




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認(rèn)領(lǐng)
文檔簡介
《HighVoltageEquipmentTesting》HighVoltageSafety主講人:何發(fā)武(副教授)OperatingWorksheet:TableofContents01Followme02Workshop03Training01FollowmeFollowmeHigh-voltagetestingisahigh-risktaskinelectricaltesting.Duringtheprocessofhigh-voltagetesting,itisnecessarytocomplywithrelevantnationalsafetyregulationstoensurepersonalsafetyandthesafetyofthepowersystem.Themainstandardforhigh-voltagetestingisreferencedfromthe“StandardforElectricalEquipmentInstallationEngineering-ElectricalEquipmentHandoverTesting”(GB50150–2016).Ⅰ.SafetyDistanceThesafetydistancereferstotheminimumairgapmaintainedbetweentheoperatorandtheliveobjecttoensurepersonalandequipmentsafety.Thesizeofthesafetydistancevariesdependingonthevoltagelevel,equipmenttype,installationmethod,andweatherconditions.AccordingtothecurrentsafetyregulationsoftheStateGridpowerplantandsubstation,thesafetydistancesforliveequipmentare0.7
mfor10
kV,1
mfor35
kV,1.5
mfor110
kV,3
mfor220
kV,4
mfor330
kV,and5
mfor500
kV.Ⅰ.SafetyDistanceThesafetydistanceforoperatingnon-power-offequipmentintheStateGrid’s10
kVdistributionstationisshowninFigure1-1.Whenthedistancebetweentheliveobjectandthehumanbody,equipment,andlivewiresduringtestingdoesnotmeettherequirements,temporarybarriers,insulatingshields,insulatingmats,etc.,mustbeinstalledforisolation.Ifsparksordischargesoundsoccurduringthetesting,itindicatesthatthedistanceisnotsufficient.Stopthetestimmediately,adjustthedistance,wipetheinsulationsurface,andtestagain.Figure1-1Ⅱ.SafetyRegulationsHigh-voltagetestsafetyoperatingprocedures:poweroutage,powertesting,grounding,hangingsignage,eachstepmustbeperformedinstrictaccordancewiththeorder.Onepersoninoperation,onepersoninguard.Accordingtothecontentoftheworkpermission,thepowerlineandequipmentshouldbeconfirmedtocutofffromthepower.Thecorrespondingvoltagelevelelectroscopeshouldbeusedintheelectricitytest,andtheelectricityshouldbetesteditembyitemattheinstallationofthegroundingwireortheclosingofthegroundingswitch.Whengrounding,afterconfirmingthereisnovoltage,thehigh-voltagelinesandequipmentshouldbegroundedandshort-circuitedimmediately,andalllinesthatmaybereverselypoweredshouldbegrounded.Ⅱ.SafetyRegulationsTheclimateconditionsforhighvoltageinsulationtestingshouldnotbelowerthan+5C,andtherelativehumidityoftheairshouldgenerallynotexceed80%.Thetestingsequenceof“non-destructivetestingbeforedestructivetesting”shouldbefollowed.Iftheweatherhumidityistoohigh,theinsulationsurfacemaycondenseorformawaterfilm,whichwillreducethesurfaceinsulationresistance,greatlyincreasethesurfaceleakagecurrent,andalsocausedistortionoftheelectricfielddistributionontheinsulationsurface,resultingincoronadischarge,affectingthemeasurementresults,andrequiringtestingtoberescheduled.Ⅱ.SafetyRegulationsBeforeandafterthetesting,establishsafetymonitoringandprotectionsystems.Thetestingpersonnelshouldwearnecessaryprotectiveequipmentbeforethetesting(“two-wearingandthree-carrying”:wearingworkinguniform,wearinginsulatingboots,carryingsafetyhelmets,carryinginsulatinggloves,andcarryingvoltagedetectors).Thetestingsiteshouldsetupfencesandhang“Stop,HighVoltageDanger”signsfacingoutward.Foroperationsabove2
m,adequatefallprotectionmeasuresshouldbetaken.Personnelandequipmentshouldmaintainasafetestingdistance,asshowninFigure1-2.Figure1-202WorkshopⅠ.WorkspecificationThesafetyleveloftheworkersmustnotbelowerthanlevelthree.Workersshouldfastentheirseatbelts,wearsafetyhelmets,andtakeanti-slipmeasures.Workcanonlybecarriedoutinclearweatherconditions,startingfrom9:00AM.Onesupervisorcanonlyoverseeonegroupofworkers.Groundingworkersmustwearsafetyhelmets.Thetoolscarriedbytheworkersmustbeplacedintoolbags,andthebagsmustbesecurelyfastenedtopreventtoolsfromfallingandinjuringgroundworkers.Ⅰ.WorkspecificationThepowersupplyinthehigh-voltageroommustbecompletelyshutoff,andpropersafetymeasuresmustbetakenbeforeworkcancommence.Workshopleadersmustbepresenton-sitetoensuresafety.Whenchangingthebusbarorsupportingporcelainbottles,payattentiontopersonalandequipmentsafetytopreventinjuriesandequipmentdamage.Ⅰ.WorkspecificationWhenconductinghigh-voltagetestsonelectricalequipment,afencemustbesetuparoundtheworkarea,withasignhangingonthefencewith“NoEntry,HighVoltageDanger!”Guardsshouldbestationedthere.Onlyoneworkgroupisallowedtoperformhigh-voltagetestsononepieceofequipmentwithinaspecificelectricalconnection.Agroundingwireshouldbeinstalledonthemaintenancesideofthedisconnectionpoint,andasignwith“NoEntry,HighVoltageDanger!”shouldbehungonthehigh-voltagetestside,facingthemaintenanceworkarea.Ⅰ.WorkspecificationIndividualsarenotallowedtoenterhigh-voltagecompartmentsorprotectivefencesalone.Thedistancebetweenindividualsandlivepartsmustbeequaltoorgreaterthanthevaluespecified.Whentherearehigh-voltageequipmentneartheworkarea,fencesshouldbesetuparoundtheworkareawithcorrespondingsignshanging.Theremustbededicatedpersonneltosupervisethework,andoperatorsmustuseinsulatingtoolswhilestandingoninsulatingmats.Short-circuitingofliveterminalsmustbeavoided.Measuresshouldbetakentoensurethatthesecondarysideofpotentialtransformersdoesnotshort-circuitandthemutualsecondarysideofcurrenttransformersdoesnotopencircuit.Ⅰ.WorkspecificationWhenthedistancebetweenworkersandlivepartsofhigh-voltageequipmentequalsthespecifiedsafetydistance,thefollowingoperationsareallowedtobeperformedonthehigh-voltageequipmentwithoutpoweroutage:replacingsiliconeandtakingoilsamples.Inanycircumstances,workersmustmaintainthespecifiedsafetydistancefromliveparts.Thesafetylevelofworkersandsupervisorsmustnotbelowerthanleveltwo.Ⅰ.WorkspecificationBeforecarryingoutanyworkrelatedtohigh-voltageelectricalequipment,powerworkersneedtothoroughlyreadtheequipmentusermanual.Duringtheworkprocess,appropriatesafetyprecautionsshouldbetaken,andrelevantoperatingspecificationsmustbestrictlyfollowedtoprotectone’sownlife.Fixedplacementofinstrumentsshouldbedoneaccordingtotheinstrument’sfunctionalclassification,asshowninFigure1-3.Figure1-3Ⅰ.WorkspecificationDuringhigh-voltagetesting,thetestsupervisorshouldbeanexperiencedstaff.Beforestartingthetest,thetestsupervisorshouldprovidedetailedinstructionsonsafetyprecautionstoalltestpersonnelandassigndedicatedpersonnelforsupervision.Themetalcasingofthetestequipmentshouldbereliablygroundedusingmulti-strandedsoftbarecopperwirewithacross-sectionalareanotlessthan25
mm2.Thehigh-voltageleadsshouldbekeptasshortaspossibleandsupportedsecurelywithinsulationmaterialsifnecessary.Thepowerswitchofthetestequipmentshouldbeadouble-poleswitchwithaclearlyvisibledisconnectpoint.Intheoperationcircuitofthetestequipment,inadditiontothepowerswitch,azeropositionswitchshouldbeconnectedinseries,andanoverloadautomatictrippingdeviceshouldbeinstalled.Beforeandafterthewithstandvoltagetestoflargecapacitorequipmentorcapacitors,sufficientgroundingandshort-circuitdischargeshouldbecarriedout.Ⅰ.WorkspecificationWhenperformingvoltagetestingonhigh-voltageequipmentorinstalling/removinggroundingwires,itisnecessaryfortwopersonstoworksimultaneously.Theoperatorandthesupervisormustwearinsulatingbootsandsafetyhelmets,andtheoperatormustwearinsulatinggloves.Duringvoltagetesting,anappropriateandqualifiedelectroscopewithsuitablevoltageratingsmustbeused.Theelectroscopeshouldfirstbetestedonenergizedequipmenttoconfirmitsproperfunctioning,andthenvoltagetestingcanbeperformedonde-energizedequipment.Finally,aretestshouldbeconductedonenergizedequipment.Ⅰ.WorkspecificationDuringvoltagetesting,allincomingandoutgoinglinesoftheequipmentbeingtestedshouldbechecked.Highvoltagetestingcaneliminateerrorssuchasstopwrongelectricityornopoweroutage,andpreventhanginggroundwireinthecaseoflive,asshowninFigure1-4,Figure1-5.Figure
1-4
Figure
1-5Ⅰ.WorkspecificationThereshouldbepersonnelsupervisionduringtheinstallationandremovalofgroundingwires,asshowninFigure11-6.Theinstalledgroundingwireshouldhavegoodcontactandreliableconnection.Thegroundingwireshouldbeconnectedtothegroundingendfirst,andthentotheconductorendduringinstallation.Thesequenceisreversedfortheremovalofthegroundingwire.Figure1-6Ⅱ.NotesInstallationandremovalofgroundingwireswithonepersonoperatingandanotherpersonsupervising.Thegroundingwireshallbeusedwithspecialclips,firmlyconnected,goodcontact,strictlyprohibitedwinding.Thegroundingwireshouldusebarecoppersofts
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 一年級上冊數(shù)學(xué)全冊教學(xué)目標(biāo)雙向細(xì)目表
- 轉(zhuǎn)租超市租房合同范本
- 磁共振檢查真的有核輻射嗎
- 擺脫“電子榨菜”依賴
- 2025年中國高速電機行業(yè)市場深度評估及投資方向研究報告
- 2025年己二酸二甲酯項目建議書
- 剿絲行業(yè)行業(yè)發(fā)展趨勢及投資戰(zhàn)略研究分析報告
- 2025年智能電網(wǎng)成套設(shè)備項目安全調(diào)研評估報告
- 赤峰風(fēng)電項目可行性研究報告
- 單層廠房出售合同范本
- 【攜程公司的戰(zhàn)略環(huán)境PEST探析和SWOT探析7500字】
- 《油液分析技術(shù)》課件
- 運動療法技術(shù)學(xué)
- 塔吊租賃(大型機械)-招標(biāo)文件模板(完整版)2021.5.13
- 物品移交接收單(模板)
- 肺透明膜病課件
- 四川省政府采購專家考試試題
- 消防工程擬投入主要施工設(shè)備機具表
- 《戰(zhàn)國策》教學(xué)講解課件
- 北師大版七年級數(shù)學(xué)下冊全冊課件【完整版】
- 小動物樂陶陶(課件)(共9張PPT)-人教版勞動二年級下冊
評論
0/150
提交評論