1、 Building construction project management . reinforcement Reinforcement is a very important structural engineering a material, often the cost of the entire project would be good or poor management and profit and loss have a very critical impact. The general management of the main reinforcement in ac
2、cordance with the following steps: count the amount of steel, steel-like turn, reinforced the length of optimization and identification, steel-use plans, steel procurement plans, contract award, the scene inbound, outbound, processing, and other banding site. The whole process flow long after the pe
3、rsonnel, and the large amount of steel bars, specifications, and this is in practice in the management of so much trouble, even result in many of the management of the actual process can not be carried out normally. Multiple projects through the practice of business processes through the study, comb
4、ined with the application software system, the author summed up a set of “Man-Machine” By combining steel and management processes, and achieved fairly good results. First, the preparation of steel construction programs. The program prepared by the labor force, total industry audit, the preparation
5、time before the project starts, covering the construction process, quality requirements. Prepared on the basis of engineering drawings and specifications. Second, the preparation of the total reinforcement plan. The plan by the labor force responsible for the preparation, the total industry audit, t
6、he preparation time should be before the project starts. The total program will be reinforced components, hierarchical establishment, as a tender basis. Project starts before the budget, split by the budget staff to the project site, as a labor force to develop reinforced material form, monthly basi
7、s for the preparation of one-use plans. Chief Engineer in assessing the total reinforcement plan, at least to choose the amount of any layer of steel to conduct sampling to calculate margin of error. Prepared on the basis of engineering drawings, specifications. Third, the preparation of reinforced
8、materials under the table and input software. The table from the labor force responsible for preparing, on the 15th of each month to complete the task next month, construction materials table. Material form to be stratified, sub-components, sub-type of establishment, for each type of steel you want
9、to mark specification, size, quantity, weight, each component, each floor should have a total weight; material in the table should be requisitioned from the store records; Labor Force by the completion of material form, submitted to Chief Engineer review. After review by the retention of a material
10、form, sent to labor force, materials Division, one. If the expected changes in the event of the table feeding should be corrected promptly in writing; With the exception of negotiation, change things, material steel sheet total must not exceed the total program; expected to form the preparation work
11、 is completed the total cost of management software to input the corresponding module, input material Table Weight = volume / (1 - loss rate of the contract). Fourth, the preparation of monthly program reinforced the original material. The plan by the general public is responsible for preparing mont
12、hly on the 18th to complete. Chief Engineer at the same time on the 10th of each month according to schedule the preparation of steel need to use Scheme as the preparation of reinforced materials sector procurement plan based on the amount of steel raw materials planned = BOM volume / (1 - loss rate
13、 of the contract), the original material planned included in the parts of steel to be specified in the plan. The preparation of materials based on steel sheets, steel processing contract schedule. 5 is a steel procurement contract. Including the signing of procurement contracts, the contract review.
14、 Reinforced by the material section chief is responsible for the procurement contract preparation, Zongjing audit, the project manager for final approval of the contract. The preparation time is reinforced before processing for 15 days. Before the signing of the contract, materials, project managers
15、 should be reinforced chief procurement method to confirm, if necessary tender, then the implementation of the companys “procurement tenders management approach.” If the company supplies, according to the company supplied materials management approach to the implementation, self-procurement, vendor
16、selection, we must first confirm that the supplier qualification, be determined in consultation with the project manager, the initial range of suppliers, in determining the context of negotiations, reinforced The purchase price of the project manager must obtain consent. Signed and sealed by the con
17、tract before the contract text should be referred to Zongjing responsible for the business terms of the contract review, contract, technical and price in part by the material section chief responsible for commerce clause in part by Zongjing responsible for cross-examination through post-contract pro
18、ject Manager for approval. Once the contract is signed the original contract to pay a unified operating departments. 6 is a reinforced monthly procurement plans. The plan by the production deputy manager responsible for the preparation, the project manager approval, be completed before 20 a month. M
19、aterial procurement plan is mainly based on technical departments for the preparation of the monthly use plans, materials procurement should also consider the following factors: the need for a cushion material use, materials, inventories this month, steel processing conditions, materials, market pri
20、ce risks, the project funding status of the Department of . The preparation of steel raw materials is based on the monthly plan. 7 is a warehouse management. Admission including procurement, weighing examine item by item, storage, fill storage lists. Steel-processing according to the construction la
21、yout plan to set the specified location by mentioning members of the unified management of materials. Upon entering each batch of steel Kuguan member must promptly obtain products from the supplier certification, submit information to members of a qualified certificate and sent to test, steel For se
22、rvices team arrived at the scene to assist in unloading, handling, Ma Fang and other work, by the material responsible person (not at the scene could be entrusted Kuguan members) Fu Jingli a request for assistance to the production of a clear manner and the amount of reimbursement from the productio
23、n of Fujing Li is responsible for arranging services for their timely assistance to complete the related work. Inspection of steel weighing, the project department materials Kuguan workers, steel processing on-site staff and suppliers to joint inspection of all models should be classified steel weig
24、hing, inspection of materials after the end of bookkeeper handle storage procedures. After the steel warehouse, steel processing of the raw materials for classes to be identified, indicating the reinforcement of the model, t number, root number, materials department is responsible for inspection. St
25、eel raw materials and forming of steel to be divided into two regions, respectively stacking. 8 is a reinforced trial. Steel storage, the Kuguan admission notice to inform members of fill material tester to do test, tester sampling timely submission and issue a test report. Only after passing the te
26、st, steel can be processed. Reposted elsewhere in the paper for free download 9 is a steel processing management. Work content, including steel processing, processing, labeling, forming reinforced Ma Fang. In the labor contract, the loss of the steel should be clearly defined. Steel machining, open
27、the bundle which raw materials, which once again from the waste materials processed by the members of unified command. On labor force according to plan, weekly plan steel processing, processing of finished steel and should be classified Mafang and use signs to identify, prevent reinforcement has bee
28、n wrongly paid, materials, workers should be on the original material, as well as forming after the reinforcement Mafang and logo in their supervision and inspection. 10 yes reinforced collar Material Management. Reinforced collar job content, including material application, examination, according t
29、o material sheet made materials, fill Chu Kudan. Made of reinforced steel material according to schedule in parts of lump sum, every requisitioned once made of reinforced materials processing class members to feed in the table mark the number of reinforcement has been requisitioned by the collar mat
30、erial were to sign and acknowledge. After receiving a part of each volume of the steel, steel processing plants made of reinforced material member to release the material table subtotals, and summary table and the material form to submit material accounting staff, materials, accounting staff and the
31、 material form of the aggregate amount of the amount of After completing Chuku Dan reconciliation, while al-loss orders filled in accordance with the contract value is the amount of steel loss. If the lashing occurred during the overshoot, the excess part of the labor force must be made to add mater
32、ials list, after review by the general public can be processed steel processing classes. At the same time also issued supplementary material steel sheet processing classes, materials section. 11 is a steel-site management. On-site management by the production staff, production vice president of assi
33、stance, such as the construction at night by the duty staff. Lashing reinforcement personnel should monitor the progress of production, production personnel should have been requisitioned for the reinforcement of the stacking, banding inspection, call it a day before the day site inspection of reinf
34、orced lashing the situation and prevent stacking of steel received at the scene of a long-term phenomenon. Steel lashing the progress of on-site pile of reinforced, reinforced the scene to defend the implementation of the project department systems correspondingly. 12 is the settlement payment. The
35、work would involve clearing steel, steel shall pay settlement steel processing, steel processing section to pay. Reinforced by the material accounting staff on a monthly basis shall be settled by the end of each fill out statements. The payment of reinforcement materials, chief from the application
36、to the project manager, project manager upon approval by the finance staff fill in a single payment and obtain payment. 13 is a steel inventory. Each month on the 25th, the Ministry of materials, materials, accounting staff, and steel-processing personnel should use the right last month to conduct i
37、nventory of steel. Steel inventory when the original material, not requisitioned molding steel and steel have been requisitioned from the store inventory must be carried out. Inventory of the number of roots with the number of on-site methods, materials accounting staff fill out the “inventory of a single.” Material accounting staff, bar three processing plants in the inventory sheet to co-sign it. If you find steel workers put the number of expected loss, damage should be reported promptly fill orders, reported loss orders to go through steel-processing personnel to sign and acknowledge,
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025-2030年中國鉬合金行業(yè)發(fā)展戰(zhàn)略及前景趨勢分析報(bào)告
- 2025-2030年中國透明聚丙烯行業(yè)運(yùn)行狀況及發(fā)展規(guī)劃分析報(bào)告
- 2025-2030年中國過氧化二異丙苯行業(yè)運(yùn)行現(xiàn)狀及發(fā)展前景分析報(bào)告
- 2025-2030年中國苗圃產(chǎn)業(yè)市場十三五規(guī)劃及發(fā)展建議分析報(bào)告
- 2025-2030年中國納米銀市場運(yùn)行態(tài)勢及投資戰(zhàn)略研究報(bào)告
- 2025-2030年中國紫菜市場競爭格局與發(fā)展策略分析報(bào)告
- 2025-2030年中國管殼式換熱器行業(yè)運(yùn)行態(tài)勢與未來發(fā)展戰(zhàn)略研究報(bào)告
- 2025-2030年中國硬質(zhì)纖維板行業(yè)運(yùn)行態(tài)勢及投資戰(zhàn)略研究報(bào)告
- 天津師范大學(xué)津沽學(xué)院《半導(dǎo)體器件》2023-2024學(xué)年第二學(xué)期期末試卷
- 江西交通職業(yè)技術(shù)學(xué)院《測量學(xué)基礎(chǔ)》2023-2024學(xué)年第二學(xué)期期末試卷
- 《產(chǎn)品設(shè)計(jì)》(北希望)教學(xué)資料 課程標(biāo)準(zhǔn) 產(chǎn)品設(shè)計(jì)課程標(biāo)準(zhǔn)
- 部編版語文四年級下冊第7單元核心素養(yǎng)教案
- 幼兒園垃圾分類PPT
- 申請?zhí)崛∽》抗e金個(gè)人授權(quán)、承諾書(樣表)
- 施工作業(yè)申請表
- 浸出液的凈化與沉積
- 銀行間本幣市場交易員資格考試真題模擬匯編(共586題)
- 苯乙酸安全技術(shù)說明書(msds)
- 幼兒園大班《防欺凌》教案5篇,幼兒園大班防欺凌活動(dòng)教案
- 衛(wèi)生管理初中級職稱大綱
- 《當(dāng)代網(wǎng)絡(luò)文學(xué)作品發(fā)展研究6300字(論文)》
評論
0/150
提交評論