GB 50468-2008 GB50468-2008焊管工藝設(shè)計規(guī)范-英文_第1頁
GB 50468-2008 GB50468-2008焊管工藝設(shè)計規(guī)范-英文_第2頁
GB 50468-2008 GB50468-2008焊管工藝設(shè)計規(guī)范-英文_第3頁
免費預(yù)覽已結(jié)束,剩余26頁請購買后查看

付費閱讀全文

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

專用

人人文庫

NATIONALSTANDARD

OFTHEPEOPLESREPUBLICOFCHINA

CodeforDesignofWeldedPipeProcess

GB50468-2008

ChiefDevelopmentDepartment:ChinaMetallurgicalConstructionAssociation

ApprovalDepartment:MinistryofHousingandUrban-RuralDevelopment

ofthePeoplesRepublicofChina

ImplementationDate:July1,2009

專用

人人文庫

ChinaPlanningPress

Beijing2015

圖書在版編目(CIP)數(shù)據(jù)

焊管工藝設(shè)計規(guī)范英文中國冶金建設(shè)協(xié)會組織編

GB50468-2008:/

譯北京中國計劃出版社

.—:,2015.12

ISBN978-7-5182-0315-4

中焊管機工藝設(shè)計設(shè)計規(guī)范中國英

Ⅰ.①G…Ⅱ.①…Ⅲ.①----

Ⅳ.①TG333.93-65

中國版本圖書館數(shù)據(jù)核字第號

CIP(2015)273603

ChineseeditionfirstpublishedinthePeoplesRepublicofChinain2009

EnglisheditionfirstpublishedinthePeoplesRepublicofChinain2015

byChinaPlanningPress

rd專用

3Floor,CTower,GuohongBuilding

No.A11,Muxidi-Beili,XichengDistrict

Beijing,100038

PrintedinChinabyBeijingJinghuaHucaisPrintingCO.,LTD

?2009byMinistryofHousingandUrban-RuralDevelopmentof

thePeoplesRepublicofChina

Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor

byanymea人人文庫ns,graphic,electronic,ormechanical,includingphotocopying,recording,

oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.

Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,

resold,hiredoutorotherwisecirculatedwithoutthepublisherspriorconsentinanyformof

blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition

includingthisconditionbeingimposedonthesubsequentpurchaser.

ISBN978-7-5182-0315-4

AnnouncementoftheMinistryofHousingandUrban-Rural

DevelopmentofthePeoplesRepublicofChina

No.166

AnnouncementonIssuingtheNationalStandard

CodeforDesignofWeldedPipeProcess

CodeforDesignofWeldedPipeProcess

isherebyapprovedasanationalstandardwitha

serialnumberofGB50468-2008,anditshallbeimplementedfromJuly1,2009.Therein,Sections

6.4.5(2)and6.4.17arecompulsoryprovisionsandmustbeenforcedstrictly.

AuthorizedbytheResearchInstituteofStandards&Norms(RISN)oftheMinistryof

HousingandUrban-RuralDevelopmentofthePeoplesRepublicofChina,thisCodeispublished

anddistributedbyChinaPlanningPress.專用

MinistryofHousingandUrban-RuralDevelopmentofthePeoplesRepublicofChina

November27,2008

人人文庫

Foreword

ThiscodewasdevelopedbyCISDIEngineeringCo.,Ltd.togetherwiththeorganizations

concernedundertheorganizationofChinaMetallurgicalConstructionAssociation(CMCA)in

NoticeonPrintingandDistributingtheDevelopmentand

accordancewiththerequirementsof

RevisionPlanofEngineeringConstructionStandardsandCodesinBatch

2006(2)(JIANBIAO

[2006]No.136)issuedbytheformerMinistryofConstruction(MOC).

Duringthedraftingprocess,theCodedevelopmentteamhasmadein-depthinvestigationsand

studies.Basedontheweldedpipesproductiontechnologiesinrecentyearsandsummarizingthe

domesticprocessdesignofweldedpipes,theyhavewidelysolicitedtheopinionsandsuggestions

fromChinasweldedpipeproducers,research&designinstitutes,universities,feedstocksuppliers,

end-users,equipmentmanufacturers,industrialassociationsandexpertsinthefieldaswell.By

analyzingandstudyingthewell-provenexperiencebothathomeandabroadforyears,whiletaking

intoconsiderationtheactualsituationsoftheprojectimplementationinChina,theteammade

seriousdiscussionsandmultiplerevisionsbeforethepresentversionwasreviewedandfinalized.

,:專用,,

ThisCodecomprises12ChaptersrespectivelycoveringGeneralProvisionsTermsandSymbolsBasic

Requirements,FeedstockforProductionofWelded-Pipes,ProductionProcessesofWelded-Pipes,Equipment

SelectionforProductionofWelded-Pipes,ServiceDuty,ProductionTimeandDesignedDutyRatio,Calculation

ofProductionCapacities,ShopLayoutandDesign,ProductionTools,MainTechnical&EconomicIndicators,

andEnvironmentalProtection,LaborSafetyandIndustrialHealth.

Theprovisionsprintedinboldtypearecompulsoryonesandmustbeenforcedstrictly.

TheMinistryofHousingandUrban-RuralDevelopmentisinchargeofthegovernanceofthis

Codeandtheinterpretationofthecompulsoryprovisions;whileCISDIEngineeringCo.,Ltd.is

responsiblefortheinterpretationofthespecifictechnicalcontents.Alltheconcernedorganizations,

intheimplementationprocessofthisCode,arekindlyrequestedtobuildupexperienceanddatain

realsenseandfeedbacktheopinions,suggestionsanddata,whenevernecessary,toCISDI

EngineeringCo.,Ltd.(address:No.1,ShuanggangRoad,YuzhongDistrict,Chongqing400013,

China)forreferenceinfuturerevision.

ChiefDevelomentOranization

pg:

人人文庫CISDIEngineeringCo.,Ltd.

ParticiatinDevelomentOranizations

pgpg:

CapitalEngineering&ResearchIncorporationLtd.

PanyuChuKongSteelPipeCo.,Ltd.

ZhejiangJiuliStainlessSteelPipeCo.,Ltd.

ChiefDraftinStaff

g:

ZengLiangpingMuDongZhangHaijunCaoZhiliangFengZhaotang

JiHaiLanXingchangLiuShizeHuangKejianCaoYongChenBenlun

ChenBaolinZhongJianxiongLiRuihuaWangYin

Contents

……………

1GeneralProvisions(1)

…………

2TermsandSymbols(2)

……………

3BasicRequirements(4)

…………………

4FeedstockforProductionofWeldedPipes(5)

………

5ProductionProcessesofWeldedPipes(6)

…………………

5.1ProductionProcessofHighFrequencyLongitudinalWeldedPipe(6)

…………………

5.2ProductionProcessofLongitudinalSubmerged-ArcWeldedPipes(6)

…………

5.3ProductionProcessofSpiralSubmerged-ArcWeldedPipes(6)

……

5.4ProductionProcessofStainlessSteelContinuousWeldedPipes(7)

…………………

5.5ProductionProcessofStainlessSteelDiscontinuousWeldedPipes(7)

……

6EquipmentSelectionforProductionofWeldedPipes(8)

6.1EquipmentSelectionforProductionofHighFrequencyLongitudinalWeldedPipes(8)

……

6.2EquipmentSelectionforProductionofLongitudinalSubmerged-ArcWeldedPipes(11)

…………

6.3EquipmentSelectionforProductionofSpiralSubmerged-ArcWeldedPipes專用()

12

……

6.4EquipmentSelectionforProductionofStainlessSteelContinuousWeldedPipes(13)

……

6.5EquipmentSelectionforProductionofStainlessSteelDiscontinuousWeldedPipes(15)

…………………

7ServiceDuty,ProductionTimeandDesignedDutyRatio(16)

………

8CalculationofProductionCapacities(17)

……………………

9ShopLayoutandDesign(18)

……………

10ProductionTools(19)

……………………

11MainTechnical&EconomicIndicators(20)

…………

12EnvironmentalProtection,LaborSafetyandIndustrialHealth(21)

…………

ExplanationsofWordinginthisCode(22)

人人文庫

1GeneralProvisions

1.0.1

ThisCodeisformulatednotonlytostandardizetheprocessdesignofwelded-pipemillsets

andassurethequalityofprocessdesignconcerned,butalsotopromotetheadvancementin

technologicalprocess,equipmentoutfitofthewelded-pipemillsetsandtheproductiontechnologies

forweldedpipes.

1.0.2

ThisCodeisapplicabletotheprocessdesignofconstruction,modernizationandexpansion

projectsofmillsetsforproductionoflongitudinalhigh-frequencylongitudinalweldedpipes,

longitudinalsubmerged-arcweldedpipes,spiralsubmerged-arcweldedpipes,andindustrial

stainlesssteelweldedpipes.

1.0.3

Thewelded-pipemillsetstobeconstructed,modernizedorexpandedshallconformtothe

nationalindustrialpolicyandmeettherequirementsforhighqualityandefficiency,low

consumption,andenvironmentalprotection.

1.0.4

Theprocessdesignofthewelded-pipemillsshallcomplywithnotonlythisCode,butalso

therequirementsspecifiedintherelevantnationalstandardsinforce專用.

人人文庫

·1·

2TermsandSymbols

2.0.1

SpotWelding

Itsaweldingprocessinwhichelectricarcisusedastheheatingsourcetomeltdownthe

weldingjointofawork-piecetoformspot-likeordiscontinuouswelds.

2.0.2

HighFrequencyLongitudinalWeldedPipe

Itsapipewithalongitudinalseamweldedbyhighfrequencyweldingprocessoverthelength

ofthepipebody.

2.0.3

PipeEndTreating

Itreferstothenon-plasticdeformationprocessingonthepipeendstoprovidetheplainpipe

withendsasrequiredfromtheproductstandards.Itincludespipeenddefectremoval,flash

trimming,dressing,bevelingandthelike.However,itdoesnotincludeendupsetting,sizing,

threading,couplingandsoon.

2.0.4

WeldedPipe

Itsapipemadeofsteelsheetorstripwhichisbenttohaveatu專用bularform,withalongitudinal

orspiralseamweldedoverthefulllengthofthepipebody.

2.0.5

MillSet

Itsacollectionoftheprocessequipmenttoproducetheproductsinthemix,coveringthe

processoffeedstockpreparationdownstreamtothefinalproductstorage.

2.0.6

AnnualScheduledOperationTimeofMillSet

Itstheyearlycalendartimedeductingthetimerequiredformajor,mediumandminor

maintenanceandnormalshiftchange-oversofthemillset.

2.0.7

AnnualAvailableProductionTimeofMillSet

Itstheannualscheduledoperationtimedeductingthetimerequiredforchangingtherolls,

toolsandspecificationsandshutdownofthemillset.

2.0.8

AnnualNecessaryProductionTimeofMillSet

Itstheactualtimerequiredforthemillsettoachievetheannualoutputasspecifiedinproduct

mix.

2.0.9

DutyRatioofMillSet

Itstheratioo人人文庫ftheannualnecessaryproductiontimetotheannualavailableproductiontimeof

themillset.

2.0.10

WeightRatioofPlateorStriptoProduct

Itstheratiobetweentheweightoftheconsumedplateorstripforproductionoftheproducts

ofallthesizesspecifiedintheproductmixandthetotalweightoftheproductsbythemillset.

2.0.11

Offline

Itsoneoftheoperationmodesinwhichawork-piece(includingfeedstockandsemi-finished

pipes)cannotbemovedfromtheproductionlineoftheweldedpipesincontinuousoperationtoa

certainsequenceofthelineorviceversawithoutthehelpofhoistingandtransportationequipment

orbyhand.

·2·

2.0.12

SpiralSubmerged-arcWeldedPipe

Itsapipewithaspiralseamweldedbysubmerged-arcweldingprocessoverthepipebody.

2.0.13

ManualInspection

Itsaprocessinwhichtheinnerandoutersurfacequality,shapeanddimensionofawelded

pipeareinspectedbyeyesorsimpletoolslikelow-poweramplifier,endoscope,gauges,etc.

2.0.14

Online/Inline

Itsoneoftheoperationmodesinwhichawork-piece(includingfeedstockandsemi-finished

pipes)canbemovedfromtheproductionlineoftheweldedpipesincontinuousoperationtoa

certainsequenceofthelineorviceversaevenwithoutthehelpofhoistingandtransportation

equipmentorbyhand.

2.0.15

LongitudinalSubmerged-arcWeldedPipe

Itsapipewithalongitudinalseamweldedbysubmerged-arcweldingprocessoverthepipe

body.

2.0.16

AutomaticButtWelder

Itsawelderwhichcanautomaticallyperformbuttweldingontheheadandtailendsofthe

stripexceptitsparametersetupandstart/stop.

2.0.17

AutomaticInsideFlashTrimmer

Itsadevicewhichcanautomaticallytrimofftheflashesfromtheinsidefaceofthewelds

/專用

exceptitsstartstopandadjustment.

2.0.18

AutomaticOutsideFlashTrimmer

Itsadevicewhichcanautomaticallytrimofftheflashesfromtheoutsidesurfaceofwelds

exceptitsstart/stopandadjustment.

2.0.19

AutomaticSubmerged-ArcWelder

Itsawelderwhichcanautomaticallyperformsubmerged-arcweldingexceptitsparameter

setupandstart/stop.

2.0.20

AutomaticGasShielded-ArcWelder

Itsawelderwhichcanautomaticallyperformthegasshieldedarcweldingexceptitsparameter

setupandstart/stop.

人人文庫

·3·

3BasicRequirements

3.0.1

Thespecificationsofmillsetsforproducinghighfrequencylongitudinalweldedpipe

(ERW),spiralsubmerged-arcweldedpipe(SSAW)andstainlesssteelcontinuousweldedpipe

(EFW)shouldbeselectedonthebasisofTable3.0.1.

Table3.0.1SpecificationsofMillSetsforProductionofERW,SSAWandEFWPipes

ERWSSAWEFW

CodeofDia.RangeofCodeofDia.RangeofCodeofDia.Rangeof

MillSetWeldedPipe(mm)MillSetWeldedPipe(mm)MillSetWeldedPipe(mm)

#4214-42#508219-508#258-25

#6020-60#720325-720#6321-63

#7625-76#920406-920#7625-76

#11433-114#1220406-1220#8932-89

#16860-168#1420508-1420#11438-114

#21973-219#2030720-2030#16860-168

#27390-273#2540760-2540專用#21989-219

#325114-325#28501,200-2850#325114-325

#406140-406#30501,420-3050#406140-406

#508168-508--#508168-508

#610219-610--#610219-610

Note:ERWintheaboveTable3.0.1referstothemillsetforproductionofhighfrequencylongitudinalweldedpipes,SSAWthemill

setforproductionofspiralsubmerged-arcweldedpipes,andEFWthemillsetforproductionofstainlesssteelcontinuouswelded

pipes.

3.0.2

Themillsetforproductionoflongitudinalsubmerged-arcweldedpipesshouldbeinstalled

nearbythewide/heavyplatemillsetwheresupplyoffeedstockisguaranteed.

人人文庫

·4·

4FeedstockforProductionofWeldedPipes

4.0.1

Themillsetsforproductionofhighfrequencylongitudinalweldedpipesspiralsubmerged-

arcweldedpipesshouldusestripcoilsasthefeedstock.Themillsetforproductionoflongitudinal

submerged-arcweldedpipesshouldusethesinglecut-to-lengthsheetsasthefeedstock.Andthe

millsetforproductionofstainlesssteelcontinuousweldedpipesshallusethestripcoilsasthe

feedstock,themillsetforproductionofstainlesssteeldiscontinuousweldedpipesshouldusethe

singlecut-to-lengthsheetsasthefeedstock.

4.0.2

Themillsetsforproductionofhighfrequencylongitudinalweldedpipes,spiralsubmerged-

arcweldedpipesandstainlesssteelcontinuousweldedpipesshouldusetheheavyorslitstripcoilsas

thefeedstock.ForERWandSSAW,theweightperunitwidthofthehot-rolledstripcoilsshould

notbelessthan16kg/mm,andthatofthecold-rolledstripcoilshouldnotbelessthan8kg/mm.For

EFW,theweightperunitwidthofthehot-rolledstripcoilsshouldnotbelessthan10kg/mmand

thatofthecold-rolledstripcoilsshouldnotbelessthan8kg/mm.

4.0.3

Thestripcoilsusedasthefeedstockforweldedpipemill專用setsshouldbeof762mmor

508mmininnerdiameter.

人人文庫

·5·

5ProductionProcessesofWeldedPipes

5.1ProductionProcessofHighFrequencyLongitudinalWeldedPipe

5.1.1

Theproductionofhighfrequencylongitudinalweldedpipesshallinvolvesuchworkingprocedures

asstrippreparation,formingandwelding,welddressing,sizingandcutting,andpipefinishing.

5.1.2strippreparation

Theprocedureshallincludethestepsofcoilcharging,uncoiling,

leveling,cropping,splicing,edgemachining,andstripflawdetection.Otherstepsmaybeaddedduly

whenrequiredfromthespecificproductmix.

5.1.3formingandwelding

Theprocedureshallcomprisebothstepsofformingandwelding.

5.1.4welddressing

Theprocedureshallincludethestepsofinsideandoutsideflashtrimming,

ultrasonicdetectionafterformingandwelding,onlineweldheattreatment,andweldcooling.

5.1.5sizingandcutting

Theprocedureshallincludethestepsofsizingandstraightening,and

cuttingtolength.

5.1.6pipefinishing

Theprocedureshallincludethestepsofsampling,pipeendtreating,inside

cleaning,hydrostatictesting,flawdetection,manualinspection,mar專用kingandproductcollection.

Otherstepsmaybeaddeddulywhenrequiredfromthespecificproductmix.

5.2ProductionProcessofLongitudinalSubmerged-ArcWeldedPipes

5.2.1

Theproductionoflongitudinalsubmerged-arcweldedpipesshallinvolvesuchworking

proceduresassheet/platepreparation,weldingofarcstriking/quenchingstrip,edgemachining,

forming,pre-welding,insideandoutsidewelding,weldflawdetection,expanding,hydrostatic

testing,post-testwelddetection,flatendchamfering,bevelenddetection,manualinspection,

weighing/lengthmeasuring/marking,andproductcollection.Otherproceduresmaybeaddedduly

whenrequiredfromthespecificproductmix.

5.2.2

Sheets/platestobeusedasthefeedstockfortheweldedpipemillsetsshallbequalifiedin

thenon-destructivetest(NDTforshort).Onlyifthesheets/platesaresuppliedwithcertificatesof

NDT,maytheNDTprocedurebeneglectedinthemillsets.

5.2.3arcstrikingquenchingedgeprocessing

The/procedureshouldbebeforetheprocedure.

5.2.4sheetplateedgepre-bending

The/procedureshouldbebeforethemainformingprocedure.

5.2.5pre-welding

Inthe人人文庫procedure,continuousweldingshallapplyinsteadofspotwelding.

5.3ProductionProcessofSpiralSubmerged-ArcWeldedPipes

5.3.1

Theproductionofspiralsubmerged-arcweldedpipesshallinvolvesuchworkingproceduresas

strippreparation,formingandwelding,andpipefinishing.

5.3.2strippreparation

Theprocedureshallincludethestepsofcoilcharging,uncoiling,leveling,crop

stripflawdetection

cutting,splicing,andedgemachining.Theproceduremaybeaddeddulyaccordingtothe

processrequirements.

5.3.3formingandwelding

Theprocedureshallincludethestepsofforming,welding,andsizing

andcutting.Theweldingcanberealizedbyonlineinsideweldingandoutsideweldingprocess,orby

·6·

onlinepre-weldingplusonlineinsideandoutsideweldingprocess,orevenbyonlinepre-welding

plusofflineinsideweldingandoutsideweldingprocess.

5.3.4pipefinishing

Theprocedureshallincludethestepsofweldrepair,pipeendtreating,inside

cleaning,sampling,weldNDT,manualinspection,weighing/measuring/marking,andproductcollection.

Otherstepslikeendsizing,hydrostatictestingandbodyflawdetectionmaybeaddeddulywhenrequired

fromthespecificproductmix.

5.4ProductionProcessofStainlessSteelContinuousWeldedPipes

5.4.1

Theproductionofstainlesssteelcontinuousweldedpipesshallinvolvesuchworkingprocedures

asstrippreparation,formingandwelding,welddressing,sizingandcutting,andpipefinishing.

5.4.2strippreparation

Theprocedureshallincludethestepsofcoilcharging,uncoiling,leveling,crop

cutting,buttwelding,looperstorage,andstripcleaning.

5.4.3formingandwelding

Theprocedureshallincludebothstepsofformingand(insideandoutside)

welding.

5.4.4welddressing

Theprocedureshallincludethestepsofinsideexcessweldmetalremoval,outside

excessweldmetalremoval,andcoldweldmachining.

5.4.5sizingandcutting

Theprocedureshallincludethestepsofonlinesizing,straightening,NDT,

diametermeasurement,andcuttingtolength.

5.4.6pipefinishing

Theprocedureshallincludethestepsofsamp專用ling,pipeendtreating,manual

inspection,hydrostatictesting,NDT,markingandproductpacking.Incaseofnon-brightheat

treatment,picklingpassivationstepshallbeaddeddulyinthisprocedure.

5.4.7

Theproductionofstainlesssteelcontinuousweldedpipesshallinvolvesuchworkingproceduresas

weldedpipecleaningandheattreatment,onlineoroffline;inparticular,theonlinecleaningandheat

treatmentshallbedownstreamtheprocedureofsizing.Formillsetsof#76orsmallerforproductionof

austeniticstainlesssteelweldedpipes,brightheattreatmentprocessshouldapply.

5.4.8

However,hydrochloricacidpicklingprocessshallnotapplyforproductionofausteniticstainless

steelweldedpipes.

5.4.9

Otherproceduresmaybeaddeddulywhenrequiredfromthespecificproductmix.

5.5ProductionProcessofStainlessSteelDiscontinuousWeldedPipes

5.5.1

Theproductionofstainlesssteeldiscontinuousweldedpipesshallinvolvesuchworking

proceduresassheet/platepreparation,cuttingtolength,arcstriking/quenchingwelding,edge

machining,forming,pre-welding,welding,pipeendtreating,heattreatment,picklingpassivation,

straightening,hydr人人文庫ostatictesting,weldNDT,manualinspection,weighing/measuring/marking,and

productpacking.WhenRBformingprocessisapplied,aroundingprocedureshallbearranged

welding

downstreamtheprocedure.

5.5.2

Sheets/platestobeusedasthefeedstockfortheweldedpipemillsetsshallbequalifiedin

thenon-destructivetest(NDTforshort).Onlyifthesheets/platesaresuppliedwithcertificatesof

NDT,maytheNDTprocedurebeneglectedinthemillsets.

5.5.3sheetplateedgepre-bending

The/procedureshouldbebeforethemainformingprocedure.

5.5.4

Hydrochloricacidpicklingprocessshallnotapplyforproductionofausteniticstainlesssteel

weldedpipes.

5.5.5

Otherproceduresmaybeaddeddulywhenrequiredfromthespecificproductmix.

·7·

6EquipmentSelectionforProductionofWeldedPipes

6.1EquipmentSelectionforProductionofHighFrequencyLongitudinalWeldedPipes

6.1.1

Themillsetsforproductionofhighfrequencylongitudinalweldedpipesshallbeequipped

withbasicautomationcontrolsystemforthewholeline.

6.1.2coilcharging

Intheprocedurecoilpreparationequipmentshallbeprovided,withfunctions

ofautomaticcoilpositioningandcoilcenterlevelpositioning.

6.1.3uncoiling

Equipmentselectionfortheprocedureshallbemadeasfollows:

1

Mechanicalorhydraulicuncoilershallbeinstalled.

2

Theuncoilershallhavetailformingfunction,andshouldbeequippedwithstripallowance

detectorandalignmentdevices.

3

Theuncoilershallhavetensioningfunction,andthetensioningforceshallbeadequateto

keepacoilfrombecomingloosewhenthestripheadentersthelevelerorlooper.

4

Theuncoilershallnotcauseanyscratchonthesurfaceofthestrip.

6.1.4leveling

Intheprocedure,arollerlevelershallbeprovided,withfive(5)rollersormore.

6.1.5head-tailcutter專用

Intheprocedure,acuttershallbeprovidedtocutoffthestripheadandtail

endsandstripalignmentdevicesshallbeinstalledinfrontofandbehindthecutter.

6.1.6splicing

Theproceduremaybeimplementedbyeitherbuttweldingpluslooperorhead-to-

tailjoining.Incaseofsplicingbybuttweldingpluslooperequipmentselectionshallbemadeas

follows:

1

Automaticbuttweldershallbeadoptedtoperformbuttweldingofstripheadandtailends,

andshouldbeprovidedwithshieldinggas.

2

Thestripstoredinthel

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論