高電壓設(shè)備測試(High Voltage Equipment Testing)(英文版) 課件 Worksheet 1 High Voltage Safety_第1頁
高電壓設(shè)備測試(High Voltage Equipment Testing)(英文版) 課件 Worksheet 1 High Voltage Safety_第2頁
高電壓設(shè)備測試(High Voltage Equipment Testing)(英文版) 課件 Worksheet 1 High Voltage Safety_第3頁
高電壓設(shè)備測試(High Voltage Equipment Testing)(英文版) 課件 Worksheet 1 High Voltage Safety_第4頁
高電壓設(shè)備測試(High Voltage Equipment Testing)(英文版) 課件 Worksheet 1 High Voltage Safety_第5頁
已閱讀5頁,還剩21頁未讀 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認(rèn)領(lǐng)

文檔簡介

《HighVoltageEquipmentTesting》HighVoltageSafety主講人:何發(fā)武(副教授)OperatingWorksheet:TableofContents01Followme02Workshop03Training01FollowmeFollowmeHigh-voltagetestingisahigh-risktaskinelectricaltesting.Duringtheprocessofhigh-voltagetesting,itisnecessarytocomplywithrelevantnationalsafetyregulationstoensurepersonalsafetyandthesafetyofthepowersystem.Themainstandardforhigh-voltagetestingisreferencedfromthe“StandardforElectricalEquipmentInstallationEngineering-ElectricalEquipmentHandoverTesting”(GB50150–2016).Ⅰ.SafetyDistanceThesafetydistancereferstotheminimumairgapmaintainedbetweentheoperatorandtheliveobjecttoensurepersonalandequipmentsafety.Thesizeofthesafetydistancevariesdependingonthevoltagelevel,equipmenttype,installationmethod,andweatherconditions.AccordingtothecurrentsafetyregulationsoftheStateGridpowerplantandsubstation,thesafetydistancesforliveequipmentare0.7

mfor10

kV,1

mfor35

kV,1.5

mfor110

kV,3

mfor220

kV,4

mfor330

kV,and5

mfor500

kV.Ⅰ.SafetyDistanceThesafetydistanceforoperatingnon-power-offequipmentintheStateGrid’s10

kVdistributionstationisshowninFigure1-1.Whenthedistancebetweentheliveobjectandthehumanbody,equipment,andlivewiresduringtestingdoesnotmeettherequirements,temporarybarriers,insulatingshields,insulatingmats,etc.,mustbeinstalledforisolation.Ifsparksordischargesoundsoccurduringthetesting,itindicatesthatthedistanceisnotsufficient.Stopthetestimmediately,adjustthedistance,wipetheinsulationsurface,andtestagain.Figure1-1Ⅱ.SafetyRegulationsHigh-voltagetestsafetyoperatingprocedures:poweroutage,powertesting,grounding,hangingsignage,eachstepmustbeperformedinstrictaccordancewiththeorder.Onepersoninoperation,onepersoninguard.Accordingtothecontentoftheworkpermission,thepowerlineandequipmentshouldbeconfirmedtocutofffromthepower.Thecorrespondingvoltagelevelelectroscopeshouldbeusedintheelectricitytest,andtheelectricityshouldbetesteditembyitemattheinstallationofthegroundingwireortheclosingofthegroundingswitch.Whengrounding,afterconfirmingthereisnovoltage,thehigh-voltagelinesandequipmentshouldbegroundedandshort-circuitedimmediately,andalllinesthatmaybereverselypoweredshouldbegrounded.Ⅱ.SafetyRegulationsTheclimateconditionsforhighvoltageinsulationtestingshouldnotbelowerthan+5C,andtherelativehumidityoftheairshouldgenerallynotexceed80%.Thetestingsequenceof“non-destructivetestingbeforedestructivetesting”shouldbefollowed.Iftheweatherhumidityistoohigh,theinsulationsurfacemaycondenseorformawaterfilm,whichwillreducethesurfaceinsulationresistance,greatlyincreasethesurfaceleakagecurrent,andalsocausedistortionoftheelectricfielddistributionontheinsulationsurface,resultingincoronadischarge,affectingthemeasurementresults,andrequiringtestingtoberescheduled.Ⅱ.SafetyRegulationsBeforeandafterthetesting,establishsafetymonitoringandprotectionsystems.Thetestingpersonnelshouldwearnecessaryprotectiveequipmentbeforethetesting(“two-wearingandthree-carrying”:wearingworkinguniform,wearinginsulatingboots,carryingsafetyhelmets,carryinginsulatinggloves,andcarryingvoltagedetectors).Thetestingsiteshouldsetupfencesandhang“Stop,HighVoltageDanger”signsfacingoutward.Foroperationsabove2

m,adequatefallprotectionmeasuresshouldbetaken.Personnelandequipmentshouldmaintainasafetestingdistance,asshowninFigure1-2.Figure1-202WorkshopⅠ.WorkspecificationThesafetyleveloftheworkersmustnotbelowerthanlevelthree.Workersshouldfastentheirseatbelts,wearsafetyhelmets,andtakeanti-slipmeasures.Workcanonlybecarriedoutinclearweatherconditions,startingfrom9:00AM.Onesupervisorcanonlyoverseeonegroupofworkers.Groundingworkersmustwearsafetyhelmets.Thetoolscarriedbytheworkersmustbeplacedintoolbags,andthebagsmustbesecurelyfastenedtopreventtoolsfromfallingandinjuringgroundworkers.Ⅰ.WorkspecificationThepowersupplyinthehigh-voltageroommustbecompletelyshutoff,andpropersafetymeasuresmustbetakenbeforeworkcancommence.Workshopleadersmustbepresenton-sitetoensuresafety.Whenchangingthebusbarorsupportingporcelainbottles,payattentiontopersonalandequipmentsafetytopreventinjuriesandequipmentdamage.Ⅰ.WorkspecificationWhenconductinghigh-voltagetestsonelectricalequipment,afencemustbesetuparoundtheworkarea,withasignhangingonthefencewith“NoEntry,HighVoltageDanger!”Guardsshouldbestationedthere.Onlyoneworkgroupisallowedtoperformhigh-voltagetestsononepieceofequipmentwithinaspecificelectricalconnection.Agroundingwireshouldbeinstalledonthemaintenancesideofthedisconnectionpoint,andasignwith“NoEntry,HighVoltageDanger!”shouldbehungonthehigh-voltagetestside,facingthemaintenanceworkarea.Ⅰ.WorkspecificationIndividualsarenotallowedtoenterhigh-voltagecompartmentsorprotectivefencesalone.Thedistancebetweenindividualsandlivepartsmustbeequaltoorgreaterthanthevaluespecified.Whentherearehigh-voltageequipmentneartheworkarea,fencesshouldbesetuparoundtheworkareawithcorrespondingsignshanging.Theremustbededicatedpersonneltosupervisethework,andoperatorsmustuseinsulatingtoolswhilestandingoninsulatingmats.Short-circuitingofliveterminalsmustbeavoided.Measuresshouldbetakentoensurethatthesecondarysideofpotentialtransformersdoesnotshort-circuitandthemutualsecondarysideofcurrenttransformersdoesnotopencircuit.Ⅰ.WorkspecificationWhenthedistancebetweenworkersandlivepartsofhigh-voltageequipmentequalsthespecifiedsafetydistance,thefollowingoperationsareallowedtobeperformedonthehigh-voltageequipmentwithoutpoweroutage:replacingsiliconeandtakingoilsamples.Inanycircumstances,workersmustmaintainthespecifiedsafetydistancefromliveparts.Thesafetylevelofworkersandsupervisorsmustnotbelowerthanleveltwo.Ⅰ.WorkspecificationBeforecarryingoutanyworkrelatedtohigh-voltageelectricalequipment,powerworkersneedtothoroughlyreadtheequipmentusermanual.Duringtheworkprocess,appropriatesafetyprecautionsshouldbetaken,andrelevantoperatingspecificationsmustbestrictlyfollowedtoprotectone’sownlife.Fixedplacementofinstrumentsshouldbedoneaccordingtotheinstrument’sfunctionalclassification,asshowninFigure1-3.Figure1-3Ⅰ.WorkspecificationDuringhigh-voltagetesting,thetestsupervisorshouldbeanexperiencedstaff.Beforestartingthetest,thetestsupervisorshouldprovidedetailedinstructionsonsafetyprecautionstoalltestpersonnelandassigndedicatedpersonnelforsupervision.Themetalcasingofthetestequipmentshouldbereliablygroundedusingmulti-strandedsoftbarecopperwirewithacross-sectionalareanotlessthan25

mm2.Thehigh-voltageleadsshouldbekeptasshortaspossibleandsupportedsecurelywithinsulationmaterialsifnecessary.Thepowerswitchofthetestequipmentshouldbeadouble-poleswitchwithaclearlyvisibledisconnectpoint.Intheoperationcircuitofthetestequipment,inadditiontothepowerswitch,azeropositionswitchshouldbeconnectedinseries,andanoverloadautomatictrippingdeviceshouldbeinstalled.Beforeandafterthewithstandvoltagetestoflargecapacitorequipmentorcapacitors,sufficientgroundingandshort-circuitdischargeshouldbecarriedout.Ⅰ.WorkspecificationWhenperformingvoltagetestingonhigh-voltageequipmentorinstalling/removinggroundingwires,itisnecessaryfortwopersonstoworksimultaneously.Theoperatorandthesupervisormustwearinsulatingbootsandsafetyhelmets,andtheoperatormustwearinsulatinggloves.Duringvoltagetesting,anappropriateandqualifiedelectroscopewithsuitablevoltageratingsmustbeused.Theelectroscopeshouldfirstbetestedonenergizedequipmenttoconfirmitsproperfunctioning,andthenvoltagetestingcanbeperformedonde-energizedequipment.Finally,aretestshouldbeconductedonenergizedequipment.Ⅰ.WorkspecificationDuringvoltagetesting,allincomingandoutgoinglinesoftheequipmentbeingtestedshouldbechecked.Highvoltagetestingcaneliminateerrorssuchasstopwrongelectricityornopoweroutage,andpreventhanginggroundwireinthecaseoflive,asshowninFigure1-4,Figure1-5.Figure

1-4

Figure

1-5Ⅰ.WorkspecificationThereshouldbepersonnelsupervisionduringtheinstallationandremovalofgroundingwires,asshowninFigure11-6.Theinstalledgroundingwireshouldhavegoodcontactandreliableconnection.Thegroundingwireshouldbeconnectedtothegroundingendfirst,andthentotheconductorendduringinstallation.Thesequenceisreversedfortheremovalofthegroundingwire.Figure1-6Ⅱ.NotesInstallationandremovalofgroundingwireswithonepersonoperatingandanotherpersonsupervising.Thegroundingwireshallbeusedwithspecialclips,firmlyconnected,goodcontact,strictlyprohibitedwinding.Thegroundingwireshouldusebarecoppersofts

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論