![Double Surface dressing 雙表處施工英文版_第1頁](http://file3.renrendoc.com/fileroot_temp3/2022-1/18/bc13cd9b-61df-4dcd-a4a1-fc4396f03eca/bc13cd9b-61df-4dcd-a4a1-fc4396f03eca1.gif)
![Double Surface dressing 雙表處施工英文版_第2頁](http://file3.renrendoc.com/fileroot_temp3/2022-1/18/bc13cd9b-61df-4dcd-a4a1-fc4396f03eca/bc13cd9b-61df-4dcd-a4a1-fc4396f03eca2.gif)
![Double Surface dressing 雙表處施工英文版_第3頁](http://file3.renrendoc.com/fileroot_temp3/2022-1/18/bc13cd9b-61df-4dcd-a4a1-fc4396f03eca/bc13cd9b-61df-4dcd-a4a1-fc4396f03eca3.gif)
![Double Surface dressing 雙表處施工英文版_第4頁](http://file3.renrendoc.com/fileroot_temp3/2022-1/18/bc13cd9b-61df-4dcd-a4a1-fc4396f03eca/bc13cd9b-61df-4dcd-a4a1-fc4396f03eca4.gif)
![Double Surface dressing 雙表處施工英文版_第5頁](http://file3.renrendoc.com/fileroot_temp3/2022-1/18/bc13cd9b-61df-4dcd-a4a1-fc4396f03eca/bc13cd9b-61df-4dcd-a4a1-fc4396f03eca5.gif)
下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、Method Statement for Double Surface Dressing rev 04UPGRADING PERAMIHO JCT TO MBINGA ROAD TO BITUMEN STANDARDMethod Statement for Double Surface DressingA. Personnel: Team leader 1 (Wang Shizheng)Mr. Zhang will be responsible for the works and all instruction issued on site could be directed to him.
2、He has a good command of English. He is able to brief in detail on this method statement before the works commence.1. Chainman 32. Surveyor 13. Chip Spreader Operator 14. Rubber Roller Operator 25. Mechanical Sweeper Operator 16. Dump Truck Driver 47. Bitumen Distributor Operator 18. Transport Light
3、 Truck Driver 19. Pick-up Driver 110. Flagman 211. Experienced Labor 8B. Equipment 1. Chip Spreader 22. Mechanical Sweeper 13. Rubber Roller 24. Bitumen Distributor 15. Dump Truck 46. Transport Light Truck 17. Pick-up 1Two thousand meters of half lane width are expected to be placed each day, that i
4、s to say, one thousand meters of full lane width per day.C. Method StatementLayer pavement method is adopted for double surface dressing. Usually by this method, a layer of bitumen shall be first spread followed by the spreading of a layer of aggregate. The construction procedure of double surface d
5、ressing is indicated below:Preparation of surfaceInitial rolling1st Layer:AggregateRolling1st Layer: 80/100 Bitumen2nd Layer: 80/100 Bitumen2nd Layer:AggregateBroom dragand final rollingThe details of procedure as following:1. Preparation of surfaceAhead of double surface dressing construction, clea
6、n surface should be prepared so as to expose the majority of aggregate. Meanwhile, bumpy and rough road sections must be repaired and leveled. The weatherglass will be used to monitor the temperature of the road surface, whenever the temperature of the road surface falls below the temperature that b
7、e depicted in section 4304(a) of the Standard Specification for Road Works, no blinder shall be sprayed. No bituminous work shall be done during foggy or rainy weather. Where newly constructed base or shoulder areas are to be sealed, the surfaces shall be checked for compliance with the surface tole
8、rances and all other requirements specified. Any portions that do not meet these requirements shall first be either corrected or removed and reconstructed before they are sealed.The road will be demarcated the area of the primed base to be sealed by means of setting out wire lines down each edge of
9、the specified seal width.2. Spreading of bitumenAfter the full seepage of the prime coat bitumen, the first layer of bitumen will be spread following the requirement of specification. The bitumen should be spread homogenously without the phenomenon of blank space or accumulation. Spreading length of
10、 bitumen shall corporate with the capacity of aggregate spreader and the spreading of aggregates long time after spreading of bitumen must be avoided. Concrete kerbing and channeling as well as any other structures adjacent to the road shall be protected against staining by bitumen being sprayed. Th
11、e test for spreading rate of the binder and aggregates shall be done before spreading works, the actual rates of application of binder and aggregate to be used in the construction will be determined by the engineer after finishing the test. The bitumen will be heated by bitumen heating plant in camp
12、 and be transported to site by the bitumen distributor, at the same time the bitumen can be heated whenever by bitumen distributors heating system on site.In the joints between binder sprays, the armor plate (length: 1.5m) or building paper (length: 1.5m) will be used to cover the joints to prevent
13、additional binder application onto the previously treated section.3. AggregateAggregates are to be spread once the bitumen spreading is completed. According to the specification, sufficient quantity shall be spread homogeneously. The superposition or blank space of aggregates should be prevented. In
14、 the occasion of aggregate gap in certain part, timely manual filling is to be conducted. The aggregate shall comply with the requirements given in Section 4502(b) in the Standard Specification for Road Works 2000 TANZANIA.4. Rolling Initial rolling of aggregateImmediately after the aggregate has be
15、en applied, rolling shall be commenced. A self-propelled 16 tons pneumatic-tyred roller shall be used to the case. Rollers shall operate parallel to the center line of the road, from the shoulders inwards the crown of the road, until the entire surface has been covered at least three times with the
16、wheels of the roller. Broom drag and final rolling of aggregateAfter the bituminous binder has set-up sufficient to prevent any aggregate from being dislodged, the surface shall be slowly dragged with a broom drag to ensure even distribution of the aggregate. After completing the spreading of the ag
17、gregate, the surface shall be rolled with the same procedure of initial rolling. 5. The joint between adjacent sectiona) Longitudinal joint:Double surface dressing construction is half width construction. One edge of first half width is the edge of base. After the completion of first half width cons
18、truction, it is required to treat the other edge: l Align this edge to make it regularl Utilize instruments to clear the parts beyond the alignment, inclusive of aggregate and excessive bitumen, so as to dress and tidy the edge.b) Transverse joint: Prior to construction the following day, same treat
19、ment like method a) needs to be performed for ending part of double surface dressing which was done last day.Construction of next half width and next day could be followed as items no.1- no.4 mentioned above. Provided that the third half width construction is required on site, previous working proce
20、dures can be repeated.D. Measurement and PaymentThe work shall be measured and paid for under section 4500: Double Surface Dressings.E. Environmental protection1. This work will be executed in accordance with Section 1700: Environmental Protection and Waste Disposal.2. The construction will also be
21、executed in accordance with the approved ESMP.3.F. Health & Safety The construction will be executed in accordance with the approved HSMP.G. Traffic ControlThe traffic will be a single lane when double surface dressing, half width will be constructed and another half width will be as diversion, traffic will be transferred from one half to another half. Few occasions may occur that there will be a diversion outside of the road, in which situation traffic will be transferred from road to the diversion. The assigned persons will ca
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 糧油加工廠出租居間合同
- 汽車美容店裝修監(jiān)理合同
- 二零二五年度辦公室勞動合同地址確認及員工績效獎金協(xié)議
- 裝修分期付款合同須知
- 報關(guān)合同和銷售合同
- 新勞動合同法規(guī)定
- 三農(nóng)村電商行業(yè)監(jiān)管與政策支持方案
- 軟件開發(fā)流程與項目管理作業(yè)指導書
- 居間合同物權(quán)方
- 建筑裝飾裝修工程作業(yè)指導書
- 子宮瘢痕處妊娠-課件
- 煙花爆竹合作協(xié)議書模板(5篇)
- 老年社會工作課件
- 最新記24小時出入量、護理文書書寫規(guī)范課件
- DB23T 2714-2020 農(nóng)村生活垃圾非焚燒低溫處理設(shè)施大氣污染物排放標準
- 【人教版】免疫系統(tǒng)的組成和功能課件1
- 建標 198-2022 城市污水處理工程項目建設(shè)標準
- 船舶輪機英語_專業(yè)用語
- 基層法律服務(wù)所設(shè)立登記表
- 第四代建筑懸挑陽臺腳手架施工
- 三相四線及三相三線錯誤接線向量圖研究分析及更正
評論
0/150
提交評論