁、板的截面。5、上下層模板的支柱應(yīng)盡可能的安裝在一條豎向中心線上。若不能設(shè)置在一條中心線上,必須對(duì)樓板承載能力進(jìn)行驗(yàn)算,合格后方可安設(shè),否則必須采取加固措施。6、模板上的預(yù)埋件及預(yù)留洞等不得遺漏且安裝牢固,位置準(zhǔn)確,符合規(guī)范要求。7、為防止砼在硬化過(guò)程中與模板粘結(jié),影響脫模,在澆筑砼之前,應(yīng)在清理過(guò)的模板表面上(包括第一次使用的模板)涂刷隔離劑,對(duì)隔離劑的基本要求是:不粘結(jié)、易脫模、易于操作、易清理、無(wú)害于人體、不腐蝕模板。8、安裝模板時(shí)必須有保護(hù)措施。模板由塔吊起吊,就位時(shí),因柱鋼筋已綁扎完畢,柱筋很容易損傷面板,故必須有施工工人在現(xiàn)場(chǎng)扶住模板,輕輕就位。9、在靠近模板電焊鋼筋、鋼管時(shí),在施焊處的模板面應(yīng)用鐵皮墊隔,防止焊火燒壞模板板面。10、在安裝模板之前,將各種電管、水管等按圖就位,避免模板安裝好后二次開(kāi)洞,模板自身就位時(shí)也應(yīng)嚴(yán)格按照配模圖紙進(jìn)行安裝。11、砼振搗器不能直接碰到板面,避免磨損撞面板,同時(shí)振搗時(shí)間要按規(guī)范規(guī)定,要適時(shí)振搗,以防模板變形。12、模板安裝完畢后,應(yīng)仔細(xì)檢查扣件、支撐架是否牢固;斜撐、支柱的數(shù)量和著力點(diǎn)是否合理,是否滿足要求;鋼楞、對(duì)拉螺栓及支柱的間距是否符合要求;各種預(yù)埋件和預(yù)留孔洞的規(guī)格尺寸、數(shù)量、位置及固定情況是否符合圖紙要求;模板結(jié)構(gòu)的整體穩(wěn)定性以及拼縫是否嚴(yán)密等,發(fā)現(xiàn)問(wèn)題,及時(shí)糾正。4.2.7模板的拆除施工1、模板的拆除應(yīng)遵循后支的先拆,先支的后拆,先拆除非承重部分,后拆除承重部分原則。模板拆除日期,應(yīng)按結(jié)構(gòu)特點(diǎn)和混凝土所達(dá)到的強(qiáng)度來(lái)確定,不允許未到拆模期限便過(guò)早拆模。2、木模板制作時(shí),與混凝土接觸面應(yīng)刨光,拼縫嚴(yán)密。木模每次使用前均應(yīng)清理干凈,并涂刷隔離劑。3、拆模時(shí)不得用鐵撬撬開(kāi)模板,還要保護(hù)模板邊角和砼邊角。拆下的模板要及時(shí)清理,清理殘?jiān)鼤r(shí),嚴(yán)禁用鐵鏟、鋼刷之類(lèi)的工具清理,可用模板清潔劑,使其自然脫落或用木鏟刮除殘留砼。4、已拆除模板及其支架的結(jié)構(gòu),應(yīng)在混凝土強(qiáng)度達(dá)到設(shè)計(jì)強(qiáng)度后,才允許承受全部計(jì)算荷載。施工中不得超載使用,當(dāng)承受施工荷載大于計(jì)算荷載時(shí),必須經(jīng)過(guò)計(jì)算加設(shè)臨時(shí)支撐。5、現(xiàn)澆構(gòu)件底模拆除時(shí)混凝土強(qiáng)度必須達(dá)到的要求結(jié)構(gòu)類(lèi)型結(jié)構(gòu)跨度(m)按設(shè)計(jì)的混凝土強(qiáng)度標(biāo)準(zhǔn)值的百分率(%)板≤2≥50≥2、≤8≥75>8≥100梁≤8≥75>8≥1006、模板安裝的允許偏差梁、板模板安裝前應(yīng)用水準(zhǔn)儀抄平彈墨線控制標(biāo)高,安裝固定后復(fù)查軸線、標(biāo)高、幾何尺寸、模板平整度及支撐系統(tǒng)穩(wěn)定性。其允許偏差不大于以下要求。項(xiàng)目允許偏差(mm)軸線位置3底板上表面標(biāo)高±5截面內(nèi)部尺寸基礎(chǔ)±10柱、梁、板+2、-5層高垂直度≤53相鄰兩板面高低差2表面平整度(2m長(zhǎng)度)54.3主體鋼筋本工程鋼筋施工均為現(xiàn)場(chǎng)制作、綁扎。鋼筋車(chē)間設(shè)置在靠近塔吊、電源等運(yùn)輸、用電方便的位置,便于管理,方便施工。4.3.1鋼筋構(gòu)造要求1、根據(jù)設(shè)計(jì)圖紙,本工程鋼筋采用冷軋帶肋級(jí)鋼筋。(鋼筋的強(qiáng)度標(biāo)準(zhǔn)值應(yīng)具有不小于95%的保證率,抗震等級(jí)為一、二的框架結(jié)構(gòu),其縱向受力鋼筋采用普通鋼筋時(shí),鋼筋的抗拉強(qiáng)度實(shí)測(cè)值與屈服強(qiáng)度實(shí)測(cè)值的比值不應(yīng)小于1.25;鋼筋的屈服強(qiáng)度實(shí)測(cè)值與強(qiáng)度標(biāo)準(zhǔn)值的比值不應(yīng)大于1.3;且鋼筋在最大拉力下的總伸長(zhǎng)率實(shí)測(cè)值不應(yīng)小于9%)2、鋼筋錨固及連接:(1)縱向鋼筋受拉的最小錨固長(zhǎng)度La及Lae、最小搭接長(zhǎng)度Lle。(2)軸心受拉及小偏心受拉桿件(如桁架和拱的拉桿)的縱向受力鋼筋不得采用搭接接頭。當(dāng)受拉鋼筋直徑大于28mm及受壓鋼筋直徑大于32mm時(shí)不宜采用綁扎搭接接頭。(3)在縱向受力鋼筋搭接長(zhǎng)度范圍內(nèi)應(yīng)配置箍筋,箍筋間距不應(yīng)大于搭接鋼筋較小直徑的5倍,且不應(yīng)大于100mm.當(dāng)受壓鋼筋直徑D>25mm時(shí),在搭接接頭兩個(gè)端面外100mm范圍內(nèi)各設(shè)置兩個(gè)箍筋。4.3.2原材料質(zhì)量要求1、所有進(jìn)場(chǎng)的鋼筋必須具備出廠合格證,進(jìn)場(chǎng)后按規(guī)定進(jìn)行抽樣試驗(yàn),合格后經(jīng)質(zhì)檢員或技術(shù)負(fù)責(zé)人同意后方可投入使用。2、合格鋼筋在儲(chǔ)運(yùn)堆放時(shí),必須掛標(biāo)牌進(jìn)行標(biāo)識(shí),并按級(jí)別、品種分規(guī)格堆放整齊,不得混雜。3、鋼筋在加工過(guò)程中,若發(fā)生脆斷、焊接性能不良或力學(xué)性能不正常等現(xiàn)象,應(yīng)對(duì)該批鋼筋進(jìn)行化學(xué)成分分析。對(duì)不符合國(guó)家標(biāo)準(zhǔn)規(guī)定的鋼材不得用于工程。4、鋼筋規(guī)格品種不齊,需要代換時(shí),應(yīng)先經(jīng)過(guò)設(shè)計(jì)和監(jiān)理單位同意,方可進(jìn)行代換并及時(shí)辦理技術(shù)核定單。4.3.3鋼筋的加工制作1、鋼筋加工應(yīng)按設(shè)計(jì)的級(jí)別、規(guī)格、形狀、尺寸、錨固長(zhǎng)度、彎鉤長(zhǎng)度、抗震或附加構(gòu)造要求進(jìn)行配筋下料成型加工。加工成型的鋼筋應(yīng)掛牌分別堆放,不得錯(cuò)漏、混用。2、主體梁的鋼筋接頭采用直螺紋、搭接焊;柱的豎向鋼筋接頭采用直螺紋連接、電渣壓力焊;現(xiàn)澆板的冷軋帶肋鋼筋采用搭接接頭,嚴(yán)禁采用搭接焊接頭,其最小搭接長(zhǎng)度應(yīng)大于300mm。3、鋼筋焊接質(zhì)量應(yīng)滿足《鋼筋焊接及驗(yàn)收規(guī)程》要求,焊工均應(yīng)持證上崗,并應(yīng)進(jìn)行試焊,按規(guī)定抽查合格后方可正式施焊。4、箍筋采用封閉箍,箍筋末端做成135°彎鉤,彎鉤的平直部分不小于10d。4.3.4鋼筋定位措施1、柱豎向鋼筋的定位:在梁下口200mm和梁上口50mm處設(shè)置柱豎向鋼筋的位置固定箍,將其與豎向柱筋焊牢并墊好墊塊,防止柱筋移位。2、梁鋼筋定位:在梁上下縱向鋼筋為兩排及以上時(shí),各排鋼筋之間的凈距為一倍d并不小于25mm,故施工時(shí)在兩排縱向鋼筋之間設(shè)三級(jí)25橫向短筋以保持排距,短筋@1m,長(zhǎng)度=梁寬-50mm。3、施工中應(yīng)特別重視保護(hù)雨蓬、挑檐等懸臂板的上部負(fù)彎矩鋼筋位置正確,絕對(duì)避免踩踏,且在澆筑混凝土?xí)r應(yīng)專(zhuān)門(mén)制作鐵馬凳作該處的混凝土澆筑跑道。4、綁扎定位(1)現(xiàn)澆板、基礎(chǔ)等鋼筋網(wǎng)綁扎:四周兩行鋼筋交叉點(diǎn)每點(diǎn)扎牢,中間部分交叉點(diǎn)可相隔交錯(cuò)扎牢,必須保證受力鋼筋不位移;雙向主筋的鋼筋網(wǎng),須將全部鋼筋相交點(diǎn)扎牢;綁扎時(shí)注意相鄰綁扎點(diǎn)的鐵絲扣要成八字形,以免網(wǎng)片歪斜變形。(2)柱梁箍筋接頭(彎鉤疊合處)交錯(cuò)布置在四角縱向鋼筋上;箍筋轉(zhuǎn)角與縱向鋼筋交叉點(diǎn)均應(yīng)呈八字形扎牢。4.3.5鋼筋的安裝綁扎1、按照設(shè)計(jì)、規(guī)范要求進(jìn)行錨固、搭接。鋼筋接頭不得設(shè)置在梁端、柱端的箍筋加密區(qū)內(nèi)。2、安裝綁扎前先根據(jù)圖紙要求找出鋼筋的擺放位置,并劃線確認(rèn):柱的箍筋,在兩根對(duì)角線主筋上劃點(diǎn);梁的箍筋,則在上部鋼筋上劃點(diǎn);現(xiàn)澆板鋼筋,在模板上用墨線彈線。3、柱縱向鋼筋總數(shù)不超過(guò)4根時(shí),可在同一截面連接,多于4根時(shí),同一截面鋼筋接頭數(shù)不多于總根數(shù)的50%,即相鄰兩根豎向鋼筋應(yīng)錯(cuò)開(kāi)LaE距離連接。4、柱梁、墻梁相交的節(jié)點(diǎn)處鋼筋布置較密,安裝綁扎前應(yīng)根據(jù)施工圖確定好各梁、柱鋼筋的安裝順序和穿插次序,確保受力鋼筋的位置正確。5、上下層柱截面變化時(shí),其下層豎向鋼筋必須在上層梁鋼筋綁扎之前先行收縮準(zhǔn)確,確保柱、墻斷面以及鋼筋的連續(xù)性。6、主次梁交接處,次梁的上下部鋼筋應(yīng)在主梁縱筋之上;當(dāng)梁邊與柱邊齊平時(shí),梁縱筋放于柱筋內(nèi)側(cè)。7、板的底部鋼筋短向筋放在下層,長(zhǎng)向筋放在短向筋之上,板上部負(fù)彎矩鋼筋的長(zhǎng)向筋在下層,短向筋在長(zhǎng)向筋之上。4.3.6鋼筋工程的質(zhì)量檢測(cè)及有關(guān)規(guī)定1、鋼筋及預(yù)埋件安裝完畢后,必須按照施工圖及規(guī)范要求進(jìn)行檢查驗(yàn)收,并作好隱蔽驗(yàn)收記錄。2、鋼筋工程質(zhì)量檢測(cè)內(nèi)容、方法及標(biāo)準(zhǔn)執(zhí)行混凝土結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范》、《構(gòu)造圖集》和《建筑工程質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)》。4.4混凝土工程本工程混凝土采用商品砼,利用混凝土輸送泵、塔吊及斗車(chē)等運(yùn)輸工具運(yùn)入施工現(xiàn)場(chǎng)。4.4.1混凝土的質(zhì)量控制1、施工時(shí)注意明確各種混凝土強(qiáng)度等級(jí)使用的范圍及部位,不得錯(cuò)用、混用。2、加強(qiáng)與商品混凝土供應(yīng)商的聯(lián)系,要其按要求提供原材料材質(zhì)證書(shū)、混凝土配合比報(bào)告單、混凝土強(qiáng)度試驗(yàn)報(bào)告單、初凝及終凝時(shí)間、坍落度要求等,并在現(xiàn)場(chǎng)澆筑地點(diǎn)隨機(jī)取樣制作試塊送檢。3、采用混凝土輸送泵進(jìn)行混凝土的運(yùn)輸,施工前先根據(jù)商品砼的生產(chǎn)率,確定所需混凝土泵臺(tái)數(shù)、管道長(zhǎng)度、布置位置等并進(jìn)行管道等的安裝工作。4、連續(xù)澆筑混凝土?xí)r應(yīng)保證混凝土不間斷供應(yīng),現(xiàn)場(chǎng)工長(zhǎng)應(yīng)做好澆注點(diǎn)與混凝土攪拌點(diǎn)的指揮協(xié)調(diào)工作,每批供料必須按雙方協(xié)定的節(jié)奏和時(shí)限供應(yīng),以防止冷縫事故。5、泵送混凝土,其輸送管路的起始水平管長(zhǎng)度不小于15m,除出口處用軟管外,輸送管路的其它部位均不能用軟管。6、混凝土輸送泵的固定不得直接支承在鋼筋、模板及預(yù)埋件上,水平管用支架、臺(tái)墊、吊具等固定,以便于排除堵管、裝拆和清洗管道。7、混凝土開(kāi)始泵送時(shí)保持慢速運(yùn)轉(zhuǎn),并觀察泵壓,待確認(rèn)正常后再以常速泵送。向下泵送時(shí),管道與垂線夾角不小于12°,以防止混凝土因自重下落形成空段引起堵塞。8、泵送混凝土的坍落度與壓力泌水量控制在14~18cm和50~120cm的范圍內(nèi),泵送過(guò)程中嚴(yán)禁向泵斗和泵槽斗內(nèi)加水。4.4.2主體混凝土施工順序1、豎向施工順序:每層結(jié)構(gòu)分二次澆筑,第一次澆框架柱,第二次澆筑梁、板混凝土。柱施工縫設(shè)在梁下口50mm2、水平施工順序:梁板施工一次連續(xù)進(jìn)行,不另留施工縫。如特殊情況需要時(shí),施工縫留在次梁板跨中間1/3范圍內(nèi)或主梁板跨中間1/3范圍內(nèi),樓梯施工縫留設(shè)在樓層平臺(tái)以上3個(gè)梯踏步以外,梯梁不允許設(shè)置施工縫。4.4.3混凝土澆筑前現(xiàn)場(chǎng)的準(zhǔn)備工作1、混凝土澆筑前應(yīng)清除模板內(nèi)雜物;仔細(xì)檢查模板結(jié)構(gòu)的整體穩(wěn)定性以及拼縫是否嚴(yán)密等;檢查網(wǎng)架及水電施工的預(yù)埋件和預(yù)留孔洞的規(guī)格尺寸、數(shù)量、位置及固定情況是否符合圖紙要求;鋼筋綁扎是否牢固,發(fā)現(xiàn)問(wèn)題,及時(shí)糾正。2、辦理鋼筋隱蔽工程驗(yàn)收記錄,搭好澆筑混凝土?xí)r的馬道或跳板,保證混凝土施工人員不踩踏綁好的鋼筋。4.4.4柱混凝土的澆筑施工1、柱混凝土分段澆筑,分層下料、振搗。每層高度≤500mm。墻、柱高度大于2m時(shí),在墻、柱的側(cè)模面開(kāi)不小于300mm高的洞口,裝上斜溜槽,分段澆筑,每段高度不大于2m。墻、柱混凝土澆筑時(shí),適當(dāng)控制混凝土的澆筑速度,以
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 維修工程合同協(xié)議書(shū)范本
- 美容行業(yè)簽合同協(xié)議
- 股東合同分紅合同協(xié)議
- 股權(quán)分配合同協(xié)議書(shū)范本
- 職業(yè)培訓(xùn)機(jī)構(gòu)合同協(xié)議
- 聘用協(xié)議書(shū)實(shí)質(zhì)為勞動(dòng)合同
- 經(jīng)濟(jì)林建設(shè)合同協(xié)議
- 紙箱廠產(chǎn)品合同協(xié)議
- 美容用品合同協(xié)議書(shū)模板
- 給排水合同協(xié)議
- 施工升降機(jī)、門(mén)式起重機(jī)、架橋機(jī)、塔吊等 安全檢查要點(diǎn)
- 鋁型材有限公司有限公司粉末靜電噴涂線安全風(fēng)險(xiǎn)分級(jí)管控清單
- 江蘇譯林版小學(xué)英語(yǔ)單詞匯總表-帶音標(biāo)可打印
- 大話務(wù)場(chǎng)景保障
- 2017綠城江南里樓書(shū)
- 詢價(jià)文件(模板)
- 財(cái)務(wù)會(huì)計(jì)基礎(chǔ)知識(shí)考試題庫(kù)
- 《永遇樂(lè)(落日熔金)》PPT課件(部級(jí)優(yōu)課)語(yǔ)文課件
- 07-12暨南大學(xué)華僑大學(xué)兩校聯(lián)考化學(xué)真題
- SPC CPK超全EXCEL模板完整版可編輯
- 衛(wèi)生監(jiān)督協(xié)管服務(wù)
評(píng)論
0/150
提交評(píng)論