




已閱讀5頁,還剩2頁未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric . Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long barstavebn tm vdce mst een. een by mlo zahrnovat analzu rizik, monost nehod charakteristik a nouzovch postup, nouzov zpracovn a obsah opaten. 4, integrovan pohotovostn plny, speciln havarijn plny a mst een by mly bt mezi sebou a s ostatnmi jednotky zapojeny v nouzi, kter jsou vzjemn propojeny. 5, havarijn pln by ml zahrnovat havarijn personl a organizace kontakt, nouzov rezervn seznam a dal informace. Informace by mly bt pravideln aktualizovny a zajist, e informace jsou pesn a platn. tyi, havarijn pln revize 1, Recenze pohotovostn plny pezkoumn formul a prvky pezkumu a opaten pijatch dvma zpsoby. Kdy host slou pedevm pro havarijn plny pro zznam v podob Recenze, prvek hodnocen pro nouzov hodnocen. . Kd pro porn ochranu konstrukce budov a nsk republice ny exploze nebezpen oblasti elektrick bezpenostnch pedpis a pedpis o porn ochranu design rafinaci ropy a chemickch podnik, napklad poadavky na pedpisech a nazench. 2. pi provdn instalace me zpsobit por, exploze, kter sti by mly bt pln nastaven peht, petlaku, micch pstroj, alarm (zvuk a svtla). 3. kde je holav plyn (pra) me unikat , holav plyn koncentrac detekce, alarm by mla bt nastavena. 4. vechny komunikoval s holav, vbun zazen s inertnm plynem, plynov penosov potrub, by mla bt nastavena zabrnit holavch a vbunch ltek do zazen, ale nemla bt samostatn zptn ventil. 5. holav plyn (pra) nastavit plamen svodi odvzduovac vvod, snadno pracovat, kde se zastavit ventily, aby pi vstupn vtrac potrub je v plamenech, peruil por plynu odvzduovac potrub ml bt nainstalovn v nejni hasicho zazen. 6. kdy dopravu holavch materil by mla odpovdat prmru potrub a stedn mrn odpor, sprvn zen prtoku, co nejvce se vyhnout statick elektiny. Antistatick opaten, jako jsou zazen, potrub, by mlo bt v souladu s technickmi pedpisy pro uzemnn design pro chemick podniky pslunch ustanoven. 7. nhl vbun petlaku nebo rychlho rozkladu vrobnch zazen nebo skladovacch zazen by mly bt vybaveny vbuchu (nevbun membrna), vvoz nonel trubice smrem k bezpenosti a aby prevence sekundrnch exploz, protiporn opaten. 8. vrobnthe principle of simplified EIA of construction projects in the region. In terms of land, linked to the implementation of urban and rural construction land increase and decrease, replacement indicators for priority areas project. Charges, into the projects of water, electricity, administrative charges and preferential policies. In the area of taxation, and settled in areas of industry and its production company, within 5 years after the completion of fiscal incentives to enterprises. In terms of financing, integration of land, tax, financial and other resources, and construct Government credit + business credit credit system, establishment of marketization, commercialization and modernization of the investment and financing platform; effective Bank-enterprise docking, encourages private capital into the Park, to raise industry development fund. 5, optimize the environment and service industries. To create policy lowlands, Highlands, integrity of service land, development land as the goal, to optimize the area under development environment. All administrative law enforcement departments to appoint a full-time personnel stationed in areas dedicated to coordinating and solving problems associated with businesses in this sector. When there are substantial issues, sector leaders arranged to personally intervene, in-person, in-person push tangible area building a green light, easy line. To further reduce and standardize administrative examination and approval items, simplify examination and approval links, improve efficiency; according to the .Since the educational practice of the mass line of the party, himself seriously in the education, practical control central eight rules and opposing the four winds and practicing three Suns, and check the spirit of Jiao Yulu, ideology, solicit opinions based on outstanding problems checked swing, careful analysis and reflection. Will now check report is as follows: first, adherence to the partys political discipline, eight in the central provision, change the style of the basic situation of 1, in compliance with the partys political disciplines. Conscientiously abide by the partys political discipline, abide by the Constitution and the rules and regulations of the party, in the political, ideological and maintain highly consistent with the CPC Central Committee on the action, there is no violation of the partys political discipline problems. 2, in the implementation of the central authorities of the eight provisions. Improving research, improving research methods, but there are less grass-roots units, primary first-hand an inadequate grasp of the problem, which is to be strengthened in the future. Second, construction, strictly in accordance with the provisions to streamline and improve the quality of meetings of the Conference. Third, streamlining file briefs, culture involves all aspects of propaganda and ideology, sometimes due to the practical needs of invention notifications, this area needs further環(huán)氧樹脂地坪漆工程技術(shù)要求一、施工技術(shù)說明1樓梯環(huán)氧樹脂地坪漆施工方案(1) 工法: 2.0mm環(huán)氧光面平涂工法(2)質(zhì)量性能評(píng)估: 1)化學(xué)性能符合國家標(biāo)準(zhǔn)和行業(yè)標(biāo)準(zhǔn)。2)物理性能符合國家標(biāo)準(zhǔn)和行業(yè)標(biāo)準(zhǔn)。3)漆膜成型厚度:最薄處不得小于1.8。4)漆膜成型止滑功能:為輕度止滑效果。5)漆膜成型表面色澤:整體表面統(tǒng)一(3)圖示:2.0mm環(huán)氧樹脂地坪漆工程施工說明(圖示)面涂一道 (面涂一道)面涂一道 (平涂面涂一道)中涂二道 (膩?zhàn)臃鄱溃┲型恳坏?(砂漿層一道)環(huán)氧底涂一道 (底涂一道)基礎(chǔ)面 (基面補(bǔ)平打磨處理)(4)需提供1的樣板。2.環(huán)氧樹脂地坪施工工藝1)主要施工流程A. 施工準(zhǔn)備+基面處理B. 環(huán)氧底涂涂裝一道C. 環(huán)氧膩?zhàn)又袑?膩?zhàn)臃鄱繢. 環(huán)氧樹脂平涂面涂涂裝一道E. 環(huán)氧樹脂面涂涂裝一道F. 清 理 維 護(hù)、地 坪 養(yǎng) 護(hù)2)施工工藝A.基面處理用專業(yè)打磨機(jī)對(duì)基面進(jìn)行打磨,并檢查基底有無裂縫、空殼,如有,則須深層切割清理后用環(huán)氧樹脂砂漿填補(bǔ)。由于環(huán)氧樹脂不溶水,所以在處理過程中只能進(jìn)行干處理,清理時(shí)不可野蠻敲打,以免敲松邊上的基層。B.環(huán)氧樹脂底涂涂裝對(duì)基面吸塵干凈后,在進(jìn)行基底處理的同時(shí),可進(jìn)行環(huán)氧底涂涂裝,保證材料在涂裝時(shí)仍符合可使用時(shí)間,在膠化前被涂刷完,讓材料保持良好的滲透性,保證粘接性能。C.環(huán)氧中涂涂裝 在底涂固化干后(約8小 時(shí)),首先采用環(huán)氧砂漿將脫層破損的地面修補(bǔ)平,再將已按比例攪拌混好的環(huán)氧砂漿用平刀批刮,使用小型專業(yè)手磨機(jī)充分打磨環(huán)氧砂漿層,使達(dá)到初步平整;D.環(huán)氧樹脂面涂涂裝 環(huán)氧膩?zhàn)由皾{層固化后打磨修飾平整并吸塵干凈,在確保封閉的表面滾涂平涂面涂一道,固化后再滾涂面涂一道,以達(dá)到現(xiàn)場(chǎng)所要求的輕度止滑表現(xiàn)效果。涂裝施工的環(huán)境要求:施工基面應(yīng)保持干凈,無其他工程施工交叉作業(yè)。E.現(xiàn)場(chǎng)清理維護(hù)、地坪養(yǎng)護(hù) 面涂完成后將有關(guān)施工材料、工具搬離現(xiàn)場(chǎng),嚴(yán)密封閉保護(hù)完成飾面,至少24小時(shí)后才可允許人進(jìn)入行走。并不可帶進(jìn)泥沙,漆膜完全固化一般需7天時(shí)間,期間應(yīng)避免進(jìn)行其他工程施工、搬運(yùn)、安裝等施工。F.現(xiàn)場(chǎng)派駐工程技術(shù)人員現(xiàn)場(chǎng)監(jiān)督,以保證工程質(zhì)量及工程進(jìn)度順利完成。3.地腳線施工1)清除表面灰塵、墻面少量開裂涂料,按要求打水平線。涂刷專用環(huán)氧封閉底漆。對(duì)空洞、裂縫處使用環(huán)氧樹脂膩?zhàn)有扪a(bǔ);固化干透后打磨、除塵。面涂漆二道2)檢查立面有無氣孔殘留未封閉、有無突出粉粒,并及時(shí)填補(bǔ)氣孔及打磨除塵,滾涂平涂面涂一道,固化干透后再滾涂面涂一道,以達(dá)到現(xiàn)場(chǎng)所要求的輕度止滑滾面表現(xiàn)效果。3、注意事項(xiàng)3.1施工注意事項(xiàng)3.1.1雨期施工:如空氣濕度超出施工條件時(shí),應(yīng)增加人工排風(fēng)設(shè)施(排風(fēng)扇等)控制濕度。遇大雨、高濕度等天時(shí)應(yīng)停止施工。3.1.2樹脂整體面層施工時(shí),環(huán)境溫度不得過低、過高,濕度不得過大,防止樹脂砂漿產(chǎn)生假固化(根據(jù)材料說明書)。3.1.3施工場(chǎng)所應(yīng)注意通風(fēng)良好。3.1.4施工中涂料避免接觸皮膚,最好雙手能有保護(hù)手套。3.1.5施工中玷污處要清洗干凈,施工后順將場(chǎng)地、垃圾清除完畢。3.1.6地面灰塵須徹底清除,以確保底漆之接著效果。3.1.7地面潮濕時(shí)須使之干燥,含水率8%以下,或者選用特殊底漆。3.1.8環(huán)氧樹脂的各層涂料若出超出有效接著地間,須將材料表面打粗并處理干凈,涂上一層底漆(依間隔時(shí)間長短),再進(jìn)行上層涂料施工。3.1.9底漆須待完全揮發(fā)后方可進(jìn)行施工,以免起泡現(xiàn)象。3.1.10材料調(diào)配時(shí),須以底布(或紙板)墊底半避免任何一種材料單獨(dú)滴于素地上,造成不干,若已滴于素地上時(shí)須立即擦去。3.1.11攪拌后的材料應(yīng)在可使用時(shí)間內(nèi)涂布完畢,避免表面接近硬化無法流平。3.1.12涂布發(fā)現(xiàn)砂粒或其它雜質(zhì)時(shí),應(yīng)立即清除。3.1.13環(huán)氧樹脂防塵耐磨地坪施工時(shí)應(yīng)注意其混合比例,混合攪拌均勻才可使用。3.1.14施工現(xiàn)場(chǎng)條件濕度應(yīng)低于RH85%,溫度在5以上,如不合于此標(biāo)準(zhǔn)時(shí),請(qǐng)停止施工或改用其它低溫耐濕產(chǎn)品以免表層不干或發(fā)白。3.2安全操作要求:3.2.1施工現(xiàn)場(chǎng)臨時(shí)用電應(yīng)符合國家現(xiàn)行標(biāo)準(zhǔn)施工現(xiàn)場(chǎng)臨時(shí)用電安全技術(shù)規(guī)程和現(xiàn)行地方標(biāo)準(zhǔn)的要求。3.2.2對(duì)某些物質(zhì)有過敏反應(yīng)的施工者不得參加施工。3.2.3在易燃、易爆區(qū)域內(nèi)動(dòng)火時(shí),必須采取防范措施,辦理動(dòng)火證后,方可動(dòng)火。3.2.4臨時(shí)用電線路、設(shè)備,必須經(jīng)認(rèn)真檢查,符合安全使用要求后,方可使用。用電設(shè)備必須進(jìn)行接地;在防爆區(qū)域內(nèi)施工,必須采用防爆電器開關(guān),其照明燈具必須彩用36V低壓和防爆燈。3.2.5在通風(fēng)條件不好的空間施工,應(yīng)有通風(fēng)排氣設(shè)備。有害氣體、粉塵不得超過允許濃度。操作人員應(yīng)佩戴口罩、手套、工作服等。3.3環(huán)保措施3.3.1施工垃圾和零散碎料要及時(shí)清理,集中消納。3.3.2裝卸材料應(yīng)做到輕拿輕放,夜間運(yùn)輸車輛進(jìn)入施工現(xiàn)場(chǎng),嚴(yán)禁鳴笛,減少噪聲擾民。3.3.3防腐蝕所用的各種材料應(yīng)封閉存放,不得遺撒,廢料和包裝容器應(yīng)及時(shí)回收,統(tǒng)一處理。3.4消防保衛(wèi)管理措施3.4.1施工現(xiàn)場(chǎng)必須堅(jiān)持“預(yù)防為主,防消結(jié)合”的工作方針,認(rèn)真貫徹中華人民共和國消防條例,逐級(jí)落實(shí)防火責(zé)任制,利用多種形式對(duì)工人進(jìn)行宣傳教育,做到人人重視消防工作。3.4.2參加施工的所有人員,入場(chǎng)前都要進(jìn)行“四防”教育,學(xué)習(xí)現(xiàn)場(chǎng)的各項(xiàng)規(guī)章制度和國家法規(guī),使每個(gè)施工人員做到制度明確、安全生產(chǎn)、文明施工。3.5成品保護(hù)措施3.5.1對(duì)所覆蓋的隱蔽工程要有可靠的保護(hù)措施,不得因?yàn)榈孛媸┕ぴ斐陕┧?、堵塞、破壞或降低等?.5.2樹脂面層完工后應(yīng)采取掛牌、攔擋給以施工人員提示,避免受到破壞。3.5.3施工中不得污染、損壞其他工種的半成品、成品。二、質(zhì)量保證(一) 工程質(zhì)量保證期(簡稱“質(zhì)保期”)為兩年。質(zhì)保期自工程竣工驗(yàn)收之日起計(jì)算,質(zhì)保費(fèi)用計(jì)入總價(jià)。(二) 質(zhì)保期內(nèi),中標(biāo)人負(fù)責(zé)對(duì)其提供的貨實(shí)行包修、包換、包退、包維護(hù)保養(yǎng),不再收取任何費(fèi)用,但不可抗力(如火災(zāi)、雷擊等)造成的故障除外。(三) 工程質(zhì)量報(bào)修12小時(shí)內(nèi)響應(yīng)。(四) 所有質(zhì)保服務(wù)方式均為中標(biāo)人上門服務(wù)。(五) 在質(zhì)保期內(nèi),中標(biāo)人應(yīng)在一定時(shí)間內(nèi)對(duì)所提供的工程及設(shè)備做定期檢查和保養(yǎng)。三、技術(shù)參數(shù): 地板類別技術(shù)參數(shù)項(xiàng) 目2.0mm環(huán)氧樹脂平涂地坪干燥時(shí)間表干2h實(shí)干24h承 載2000kg耐 磨 性(750g/1000r失重)0.03 g鉛筆硬度1-2H抗彎強(qiáng)度18 MPa抗壓強(qiáng)度50 MPa耐沖擊性30.cm附著強(qiáng)度1級(jí)耐機(jī)油、柴油60天無變化耐20%硫酸20天無明顯變化 注:以上數(shù)據(jù)系依據(jù)實(shí)驗(yàn)室條件制樣檢測(cè)而得,僅供參考。四、環(huán)氧樹脂地坪涂料用量2.0環(huán)氧樹脂地坪 方案項(xiàng)目2.0mm環(huán)氧樹脂地坪主材底 涂0.2/(環(huán)氧樹脂固含量70%)環(huán)氧中涂1.0/(環(huán)氧樹脂固含量95%)面 涂0.3/(環(huán)氧樹脂固含量80%)主材合計(jì)1.5/2.0mm環(huán)氧樹脂防靜電地坪方案項(xiàng)目2.0mm環(huán)氧樹脂防靜電地坪主材底 涂0.2/(環(huán)氧樹脂固含量70%)環(huán)氧中涂1.0/(環(huán)氧樹脂固含量95%)面 涂0.3/(環(huán)氧樹脂固含量80%)主材合計(jì)1.5/temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric . Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long barch zazen, budov a konstrukc, tanky a jin zsuvky prmyslov vody, krom ustanoven vodu tak, by mlo bt instalovno v oblasti s vodou k utsnn vrtu, uzavrac ventil, aby se zabrnilo velk mnostv holavch a vbunch materil do kanalizace. 9. pouit v holavch, vbunch plyn pojistn ventil a vtrac potrub, je nutn export trubice je umstn mimo a vy ne 2 metry nad budovou. (B) pouvn ohn, ohe (viz systm sprvy prce) (c) porn zazen a organizac 1. realizace prevence prvn a integrovan prevence ohe politiku, pijmout modern technologie poru a vbuchu prevence a pomoci, provdn zen podle cl. 2. zzen veden spolenosti a vedouc jednotlivch oddlen Porn bezpenost vboru, workshop zaloena porn ochrany, vedouc skupiny a nastavit dobrovolnch hasi. 3. spolenost tvaru ochrany spotebitele na pln vazek hasii, hasii formulovat pln protiporn prevence a akn pln, provdn zen podle cl, pravideln proveden publicitu porn prevence a vzdlvn a kolen, v kombinaci s oekvan porn cvien. 4. soubor stacionrn ohn uvnit spolenosti zazen, protiporn zazen mus bt v Sprva slueb, rozvoj provozn postupy a systmy zen. 5. porn zazen na serveru nastavit jasn, pstup k pohodln a bezpen msto, pravideln kontroly drby, ti (to je, pevn, fixn typ a mnostv, podle odbornk), a nem nikdo nenapadal, pachatel dle systmu ke zpracovn. 6. vechny holav a vbun ltky ve spolenosti a potenciln ped porem a vbuchem nebezpen vroby, skladovn, prodej a pouvn procesu a jeho souvisejc vybaven, psn zen. 7. kdy je ohe, pole tby okamit uspodejte do boje s ohnm, a ohledn vroby, plnovn, alarmy a ohn a adresu urit sti ohn a pinastreamlining. Four are standard visits, except as required to participate in training, no other activity. Five is to improve news reporting, for propaganda work strictly according to the regulations. Six is strictly your presentation published strictly according to the regulations. Seven is strictly thrift, required the use of vehicles and office space and corporate hospitality. 3, change the style. Propaganda and ideological work of the new situation and new requirements of the new tasks, had done a lot of fruitful work, has made many achievements, but further closer to the grass roots, close to reality, close to the masses and also inadequate innovation must continue to improve. Second, the four winds some outstanding issues 1, oppose formalism. One theory is that he didnt, with less close contact. Theoretical study of consciousness is not high enough, system performance is not strong enough; more passive learning, active learning few generalities and learn more, delving into less. Especially based on rational thinking on major issues, applying theory to guide the work done is not good enough, not really understand and grasp the spirit and essence of the scientific Outlook on development, did not truly achieve mastery, to apply, to a certain extent, affe
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 愛是心理健康課
- 警察培訓(xùn)開班儀式
- 山東省聊城市莘縣第一中學(xué)2024-2025學(xué)年高二下學(xué)期第三次月考語文試題(含答案)
- 綜合實(shí)踐課程培訓(xùn)大綱
- 內(nèi)科醫(yī)生臨床教學(xué)核心要點(diǎn)
- 兒童高危兒培訓(xùn)課件
- 護(hù)理操作口述書籍分享
- 心力衰竭護(hù)理飲食宣教
- 重癥肺炎病人護(hù)理
- 輿情公關(guān)培訓(xùn)課件模板
- 醫(yī)療廢物交接與記錄的重要性
- 個(gè)人極端事件防范應(yīng)急預(yù)案
- (環(huán)境管理)環(huán)境保護(hù)與水土保持監(jiān)理實(shí)施細(xì)則
- 軍事訓(xùn)練傷的防治
- 國開《化工安全技術(shù)》形考任務(wù)1-4答案
- 安全生產(chǎn)月“一把手”講安全課件
- 產(chǎn)業(yè)命題賽道命題解決對(duì)策參考模板
- 985、211和雙一流大學(xué)名單
- 三人合伙經(jīng)營協(xié)議書電子版(2篇)
- 汽車產(chǎn)品認(rèn)證
- 蛇類解剖生理特征(特種寵物疾病防治)
評(píng)論
0/150
提交評(píng)論