




版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領
文檔簡介
Author:DennisMcCulloughCleanDesignPrinciples‘Do/Don’ts’forPiggingDesignMicro/CleanDesignDo-Don’tsareprimarilyreferencetrainingmaterials;forP&Gprojectexecution,alwaysrefertotheCleanDesignStandards.Micro/CleanDesignPrinciplesCleanDesignSpecsforPiggingDefinitionsPrinciplesMaterialsofConstruction(MOC)Design:PigPiggingsystemRadiusrequirementsLaunch/RetrievalStation3-wayvalvesPigcontrolCIP/SIPDesignforcleaningefficiencyOtherDesignConsiderationsNewImprovements:IcePiggingMicro/CleanDesignPrinciplesPiggingDesignOverviewComponentsofaPiggingSystemMicro/CleanDesignPrinciplesPiggingDesignPiggingDefinition(s)Pigging
meaning(s):
(n)
domesticswine(n)
acoarseobnoxiousperson(n)
apersonregardedasgreedyandpig-like(n)
uncomplimentarytermsforapoliceman(n)
moldconsistingofabedofsandinwhichpigironiscast(n)
acrudeblockofmetal(leadoriron)pouredfromasmeltingfurnace(v)
livelikeapig,insqualor(v)
eatgreedilyA“Pig”isadevicethat,propelledbyfluidflow,travelthroughpipelinesinordertoremovedeposits,displaceproduct,andinspectormaintaintheline.Micro/CleanDesignPrinciples“Don’t”PiggingDefinition(s)PiggingDesignMicro/CleanDesignPrinciplesPiggingDesignPrinciplesManagementofMicroforoursystemsrequirescleaningandsanitization.Piggingsystemsareaneffectivewayofcleaning,eliminatingusagelossesandreducedwashwater.However,currentpiggingtechnologiesrequirespecialpipingdesign,whichaffectstheeconomicattractivenessofpiggingsystems.PiggingDesignMicro/CleanDesignPrinciplesIsthepipingIDsconsistentthroughoutthepiggablepathorwillpipeneedtobereplaced?Doexistingpipingsystemshaveelbowswithradiisufficienttopassthepig?Dotheexistingsystemshavevalvingorcomponentsthatwillrequirereplacementorreconfigurationinordertoallowthepigtotraveltheentirepath?Willmultiplepigsberequiredtoachievethedesiredresults?CannotputbutterflyvalvesinapiggablesystemPiggingDesignPiggingDesignPrinciplesMINIMALRISK(=standardfornewequipment)MODERATERISKHIGHRISKPiggingSystem:Designincorporates"captivesmartpig",thepigis"trackable"viaelectronicmeansandis(bi-directionalpigdesign.Pipelineitselfisneveropenedupduringprocessoperation.Theinternalcoreofthepigcontainsflexiblemagnetizedsiliconethatallowsittobedetectedinthepipenon-intrusively,usingaspecificallydesignedPigDetector.Designdoesnotallowreceiptofpigsatthelauncher,asblockagesinthepipelinemayrequirethepigstobepushedbacktothelauncher.PipeDesign:316LSS.AllinternalsurfacesorbitallyweldedandgroundsmoothandpolishedtoRa<0.8μm(32μinch).withnovisibleroughness,pitting,corrosionordamagedareas.Constantborediameter.316SS.Allinternalweldsgroundsmooth.StandardmillfinishofRa0.8-1.0μm(32-42μinch)oninternalpipewallsSomeroughnessevident,butnopittingorcorrosionevident.Not316or316LSS.Weldsandinternalfinishesnottreated,corrosionandpittingpresentinanypartofthesystem.Clamps/gaskets/sealsprotrudeinteriorofthepiperestrictingpigflowpath.Pig:FDA/Medical&FoodGradeapprovedmaterial.Compatiblewithprocessmaterialwithnodegradationofthepig.InternalweldsgroundsmoothCompatibilityissuewithpigandproduct.CheckyourMOCcompatibilitywithyourproduct&sanitizingagentwithCETL!Micro/CleanDesignPrinciplesPigging:MaterialsofConstruction/DesignMoredetails:SeeP&GCleanDesignStandardsoncGMPsiteMicro/CleanDesignPrinciples“Don’t”“Do”PigwithClawsRegularPig1LiterBottle(sizecomparison)PigDesign(CascadeCoolerExamples)PiggingDesignMicro/CleanDesignPrinciplesPiggingDesign“Do”PigDesignExample(CourtesyofLIAG)Micro/CleanDesignPrinciplesPiggingDesignPigLaunchStation:Example“Do”“Don’t”“Do”PiggingDesignMicro/CleanDesignPrinciplesPipeCleaningLaunchStation:Ensureallpartsofthelaunchandretrievalstationsarefullycleanableanddrainableconnectionsaredrainable;nobutterflyvalvesNote:Mustcleanandsanitizethroughlaunchandretrievalstationsradius=3D=12”r=12”r=12”4”diameterpipeDefinox(piggingvendor)recommendsthatthebendradiusbe3Xthepipediameter.Micro/CleanDesignPrinciplesPiggingDesign“Do”Note:Thereare“special”pigDesigns;e.g.,LiagthatcanmeetStandardpipebendradii(1.5D)Micro/CleanDesignPrinciples“Don’t”PiggingDesign3-wayValveDesign:EnsureMicrobiologyreviewspiggingdesigns:AvoidcrevicesthatdonotallowfullcleaningShowPBM3-wayvalveascomparisonPiggingsystemthree-wayvalveThree-wayvalvesealsbrokenandleakingMicro/CleanDesignPrinciples“Don’t”PiggingDesignMariscala3-wayPiggingValveDesign:EnsurewecheckwithMicrobiologyonproposeddesignsOneshouldconsiderthedifferentoperationsthatthepig/pipingsystemwillneedtoperform:
BackfillLine(followingpigwithproducttoavoidaeration)ProductRecovery(avoidproductlossbypushinglinefillsintostorage)ProductFilling/Recovery(controlpressureatfillerwithpigwhilerecoveringproductinfillingsystem)Micro/CleanDesignPrinciplesPiggingDesignMicro/CleanDesignPrinciplesPiggingDesignLevelofControl:Willitbenecessarytoremovethepigswhileprocesslineisinoperation?Note:thisdoesnotprovideoptimum“Minimal”microrisk.Thiswillrequireasystemtoincludepiggablevalves.Somemanufacturershavefeaturessuchasmilledareasontheballtodirectfluidflowthroughthecavityofthevalvebody.Cleaningsequencesshouldbeverifiedthatthebodycavitiesarebeingsufficientlycleaned.Sudmo,Defonix,PBMandothermanufacturemakevalvesdesignedtopasspigsaswell.Donotusebutterflyvalves—thepigwillnotpass.Willitbenecessarytostopthepigsatpointsintheline?Thiswilldetermineifthedesignneedstoincludeequipment(e.g.,liketheintermediateactuatorfromDefinox).Willitbenecessarytoknowthewhenapigreachesapointintheline.Mostpigsareequippedwithalinedetectionsystem.Thiscandeterminethepig’sposition.Doesthesystem/operationswishtowashandsanitizethesystemwithpigsinoroutofthecatch?Somesystems(catches)donothaveproperclearancestowashandsanitize.Thesesystemsrequireremovalofthepigsandsanitizingofthepigbyseparatemeans(i.e.hotboxoralcoholbath)PigControlRequirementsMicro/CleanDesignPrinciplesAutomaticPressureControlTomoreaccuratelydeterminethestoppingpointsofpigs,wecandecreasethepressurewhenthepigisnearthecatcher.Thiswillhelptoreducetheforceoftheimpact.PiggingDesign“Do”PigControlRequirementsPumpMMTankBottomMillNewSimplifiedDesignToHXMicro/CleanDesignPrinciplesPumpMMTankBottomMillToHX“Do”“Don’t”O(jiān)riginalDesignCIP/SIPdesignpipingtopromotedrainabilityforequipmentPiggingDesignPumpFMTankBottomMicro/CleanDesignPrinciplesPumpFMTankBottom“Do”“Don’t”CIP/SIPdesignpipingtopromotedrainabilityforequipmentNewSimplifiedDesignOriginalDesignPiggingDesignA“Pig”isadevicethat,propelledbyfluidflow,travelthroughpipelinesinordertoremovedeposits,displaceproduct,andinspectormaintaintheline.Anice“Pig”consistsofcrushediceinwaterwithafreezingpointdepressant.Anice-waterslurrycontainingafreezingpointdepressant,behaveslikeapigataniceconcentrationofabout40%.Below30%andslurrybehaveslikewater,whileabove70%icetheslurryistoosolidtomove.Slurriescanprovideincreasingmechanicalscouringatthewallwithouthavingtoincreasetheflowrateandsoenhancecleaning.The“effectiveviscosity”ofafluidcontainingparticulatematterishigherthanfluid.Micro/CleanDesignPrinciplesIcePigging(InDevelopment)Micro/CleanDesignPrinciplesInconstantdiameterpipe,theiceslurryicepresentsa‘solid’piston-likeprofileTheicepigcannegotiatepumps,valves,staticmixers,heatexchangersandpipelinesthatcannotcarryconventionalpigsCommonly,saltmaybeusedasthefreezingpointdepressantbutothersubstancescanbeusedsuchasglycerol,sorbitol,ethanol,glycol,oraceticacid.Infact,itmaybepossibletousetheproductitself(orasol
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- T-ZHAQ 6-2024 帶逆變輸出的儲能電源
- 醫(yī)院與醫(yī)學檢驗技術人員2025年度勞動合同
- 二零二五年度股權質(zhì)押與企業(yè)債務重組合同
- 二零二五年度集體宿舍租賃與社區(qū)治理服務合同
- 全面履行原則在2025年度房地產(chǎn)項目開發(fā)合同中的執(zhí)行要求
- 二零二五年度汽車運輸安全責任保險合作協(xié)議
- 二零二五年度文化展覽聘請藝術藝人演出合同
- 2025年度高科技研發(fā)項目投資債轉股協(xié)議書
- 2025年度新能源汽車產(chǎn)業(yè)鏈債權轉讓合同
- 二零二五年度電子元器件制造勞務派遣員工合同
- NB-T31065-2015風力發(fā)電場調(diào)度運行規(guī)程
- 2024山東能源集團中級人才庫選拔【重點基礎提升】模擬試題(共500題)附帶答案詳解
- 油田設備租賃行業(yè)市場現(xiàn)狀供需分析及市場深度研究發(fā)展前景及規(guī)劃行業(yè)投資戰(zhàn)略研究報告(2024-2030)
- 四川省綿陽市東辰學校2023-2024學年七年級下學期3月月考語文卷
- 中國古典風格設計
- 社會實踐報告表格范本
- 市政綜合項目工程竣工項目驗收總結報告自評
- 2024年“民用無人機及多旋翼無人機”駕駛員操控員技能與理論知識考試題庫含答案
- 2019譯林版高中英語全七冊單詞總表
- T-BJCC 1003-2024 首店、首發(fā)活動、首發(fā)中心界定標準
- 園區(qū)宣傳方案
評論
0/150
提交評論