1、Good is good, but better carries it.精益求精,善益求善。b蘇州中環(huán)快速路工程園區(qū)段總體施工組織設(shè)計(jì)b蘇州中環(huán)快速路工程園區(qū)段總體施工組織設(shè)計(jì)蘇州中環(huán)快速路工程園區(qū)段ZHNX-5標(biāo)(K10+635.223K11+180.9)總體施工組織設(shè)計(jì)編制: 審核: 審批: 蘇州交通工程集團(tuán)有限公司蘇州中環(huán)快速路工程園區(qū)段ZHNX-5標(biāo)項(xiàng)目經(jīng)理部二零一三年一月二十日1Four outstanding works. They are derived from their own inner feelings. I also sent a student to attend
2、the class Department speech contest, failed to get a good result, but also actively cooperate with the Department and class activities! in order to create a demonstration dorm room, our weekly class to every bedroom check, where proposed is insufficient. In order to clean up the bedroom, we use the
3、brush brushes a bedroom again. For the class out of a force. In the event we, many projects did not get the desired results. But we understand that we tried, and in the struggle. Also has made good progress in many of the! in my class the work carried out and the results achieved, thanks to the conc
4、ern and support of the Department, thanks to instructor teacher's good, proper guidance, thanks to 46 students in the class will work closely together, to work together. Of course, we also have our weaknesses, needs to be further correction in their future learning and life, with a view to achie
5、ving greater results. Five declarations of good party branch "branch is a fortress, a party member is a banner". Fighting in the railway engineering construction Group Headquarters Headquarters branches, a total of members 18. Role of the Xiang-GUI railway and tight South Lebanon railway,
6、heavy, poor conditions of disadvantage, the branch closely around the construction work. Holding high the flag of our party members, unite and lead staff on the difficulties, overcome difficulties, take the zhengyou, a job well done and an engineering task, won the highly valued by leaders at all le
7、vels. Since October last year since the project began, Headquarters Branch is tightly around the center of its activities. Face South, climate is wet, sooner or later temperature larger, specific difficult, I branch from thought requirements all workers active motivated, do can long-term hard, dare
8、fight of spirit prepared, while requirements all members lead, encouraged colleagues Zhijian each other help, each other learning business knowledge, overcome temporarily difficult, active into to engineering official starts of the prepared work in the to, play out has as a branch of fighting fortre
9、ss role and members of pioneer model role. Since its start, I command under the correct leadership of the party branch in the Group and the superior party, centering on building a qualified party branches, branch of the forts and the battle to play the exemplary vanguard role of party members, activ
10、ely working. In command personnel less, and task heavy of situation Xia, all members always according to "party stronger, and style to are, and service better, and efficiency to high" of requirements, from overall starting, better to completed has production organization, and coordination,
11、 and guarantees and the management work, in engineering progress, and quality, and benefits, and safety, aspects are made has good of results, get has owners and the Group and grass-roots units of praise. First, give full play to the exemplary role of party members. The exemplary role of party membe
12、rs and cadres are silent on the command, the exemplary role of party members and cadres are the best of the ideological and political education. We pay close attention to party building, requires political party members and cadres must take the lead in learning, set strict demands on themselves, .1目
13、 錄第一章 工程概況1一、概述11、工程概況1二、工程建設(shè)條件2三、工程地質(zhì)情況2四、工程特點(diǎn)2第二章 組織機(jī)構(gòu)1一、施工組織機(jī)構(gòu)1二、施工任務(wù)劃分2第三章 主要設(shè)備、人員、材料4一、施工動(dòng)員4二、設(shè)備、材料、人員動(dòng)員周期4三、設(shè)備、人員及材料運(yùn)至施工現(xiàn)場(chǎng)的方法5四、勞動(dòng)力用工計(jì)劃5五、主要機(jī)械設(shè)備及測(cè)試儀器配置5第四章 施工總平面布置6一、施工總體布置6二、施工用水、用電,污水排放7三、通訊7第五章 現(xiàn)場(chǎng)交通組織及安全措施8一、道路封閉及交通分流情況說(shuō)明8二、有關(guān)圍擋施工方案8第六章 總體進(jìn)度計(jì)劃、主要分項(xiàng)工程的施工順序11一、總體進(jìn)度計(jì)劃11二、主要工程施工順序11三、難點(diǎn)分析12四、本工
14、程的關(guān)鍵線路12五、細(xì)化后的施工計(jì)劃13第七章 主要工程項(xiàng)目的施工方案、施工方法16一、施工準(zhǔn)備16二、路基工程18三、排水工程26四、路面工程29五、橋梁工程33A、正循環(huán)鉆機(jī)施工方法342)護(hù)筒埋設(shè)343)鉆孔344)清孔355)下鋼筋籠35B、灌注混凝土35C、故障處理36D、質(zhì)量檢驗(yàn)37(2)承臺(tái)(系梁)施工38B、承臺(tái)(系梁)底的處理38C、模板及鋼筋38D、砼的澆注38E、降低水化熱措施392)適當(dāng)延長(zhǎng)澆筑時(shí)間,以利于砼水化熱的釋放;39(4)下部結(jié)構(gòu)施工392)模板支立393)混凝土澆筑40B、蓋梁施工403)安裝支架及底模40B、支架搭設(shè)與預(yù)壓41C、模板制作與安裝41D、橋梁
15、支座安裝42F、砼的澆筑和養(yǎng)護(hù)431)澆筑432)砼的養(yǎng)護(hù)43G、預(yù)應(yīng)力鋼束張拉44H、壓漿、封錨c442°水泥漿出料后應(yīng)馬上進(jìn)行泵送,否則要不停的攪拌;45I、支架拆除45J、預(yù)留天窗封頂45(5)橋面系施工46A、梁頂清理46B、橋面鋼筋46C、標(biāo)準(zhǔn)帶施工46D、橋面砼澆筑46E、防撞護(hù)欄47F、伸縮縫施工47第八章 確保工程質(zhì)量和工期的措施(包括創(chuàng)優(yōu)計(jì)劃)50一、確保工程質(zhì)量的措施50(一)相關(guān)制度及措施50(二)橋梁工程51(三)其他措施51二、確保工期的措施52(一)工期總體要求52(二)節(jié)點(diǎn)工期控制(詳細(xì)節(jié)點(diǎn)見(jiàn)后附 表 施工總體計(jì)劃)52(三)工期保證措施53(四)工期保
16、證措施54三、質(zhì)量創(chuàng)優(yōu)計(jì)劃56(一)質(zhì)量創(chuàng)優(yōu)工作指導(dǎo)思想和主要目標(biāo):56(二)質(zhì)量創(chuàng)優(yōu)活動(dòng)的主要工作安排56第九章 重點(diǎn)(關(guān)鍵)工程的施工方案、施工方法及技術(shù)措施59一、主線第四聯(lián)變截面現(xiàn)澆預(yù)應(yīng)力箱梁安排先施工59二、上跨地面橋段支架搭設(shè)施工59第十章、冬季和雨季的施工安排62一、冬季施工措施62(一)冬季鋼筋施工62(二)冬季砼施工62(三)冬季施工的安全與防火63二、雨季施工及防汛措施63三、農(nóng)忙季節(jié)的施工安排63第十一章、 質(zhì)量、安全、文明施工、環(huán)保保證體系64一、質(zhì)量保證體系64二、安全保證體系69三、文明施工保證體系75(一)文明施工、環(huán)保目標(biāo)75(二)成立文明施工管理機(jī)構(gòu)75(三)
17、、文明施工措施75四、環(huán)境保證體系801、生活區(qū)環(huán)保措施812、施工中的環(huán)保措施813、竣工環(huán)境恢復(fù)824、水土保持及棄渣處理措施82第十二章 其他事項(xiàng)84一、項(xiàng)目風(fēng)險(xiǎn)預(yù)測(cè)與防范及事故應(yīng)急預(yù)案84(二)事故應(yīng)急預(yù)案84二、春節(jié)期間施工安排85三、交通協(xié)調(diào)管理措施86四、管道保護(hù)措施86五、廉政保證措施87六、民工工資支付保證措施89附件:平面布置圖、工藝框圖、機(jī)械設(shè)備進(jìn)場(chǎng)計(jì)劃表、主要材料進(jìn)場(chǎng)計(jì)劃表、主要試驗(yàn)、測(cè)量?jī)x器表、資金流動(dòng)計(jì)劃表、分項(xiàng)工程生產(chǎn)率和施工周期表、分項(xiàng)工程進(jìn)度率計(jì)劃、施工進(jìn)度橫道圖、雙代號(hào)網(wǎng)絡(luò)圖第一章 工程概況一、概述1、工程概況本標(biāo)段工程為蘇州中環(huán)快速路園區(qū)段第五施工標(biāo)段,主
18、要施工范圍為獨(dú)墅湖大道交叉口兩側(cè)星華街沿線,樁號(hào)為K10+635.205K11+180.9,線路長(zhǎng)545.695米,包括高架快速路及2條獨(dú)墅湖立交匝道(WN匝道橋、NW匝道橋)及獨(dú)墅湖大道的人非改造。高架快速路采用雙向六車(chē)道標(biāo)準(zhǔn),標(biāo)準(zhǔn)段路幅為:0.5m(護(hù)欄)+0.5m(路緣帶)+2*3.75(大車(chē)道)+3.5(小車(chē)道)+0.5m(路緣帶)+0.5m(中央分隔帶)+0.5m(路緣帶)+3.5(小車(chē)道) +2*3.75(大車(chē)道)+0.5m(路緣帶)+0.5m(護(hù)欄)25.5m。地面道路采用雙向六車(chē)道標(biāo)準(zhǔn),標(biāo)準(zhǔn)段路幅為:5.0m(人行道)+4.0m(非機(jī)動(dòng)車(chē)道)+3.0m(側(cè)分帶)+0.3m(路緣
19、帶)+3*3.4m(小車(chē)道)+0.3m(路緣帶)+10m(中分帶)+0.3m(路緣帶)+3*3.4m(小車(chē)道)+0.3m(路緣帶)+3.0m(側(cè)分帶)+4.0m(非機(jī)動(dòng)車(chē)道)+5.0m(人行道)55.6m。獨(dú)墅湖大道立交定向匝道采用雙車(chē)道標(biāo)準(zhǔn):0.5m(護(hù)欄)+0.25m(路緣帶)+2*4.25(行車(chē)道)+0.25m(路緣帶)+0.5m(護(hù)欄)10m。進(jìn)出快速路主線交織段主線車(chē)道外側(cè)增設(shè)2條輔助車(chē)道,半幅標(biāo)準(zhǔn)段為:0.5m(護(hù)欄)+0.5m(路緣帶)+2*3.5(輔助車(chē)道)+0.5m(安全帶)+2*3.75(大車(chē)道)+3.5m(小車(chē)道)0.5m(路緣帶)+0.5/2m(中央防撞護(hù)欄)20.25
20、m中環(huán)快速路設(shè)計(jì)行車(chē)速度:80km/h,快速路地面輔路:新建路段50km/h,老路利用段40km/h;平行匝道及立交匝道:40km/h。橋梁荷載等級(jí):公路I級(jí)。本工程的主要內(nèi)容為:(1)主線高架橋5聯(lián),采用大懸臂斜腹板箱梁、雙柱花瓶墩;匝道橋11聯(lián),采用斜腹板箱梁,實(shí)體花瓶墩。上部箱梁均采用滿(mǎn)堂支架施工。(2)地面道路拓寬改造工程、地面6號(hào)橋梁改造工程、匝道引坡及擋墻工程。(3)雨、污水改遷工程。(4)伸縮縫工程。(5)河道駁岸工程。本標(biāo)段工程,計(jì)劃開(kāi)工日期2013年3月1日開(kāi)工,完工日期2014年5月31日,共計(jì)457個(gè)日歷天。二、工程建設(shè)條件1、本工程所用材料、機(jī)械從滬寧高速、蘇嘉杭高速及
21、原有東方大道等地面道路施工進(jìn)場(chǎng)非常便利。施工場(chǎng)地平整,施工區(qū)域內(nèi)水、電資源非常豐富,有利工程施工。2、現(xiàn)狀星華街為通車(chē)道路并與獨(dú)墅湖大道十字交叉,根據(jù)招標(biāo)文件要求及我部施工計(jì)劃安排,對(duì)星華街施工區(qū)域采用全封閉施工,封閉前上報(bào)交通組織分流方案和封閉圍擋方案。施工區(qū)域內(nèi)做好施工便道,WN匝道橋施工便道將充分利用主線便道及獨(dú)墅湖大道,NW匝道施工便道將單獨(dú)做一條6米寬便道,以滿(mǎn)足施工需要。3、本工程內(nèi)地下管線較多,對(duì)橋梁鉆孔樁施工帶來(lái)了極大的困難。在施工之前,需要對(duì)每一個(gè)獨(dú)立的橋墩部位進(jìn)行管線排查,同時(shí)認(rèn)真做好開(kāi)工前的測(cè)量放樣準(zhǔn)備工作,做到位置準(zhǔn)確。并加強(qiáng)與業(yè)主、相關(guān)管線單位聯(lián)絡(luò),加強(qiáng)協(xié)調(diào)工作,并對(duì)
22、管線遷移工作進(jìn)行跟蹤,并在管線周報(bào)中予以反映現(xiàn)場(chǎng)管線遷改動(dòng)態(tài)。4、由于沿線為廠區(qū)及零星居民小區(qū),并處于東南面的上風(fēng)口,現(xiàn)場(chǎng)施工將嚴(yán)格控制揚(yáng)塵及噪音,并做好施工現(xiàn)場(chǎng)灑水降塵工作。三、工程地質(zhì)情況根據(jù)設(shè)計(jì)院施工圖紙說(shuō)明,我標(biāo)段主要分布土層有(自上而下):填土、粉質(zhì)粘土、粘土、粉質(zhì)粘土、粉土、粉砂夾粉土、粘土、粘土、粉土、粉砂夾粉土、粉質(zhì)粘土、粉粘夾粉土、粉質(zhì)粘土。四、工程特點(diǎn)1、施工進(jìn)場(chǎng)交通較為便利,施工區(qū)域需修建便道滿(mǎn)足工程施工需要。2、根據(jù)招標(biāo)文件要求,砼采用商品砼。3、本標(biāo)段涉及高壓線、各種管線較多,不確定因素較多,且工期緊,任務(wù)重,需精心組織,合理安排,確保優(yōu)質(zhì)安全按期完成施工任務(wù)。120
23、第二章 組織機(jī)構(gòu)一、施工組織機(jī)構(gòu)中標(biāo)后我方迅速組成蘇州市中環(huán)快速路工業(yè)園區(qū)段工程五標(biāo)段項(xiàng)目經(jīng)理部,經(jīng)理部下設(shè)經(jīng)理室、副經(jīng)理室、總工室、工程部、檔案室、試驗(yàn)室、安機(jī)部、綜合部和財(cái)務(wù)部等,配合各分部工程施工,項(xiàng)目經(jīng)理部組織機(jī)構(gòu)如下圖所示。項(xiàng)目經(jīng)理部組織機(jī)構(gòu)圖項(xiàng)目經(jīng)理:趙云斌常務(wù)副經(jīng)理:茍永斌項(xiàng)目副經(jīng)理:李偉華總工程師:婁 偉副總工程師:徐建成安機(jī)部樊龍華檔案室王偉偉財(cái)務(wù)部謝永盛工程部王國(guó)亭試驗(yàn)室卞建民綜合部周益新橋梁施工三隊(duì)橋梁施工二隊(duì)橋梁施工一隊(duì)路基施工隊(duì)各部門(mén)職責(zé):經(jīng)理室:負(fù)責(zé)整個(gè)工程的質(zhì)量、進(jìn)度、安全文明施工、環(huán)境保護(hù)等方面的工作,并負(fù)責(zé)對(duì)整個(gè)工程的人力、物力、財(cái)力進(jìn)行合理調(diào)配,對(duì)整個(gè)工程全
24、面負(fù)責(zé)統(tǒng)籌規(guī)劃;總工室:全面負(fù)責(zé)本項(xiàng)目的施工技術(shù)管理工作,主持編制本項(xiàng)目的實(shí)施性施工組織設(shè)計(jì);及時(shí)掌握工程施工進(jìn)度和質(zhì)量動(dòng)態(tài),指導(dǎo)和解決工程施工中的技術(shù)問(wèn)題,根據(jù)質(zhì)量創(chuàng)優(yōu)實(shí)施辦法,及時(shí)做出整改措施和獎(jiǎng)懲辦法;負(fù)責(zé)對(duì)工程計(jì)劃、質(zhì)量和成本等進(jìn)行定期量化分析,檢查督促工程施工中的技術(shù)管理和質(zhì)量管理的執(zhí)行情況。工程部主要負(fù)責(zé)工程合同履行、技術(shù)交底、技術(shù)指導(dǎo)、施工任務(wù)安排等工作。檔案室:對(duì)業(yè)主、總監(jiān)辦、總公司以及其他上級(jí)單位下發(fā)的文件進(jìn)行整理、登記、歸檔,下發(fā)施工隊(duì)的文件、通知等進(jìn)行編號(hào)留底歸檔,同時(shí)對(duì)工程資料負(fù)責(zé)整理歸檔。試驗(yàn)室主要負(fù)責(zé)砼生產(chǎn)廠家的先擇,各種標(biāo)準(zhǔn)試驗(yàn)的計(jì)算及驗(yàn)證,各類(lèi)材料、購(gòu)件的試驗(yàn)檢
25、測(cè),試驗(yàn)資料的出具等。安機(jī)部主要負(fù)責(zé)施工過(guò)程中的安全生產(chǎn)、文明施工、環(huán)境保護(hù)等方面的工作。綜合部主要負(fù)責(zé)項(xiàng)目部后勤、工程安全生產(chǎn)、文明施工、創(chuàng)文明工地申報(bào)手續(xù)辦理、工程宣傳報(bào)道等。財(cái)務(wù)部主要負(fù)責(zé)工程資金管理、工程核算,做到專(zhuān)款專(zhuān)用等。為了確保工程質(zhì)量和進(jìn)度,項(xiàng)目經(jīng)理部將成立質(zhì)量管理領(lǐng)導(dǎo)小組、安全生產(chǎn)、文明施工、環(huán)境保護(hù)領(lǐng)導(dǎo)小組,實(shí)行全面質(zhì)量管理。在總結(jié)我公司已建市政互通立交施工經(jīng)驗(yàn)的基礎(chǔ)上,精心組織施工。經(jīng)理部還成立技術(shù)攻關(guān)小組,以項(xiàng)目總工程師為組長(zhǎng),負(fù)責(zé)攻關(guān)項(xiàng)目施工中出現(xiàn)的疑難問(wèn)題。二、施工任務(wù)劃分為了積極響應(yīng)招標(biāo)文件要求,在最短的時(shí)間內(nèi),用最優(yōu)的施工隊(duì)伍,以最好的工程質(zhì)量完成合同工程項(xiàng)目,
26、我公司結(jié)合工程量的大小、總工期要求、施工隊(duì)施工能力及工程里程等方面因素對(duì)該工程項(xiàng)目施工任務(wù)進(jìn)行了合理分組,沿線主要設(shè)3個(gè)橋梁施工隊(duì)、1個(gè)道路施工隊(duì)(排水、駁岸和附屬工程)進(jìn)場(chǎng)施工,施工隊(duì)伍安排及任務(wù)劃分如下。隊(duì)伍名稱(chēng)施工任務(wù)技術(shù)員工人橋梁施工一隊(duì)負(fù)責(zé)主線高架橋Z205Z207墩(第一聯(lián))主線NW匝道5聯(lián)的橋梁基礎(chǔ)、下部及上部結(jié)構(gòu)等施工。330橋梁施工二隊(duì)負(fù)責(zé)主線高架橋Z214Z221墩(第四聯(lián)、第五聯(lián))主線及WN匝道WN12WN21墩之間3聯(lián)的橋梁基礎(chǔ)、下部及上部結(jié)構(gòu)等施工。460橋梁施工三隊(duì)負(fù)責(zé)主線 Z207Z214墩(第二、第三聯(lián))及WN匝道WN1WN12墩之間3聯(lián)的橋梁基礎(chǔ)、下部及上部結(jié)
27、構(gòu)等施工。460道路施工隊(duì)負(fù)責(zé)合同段內(nèi)路基土石方,橋梁引坡道及路面底基層、基層的施工; 負(fù)責(zé)臨時(shí)交通安全設(shè)施布置及維護(hù)、橋梁防護(hù)及排水、安裝工程及道路路緣石、擋墻、駁岸等工程施工;負(fù)責(zé)合同段內(nèi)雨水管道工程施工440第三章 主要設(shè)備、人員、材料一、施工動(dòng)員我單位中標(biāo)后,進(jìn)行了充分的施工前動(dòng)員,動(dòng)員工作的主要內(nèi)容:介紹本工程的基本情況和建設(shè)意義;講述本標(biāo)段工程概況和工程特點(diǎn)、施工方法及注意事項(xiàng);強(qiáng)化對(duì)工期、質(zhì)量、安全、環(huán)保和成本意識(shí)的教育;明確本標(biāo)段的創(chuàng)優(yōu)目標(biāo)、體系和措施。經(jīng)過(guò)以上動(dòng)員達(dá)到:施工人員了解工程基本概況、施工特點(diǎn)以及應(yīng)注意的事項(xiàng);提高思想認(rèn)識(shí),以飽滿(mǎn)的熱情投入施工,按期、優(yōu)質(zhì)、安全、高
28、效地完成施工任務(wù)。二、設(shè)備、材料、人員動(dòng)員周期根據(jù)工程進(jìn)度安排和業(yè)主、總監(jiān)辦的要求,設(shè)備、材料、人員分期分批進(jìn)入現(xiàn)場(chǎng),并根據(jù)變化隨時(shí)加以調(diào)整。根據(jù)本合同段工程的工程量和工程特點(diǎn),我們選拔了精明強(qiáng)干的項(xiàng)目經(jīng)理,選聘懂技術(shù)、懂業(yè)務(wù)、懂管理的各類(lèi)業(yè)務(wù)、技術(shù)人員,選擇精干的施工隊(duì)伍,建立有效的施工組織機(jī)構(gòu),保質(zhì)保量地完成好本合同段工程的施工任務(wù)。業(yè)務(wù)管理人員的選配本著業(yè)務(wù)系統(tǒng)化管理的原則和程序,優(yōu)先選配懂技術(shù)、懂業(yè)務(wù)、懂管理的技術(shù)人員。施工力量的選擇根據(jù)本工程的質(zhì)量和進(jìn)度要求,結(jié)合施工隊(duì)伍的技術(shù)裝備情況、技術(shù)熟悉程度和施工能力來(lái)確定施工隊(duì)伍。第一批施工人員和部分先期使用的機(jī)械設(shè)備,于2013年1月5日
29、進(jìn)駐現(xiàn)場(chǎng),施工隊(duì)伍和機(jī)械設(shè)備主要從就近工點(diǎn)調(diào)入。首批機(jī)械設(shè)備主要有指揮車(chē)2輛、載重汽車(chē)5輛、推土機(jī)1輛、挖掘機(jī)2臺(tái)、裝載機(jī)1臺(tái)、發(fā)電機(jī)2臺(tái)及測(cè)試儀器。進(jìn)場(chǎng)后主要工作包括:詳細(xì)了解、調(diào)查施工現(xiàn)場(chǎng),臨設(shè)用地進(jìn)行平整,選擇商品混凝土供應(yīng)商,辦理有關(guān)證件手續(xù),征求業(yè)主、總監(jiān)辦的意見(jiàn)及進(jìn)行工程咨詢(xún)。第二批施工人員及設(shè)備于2013年2月16日進(jìn)駐工地,機(jī)械設(shè)備有裝載機(jī)1臺(tái)、正循環(huán)鉆機(jī)2臺(tái)、挖掘機(jī)1臺(tái)、自卸汽車(chē)5輛、空壓機(jī)2臺(tái)、及先期開(kāi)工應(yīng)配備的其它大型機(jī)械設(shè)備,盡快形成規(guī)模施工能力,主要工作是進(jìn)行機(jī)械設(shè)備測(cè)試及試運(yùn)轉(zhuǎn)、設(shè)立各種施工作業(yè)標(biāo)志,為主體工程開(kāi)工做好一切準(zhǔn)備。第三批施工人員和設(shè)備根據(jù)實(shí)際需要在工程
30、全面展開(kāi)之前及時(shí)進(jìn)入施工現(xiàn)場(chǎng),并將工程施工步步推向高朝。三、設(shè)備、人員及材料運(yùn)至施工現(xiàn)場(chǎng)的方法我部充分發(fā)揮企業(yè)的資源優(yōu)勢(shì),人員和機(jī)械設(shè)備集中在江蘇省內(nèi)地區(qū),施工隊(duì)伍人員及機(jī)械設(shè)備正在集團(tuán)公司待命,將根據(jù)工程需要及時(shí)進(jìn)駐現(xiàn)場(chǎng)。工程用鋼筋由我經(jīng)理部直接委托總公司材料部按照招標(biāo)文件推薦廠家購(gòu)買(mǎi)進(jìn)場(chǎng);其他材料由料源地用汽車(chē)直接運(yùn)輸至工地。四、勞動(dòng)力用工計(jì)劃根據(jù)施工進(jìn)度計(jì)劃、各階段的工程量,以及公司勞務(wù)用工水平,各階段勞動(dòng)力投入計(jì)劃見(jiàn)下表所示。序號(hào)工種鉆孔樁階段承臺(tái)階段立柱(連系梁)現(xiàn)澆箱梁階段橋面系階段土方路基排水工程階段1普工4025256030202木工51020103鋼筋工25151530104
31、混凝土振搗工8820105架子工82056電焊工61057電工2112118機(jī)械操作維修工5合計(jì)6760671627126五、主要機(jī)械設(shè)備及測(cè)試儀器配置本標(biāo)段擬投入的主要施工機(jī)械設(shè)備及材料試驗(yàn)、測(cè)量?jī)x器設(shè)備詳見(jiàn)蘇州中環(huán)快速路園區(qū)段五標(biāo)工程的主要施工機(jī)械表、蘇州中環(huán)快速路園區(qū)段五標(biāo)工程主要的材料試驗(yàn)、測(cè)量?jī)x器設(shè)備表。第四章 施工總平面布置一、施工總體布置1、項(xiàng)目經(jīng)理部項(xiàng)目經(jīng)理部駐地設(shè)置主線星華街與獨(dú)墅湖大道NW匝道右側(cè),項(xiàng)目經(jīng)理部整個(gè)布設(shè)嚴(yán)格按照招標(biāo)文件要求建設(shè)。項(xiàng)目經(jīng)理部由項(xiàng)目經(jīng)理室、項(xiàng)目總工室、工程管理部、檔案室、試驗(yàn)室、安機(jī)部、財(cái)務(wù)部及綜合部組成,并張貼標(biāo)志牌,各辦公室劃分明確,職能、職責(zé)
32、上墻明示;做到設(shè)施齊全、功能完善、環(huán)境優(yōu)美,安全整潔。區(qū)內(nèi)場(chǎng)地全部C25砼硬化,場(chǎng)地外圍開(kāi)挖排水溝,設(shè)立集水井,做到雨天無(wú)積水。建立室外停車(chē)場(chǎng)可以提供15個(gè)車(chē)位以上。安裝固定電話及傳真機(jī),實(shí)現(xiàn)寬帶接入,保證內(nèi)外信息溝通及時(shí)準(zhǔn)確。2、施工隊(duì)駐地隊(duì)伍名稱(chēng)駐 地橋梁施工一隊(duì)項(xiàng)目部大院后側(cè)橋梁施工二隊(duì)項(xiàng)目部大院后側(cè)橋梁施工三隊(duì)項(xiàng)目部大院后側(cè)路基施工隊(duì)項(xiàng)目部大院后側(cè)詳見(jiàn)施工總平面布置圖。3、臨時(shí)便道主線便道充分利用現(xiàn)有星華街機(jī)動(dòng)車(chē)道和非機(jī)動(dòng)車(chē)道,第一聯(lián)加寬處需在主線右側(cè)位置澆筑臨時(shí)便道, WN匝道充分利用現(xiàn)有獨(dú)墅湖大道和星華街現(xiàn)有機(jī)動(dòng)車(chē)道和非機(jī)動(dòng)車(chē)道,其中12#墩附近(現(xiàn)有星華街與獨(dú)墅湖大道西北角)將根
33、據(jù)現(xiàn)場(chǎng)情況做一條臨時(shí)水泥混凝土便道,在NW匝道橋左側(cè)做一條臨時(shí)便道,便道長(zhǎng)度約為250米,澆筑后的路面寬度為6m,結(jié)構(gòu)擬采用50cm厚道碴+15cm厚C25混凝土,滿(mǎn)足重載車(chē)輛通行的要求。在便道外側(cè)挖出臨時(shí)排水溝,本工程實(shí)施期間,我部負(fù)責(zé)便道的維護(hù)與保養(yǎng),同時(shí)滿(mǎn)足雨天通行的要求。詳細(xì)的便道布設(shè)位置見(jiàn)施工總平面布置圖。4、鋼筋加工棚我部現(xiàn)場(chǎng)鋼筋加工棚擬設(shè)置一個(gè),在WN匝道橋右側(cè)(獨(dú)墅湖大道南半幅機(jī)動(dòng)車(chē)車(chē)道位置),鋼筋加工棚的選址主要考慮到施工的銜接、計(jì)劃安排、現(xiàn)場(chǎng)的實(shí)際情況等,鋼筋加工棚在做之前到相關(guān)園區(qū)施工單位參觀學(xué)習(xí),學(xué)習(xí)兄弟單位的好的做法,并認(rèn)真做好我部現(xiàn)場(chǎng)的鋼筋加工棚。 二、施工用水、用
34、電,污水排放施工用電與當(dāng)?shù)仉娏Σ块T(mén)聯(lián)系,利用現(xiàn)有電網(wǎng)安裝1臺(tái)變壓器,一臺(tái)500KW.施工區(qū)域內(nèi)有供水、配水管道,將聯(lián)系供水部門(mén),一是做好生活區(qū)域內(nèi)用水,二是做好施工區(qū)域內(nèi)結(jié)構(gòu)物養(yǎng)護(hù)、壓漿用水,水源在使用前都進(jìn)行嚴(yán)格檢測(cè),并經(jīng)檢驗(yàn)符合施工用水標(biāo)準(zhǔn)后才能使用,做好水源保護(hù)工作,不污染水源。三、通訊項(xiàng)目部向當(dāng)?shù)仉娦啪稚暾?qǐng)程控電話兩部,設(shè)傳真機(jī)一部,均設(shè)在經(jīng)理部,技術(shù)人員等現(xiàn)場(chǎng)負(fù)責(zé)人均有移動(dòng)手機(jī),項(xiàng)目部辦公安裝寬帶,實(shí)現(xiàn)聯(lián)網(wǎng)辦公。第五章 現(xiàn)場(chǎng)交通組織及安全措施一、道路封閉及交通分流情況說(shuō)明蘇州市中環(huán)快速路工業(yè)園區(qū)5標(biāo)段主線高架橋施工位于星華街,施工起點(diǎn)樁號(hào)為K10+635.205(東延路南側(cè)),終點(diǎn)樁
35、號(hào)為K11+180.9(新城路北側(cè))。匝道橋連接獨(dú)墅湖大道,獨(dú)墅湖大道施工起點(diǎn)為nhK3+120,終點(diǎn)位于nhK3+840位置。因工期短、任務(wù)重,為保證工程順利實(shí)施及安全文明施工需要,對(duì)施工路段實(shí)行道路全封閉。封閉點(diǎn)設(shè)有2處:1、對(duì)獨(dú)墅湖大道與金堰路十字路口東側(cè)獨(dú)墅湖大道進(jìn)行封閉;2、對(duì)星華街K11+180.9處向北進(jìn)行封閉。具體情況如附件圖片所示,圖中陰影部分為封閉施工區(qū)域。我公司根據(jù)現(xiàn)場(chǎng)及實(shí)際交通情況,為保證車(chē)輛安全暢行,建議對(duì)道路交通作如下分流:車(chē)輛主要從金堰路(南北向)分流,北接金雞湖大道,南接新城路、新華路、東方大道。二、有關(guān)圍擋施工方案我部在報(bào)施工組織設(shè)計(jì)前已經(jīng)對(duì)交通圍擋方案進(jìn)行了
36、優(yōu)化,并將有關(guān)圍擋尺寸、圍擋位置、圍擋的要求進(jìn)行了標(biāo)注,做到:用圍擋將施工區(qū)域與外界隔離,開(kāi)口處配置相應(yīng)的管理人員,保證施工期間的交通安全,同時(shí)按照交通管理部門(mén)的規(guī)定在施工區(qū)域外圍制作安裝臨時(shí)交通標(biāo)志和設(shè)施,并承擔(dān)相應(yīng)的交通管制費(fèi)用,并在施工區(qū)域前設(shè)置限速牌、震蕩帶、減速駁等標(biāo)志標(biāo)線。封閉圍擋按照招標(biāo)文件的要求,設(shè)置2.4m高度的標(biāo)準(zhǔn)圍擋。圍擋采用雙層夾芯彩鋼板,并沿封閉區(qū)域設(shè)置固定基礎(chǔ),為確保堅(jiān)固,能抵御六級(jí)以上風(fēng)力,每6m設(shè)置豎向鋼支架一處,圍擋顏色采用三白一藍(lán)組合色。我部在施工前上報(bào)交通組織分流方案和圍擋方案,對(duì)我標(biāo)星華街及獨(dú)墅湖大道進(jìn)行圍擋封閉施工,在施工起點(diǎn)、終點(diǎn)位置做好單獨(dú)封閉圍擋
37、,獨(dú)墅湖大道及星華街主線終點(diǎn)位置按照?qǐng)@區(qū)標(biāo)準(zhǔn)采用三白一藍(lán)雙層夾心彩鋼板圍擋(涂刷SIPPM廣告),并按照交警部門(mén)的規(guī)定在施工區(qū)域外圍制作安裝臨時(shí)交通標(biāo)志和設(shè)施,夜間照明設(shè)施,保證沿線單位、居民車(chē)輛通行。施工期間我部擬派遣專(zhuān)職交管員在現(xiàn)場(chǎng)疏導(dǎo)交通,維護(hù)通行安全,同時(shí)負(fù)責(zé)對(duì)本項(xiàng)目所有標(biāo)段交通標(biāo)志標(biāo)牌及監(jiān)控設(shè)備的維護(hù)及看管。1、成立以項(xiàng)目經(jīng)理為組長(zhǎng)的交通安全管理領(lǐng)導(dǎo)小組,由安機(jī)部負(fù)責(zé)具體實(shí)施,明確安全生產(chǎn)責(zé)任,派一位副經(jīng)理專(zhuān)門(mén)負(fù)責(zé)本工程交通安全管理工作,并負(fù)責(zé)與路政、交警等單位的協(xié)調(diào)工作。2、每項(xiàng)工程開(kāi)工前,應(yīng)根據(jù)公路工程施工安全技術(shù)規(guī)程(JTJ076-95)及工程實(shí)施情況,制定安全操作細(xì)則,并向施
38、工人員進(jìn)行安全技術(shù)和道路交通安全方案交底。3、交通管制方案實(shí)施前,必須經(jīng)過(guò)交警部門(mén)的批準(zhǔn),并嚴(yán)格按上報(bào)方案實(shí)施。4、施工技術(shù)人員嚴(yán)格按各分項(xiàng)工程施工方案執(zhí)行,特別是有關(guān)道路拼接等的安全、質(zhì)量要求。5、夜間施工設(shè)專(zhuān)職設(shè)備維修人員及電工。6、現(xiàn)場(chǎng)指揮人員、交通維護(hù)人員、施工技術(shù)人員、項(xiàng)目經(jīng)理部管理人員配備10公里范圍對(duì)講機(jī),并有專(zhuān)線與交管部門(mén)24小時(shí)聯(lián)系,隨時(shí)報(bào)告路況情況。7、施工車(chē)輛、材料運(yùn)輸車(chē)等要采取遮蓋防護(hù)措施,嚴(yán)防漏灑材料和帶泥現(xiàn)象,原則上安排在夜間交通量較少時(shí)進(jìn)行,并盡量減少對(duì)車(chē)道的影響。第六章 總體進(jìn)度計(jì)劃、主要分項(xiàng)工程的施工順序一、總體進(jìn)度計(jì)劃計(jì)劃的總工期為:計(jì)劃開(kāi)工日期:2013
39、年3月 01 日計(jì)劃竣工日期:2014年 5月 31 日總工期:共計(jì)15個(gè)月。二、主要工程施工順序1、封閉道路根據(jù)現(xiàn)場(chǎng)實(shí)際施工情況,需對(duì)我標(biāo)段重點(diǎn)位置,以及獨(dú)墅湖大道與金堰路口進(jìn)行封閉,封閉前制定詳細(xì)的施工圍擋方案,并對(duì)交通分流方案進(jìn)行優(yōu)化,封閉時(shí)邀請(qǐng)相關(guān)交警部門(mén)現(xiàn)場(chǎng)指導(dǎo),做到準(zhǔn)備充分。2、臨時(shí)便道首先進(jìn)行便道的施工, 主線便道主要是第一聯(lián)加寬處及NW匝道橋,NW匝道橋左側(cè)做一條便道路面寬度為6m,結(jié)構(gòu)擬采用50cm厚道碴+15cm厚C25混凝土,滿(mǎn)足重載車(chē)輛通行的要求.3、主線鉆孔樁的施工:我標(biāo)主線施工分成五聯(lián),合理布置施工有利于基礎(chǔ)及下部結(jié)構(gòu)的開(kāi)展,為此計(jì)劃10臺(tái)鉆機(jī),分別從Z205#墩、
40、Z215#墩開(kāi)始施工,每?jī)蓚€(gè)墩安排一臺(tái)鉆機(jī)。4、承臺(tái)的施工1個(gè)墩樁結(jié)束后,盡快進(jìn)行樁基檢測(cè),并開(kāi)始承臺(tái)的施工,承臺(tái)施工把握一聯(lián)盡量安排在一起,施工前嚴(yán)格按照計(jì)劃實(shí)施,有利于下一步立柱的銜接施工。5、立柱(墩身)的施工立柱的施工,是在承臺(tái)施工完成檢驗(yàn)合格基礎(chǔ)上進(jìn)行的,施工時(shí)主要是按照承臺(tái)先完成的立柱先施工,有利于下一步現(xiàn)澆箱梁計(jì)劃的實(shí)施。6、現(xiàn)澆預(yù)應(yīng)力砼箱梁現(xiàn)澆箱梁是整個(gè)計(jì)劃的核心部分,我部計(jì)劃投入三聯(lián)支架,施工前對(duì)現(xiàn)場(chǎng)標(biāo)高、長(zhǎng)度、寬度進(jìn)行充分的計(jì)算,以確?,F(xiàn)澆箱梁工期計(jì)劃如期實(shí)現(xiàn)。各分項(xiàng)工程進(jìn)度計(jì)劃(包含WN、NW匝道橋部分):1、鉆孔樁:2013年3月1日-2013年6月10日。2、承臺(tái):2
41、013年4月15日-2013年7月10日。3、立柱(墩身)施工:2013年4月10日-2013年8月20日。4、現(xiàn)澆箱梁:2013年6月1日-2014年2月28日5、橋面系及護(hù)欄:2013年11月1日-2014年4月30日6、路基工程:2013年5月1日-2014年3月31日7、路面工程:2013年4月1日-2014年4月30日8、排水工程、駁岸工程:2013年6月1日-2014年4月30日9、收尾工作:2014年5月1-2014年5月31日三、難點(diǎn)分析施工現(xiàn)場(chǎng)施工面相對(duì)集中,現(xiàn)場(chǎng)各種管線線路較多,工期緊、任務(wù)重,施工面較多,不確定因素較多,為此我部將認(rèn)真安排詳細(xì)的施工計(jì)劃,并定期進(jìn)行總結(jié),對(duì)
42、施工中遇到的問(wèn)題進(jìn)行跟蹤,并及時(shí)解決;另外獨(dú)墅湖大道道路拓寬改造涉及內(nèi)容比較多,需要施工時(shí)統(tǒng)籌安排。四、本工程的關(guān)鍵線路本工程的關(guān)鍵線路星華街主線高架橋第四聯(lián)的施工,首先是第四聯(lián)施工,其次是第三聯(lián)下部結(jié)構(gòu)的施工,特別是立柱(墩身)的WN匝道14#N墩身完成后再進(jìn)行第三聯(lián)現(xiàn)澆箱梁的施工,然后再進(jìn)行WN匝道橋第五、六聯(lián)的現(xiàn)澆箱梁施工。關(guān)鍵線路圖:第三聯(lián)上部箱梁的施工2013.8.1-2013.9.10主線第四聯(lián)施工2013.3.1-7.20第三聯(lián)及WN匝道14#墩下部結(jié)構(gòu)的施工 2013.4.20-7.31現(xiàn)澆箱梁的施工2013.6.1-2014.2.28路基工程的施工2013.5.1-2014.
43、4.30五、細(xì)化后的施工計(jì)劃1、主線橋主線橋?yàn)槲覙?biāo)關(guān)鍵線路,故主線橋施工是整個(gè)施工計(jì)劃的核心部分,具體計(jì)劃如下:(第一聯(lián)、第四聯(lián)同步進(jìn)行,其中支架準(zhǔn)備三聯(lián),竹膠板準(zhǔn)備三聯(lián))(1)第四聯(lián)鉆孔樁(214-217#墩)計(jì)劃工期為2013.3.1-2013.3.31第四聯(lián)承臺(tái)(214-217#墩)計(jì)劃工期為2013.4.15-2013.4.25第四聯(lián)立柱(214-217#墩)計(jì)劃工期為2013.4.25-2013.5.31第四聯(lián)現(xiàn)澆箱梁支架搭設(shè)、底模鋪設(shè)(214-217#墩)計(jì)劃工期:2013.6.1-2013.6.10第四聯(lián)支架預(yù)壓計(jì)劃工期:2013.6.11-2013.6.17第四聯(lián)現(xiàn)澆箱梁底板鋼
44、筋綁扎、澆筑計(jì)劃工期:2013.6.20-2013.6.30第四聯(lián)現(xiàn)澆箱梁頂板鋼筋綁扎、澆筑計(jì)劃工期:2013.7.10-2013.7.20(2)第一聯(lián)鉆孔樁(205-207#墩)計(jì)劃工期為2013.3.10-2013.4.10第一聯(lián)承臺(tái)(205-207#墩)計(jì)劃工期為2013.4.20-2013.5.5第一聯(lián)立柱(205-207#墩)計(jì)劃工期為2013.5.10-2013.6.10第一聯(lián)現(xiàn)澆箱梁支架搭設(shè)、底模鋪設(shè)(205-207#墩)計(jì)劃工期:2013.6.11-2013.6.20第一聯(lián)支架預(yù)壓計(jì)劃工期:2013.6.21-2013.6.27第一聯(lián)現(xiàn)澆箱梁底板鋼筋綁扎、澆筑計(jì)劃工期:2013
45、.7.1-2013.7.10第一聯(lián)頂板鋼筋綁扎、澆筑計(jì)劃工期:2013.7.20-2013.7.31(3)第二聯(lián)鉆孔樁(207-211#墩)計(jì)劃工期為2013.3.20-2013.4.20第二聯(lián)承臺(tái)(207-211#墩)計(jì)劃工期為2013.4.20-2013.5.5第二聯(lián)立柱(207-211#墩)計(jì)劃工期為2013.5.10-2013.6.10第二聯(lián)現(xiàn)澆箱梁支架搭設(shè)、底模鋪設(shè)(207-211#墩)計(jì)劃工期:2013.6.10-2013.7.1第二聯(lián)支架預(yù)壓計(jì)劃工期:2013.7.1-2013.7.8第二聯(lián)現(xiàn)澆箱梁底板鋼筋綁扎、澆筑計(jì)劃工期:2013.7.11-2013.7.20第二聯(lián)頂板鋼筋綁
46、扎、澆筑計(jì)劃工期:2013.8.5-2013.8.15(4)第三聯(lián)鉆孔樁(211-214#墩)計(jì)劃工期為2013.4.20-2013.5.20第三聯(lián)承臺(tái)(211-214#墩)計(jì)劃工期為2013.5.31-2013.6.15第三聯(lián)立柱(211-214#墩)計(jì)劃工期為2013.6.20-2013.7.20第三聯(lián)現(xiàn)澆箱梁支架搭設(shè)、底模鋪設(shè)(217-221#墩)計(jì)劃工期:2013.8.1-2013.8.10第三聯(lián)支架預(yù)壓計(jì)劃工期:2013.8.11-2013.8.17第三聯(lián)現(xiàn)澆箱梁底板鋼筋綁扎、澆筑計(jì)劃工期:2013.8.20-2013.8.30第三聯(lián)現(xiàn)澆箱梁鋼筋筋綁、頂板計(jì)劃工期:2013.9.1-
47、2013.9.10(5)第五聯(lián)鉆孔樁(217-221#墩)計(jì)劃工期為2013.5.20-2013.6.10第五聯(lián)承臺(tái)(217-221#墩)計(jì)劃工期為2013.6.15-2013.6.30第五聯(lián)立柱(217-221#墩)計(jì)劃工期為2013.7.5-2013.8.15第五聯(lián)現(xiàn)澆箱梁支架搭設(shè)、底模鋪設(shè)(217-221#墩)計(jì)劃工期:2013.9.10-2013.9.25第五聯(lián)支架預(yù)壓計(jì)劃工期:2013.9.26-2013.10.3第五聯(lián)現(xiàn)澆箱梁底板鋼筋綁扎、澆筑計(jì)劃工期:2013.10.5-2013.10.15第五聯(lián)頂板鋼筋綁扎、澆筑計(jì)劃工期:2013.10.25-2013.10.31(6)主線橋橋
48、面鋪裝、護(hù)欄計(jì)劃工期: 2013.11.1-2013.12.31(7)WN匝道施工計(jì)劃鉆孔樁計(jì)劃工期:2013.4.10-2013.6.10 承臺(tái)計(jì)劃工期:2013.6.25-2013.7.10立柱計(jì)劃工期:2013.7.25-2013.8.25現(xiàn)澆箱梁計(jì)劃工期:2013.9.1-2014.3.20橋面鋪裝、護(hù)欄計(jì)劃工期:2014.3.25-2014.4.30(8)NW匝道橋施工計(jì)劃 鉆孔樁計(jì)劃工期:2013.4.15-2013.6.10 承臺(tái)計(jì)劃工期:2013.6.25-2013.7.10立柱計(jì)劃工期:2013.7.20-8.20現(xiàn)澆箱梁計(jì)劃工期:2013.9.1-2014.2.28橋面鋪裝
49、、護(hù)欄計(jì)劃工期:2014.3.1-2014.3.31(9)路基(含擋土墻、方樁等)、路面計(jì)劃工期:2013.5.1-2014.4.30(10)排水、駁岸工程計(jì)劃工期:2013.6.1-2014.4.30第七章 主要工程項(xiàng)目的施工方案、施工方法一、施工準(zhǔn)備我單位在收到中標(biāo)通知書(shū)后,即展開(kāi)施工準(zhǔn)備工作,準(zhǔn)備工作主要做好以下幾項(xiàng)工作:1、技術(shù)準(zhǔn)備(1)作好調(diào)查工作:氣象、地形和水文地質(zhì)情況的調(diào)查,地上、地下情況調(diào)查,各種物質(zhì)資源和技術(shù)條件的調(diào)查。(2)在公司總工程師的帶領(lǐng)下組織有關(guān)工程技術(shù)人員熟悉工程施工設(shè)計(jì)圖紙的技術(shù)規(guī)范,對(duì)于圖紙上的疑點(diǎn)及時(shí)與甲方人員溝通并達(dá)成共識(shí),進(jìn)一步明確施工技術(shù)要求和質(zhì)量標(biāo)
50、準(zhǔn),根據(jù)公司在以往施工積累的經(jīng)驗(yàn)提出有利于施工或有利于提高工程質(zhì)量的合理化建議,供建設(shè)單位和設(shè)計(jì)單位參考。(3)熟悉、會(huì)審施工設(shè)計(jì)圖紙,組織項(xiàng)目部工程技術(shù)人員及施工管理人員勘察現(xiàn)場(chǎng),進(jìn)一步深化施工技術(shù)方案,使方案更可行,更具有可操作性,更節(jié)省成本,提高工效。(4)根據(jù)施工總進(jìn)度計(jì)劃安排,編制出詳細(xì)的月、周施工進(jìn)度計(jì)劃,設(shè)備進(jìn)場(chǎng)計(jì)劃,勞動(dòng)力調(diào)配計(jì)劃,材料采購(gòu)計(jì)劃,實(shí)行“以日保周,以周保月”滿(mǎn)足招標(biāo)文件規(guī)定的節(jié)點(diǎn)工期。(5)項(xiàng)目經(jīng)理部向蘇州工業(yè)園區(qū)測(cè)繪有限公司購(gòu)買(mǎi)控制點(diǎn)。辦理好水準(zhǔn)點(diǎn)控制樁的交接手續(xù),并在現(xiàn)場(chǎng)建立符合施工精度要求的高程控制網(wǎng),導(dǎo)線控制網(wǎng),設(shè)置臨時(shí)水準(zhǔn)點(diǎn)和各種控制樁,必須安排專(zhuān)人嚴(yán)格
51、保護(hù),防止破壞,以免造成失效,影響工程精度。(6)施工組織設(shè)計(jì)的編制根據(jù)本工程的特點(diǎn)制定有針對(duì)性的施工組織設(shè)計(jì),確定合理的區(qū)域、施工流程、施工技術(shù)、質(zhì)量保證、安全文明生產(chǎn)等具體措施。同時(shí)根據(jù)業(yè)主、總監(jiān)辦的周例會(huì)要求,對(duì)進(jìn)度計(jì)劃進(jìn)行調(diào)整。(7)試驗(yàn)室項(xiàng)目部配備現(xiàn)場(chǎng)試驗(yàn)室,配齊各種試驗(yàn)設(shè)備并進(jìn)行前期開(kāi)工項(xiàng)目的原材料的試驗(yàn)及商品砼廠家的確定,為項(xiàng)目開(kāi)工作好準(zhǔn)備。2、施工物資準(zhǔn)備根據(jù)本工程的工種進(jìn)度、質(zhì)量要求及地域環(huán)境、工作量確定施工機(jī)械、器具及設(shè)備、周轉(zhuǎn)料、模板體系、材料供應(yīng)商、材料供應(yīng)方式及供應(yīng)計(jì)劃。(1)材料的準(zhǔn)備A、實(shí)地考察,正確分析施工期間建筑材料市場(chǎng)的情況,確定材料運(yùn)輸路線,并做好機(jī)械準(zhǔn)備
52、、周轉(zhuǎn)材料的調(diào)整及維修、保養(yǎng)、檢定工作,確定各工作期間所需的材料及施工機(jī)械、器具并提前組織到現(xiàn)場(chǎng)。B、根據(jù)施工進(jìn)度計(jì)劃和施工預(yù)算中的工料分析,編制工程所需材料用量計(jì)劃,作為備料、供料和確定倉(cāng)庫(kù)、堆場(chǎng)面積及組織運(yùn)輸?shù)囊罁?jù)。C、本工程鋼筋、商品砼等均外購(gòu),進(jìn)場(chǎng)材料經(jīng)驗(yàn)收合格后方可使用。所有采購(gòu)材料、設(shè)備型號(hào)來(lái)自工業(yè)園區(qū)材料采購(gòu)建議名錄中的廠家,并經(jīng)監(jiān)理工程師和發(fā)包人同意。施工過(guò)程中派專(zhuān)人進(jìn)駐管理進(jìn)行生產(chǎn)監(jiān)控。(2)機(jī)械設(shè)備準(zhǔn)備A、根據(jù)施工組織設(shè)計(jì)中確定的施工方法、施工機(jī)具配備要求、數(shù)量及施工進(jìn)度安排,編制施工機(jī)具需求量計(jì)劃。B、對(duì)大型施工機(jī)械(如鉆機(jī)、挖機(jī)等),提出需求量和時(shí)間要求,準(zhǔn)時(shí)運(yùn)抵現(xiàn)場(chǎng),
53、并做好現(xiàn)場(chǎng)準(zhǔn)備工作。C、基于本工程的特點(diǎn),設(shè)備使用量較大、工序復(fù)雜,在施工前應(yīng)及時(shí)落實(shí),使之準(zhǔn)時(shí)到位,并作好開(kāi)工前的檢修工作,確保設(shè)備、工作良好。由于工期緊張,我部增加鉆機(jī)數(shù)量,以確保6月15日之前完成鉆孔樁施工。3、現(xiàn)場(chǎng)準(zhǔn)備(1)辦妥有關(guān)手續(xù)辦理各項(xiàng)施工證件(臨時(shí)用電、臨時(shí)用水、臨時(shí)用地),為工程按期開(kāi)工打好基礎(chǔ)。(2)作好現(xiàn)場(chǎng)規(guī)劃按照施工總平面布置圖結(jié)合實(shí)地考察情況搭設(shè)工棚、料庫(kù)、鋼筋加工場(chǎng);安裝供水管線、架設(shè)供電線路;整修臨時(shí)道路和臨時(shí)排水設(shè)施等。(3)道路封閉及區(qū)域內(nèi)安全管理道路封閉前認(rèn)真制定了相關(guān)封閉分流方案及設(shè)立的各種安全警示標(biāo)志,并嚴(yán)格按照招標(biāo)文件的要求高標(biāo)準(zhǔn)做好圍擋工作,圍擋采
54、用雙層夾芯彩鋼板,設(shè)置高度為2.4米;彩鋼板圍擋顏色采用三白一藍(lán)組合色,開(kāi)口處設(shè)立門(mén)崗并配置相應(yīng)的管理人員;封閉區(qū)域內(nèi)禁止任何車(chē)輛進(jìn)入(內(nèi)部車(chē)輛除外),同時(shí)對(duì)施工車(chē)輛駕駛員進(jìn)行安全交底,進(jìn)一步做好區(qū)域內(nèi)安全管理工作,安排專(zhuān)人督促檢查啊。二、路基工程1、工程概況本標(biāo)段道路工程主要工程量為:路基挖方約2.6萬(wàn)方,填方約6.9萬(wàn)方,路面底基層0.32萬(wàn)方。2、施工組織及安排安排道路施工隊(duì)按照前述施工任務(wù)進(jìn)場(chǎng)施工。路基隊(duì)進(jìn)場(chǎng)首先組織路基清表及河塘清淤,接著施工橋頭段擋土墻等,同時(shí)其它工作面分層填筑路基土方,橋頭擋土墻完成后施工臺(tái)背回填土方,最后施工12%灰土路面底基層。安排雨水管道施工隊(duì),先期進(jìn)場(chǎng)后盡
55、快對(duì)本標(biāo)段雨水管道工程及管線加固保護(hù)進(jìn)行施工,為路基施工創(chuàng)造工作面。工程后期橋梁主體工程及路基完成后進(jìn)行防護(hù)及排水工程施工。路基工程的取土場(chǎng)設(shè)置于獨(dú)墅湖大道南側(cè)河道南岸以南,WN6、WN7、WN8南側(cè)。3、路基施工方案及施工方法(1)基本要求路堤填筑前應(yīng)全段清除15厘米耕植土。每作業(yè)段長(zhǎng)度控制在200米左右,當(dāng)天填筑,當(dāng)天碾壓成型,以保證路基高質(zhì)量、高速度完成。(2)試驗(yàn)路段選擇A、選擇能代表整個(gè)標(biāo)段施工特點(diǎn)的路段(長(zhǎng)度為100米左右)做為試驗(yàn)路段,針對(duì)不同的填筑材料、壓實(shí)機(jī)型、松鋪厚度、質(zhì)量標(biāo)準(zhǔn),取得不同的實(shí)踐試驗(yàn)數(shù)據(jù)。B、通過(guò)試驗(yàn)段收集滿(mǎn)足設(shè)計(jì)要求的密實(shí)度、經(jīng)濟(jì)合理的填筑厚度,最佳的填土速率,碾壓遍數(shù)及機(jī)械組合等參數(shù)。(3)老路面層的鑿除老路面層破碎將由破碎機(jī)、挖掘機(jī)、裝載機(jī)協(xié)同工作。破碎時(shí)安排專(zhuān)人指揮,采用梅花形破碎法將結(jié)構(gòu)層分片打碎,使之不再成為整體。然后由挖掘機(jī)將分片打碎的板塊徹底翻開(kāi)、相互分離。最后由裝載機(jī)或挖掘機(jī)配合自卸汽車(chē)裝車(chē)運(yùn)出,統(tǒng)一歸堆,集中處理。(4)承臺(tái)開(kāi)挖恢復(fù)區(qū)及匝道引坡段路基處理橋梁(匝道擋墻)承臺(tái)開(kāi)挖后,基坑回填中粗砂,水密法密實(shí),路面結(jié)構(gòu)機(jī)動(dòng)車(chē)道及
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年違約借款合同違約責(zé)任追究辦法3篇
- 2025年度個(gè)人房屋買(mǎi)賣(mài)價(jià)格調(diào)整及支付合同4篇
- 2025年度企業(yè)應(yīng)收賬款債權(quán)轉(zhuǎn)讓與風(fēng)險(xiǎn)控制協(xié)議書(shū)3篇
- 2025年度房地產(chǎn)樣板間設(shè)計(jì)與施工合同范本4篇
- 2025年度電子商務(wù)個(gè)人勞務(wù)派遣合作協(xié)議書(shū)4篇
- 工廠租地合同(2篇)
- 二零二五年度民政局離婚協(xié)議書(shū)模板法律咨詢(xún)附加服務(wù)合同4篇
- 2025年度銷(xiāo)售顧問(wèn)市場(chǎng)調(diào)研聘用合同2篇
- 2024西部縣域經(jīng)濟(jì)百?gòu)?qiáng)研究
- STEM教育實(shí)踐講解模板
- 2025年山東浪潮集團(tuán)限公司招聘25人高頻重點(diǎn)提升(共500題)附帶答案詳解
- 2024年財(cái)政部會(huì)計(jì)法律法規(guī)答題活動(dòng)題目及答案一
- 2025年江西省港口集團(tuán)招聘筆試參考題庫(kù)含答案解析
- (2024年)中國(guó)傳統(tǒng)文化介紹課件
- 液化氣安全檢查及整改方案
- 《冠心病》課件(完整版)
- 2024年云網(wǎng)安全應(yīng)知應(yīng)會(huì)考試題庫(kù)
- 公園保潔服務(wù)投標(biāo)方案
- 光伏電站項(xiàng)目合作開(kāi)發(fā)合同協(xié)議書(shū)三方版
- 高中物理答題卡模板
- 芳香植物與芳香療法講解課件
評(píng)論
0/150
提交評(píng)論