版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1.4.2給水管道的敷設(shè)LayingofWaterSupplyPipes二、給水管道的敷設(shè)LayingofWaterSupplyPipes(1)塑料給水管道在室內(nèi)宜暗設(shè)。明設(shè)時(shí)立管應(yīng)布置在不易受撞擊處。當(dāng)不能避免時(shí),應(yīng)在管外加保護(hù)措施。
Plasticwatersupplypipesshouldbeconcealedindoors.Thestandpipeshallbearrangedinalessvulnerableplacewheninstalledintheopen.Protectivemeasuresshallbeaddedoutsidethepipeifthiscannotbeavoided.二、給水管道的敷設(shè)LayingofWaterSupplyPipes(2)不得直接敷設(shè)在建筑物結(jié)構(gòu)層內(nèi)。
Thewatersupplypipeshallnotbedirectlylaidonthestructuralfloorofthebuildings.電氣專業(yè)的線管Conduitofelectricalprofessions二、給水管道的敷設(shè)LayingofWaterSupplyPipes(3)干管和立管應(yīng)敷設(shè)在吊頂、管井、管窿內(nèi),支管可敷設(shè)在吊頂、樓(地)面的墊層內(nèi)或沿墻敷設(shè)在管槽內(nèi)。Mainpipesandstandpipesshallbelaidinceilings,pipewellsandpipealleys,whilebranchpipescanbelaidinceilings,inthecushionof
thefloor(ground)orlaidinthepipegroovesalongthewall.二、給水管道的敷設(shè)LayingofWaterSupplyPipes(4)敷設(shè)在墊層或墻體管槽內(nèi)的給水支管的外徑不宜大于25mm。Theouterdiameterofthewatersupplybranchpipelaidinthecushionorwallpipegroovesshouldnotbegreaterthan25mm.(5)敷設(shè)在墊層或墻體管槽內(nèi)的給水管管材宜采用塑料、金屬與塑料復(fù)合管材或耐腐蝕的金屬管材。Thewatersupplypipeslaidinthecushionorwallpipegroovesshouldbeplastic,metalandplasticcompositepipesorcorrosion-resistantmetalpipes.二、給水管道的敷設(shè)LayingofWaterSupplyPipes(6)敷設(shè)在墊層或墻體管槽內(nèi)的管材,不得采用可拆卸的連接方式;柔性管材宜采用分水器向各衛(wèi)生器具配水,中途不得有連接配件,兩端接口應(yīng)明露。Pipeslaidinthecushionorpipegrooveofthewallshallnotadoptadetachableconnectionmode.Flexiblepipesshoulduseawaterdistributortodistributewatertoeachsanitaryware,andthereshallbenoconnectingfittingsmidway,andtheinterfacesatbothendsshallbeexposed.分水器Waterdistributor二、給水管道的敷設(shè)LayingofWaterSupplyPipes(7)需要泄空的給水管道,其橫管宜設(shè)有0.002~0.005的坡度坡向泄水裝置。Forthewatersupplypipethatneedstobeemptied,thetransversepipeshallbeprovidedwithadrainagedevicewithaslopeof0.002~0.005.(8)給水管道穿越下列部位或接管時(shí),應(yīng)設(shè)置防水套管:Awaterproofcannulashallbeprovidedwhenthewatersupplypipespassthroughthefollowingpartsorconnectingpipes:穿越地下室或地下構(gòu)筑物的外墻處。
Theexteriorwallofbasementorundergroundstructures.穿越屋面處。
Theroof.穿越鋼筋混凝土水池(箱)的壁板或底板連接管道時(shí)。
Thewallplateorbottomplateofthereinforcedconcretepool(tank)whenpipesareconnected.二、給水管道的敷設(shè)LayingofWaterSupplyPipes(9)明設(shè)的給水立管穿越樓板時(shí),應(yīng)采用防水措施。套管頂部高出裝飾地面20mm,衛(wèi)生間、廚房?jī)?nèi)高出50mm,底部與樓板地面相平。
Waterproofmeasuresshallbetakenwhentheexposedwatersupplystandpipepassesthroughtheslab.Thetopofthecannulais20mmhigherthanthedecorativefloor,50mmhigherinthetoiletandkitchen,andthebottomisflushwiththeslab.二、給水管道的敷設(shè)LayingofWaterSupplyPipes(10)在室外明設(shè)的給水管道,應(yīng)避免受陽光直接照射,塑料給水管還應(yīng)有有效保護(hù)措施;在結(jié)凍地區(qū)應(yīng)做絕熱層,絕熱層的外殼應(yīng)密封防滲。Thewatersupplypipesexposedoutdoorsshallbeprotectedfromdirectsunlight.Effectiveprotectionmeasuresshallalsobetakenforplasticwatersupplypipes.Infrozenareas,heatinsulationlayersshallbemade,whoseshellshallbesealedtopreventseepage.敷設(shè)在有可能凍結(jié)的房間、地下室及管井、管溝等處的給水管道應(yīng)有防凍措施。Anti-freezingmeasuresshallbetakenforwatersupplypipeslaidinrooms,basements,pipewellsandtrenchesthatmaybefrozen.二、給水管道的敷設(shè)LayingofWaterSupplyPipes(11)室內(nèi)冷、熱水管上、下平行敷設(shè)時(shí),冷水管應(yīng)在熱水管下方。衛(wèi)生器具的冷水連接管,應(yīng)在熱水連接管的右側(cè)。Whencoldandhotwaterpipesarelaidindoorsinparallelupanddown,thecoldwaterpipeshallbeunderthehotwaterpipe.Thecoldwaterconnectingpipeofsanitarywareshallbeontherightsideofthehotwaterconnectingpipe.二、給水管道的敷設(shè)LayingofWaterSupplyPipes(12)小區(qū)的室外給水管道應(yīng)沿區(qū)內(nèi)道路敷設(shè),宜平行于建筑物敷設(shè)在人行道、慢車道或草地下。管道外壁距建筑物外墻的凈距不宜小于1.0m,且不得影響建筑物的基礎(chǔ)。Outdoorwatersupplypipesinresidentialquartersshallbelaidalongtheroadsandshallbelaidparalleltobuildingsundersidewalks,slowlanesorgrassland.Thecleardistancebetweentheouterwallofthepipesandtheexteriorwallofthebuildingsshouldnotbelessthan1.0m,andshallnotaffectthefoundationofthebuildings.二、給水管道的敷設(shè)LayingofWaterSupplyPipes(13)室外給水管道的覆土深度,應(yīng)根據(jù)土壤冰凍深度、車輛荷載、管道材質(zhì)及管道交叉等因素確定。管頂最小覆土深度不得小于土壤冰凍線以下0.15m,行車道下的管線覆土深度不宜小于0.70m。Thecoveringdepthofoutdoorwatersupplypipesshallbedeterminedbysoilfreezingdepth,vehicleload,pipesmaterial,pipelinecrossingandotherfactors.Theminimumcoveringdepthofthepipetopshallnotbelessthan0.15mbelowthesoilfrostline,andthecoveringdepthofthepipesunderthecarriagewa
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 工作計(jì)劃大全
- 客服部工作計(jì)劃
- 中國全自動(dòng)票據(jù)分切機(jī)項(xiàng)目投資可行性研究報(bào)告
- 交通臺(tái)實(shí)習(xí)報(bào)告10篇
- 應(yīng)屆生會(huì)計(jì)求職信集錦十篇
- 三年級(jí)教師述職報(bào)告6篇
- 小學(xué)教師競(jìng)崗演講稿5篇
- 2022萬圣節(jié)作文(十五篇大全)
- 參觀實(shí)習(xí)工作報(bào)告匯編9篇
- 小額貸款公司各項(xiàng)管理制度
- 貴州大學(xué)新型智庫建設(shè)實(shí)施方案
- 小學(xué)三年級(jí)信息技術(shù)考核方案
- 熱工設(shè)備安全操作和維護(hù)
- 當(dāng)代世界經(jīng)濟(jì)與政治學(xué)習(xí)通超星期末考試答案章節(jié)答案2024年
- 2024年中國人保行測(cè)筆試題庫
- 初++中數(shù)學(xué)設(shè)計(jì)學(xué)校田徑運(yùn)動(dòng)會(huì)比賽場(chǎng)地+課件++人教版七年級(jí)數(shù)學(xué)上冊(cè)
- 2024年秋八年級(jí)英語上冊(cè) Unit 7 Will people have robots教案 (新版)人教新目標(biāo)版
- 人教版英語八年級(jí)上冊(cè)Unit 6《Im going to study computer science》說課稿
- 2《永遇樂京口北固亭懷古》同步練習(xí)(含答案)統(tǒng)編版高中語文必修上冊(cè)-3
- (完整版)光伏施工質(zhì)量控制重點(diǎn)
- 微積分試卷及規(guī)范標(biāo)準(zhǔn)答案6套
評(píng)論
0/150
提交評(píng)論