mis12信息系統(tǒng)復(fù)習(xí)參考_第1頁
mis12信息系統(tǒng)復(fù)習(xí)參考_第2頁
mis12信息系統(tǒng)復(fù)習(xí)參考_第3頁
mis12信息系統(tǒng)復(fù)習(xí)參考_第4頁
mis12信息系統(tǒng)復(fù)習(xí)參考_第5頁
已閱讀5頁,還剩19頁未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、精選優(yōu)質(zhì)文檔傾情為你奉上精選優(yōu)質(zhì)文檔傾情為你奉上專心專注專業(yè)專心專注專業(yè)精選優(yōu)質(zhì)文檔傾情為你奉上專心專注專業(yè)Management Information Systems, 12e (Laudon)Chapter 13 Building Information Systems1) The most common form of IT-enabled organizational change is automation.Answer: TRUEDiff: 2Page Ref: 489AACSB: Use of ITCASE: ContentObjective: 13.12) Rationaliz

2、ation of procedures describes a radical rethinking of the business models.Answer: FALSEDiff: 2Page Ref: 490AACSB: Reflective ThinkingCASE: ContentObjective: 13.13) Failure to address properly the organizational changes surrounding the introduction of a new system can cause the demise of an otherwise

3、 good system.Answer: TRUEDiff: 2Page Ref: 490AACSB: Analytic SkillsCASE: EvaluationObjective: 13.14) TQM describes the measurement of quality as 3.4 defects per million.Answer: FALSEDiff: 2Page Ref: 490AACSB: Reflective ThinkingCASE: ContentObjective: 13.15) Thorough testing is not required if, duri

4、ng the programming stage, the design documents are sufficiently detailed.Answer: FALSEDiff: 2Page Ref: 499AACSB: Analytic SkillsCASE: AnalysisObjective: 13.26) The system is not in production until conversion is complete.Answer: TRUEDiff: 2Page Ref: 501AACSB: Use of ITCASE: ContentObjective: 13.27)

5、Documentation reveals how well the system has met its original objectives.Answer: FALSEDiff: 3Page Ref: 501AACSB: Use of ITCASE: ContentObjective: 13.28) A data flow diagram offers a logical and graphical model of information flow, partitioning a system into modules that show manageable levels of de

6、tail.Answer: TRUEDiff: 2Page Ref: 502AACSB: Use of ITCASE: ContentObjective: 13.39) A structure chart is a bottom-up chart, showing each level of design, its relationship to other levels, and its place in the overall design structure.Answer: FALSEDiff: 2Page Ref: 503AACSB: Use of ITCASE: ContentObje

7、ctive: 13.310) Object-oriented development is more incremental than traditional structured development.Answer: TRUEDiff: 2Page Ref: 504AACSB: Use of ITCASE: ContentObjective: 13.311) Objects are grouped into hierarchies, and hierarchies into classes.Answer: FALSEDiff: 2Page Ref: 504AACSB: Use of ITC

8、ASE: ContentObjective: 13.312) CASE tools facilitate the creation of clear documentation and the coordination of team development efforts.Answer: TRUEDiff: 1Page Ref: 505AACSB: Use of ITCASE: ContentObjective: 13.313) The oldest method for building information systems is prototyping.Answer: FALSEDif

9、f: 2Page Ref: 506AACSB: Use of ITCASE: ContentObjective: 13.414) Prototyping is more iterative than the conventional lifecycle.Answer: TRUEDiff: 2Page Ref: 507AACSB: Use of ITCASE: ContentObjective: 13.415) A problem with prototyping is that the systems constructed using this method may not be able

10、to handle large quantities of data in a production environment.Answer: TRUEDiff: 2Page Ref: 507AACSB: Use of ITCASE: ContentObjective: 13.416) End-user-developed systems can be completed more rapidly than those developed through the conventional systems lifecycle.Answer: TRUEDiff: 1Page Ref: 509AACS

11、B: Use of ITCASE: ContentObjective: 13.417) One advantage of fourth-generation tools is that they can easily handle processing large numbers of transactions or applications with extensive procedural logic and updating requirements.Answer: FALSEDiff: 1Page Ref: 509AACSB: Use of ITCASE: ContentObjecti

12、ve: 13.418) In some forms of outsourcing, a company hires an external vendor to create the software for its system, but operates the software on its own computers.Answer: TRUEDiff: 1Page Ref: 510AACSB: Use of ITCASE: ContentObjective: 13.419) A primary benefit of offshore outsourcing is that this ca

13、n substantially reduce hidden costs.Answer: FALSEDiff: 1Page Ref: 511AACSB: Use of ITCASE: ContentObjective: 13.420) Systems development activities always take place in sequential order.Answer: FALSEDiff: 2Page Ref: 514AACSB: Use of ITCASE: ContentObjective: 13.521) What is the primary driving facto

14、r in firms to select domestic outsourcing firms to build system solutions?A) to take advantage of technical skills the firm does not haveB) to save labor costsC) to avoid change management issuesD) all of the aboveAnswer: ADiff: 2Page Ref: 511AACSB: Reflective ThinkingCASE: ContentObjective: 13.422)

15、 The four kinds of structural organizational change enabled by IT, in order from least to most risky, areA) rationalization, automation, reengineering, and redesigning. B) rationalization, automation, reengineering, and paradigm shift. C) automation, rationalization, reengineering, and paradigm shif

16、t. D) automation, redesigning, restructuring, and paradigm shift. Answer: CDiff: 2Page Ref: 489AACSB: Analytic SkillsCASE: AnalysisObjective: 13.123) Business processes are analyzed, simplified, and redesigned inA) business process redesign.B) rationalization of procedures.C) automation.D) paradigm

17、shifts.Answer: ADiff: 2Page Ref: 490AACSB: Reflective ThinkingCASE: ContentObjective: 13.124) In automationA) business processes are simplified.B) business processes are reorganized to cut waste and eliminate repetitive, paper-intensive tasks.C) standard operating procedures are streamlined to remov

18、e bottlenecks.D) employees are enabled to perform their tasks more efficiently.Answer: DDiff: 2Page Ref: 489AACSB: Reflective ThinkingCASE: ContentObjective: 13.125) A bank has reworked its mortgage application process so that several steps are handled by computer software, and some steps are combin

19、ed to reduce bottlenecks in processing. The goal is to gradually improve its efficiency over time. This is an example ofA) automation.B) rationalization of procedures.C) paradigm shift.D) business process redesign.Answer: BDiff: 2Page Ref: 490AACSB: Analytic SkillsCASE: AnalysisObjective: 13.126) An

20、 upscale organic foods grocery chain is implementing an information system that will enable it to add same-day home delivery of groceries to its customers. This is an example ofA) automation.B) rationalization of procedures.C) paradigm shift.D) business process redesign.Answer: CDiff: 2Page Ref: 490

21、AACSB: Analytic SkillsCASE: AnalysisObjective: 13.127) In order, what are the first three steps in BPM?A) (1) identifying processes for change, (2) analyzing existing processes, (3) designing the new processB) (1) analyzing existing processes, (2) identifying processes for change, (3) designing the

22、new processC) (1) identifying processes for change, (2) designing the new process, (3) implementing the new processD) (1) analyzing processes to change (2) designing the new process, (3) measuring the optimized processAnswer: ADiff: 2Page Ref: 492-493AACSB: Reflective ThinkingCASE: ContentObjective:

23、 13.128) _ provide(s) a methodology and tools for dealing with the organizations ongoing need to revise and optimize its numerous business processes. A) Business process redesignB) Business process managementC) CASE toolsD) TQMAnswer: BDiff: 3Page Ref: 491AACSB: Reflective ThinkingCASE: ContentObjec

24、tive: 13.129) The idea that the achievement of quality control is an end in itself describes a main concept ofA) BPM.B) BPR.C) six sigma.D) TQM.Answer: DDiff: 3Page Ref: 490AACSB: Reflective ThinkingCASE: ContentObjective: 13.130) Which process develops a detailed description of the functions that a

25、 new information system must perform?A) feasibility studyB) requirements analysisC) systems designD) test plan developmentAnswer: BDiff: 2Page Ref: 497AACSB: Use of ITCASE: ContentObjective: 13.231) The entire system-building effort is driven byA) organizational change.B) feasibility studies.C) the

26、information value chain.D) user information requirements.Answer: DDiff: 2Page Ref: 497-498AACSB: Analytic SkillsCASE: AnalysisObjective: 13.332) Systems designA) describes what a system should do to meet information requirements.B) shows how the new system will fulfill the information requirements.C

27、) identifies which users need what information, where, when and how. D) is concerned with the logical view of the system solution. Answer: BDiff: 2Page Ref: 498AACSB: Use of ITCASE: ContentObjective: 13.233) System design specifications that address the category of database design issues will includ

28、e specifications forA) transaction volume and speed requirements.B) data entry.C) job design.D) program logic and computations.Answer: ADiff: 3Page Ref: 498AACSB: Use of ITCASE: ContentObjective: 13.234) Enabling organizations to make continual improvements to many business processes and to use proc

29、esses as the fundamental building blocks of corporate information systems is the goal ofA) business process management.B) business process redesign.C) workflow engineering.D) workflow management.Answer: ADiff: 3Page Ref: 491AACSB: Reflective ThinkingCASE: ContentObjective: 13.135) Transferring data

30、from a legacy system to the new system would be defined by which category of system design specifications?A) inputB) databaseC) manual proceduresD) conversionAnswer: DDiff: 3Page Ref: 498AACSB: Use of ITCASE: ContentObjective: 13.236) Determining methods for feedback and error handling would be defi

31、ned by which category of system design specifications?A) training and documentationB) user interfaceC) manual proceduresD) security and controlsAnswer: BDiff: 3Page Ref: 498AACSB: Use of ITCASE: ContentObjective: 13.237) Unit testingA) includes all the preparations for the series of tests to be perf

32、ormed on the system.B) tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned.C) tests each program separately.D) provides the final certification that the system is ready to be used in a production setting.Answer: CDiff: 1Page Ref:

33、 499AACSB: Use of ITCASE: ContentObjective: 13.238) System testingA) includes all the preparations for the series of tests to be performed on the system.B) tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned.C) tests each program

34、 separately.D) provides the final certification that the system is ready to be used in a production setting.Answer: BDiff: 2Page Ref: 499AACSB: Use of ITCASE: ContentObjective: 13.239) Acceptance testingA) includes all the preparations for the series of tests to be performed on the system.B) tests t

35、he functioning of the system as a whole in order to determine if discrete modules will function together as planned.C) tests each program separately.D) provides the final certification that the system is ready to be used in a production setting.Answer: DDiff: 1Page Ref: 499AACSB: Use of ITCASE: Cont

36、entObjective: 13.240) In a parallel conversion strategy, the new systemA) is tested by an outsourced company.B) replaces the old one at an appointed time.C) and the old are run together.D) is introduced in stages.Answer: CDiff: 2Page Ref: 500AACSB: Use of ITCASE: ContentObjective: 13.241) In the dir

37、ect cutover conversion strategy, the new systemA) is tested by an outsourced company.B) replaces the old one at an appointed time.C) and the old are run together.D) is introduced in stages.Answer: BDiff: 1Page Ref: 500AACSB: Use of ITCASE: ContentObjective: 13.242) Changes in hardware, software, doc

38、umentation, or production to a production system to correct errors, meet new requirements, or improve processing efficiencies are termedA) compliance.B) production.C) maintenance.D) acceptance.Answer: CDiff: 2Page Ref: 501AACSB: Use of ITCASE: ContentObjective: 13.243) In what stage of systems devel

39、opment are design specifications created?A) systems analysisB) systems designC) testingD) conversionAnswer: BDiff: 2Page Ref: 501AACSB: Use of ITCASE: ContentObjective: 13.244) The primary tool for representing a systems component processes and the flow of data between them is theA) data dictionary.

40、B) process specifications diagram.C) user documentation.D) data flow diagram.Answer: DDiff: 2Page Ref: 502AACSB: Use of ITCASE: ContentObjective: 13.345) To understand and define the contents of data flows and data store, system builders useA) a data dictionary.B) process specifications diagrams.C)

41、user documentation.D) data flow diagrams.Answer: ADiff: 3Page Ref: 503AACSB: Use of ITCASE: ContentObjective: 13.346) To show each level of a systems design, its relationship to other levels, and its place in the overall design structure, structured methodologies useA) structure charts.B) Gantt and

42、PERT charts.C) process specifications.D) data flow diagrams.Answer: ADiff: 2Page Ref: 503AACSB: Use of ITCASE: ContentObjective: 13.347) An entire information system is broken down into its subsystems by usingA) high-level data flow diagrams.B) low-level data flow diagrams.C) process specifications.

43、D) structured diagrams.Answer: ADiff: 2Page Ref: 502AACSB: Use of ITCASE: ContentObjective: 13.348) In object-oriented developmentA) the class is used as the basic unit of systems analysis and design. B) an object is a collection of data that is acted on by external processes. C) processing logic re

44、sides within objects. D) a strict, step-by-step development process is essential. Answer: CDiff: 2Page Ref: 504AACSB: Analytic SkillsCASE: EvaluationObjective: 13.349) In an object-oriented development framework for a university, how would the classes Degree, Mathematics, and Physics be related?A) D

45、egree would be a sister class to Mathematics and Physics.B) Degree is a superclass to Mathematics and Physics.C) Mathematics and Physics would be ancestors to Degree.D) Degree would be a subclass to Mathematics and Physics.Answer: BDiff: 2Page Ref: AACSB: Analytic SkillsCASE: AnalysisObjective: 13.3

46、50) Object-oriented modeling is based on the concepts ofA) objects and relationships.B) classes and objects.C) class and inheritance.D) objects and inheritance.Answer: CDiff: 2Page Ref: 504AACSB: Use of ITCASE: ContentObjective: 13.351) Object-oriented development could potentially reduce the time a

47、nd cost of writing software becauseA) object-oriented programming requires less training.B) iterative prototyping is not required.C) objects are reusable.D) a single user interface object can be used for the entire application.Answer: CDiff: 2Page Ref: 505AACSB: Use of ITCASE: ContentObjective: 13.3

48、52) CASE tools automateA) documentation.B) code generation.C) creating data dictionaries.D) all of the above.Answer: DDiff: 2Page Ref: 505AACSB: Use of ITCASE: ContentObjective: 13.353) The oldest method for building information systems isA) component-based development.B) prototyping.C) object-orien

49、ted development.D) the systems development lifecycle.Answer: DDiff: 2Page Ref: 506AACSB: Use of ITCASE: ContentObjective: 13.454) In the traditional systems development lifecycle, end usersA) are important and ongoing members of the team from the original analysis phase through maintenance.B) are im

50、portant only in the testing phases.C) have no input.D) are limited to providing information requirements and reviewing the technical staffs work.Answer: DDiff: 2Page Ref: 506AACSB: Use of ITCASE: ContentObjective: 13.455) In which type of systems building are the development stages organized so that

51、 tasks in one stage are completed before the tasks in the next stage begun?A) traditionalB) prototypingC) RADD) all of the aboveAnswer: ADiff: 1Page Ref: 506-507AACSB: Use of ITCASE: ContentObjective: 13.456) As a technical project manager you have decided to propose implementing a prototyping metho

52、dology for a small Web-based design project. What is the order of steps you will follow in this project?A) Develop the prototype; use the prototype; revise and enhance the prototype.B) Identify user requirements, develop the prototype, use the prototype, revise and enhance the prototype.C) Define th

53、e requirements, develop solutions, select the best prototype, and implement the prototype.D) Define the requirements, develop the prototype, revise and enhance the prototype.Answer: BDiff: 2Page Ref: 507AACSB: Analytic SkillsCASE: SynthesisObjective: 13.557) A systems building approach in which the

54、system is developed as successive versions, each version reflecting requirements more accurately, is described to beA) end-user oriented.B) iterative.C) object-oriented.D) agile.Answer: BDiff: 2Page Ref: 507AACSB: Use of ITCASE: ContentObjective: 13.458) Which type of fourth-generation language tool

55、s are end-users most likely to work with?A) report generators and query languagesB) report generators and application generatorsC) PC software tools and query languagesD) PC software tools and report generatorsAnswer: CDiff: 3Page Ref: 509AACSB: Use of ITCASE: ContentObjective: 13.459) Which type of

56、 fourth-generation language tool contains preprogrammed modules that can be used to create entire applications?A) PC software toolsB) report generatorsC) application generatorsD) application software packagesAnswer: CDiff: 2Page Ref: 509AACSB: Use of ITCASE: ContentObjective: 13.460) When systems ar

57、e created rapidly, without a formal development methodologyA) end users can take over the work of IT specialists.B) the organization quickly outgrows the new system.C) hardware, software, and quality standards are less important.D) testing and documentation may be inadequate.Answer: DDiff: 2Page Ref

58、: 510AACSB: Use of ITCASE: ContentObjective: 13.461) Management should control the development of end-user applications byA) developing a formal development methodology.B) requiring cost justification for end-user IS projects.C) establishing standards for user-developed applications.D) both B and CE

59、) both A and BAnswer: DDiff: 3Page Ref: 510AACSB: Use of ITCASE: ContentObjective: 13.462) Fourth-generation tools cannot replace conventional development tools because theyA) cannot handle large numbers of transactions or extensive procedural logic.B) are not designed to integrate with legacy syste

60、ms.C) do not incorporate methods for documentation.D) do not incorporate methods for testing.Answer: ADiff: 3Page Ref: 509AACSB: Use of ITCASE: ContentObjective: 13.463) Categories of tools for BPM include all of the following exceptA) tools to integrate existing systems to support business processe

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論