滑坡治理注漿加固施工組織設(shè)計(jì)199618224_第1頁(yè)
滑坡治理注漿加固施工組織設(shè)計(jì)199618224_第2頁(yè)
滑坡治理注漿加固施工組織設(shè)計(jì)199618224_第3頁(yè)
滑坡治理注漿加固施工組織設(shè)計(jì)199618224_第4頁(yè)
滑坡治理注漿加固施工組織設(shè)計(jì)199618224_第5頁(yè)
已閱讀5頁(yè),還剩21頁(yè)未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、*(K20+800K20+935)左側(cè)滑坡處治施工組織設(shè)計(jì)目 錄1工程概況 ···········································

2、3;·················································

3、3;·········1地形地貌········································

4、;··················································

5、;·······1地層巖性··········································

6、··················································

7、·····1水文地質(zhì)特征············································

8、;·············································12施工組織方案···

9、83;·················································

10、83;···········································1······&#

11、183;·················································&#

12、183;········································1·········&

13、#183;·················································&

14、#183;·····································1············

15、··················································

16、·······63施工場(chǎng)地布置·········································

17、3;·················································

18、3;·····6············································

19、83;·················································

20、83;··········6·······································&#

21、183;·················································&#

22、183;···········6······································&

23、#183;·················································&

24、#183;6·················································

25、········································7··········

26、;··················································

27、;·····························74施工總體部署 ···················&#

28、183;·················································&#

29、183;·························7························&

30、#183;·················································&

31、#183;··········7·······································

32、··········································9········

33、;··················································

34、;·······95工期方案及工期保證措施········································

35、3;··································10···············&#

36、183;·················································&#

37、183;·································10················

38、··················································

39、·····························10····················

40、3;·················································

41、3;················116. 工程質(zhì)量································&

42、#183;·················································&

43、#183;················13·································

44、;··················································

45、;············13·····································

46、83;·················································137

47、 施工平安·················································&

48、#183;·················································&

49、#183;··15···············································

50、;················································15·

51、83;·················································

52、83;···································167.3 平安生產(chǎn)紀(jì)律············

53、83;·················································

54、83;·······················18··························&

55、#183;·················································&

56、#183;··198施工環(huán)境保護(hù)、水土保持和文物保護(hù)等措施和方案·································209文明施工保證措施及創(chuàng)立文明工地的規(guī)劃······

57、83;········································21·········&

58、#183;·················································&

59、#183;···················21······························

60、;··················································

61、;·······2110勞動(dòng)衛(wèi)生保障措施·········································

62、;············································22*(K20+800K20+935)左側(cè)滑坡處治施工組織設(shè)計(jì)1、工程

63、概況待處治的滑坡位于*K20+800K20+ 935段左側(cè),南北向長(zhǎng)約65m左右,東西向順路線(xiàn)長(zhǎng)度達(dá)135m,平面上呈弧形,前后緣高差達(dá)22m。場(chǎng)地原始地形為丘陵,高速公路由東至西方向穿過(guò)該區(qū)。邊坡上部為階梯狀農(nóng)田?;潞蟊谖挥谵r(nóng)田之中,滑坡后緣自然邊坡較平緩,滑坡兩側(cè)為走向垂直于路線(xiàn)方向的沖溝。第四系全新統(tǒng)Qh1)填筑土:其成份為粉砂巖塊石,主要分布于施工便道,厚度約1.00m2.00m。2) 種植土:松軟,分布于農(nóng)田和山坡上,厚0.30m。3) 亞粘土:褐黃色、褐紅色,硬塑狀,厚約厚1.602.00m,主要分布于邊坡后面的農(nóng)田。白堊系下統(tǒng)K11) 粉砂巖:紫紅色,以鈣泥質(zhì)膠結(jié)為主,局部夾泥

64、質(zhì)膠結(jié),中厚層狀,巖石遇水軟化。全風(fēng)化層,褐紅色,呈可塑硬土狀,厚1.606.70m;局部底部存在2.20m厚的泥化夾層;強(qiáng)風(fēng)化層,巖石較破碎,巖芯呈碎石、碎塊狀,巖性較軟。場(chǎng)地地下水主要接受大氣降水補(bǔ)給。邊坡上部匯水面積大,在雨季,邊坡上部所會(huì)聚雨水經(jīng)坡面所形成的面流易在裂縫處下滲而轉(zhuǎn)化為地下水, 流向斜坡坡腳處,并于滑坡坡體內(nèi)中部及坡腳處以下降泉的形式排泄。2、施工組織方案該滑坡治理工程施工的總體目標(biāo)是“平安、經(jīng)濟(jì)、環(huán)保、舒適、美觀。同時(shí)提倡節(jié)約理念和貫徹交通部?關(guān)于在公路建設(shè)中實(shí)行最嚴(yán)格的耕地保護(hù)制度的假設(shè)干意見(jiàn)?。從以上施工總體目標(biāo)出發(fā),結(jié)合該工程場(chǎng)地地形和工程地質(zhì)條件,該滑坡治理工程

65、設(shè)計(jì)采用注漿處理方案。2.2 施工程序按照設(shè)計(jì)方案,該滑坡治理工程涉及的主要子工程工程有:放坡施工;注漿加固;防排水措施施工。2.2.1 放坡施工由于采用注漿加固處理,只需對(duì)原坡面進(jìn)行修整,自路基左側(cè)起按原放坡設(shè)計(jì)坡比進(jìn)行放坡,比例及高度參數(shù)如下:第一級(jí):自坡腳由下至上按1:1.5放坡,坡面植草防護(hù) ,上部按坡頂?shù)匦慰刂聘叨龋罡咛帪?3m;其余坡面保持原有地形地貌。本滑坡處治設(shè)計(jì)采用注漿加固,注漿區(qū)域?yàn)榱芽p所圍成的區(qū)域,即在整個(gè)滑體上鉆孔,注漿,插鋼筋。鉆孔深度設(shè)計(jì)要求穿過(guò)滑動(dòng)面,進(jìn)入滑床巖體23m,注漿采用孔口封閉純壓式注漿。采取梅花形布孔,鉆孔間距5m,每排間距5m。放坡坡面采用植草防護(hù)

66、。注漿加固主要包括注漿試驗(yàn)、注漿施工、注漿質(zhì)量效果檢驗(yàn)三個(gè)步驟。2.2.2.1 注漿試驗(yàn)為了了解地層注漿特性,檢驗(yàn)本次滑坡注漿處治所設(shè)參數(shù)的正確性以及能否到達(dá)預(yù)計(jì)的注漿效果,應(yīng)先期進(jìn)行注漿試驗(yàn),并以試驗(yàn)成果修正注漿設(shè)計(jì)方案。注漿試驗(yàn)安排如下:1) 注漿試驗(yàn)地段的選擇注漿試驗(yàn)地段的選擇在具有代表性,且地質(zhì)條件中等偏劣的地段。本次注漿試驗(yàn)地段按設(shè)計(jì)文件選在K20+880左側(cè)55m處10mx8.6m的區(qū)域。2)注漿試驗(yàn)孔的布置本次注漿試驗(yàn)按設(shè)計(jì)要求布孔共11個(gè),其中注漿孔7個(gè),檢查孔4個(gè)。注漿孔按照3個(gè)次序進(jìn)行鉆孔注漿,具體布置見(jiàn)下列圖:注漿實(shí)驗(yàn)施工將嚴(yán)格按照分序加密原那么進(jìn)行,每序次孔施工時(shí)間間隔

67、大于12h。3) 注漿試驗(yàn)鉆孔注漿孔孔徑110mm。深度按設(shè)計(jì)要求穿過(guò)滑動(dòng)面進(jìn)入滑床弱風(fēng)化巖層不小于2m,采用清水循環(huán)鉆進(jìn),鉆孔位置應(yīng)不偏離設(shè)計(jì)孔位0.1m,孔斜控制在2%以?xún)?nèi)。4試驗(yàn)孔注漿 本次注漿試驗(yàn)采用孔口封閉式一次循環(huán)注漿,漿材選用32.5級(jí)普通硅酸鹽水泥。 水灰比初始為1:1,并逐漸減小至0.6:1。 對(duì)于漿液性能的評(píng)價(jià),假設(shè)參加外摻劑需通過(guò)漿液室內(nèi)試驗(yàn)確定。按設(shè)計(jì)要求,注漿試驗(yàn)的漿液室內(nèi)試驗(yàn)將包括以下幾個(gè)方面:a、配比試驗(yàn)b、流動(dòng)性,凝結(jié)時(shí)間c、結(jié)石的容重、強(qiáng)度、彈性模量。 注漿壓力進(jìn)行注漿試驗(yàn)時(shí),可以采用逐步提高注漿壓力的方法,注漿量突然增大時(shí),說(shuō)明地層結(jié)構(gòu)發(fā)生破壞或孔隙尺寸己被

68、擴(kuò)大,可把此時(shí)的注漿壓力作為確定容許注漿壓力的依據(jù)。5 注漿效果檢驗(yàn)注漿效果檢驗(yàn)按設(shè)計(jì)要求在注漿試驗(yàn)孔注漿完成7d后進(jìn)行,試驗(yàn)方法為在檢查孔鉆孔取未擾動(dòng)樣進(jìn)行室內(nèi)土工試驗(yàn)。2.2.2.2 注漿施工1總體施工順序第一步:測(cè)量放線(xiàn)、布置注漿孔位;第二步:鉆注漿孔;第三步:注漿完畢后插入鋼筋(125),鋼筋長(zhǎng)度要求自設(shè)計(jì)坡面至滑動(dòng)面以下巖層23m;第四步:根據(jù)設(shè)計(jì)開(kāi)挖坡面;第五步:坡面防護(hù)施工。2) 注漿施工工藝孔位布置:注漿孔:注漿孔孔徑91mm。深度按設(shè)計(jì)要求穿過(guò)滑動(dòng)面進(jìn)入巖層23m,孔間距為5mx5m平面,梅花形布置。注漿孔的施工順序:注漿分兩序施工,從地裂縫后緣起先施工第序孔,再施工第序孔。

69、注漿總體施工方向?yàn)檠鼗逻吘売缮现料逻M(jìn)行鉆孔注漿。 注漿材料采用32.5級(jí)普通硅酸鹽水泥,灌漿用水將選用符合拌制混凝土用水要求的水。水灰比按設(shè)計(jì)要求,初灌時(shí)為1:1,隨后逐步降低水灰比至0.6:1。水泥漿攪拌時(shí)問(wèn)不少于3min,漿液自制備至用完的時(shí)間不超過(guò)4h。 注漿壓力按初步設(shè)計(jì)注漿壓力為0.2Mpa-0.6MPa,根據(jù)現(xiàn)場(chǎng)注漿情況進(jìn)行調(diào)整。注漿過(guò)程中,注漿壓力或注入率突然改變較大時(shí),應(yīng)立即查明原因,采取相應(yīng)的措施處理或上報(bào)設(shè)計(jì)和業(yè)主單位。 注漿過(guò)程控制與結(jié)束標(biāo)準(zhǔn)和封孔標(biāo)準(zhǔn)在孔口埋設(shè)89的無(wú)縫鋼管,管口上端為套管母絲,埋入深度為進(jìn)入孔口2.5m。結(jié)束標(biāo)準(zhǔn):在設(shè)計(jì)壓力下不吸漿或吸漿量<0

70、.4 L/min時(shí),持續(xù)30 min,即可結(jié)束注漿。采用壓力灌漿封孔,即在全孔灌漿完畢后,將全孔分成幾段自下至上,采用一定的壓力及濃漿封孔。 施工操作要領(lǐng)a、在配置漿液時(shí),應(yīng)先開(kāi)動(dòng)攪拌機(jī),加水到一定程度時(shí)方可向攪拌桶內(nèi)依次參加水泥充分?jǐn)嚢琛、儲(chǔ)漿池內(nèi)的漿液應(yīng)不斷的攪動(dòng)。c、單孔灌漿過(guò)程必須連續(xù),中間停歇時(shí)間不得過(guò)長(zhǎng),以免漿液凝固堵塞通道。d、當(dāng)灌漿設(shè)備需維修時(shí),在維修前,應(yīng)將灌漿管道用清水清洗干凈。e、注漿過(guò)程中要對(duì)泵壓及泵量變化進(jìn)行記錄。 特殊情況處理 冒漿處理a、外表堵蓋處理:即大裂隙冒漿處,采用舊棉花、麻線(xiàn)等物嵌入縫隙內(nèi),再用速凝材料進(jìn)行封堵;當(dāng)冒漿嚴(yán)重時(shí),可在冒漿部位澆筑混凝土蓋板而

71、后進(jìn)行灌漿。b、采用低壓、濃漿、限流、限量、間歇灌漿的方法進(jìn)行灌注。必要時(shí),可在漿液中摻入速凝劑。 防止串漿的主要措施加大第一次序孔間的孔距。b、適當(dāng)?shù)匮娱L(zhǎng)相鄰兩個(gè)次序先后施工的間隔時(shí)間,待前一次序孔灌漿的漿液根本凝固后,再開(kāi)始后一序孔的鉆注工作。c、發(fā)生串漿后,如串漿孔具備灌漿條件,可以同時(shí)進(jìn)行灌漿,但應(yīng)一臺(tái)泵注一孔,否那么應(yīng)將串漿孔用塞塞住,待灌漿孔灌漿結(jié)束后,串漿孔再行掃孔、沖洗,而后繼續(xù)鉆進(jìn)和灌漿。 大量漏失發(fā)生大量漏失時(shí),采用以下原那么進(jìn)行處理:a、采用低壓、濃漿、限流、限量、間歇灌漿的方法進(jìn)行灌注。b、必要時(shí),可注入砂漿或其它惰性充填材料。c、采用水泥-水玻璃處理。2.2.2.3

72、注漿質(zhì)量效果檢驗(yàn)注漿質(zhì)量檢驗(yàn)按設(shè)計(jì)要求在注漿結(jié)束3-7天后進(jìn)行,采用鉆孔取芯進(jìn)行室內(nèi)土工試驗(yàn)的方法。檢驗(yàn)孔數(shù)量不少于注漿孔總數(shù)的5%,檢驗(yàn)結(jié)束后,按設(shè)計(jì)要求進(jìn)行補(bǔ)充注漿。該工程設(shè)計(jì)的排水系統(tǒng)為地面排水系統(tǒng)。地面排水系統(tǒng)設(shè)計(jì)有截水溝、排水溝和路基邊溝。2.3 施工監(jiān)測(cè)要求及應(yīng)急措施針對(duì)施工過(guò)程的平安隱患,我司將采取切實(shí)可行的防護(hù)措施。同時(shí),為確?;绿幹问┕さ钠桨玻瑢⑴浜舷嚓P(guān)單位自行施工監(jiān)測(cè)包括對(duì)滑坡滑動(dòng)監(jiān)測(cè)和施工對(duì)滑坡影響的監(jiān)測(cè),隨時(shí)掌握滑坡整治施工過(guò)程中的邊坡動(dòng)態(tài)變化,滑坡裂縫的發(fā)生和開(kāi)展以及對(duì)其它工程的位移和變形的影響。將及時(shí)預(yù)報(bào)施工中出現(xiàn)的問(wèn)題,并把獲得的信息及時(shí)反應(yīng)到設(shè)計(jì)方,據(jù)此指導(dǎo)施

73、工。3、施工場(chǎng)地布置施工場(chǎng)地布置具體須按場(chǎng)地現(xiàn)場(chǎng)情況靈活布置??筛鶕?jù)現(xiàn)場(chǎng)實(shí)際情況,設(shè)置工地辦公室、值班室及機(jī)械停放和材料堆場(chǎng)。在滑坡體外適當(dāng)距離較平緩的場(chǎng)地處建一個(gè)拌和站,包括兩個(gè)攪拌桶、一個(gè)裝有攪拌機(jī)的儲(chǔ)漿池2m×2m、深1.2m 、一蓄水池3m×3m、深1.2m 、一水泥堆放場(chǎng)地5m×5m。具體施工布置根據(jù)現(xiàn)場(chǎng)條件進(jìn)行調(diào)整。 本工程臨時(shí)用電由建設(shè)單位指定的供電地點(diǎn)接出,到工地的配電間,裝表計(jì)量。(1) 不考慮生活用電的影響,施工機(jī)械設(shè)備用電頂峰期用電容量約為 150KW。架空線(xiàn)電纜采用50-70mm2的鋁鉸線(xiàn)。(2)施工用電措施總配電屏中分配電路為動(dòng)力照明混合

74、系統(tǒng)??偱潆娖恋姆致分Ь€(xiàn)各到達(dá)固定安裝的分配電箱中,由各分配電箱分路到達(dá)各單機(jī)開(kāi)關(guān)。各級(jí)配電箱中的匣刀、漏電保護(hù)開(kāi)關(guān)必須標(biāo)明送電目標(biāo)或所控制的范圍。各級(jí)配用電源必須設(shè)置漏電保護(hù)開(kāi)關(guān)。(3)支線(xiàn)架設(shè)變壓器引線(xiàn)時(shí)開(kāi)始視為埋地臨時(shí)用電線(xiàn)路。施工現(xiàn)場(chǎng)的全部線(xiàn)路均必須架空設(shè)置、采用木質(zhì)電桿,直徑必須符合要求,并且埋設(shè)穩(wěn)。轉(zhuǎn)角桿采用雙橫擔(dān),雙絕緣子的十字橫擔(dān),并置雙向線(xiàn)桿接線(xiàn),桿上的接線(xiàn)高于地面米處,裝設(shè)緊絕緣子,拉線(xiàn)與電桿的夾角在30°45°之間。拉線(xiàn)截面不小于3×Ø40,拉線(xiàn)錨固物埋設(shè)深度不少于1m。固定安裝的電設(shè)備線(xiàn)路必須用絕緣套設(shè)過(guò)路保護(hù)。架空導(dǎo)線(xiàn)與各種金屬

75、物(如招牌、鐵閘等)的距離不得小于米,與各種不良導(dǎo)體的距離不得小于米,通過(guò)門(mén)窗上方時(shí)最小距離約米,通過(guò)門(mén)窗下方最小垂直距離約米,導(dǎo)線(xiàn)平行通過(guò)門(mén)窗的最小水平距離為米。本工程用水從建設(shè)方指定的地點(diǎn)接出,鋪設(shè)一路輸水管道或者用水車(chē)運(yùn)水到工地。由于懷新高速公路此路段的路基建設(shè)已初步成型,交通方便。4、施工總體部署本工程采用工程管理法施工,由工程經(jīng)理全面組織施工,確保高速、優(yōu)質(zhì)、平安完本錢(qián)工程施工任務(wù)。現(xiàn)場(chǎng)指揮部由技術(shù)素質(zhì)好,工作能力強(qiáng)的管理人員組成施工技術(shù)、質(zhì)量平安、材料設(shè)備、財(cái)務(wù)勞資、防火保衛(wèi)、生活福利、總包協(xié)調(diào)等組織齊全的施工現(xiàn)場(chǎng)管理機(jī)構(gòu),對(duì)工程施工全過(guò)程實(shí)行統(tǒng)一方案,統(tǒng)一指揮、統(tǒng)一管理、統(tǒng)一協(xié)調(diào)

76、。指揮部定期召開(kāi)內(nèi)部協(xié)調(diào)會(huì),檢查當(dāng)天工作完成情況,解決存在問(wèn)題,解決落實(shí)第二天的生產(chǎn)任務(wù)?,F(xiàn)場(chǎng)組織機(jī)構(gòu)設(shè)置見(jiàn)下列圖。工程經(jīng)理工程技術(shù)負(fù)責(zé)人工程平安負(fù)責(zé)人工程技術(shù)部綜合辦公室(含后勤)質(zhì)量平安部鉆孔注漿施工組放坡施工組組織機(jī)構(gòu)設(shè)置圖勞動(dòng)力安排方案表序號(hào)崗位人數(shù)備 注1工程經(jīng)理12技術(shù)負(fù)責(zé)人13平安負(fù)責(zé)人14施工技術(shù)員25測(cè)量員16平安員17試驗(yàn)員18材料員19鉆機(jī)操作工810灌漿操作工811設(shè)備維修員112電工113其他人員3共 計(jì)301開(kāi)工前需聯(lián)系好水泥供給廠家,確保有充足的貨源,每天按時(shí)按量將水泥供給到工地。2備料進(jìn)場(chǎng)前取樣做水泥和鋼筋原材料等試驗(yàn)3根據(jù)施工組織設(shè)計(jì)的施工進(jìn)度方案和施工預(yù)算中

77、的工料分析, 編制工程所需的材料用量方案, 做好備料、 供料和確定倉(cāng)庫(kù)、 堆場(chǎng)面積及組織運(yùn)輸?shù)囊罁?jù)。4根據(jù)材料需要用量方案, 做好材料的訂貨和采購(gòu)工作。 使方案得到落實(shí)。5組織材料按方案進(jìn)場(chǎng), 并作好保管工作。6水泥倉(cāng)庫(kù)、堆料場(chǎng)至少儲(chǔ)藏1-2天的材料用量。主要施工機(jī)械裝備表名稱(chēng)規(guī)格型號(hào)功率單位數(shù)量備注工程鉆機(jī)X-100型鉆機(jī)臺(tái)2柴油動(dòng)力空壓機(jī)T600-17/790KW臺(tái)2攪拌機(jī)臺(tái)21臺(tái)備用攪拌桶個(gè)2泥漿泵TBW-15015KW臺(tái)31臺(tái)備用發(fā)電機(jī)組30KW臺(tái)2電焊機(jī)BX1-500500A臺(tái)2水 泵臺(tái)2全站儀臺(tái)1運(yùn)輸車(chē)臺(tái)2不含水泥運(yùn)輸車(chē)砂輪切割機(jī)DE32臺(tái)1潛孔鉆QK-100臺(tái)臺(tái)35工期方案及工期

78、保證措施主要工作量估算序號(hào)工程內(nèi)容工程量1注漿孔施工共246個(gè)孔2210m2插鋼筋25共246根2210m3430m34截水溝C20砼預(yù)制塊35截水溝砂礫墊層36截水溝現(xiàn)澆C15砼4.5 m3該滑坡治理工程總工期定為3540天。詳見(jiàn)施工進(jìn)度方案表如下:施工進(jìn)度方案表 工期工程名稱(chēng)第15天第610天第1115天第1620天第2125天第2630天第3135天人員、設(shè)備進(jìn)場(chǎng)鉆孔注漿施工放坡施工截水溝施工5.3 工期保證措施5.3.1 施工組織機(jī)構(gòu)1參閱以工程為核心的責(zé)、權(quán)、利關(guān)系,定崗、定人、授權(quán),各負(fù)其責(zé)。2選取優(yōu)秀的管理人員組成工程經(jīng)理部,對(duì)工程實(shí)行方案管理,組織、協(xié)調(diào)、控制、監(jiān)督和指揮職能,

79、同進(jìn)派出技術(shù)過(guò)硬、吃苦耐勞的施工隊(duì)伍,確保高標(biāo)準(zhǔn)、高速度地完本錢(qián)工程的施工任務(wù)。3在開(kāi)工前各方面的人員要落實(shí)到位,凡被選調(diào)入工程組的管理人員、專(zhuān)業(yè)工長(zhǎng)隨時(shí)候命,工程一開(kāi)工即進(jìn)駐工程現(xiàn)場(chǎng)開(kāi)展工作。4堅(jiān)持每天一次的工作調(diào)度會(huì),做到當(dāng)天問(wèn)題當(dāng)天處理,并讓每個(gè)生產(chǎn)者清楚明天的工作,并及時(shí)布置安排。5定期召開(kāi)每周一次各部門(mén)負(fù)責(zé)人參加的協(xié)調(diào)會(huì),及時(shí)協(xié)調(diào)各部門(mén)之間的關(guān)系,合理調(diào)整機(jī)械設(shè)備、物資和人力,及時(shí)解決生產(chǎn)中出現(xiàn)的問(wèn)題,并積極參與協(xié)調(diào)好工程施工外部關(guān)系。6建立嚴(yán)格?工程施工日志?制度,并每日詳細(xì)記錄工程進(jìn)度、質(zhì)量、設(shè)計(jì)修改等問(wèn)題,以及施工過(guò)程中必須記錄的有關(guān)問(wèn)題。7建立獎(jiǎng)罰嚴(yán)明的經(jīng)濟(jì)責(zé)任制,每月進(jìn)行一

80、次總結(jié),對(duì)提前完成任務(wù)的施工人員進(jìn)行獎(jiǎng)勵(lì);未能按時(shí)完成任務(wù)的按拖延的天數(shù)進(jìn)行罰款,誰(shuí)拖延誰(shuí)受罰。5.3.2 機(jī)械設(shè)備投入為保證工期目標(biāo)的實(shí)現(xiàn),我司將對(duì)準(zhǔn)備投放到本工程的機(jī)械設(shè)備進(jìn)行全面的檢修保養(yǎng),以保證機(jī)械設(shè)備進(jìn)場(chǎng)完好,正常運(yùn)作,備足備用件。5.3.3 材料供給開(kāi)工前制定材料進(jìn)場(chǎng)方案,特殊材料和設(shè)計(jì)指定的材料盡早落實(shí),及時(shí)組織進(jìn)場(chǎng),并提前進(jìn)行原材料檢驗(yàn)工作和混凝土及砂漿的試配。5.3.4 施工管理1在施工過(guò)程中以總工期為目標(biāo),以階段控制為保證。將總體的工期目標(biāo)分解為具體的月、旬、周方案,通過(guò)分階段方案的落實(shí)來(lái)確??偣て诘膶?shí)施。2堅(jiān)持每月方案報(bào)表的編制、落實(shí),以便甲方能根據(jù)報(bào)表的情況撥付工程款項(xiàng)

81、,落實(shí)資金,滿(mǎn)足施工需要。3組織好勞動(dòng)力隊(duì)伍,合理編排班組,以便在施工頂峰期組織連續(xù)的流水作業(yè)。4建立健全各級(jí)責(zé)任制,實(shí)行重獎(jiǎng)重罰。5建立文明衛(wèi)生管理小組,加強(qiáng)對(duì)食堂和住所衛(wèi)生監(jiān)督檢查和管理,減少病員,確保正常的施工勞動(dòng)力隊(duì)伍。6建立甲、乙雙方聯(lián)席例會(huì)制度,檢查方案實(shí)施情況,研究解決影響工程進(jìn)度的關(guān)鍵問(wèn)題,安排下一步工作。5.3.5 技術(shù)措施1認(rèn)真、仔細(xì)熟悉圖紙,確切了解工程的各項(xiàng)內(nèi)容、技術(shù)質(zhì)量指標(biāo),在此根底上認(rèn)真做好圖紙會(huì)審工作,通過(guò)會(huì)審把圖紙中不夠明確的局部以及錯(cuò)漏局部明確解決,以免貽誤工期。2進(jìn)一步編制詳細(xì)的施工組織設(shè)計(jì),及時(shí)編制主要的分項(xiàng)施工作業(yè)方案,并向各級(jí)管理人員、工人傳達(dá)交底。3

82、一定要安排好不同工種之間的交叉作業(yè)順序。4雨水是影響施工進(jìn)度的一個(gè)重要因素。為此,我們特別提出了雨季期施工措施,主要是做好防排水工作,以盡量減少雨水由滑裂縫滲入護(hù)坡體內(nèi)。6工程質(zhì)量本工程質(zhì)量目標(biāo):工程一次驗(yàn)收合格率100%,工程優(yōu)良率95%以上,確保優(yōu)質(zhì)。6.2.1質(zhì)量保證、控制體系建立1建立高于國(guó)家驗(yàn)評(píng)標(biāo)準(zhǔn)的企業(yè)內(nèi)部創(chuàng)優(yōu)標(biāo)準(zhǔn),以此標(biāo)準(zhǔn)實(shí)施考核、檢查工程施工。嚴(yán)格按照公司質(zhì)量保證的要求開(kāi)展工作,使質(zhì)量工作貫穿于各個(gè)部門(mén)、各個(gè)環(huán)節(jié)、各道工序。2抓好質(zhì)量預(yù)控和質(zhì)量意識(shí)教育。組織施工人員學(xué)習(xí)施工標(biāo)準(zhǔn)、操作規(guī)程和質(zhì)量驗(yàn)評(píng)標(biāo)準(zhǔn),進(jìn)行技術(shù)交底和質(zhì)量通病防治教育,使施工人員了解工程概況,掌握工程要領(lǐng)及質(zhì)量要

83、求,做到人人心中有標(biāo)準(zhǔn),個(gè)個(gè)干中求質(zhì)量。3嚴(yán)把質(zhì)量關(guān)。創(chuàng)優(yōu)良工程要選用優(yōu)質(zhì)的材料和設(shè)備,對(duì)工程中使用的各種材料、設(shè)備把住采購(gòu)和驗(yàn)收兩個(gè)關(guān),材料員對(duì)進(jìn)入現(xiàn)場(chǎng)的原材料、半成品、構(gòu)配件、器具等對(duì)照樣品全數(shù)檢查驗(yàn)收,并檢查有無(wú)符合國(guó)家的質(zhì)量標(biāo)準(zhǔn)質(zhì)保書(shū)和合格證,杜絕“無(wú)質(zhì)保書(shū)、無(wú)合格證、無(wú)檢測(cè)標(biāo)準(zhǔn)的三無(wú)材料和產(chǎn)品進(jìn)場(chǎng)。4堅(jiān)持三級(jí)檢查驗(yàn)收制度,嚴(yán)把分項(xiàng)工程驗(yàn)收關(guān)。分項(xiàng)工程的優(yōu)良率是創(chuàng)優(yōu)的重點(diǎn),在每個(gè)分項(xiàng)或工序施工過(guò)程中。認(rèn)真執(zhí)行操作班組自檢、施工員全面檢、質(zhì)量員核驗(yàn)檢三道關(guān),達(dá)不到質(zhì)量要求的必須返工重做。加強(qiáng)質(zhì)量跟蹤和檢查,對(duì)特殊工序和材料加強(qiáng)質(zhì)量跟蹤和檢查,保證產(chǎn)品質(zhì)量的可追溯性。5施工中搞好工程技術(shù)檔

84、案資料的收集和整理工作。工程竣工前,先進(jìn)行自檢,并全部合格后,再進(jìn)行整體工程的細(xì)致預(yù)檢,全部到達(dá)驗(yàn)收標(biāo)準(zhǔn)后,再進(jìn)行正式竣工驗(yàn)收。6工程工地成立質(zhì)量小組,對(duì)易發(fā)生質(zhì)量通病的環(huán)節(jié)進(jìn)行攻關(guān),確保工程成為無(wú)質(zhì)量通病的優(yōu)良工程。7制定經(jīng)濟(jì)措施對(duì)管理人員和施工班組人員進(jìn)行進(jìn)度和質(zhì)量考核制度,實(shí)行獎(jiǎng)優(yōu)罰劣。(1)人員質(zhì)量保證措施a、選派組織能力強(qiáng),工作作風(fēng)嚴(yán)謹(jǐn)?shù)募夹g(shù)負(fù)責(zé)人,參加過(guò)我公司組織的多個(gè)滑坡注漿加固治理工程施工,具有施工管理經(jīng)驗(yàn)豐富的管理人員擔(dān)任工程經(jīng)理,從管理上提供人力資源方面的質(zhì)量保證。b、工地施工員、技術(shù)員、測(cè)量工程、質(zhì)檢員、平安員、預(yù)算員、試驗(yàn)、檢驗(yàn)人員等都是具有多個(gè)類(lèi)似工程經(jīng)驗(yàn)的從業(yè)人員,

85、理論與實(shí)踐相結(jié)合,能很好的處理工程中遇到的各種技術(shù)難題。 c、所有重要崗位均持證上崗,并保證人員相對(duì)穩(wěn)定。(2)機(jī)械設(shè)備的質(zhì)量保證措施本工程選用的鉆機(jī)、攪拌機(jī)、注漿泵等機(jī)械設(shè)備都處于完好狀態(tài),適合本項(xiàng)工程的施工,從硬件上提供施工的質(zhì)量保證,詳細(xì)資料見(jiàn)?主要施工機(jī)械裝備表?,從而保證了機(jī)械設(shè)備有良好的出勤率和最優(yōu)的平安保障,同時(shí)配備一定機(jī)械維修工跟班作業(yè),確保工程設(shè)備處于最正確運(yùn)行狀態(tài)。(1) 水泥漿不得離析:水泥漿要嚴(yán)格按配合比配置。為防止水泥漿發(fā)生離析,可在灰漿拌制機(jī)中不斷攪動(dòng)。2嚴(yán)格按照設(shè)計(jì)文件要求布置好鉆孔位置,嚴(yán)格按照標(biāo)準(zhǔn)規(guī)程及公司制定的操作規(guī)程作業(yè)。3按設(shè)計(jì)針對(duì)不同施工情況配制適當(dāng)配

86、合比的漿液,施工用水量由水表計(jì)量控制。4加強(qiáng)邊坡地表位移監(jiān)測(cè)和滑坡體深部位移監(jiān)測(cè),發(fā)現(xiàn)異常情況及時(shí)反應(yīng)建設(shè)單位和設(shè)計(jì)單位,以便采取補(bǔ)救措施。5認(rèn)真做好原材料檢驗(yàn)。另外我們還設(shè)立自檢機(jī)構(gòu),施工中嚴(yán)格按設(shè)計(jì)及施工組織方案進(jìn)行施工以及質(zhì)量自檢,質(zhì)檢員須認(rèn)真負(fù)責(zé)每一個(gè)施工環(huán)節(jié)的質(zhì)量監(jiān)督,確保整個(gè)工程質(zhì)量,發(fā)現(xiàn)問(wèn)題及時(shí)解決。與業(yè)主、監(jiān)理密切配合,經(jīng)常匯報(bào)協(xié)商研究工程質(zhì)量和相關(guān)技術(shù)問(wèn)題,努力創(chuàng)立優(yōu)質(zhì)工程。7 施工平安本工程平安目標(biāo)為“三無(wú)、“創(chuàng)立。“三無(wú)即無(wú)工傷事故,無(wú)交通事故,無(wú)質(zhì)量事故?!皠?chuàng)立即創(chuàng)立文明施工工地。1工地設(shè)置平安生產(chǎn)領(lǐng)導(dǎo)小組,下設(shè)質(zhì)安員,班組設(shè)兼職質(zhì)安員,明確各級(jí)平安崗位責(zé)任人,健全平安

87、管理體系。2堅(jiān)持三級(jí)平安教育制度,對(duì)特殊工種工人堅(jiān)持持證上崗。3堅(jiān)持技術(shù)交底的同時(shí)進(jìn)行平安技術(shù)交底,使參加操作人員明確平安操作規(guī)程和防患要領(lǐng),嚴(yán)格遵守各種機(jī)具操作規(guī)程。4按有關(guān)規(guī)定做好“三寶四器的防護(hù),掛平安警示牌,堅(jiān)持定期平安檢查制度,發(fā)現(xiàn)事故苗頭及時(shí)消除,確保平安施工。5堅(jiān)持防火平安教育,防火及消防材料要符合省、市防火標(biāo)準(zhǔn)。6施工開(kāi)始前工程平安領(lǐng)導(dǎo)小組應(yīng)針對(duì)現(xiàn)場(chǎng)實(shí)際和施工組織方案,編寫(xiě)平安生產(chǎn)方案及措施,并在施工中認(rèn)真落實(shí)。7建立平安管理網(wǎng)絡(luò):工程經(jīng)理部設(shè)專(zhuān)職平安員1名,在施工現(xiàn)場(chǎng)巡回檢查,對(duì)各種不平安因素,及時(shí)提出改良意見(jiàn),將不平安隱患消滅在萌芽狀態(tài)之中。施工人員必須遵守操作規(guī)程,嚴(yán)禁違

88、章作業(yè),玩忽職守。做好平安教育,平安交底和平安檢查,委派工地平安員專(zhuān)職平安檢查工作。施工隊(duì)再設(shè)1名兼職平安員,負(fù)責(zé)平安催促檢查工作。8對(duì)所有參與的施工設(shè)備進(jìn)行開(kāi)工前檢查,檢修、設(shè)備完好率達(dá)100%。9設(shè)立專(zhuān)職平安員,負(fù)責(zé)施工中日常的平安施工檢查,發(fā)現(xiàn)隱患,及時(shí)催促整改。建立施工平安檔案。10施工現(xiàn)場(chǎng)必須設(shè)置各種警示標(biāo)志,保證施工平安。11季節(jié)性施工措施 雨季施工措施雨季施工前,對(duì)施工現(xiàn)場(chǎng)的物料存放區(qū)域、構(gòu)件存放區(qū)、臨建、現(xiàn)場(chǎng)施工區(qū)域進(jìn)行徹底檢查,做好防雨措施;雨季施工時(shí),應(yīng)根據(jù)當(dāng)?shù)貧庀笮畔⒆龊梅篮榉姥捶览纂姽ぷ?,遇有暴風(fēng)雨時(shí),應(yīng)暫時(shí)停止工作。切斷設(shè)備電源,并疏散到平安地點(diǎn),確保施工平安。a雨季

89、施工前,要疏通整個(gè)場(chǎng)地的排水系統(tǒng),并了解該地區(qū)的常年雨水量和積水情況,編制好詳細(xì)的雨季施工措施。b進(jìn)入雨季,水泥庫(kù)要加強(qiáng)防范,地坪要高出該地區(qū)積水線(xiàn)30cm。c雨期施工,室外配電板、配電箱應(yīng)有防雨設(shè)施,斜道應(yīng)設(shè)置防滑道,確保平安施工。d下雨施工前,就準(zhǔn)備充足的防雨材料,并在施工期間派人晝夜值班,以防意外事情發(fā)生。e停雨恢復(fù)施工前,應(yīng)由電工做好漏電測(cè)試,確保平安前方可組織施工。冬季施工措施a工程部根據(jù)本地氣候特點(diǎn)編制適合本工程的冬期施工方案。 b室外日平均氣溫連續(xù)5天平均低于5,砼拌制應(yīng)采取冬季措施,并應(yīng)及時(shí)做好氣溫突然下降的防凍措施。 c配制冬期施工的水泥砂漿和漿液,應(yīng)優(yōu)先選用硅酸鹽水泥。 d

90、施工用水使用熱水時(shí),熱水采用水箱加熱,水的溫度控制在60左右,并用草袋及塑料布覆蓋保溫。 e水泥現(xiàn)用現(xiàn)出庫(kù),攪拌站搭設(shè)防護(hù)棚。骨料不加熱,但及時(shí)防止雨雪沖洗及冰塊夾雜,用水箱加熱拌合用水,保證拌合水溫在60左右。 12夜間施工,配備專(zhuān)職的平安員跟班作業(yè),工作場(chǎng)地配備足夠的平安照明,并設(shè)置平安警示燈。13加強(qiáng)對(duì)平安防護(hù)用品佩戴使用的檢查,確保勞動(dòng)保護(hù)措施的真正落實(shí)。合理安排飲食,特別是要保證充足、衛(wèi)生的飲用水。要切實(shí)抓好食堂衛(wèi)生,防止食物中毒。要改善務(wù)工人員的生活,施工現(xiàn)場(chǎng)員工集體宿舍應(yīng)當(dāng)符合衛(wèi)生標(biāo)準(zhǔn),有防蠅滅鼠措施,防止傳播性疾病發(fā)生。施工現(xiàn)場(chǎng)要嚴(yán)格按照施工用電標(biāo)準(zhǔn)?施工現(xiàn)場(chǎng)臨時(shí)用電平安技術(shù)標(biāo)準(zhǔn)?JGJ46標(biāo)準(zhǔn),加強(qiáng)現(xiàn)場(chǎng)用電管理?,F(xiàn)場(chǎng)專(zhuān)職平安員和電工每天不少于一次、工程每周不少于二次的檢查,對(duì)存在的問(wèn)題,要及時(shí)整改落實(shí)責(zé)任。高溫季節(jié),極易發(fā)生火災(zāi),施工現(xiàn)場(chǎng)加強(qiáng)對(duì)易燃易爆物品管理,嚴(yán)格執(zhí)行消防制度、動(dòng)火審批及監(jiān)護(hù)制度,按照不同條件,合理配備滅火器材,消除火災(zāi)隱患。7.3 平安生產(chǎn)紀(jì)律1進(jìn)入施工現(xiàn)場(chǎng),必須遵守平安生產(chǎn)規(guī)章制度。2進(jìn)入施工區(qū),必須戴平安帽。3禁止在施工現(xiàn)場(chǎng)喝酒。4現(xiàn)場(chǎng)內(nèi)不準(zhǔn)赤腳,不準(zhǔn)穿拖鞋和高跟鞋。5高空作業(yè)嚴(yán)禁穿硬底鞋和帶釘易滑鞋。6非有關(guān)人員不準(zhǔn)進(jìn)入危險(xiǎn)區(qū)域。7未

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論