2022鉆井英語(yǔ)涉外面試題自編_第1頁(yè)
2022鉆井英語(yǔ)涉外面試題自編_第2頁(yè)
2022鉆井英語(yǔ)涉外面試題自編_第3頁(yè)
2022鉆井英語(yǔ)涉外面試題自編_第4頁(yè)
2022鉆井英語(yǔ)涉外面試題自編_第5頁(yè)
已閱讀5頁(yè),還剩7頁(yè)未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、涉外英語(yǔ)培訓(xùn)面試題 Say something about your position as much as you can.As a drilling engineer, working in Saudi market is quite different from working in domestic market. Our main job is to coordinate with third party, convey the instruction to the rig crew, collect data and complete IADC report. We are als

2、o responsible for well control, managing the drilling tools, and training the crew members.What are the duties of your position?Be responsible for the implementation of instruction.According to the well design, give some technical advices to the company if need.Coordinate and cooperate with other de

3、partments.Manage drilling instruments and drilling tools.Organize BOP drill and record the results.Be responsible for the management of well control.Collect data and complete IADC report.Train the new arrivals some information about well control.When overflow occurred during drilling, what do you do

4、?Give an alarm.Open the hydraulic valve to allow the mud fluid to flow to the degasser.Close the annular BOP, then close ram BOP.Close the choke valve slowly, dont exceed the maximum allowed casing pressure.Keep the pressure stable, read and record the mud volume.What is rigging up and how to rig up

5、? Say something about it. Rigging up means installing all the equipment one by one after mobilization. Usually we install the derrick substructure first, then install the drawworks, platform , rotary table, derrick. At the some time, install the mud tank, mud pump, diesel generating sets, then insta

6、ll the drilling line and pull the derrick up, then install the TDS.According to your understanding, what is the different between MWD and LWD? MWD means measurement while drilling, it only can measure the data of well , azimuth, and TVD. LWD means logging while drilling, It can not only measure the

7、data of well inclination, azimuth, TVD but also the data of rock resistivity, nature gamma, pore pressure, rock porosity, rock density.Basically, what does the hoisting system consist of? The hoisting system consist of draw works, crown block, drilling line, traveling block and hook.How many types o

8、f bits we usually used? They are cone bit (rock bit), PDC bit, diamond bit, drag bit and coring bit. Describe function of mud. The principal function of the mud are:1.To clean the hole 2.To cool the bit 3.To prevent the formation form collapse 4.To lubricate the drilling tools 5.To balance the forma

9、tion pressure 6.To remove cuttings form the bottom of the hole.How many points do you check daily? What are they? Seven. BOP stack, remote control house, tool sledge, mud tank level sensor, mud volume, mud property, drilling parameters.How many well killing methods do you know? Describe them? Two. t

10、hey are the drillers method and engineers method. Drillers method requires two cycles of circulation. In the first circle, we use old mud to displace contaminated mud out of bore hole. In the second cycle ,weighted mud been pumped into the bore hole to kill the well. Engineers method requires only o

11、ne cycle of circulation. After shut in the well, according to the shut-in pressure, we can calculate the mud density for kill the well, then weight the mud and pump the weighted mud to displace the contaminated mud and kill the well at the same time.What can we do if overflow occurs in empty well? G

12、ive an alarm Ensure the well bore is full of mud and stop pumping Drain off the metering tank 2030minutes later, monitor and record the rising of fluid level in the metering tank for 510 minutes.Do you know about S135 drill pipe? What does S135 mean? Yes, I do. S135 means that the tensile strength i

13、s 135kpsiWhat kinds of drilling tools does a fishing assembly consist of? It normally consist of make-up sub, safety sub, drilling jar, drill collar and accelerator.Generally, how many bit breakers are there on the drill floor? Describe the size. 24”, 20”, 17 1/2”, 12 1/4”, 9 7/8”, 8 1/2”, 6”General

14、ly, what are the parameters of drilling? Pump pressure, weight on bit, rotary speed, flow rate, torque and so on.How many kinds of electrical voltage do you have on the well site? Three. 110V, 220V, 380V 110-volt is used for imported electrical equipment 220-volt is used for office equipment and lig

15、hting system 380-volt is used for circulation systemWhat do you call the space between the drill pipe and the sides of borehole? Annular spaceDescribe some units we usually used in KSA. Inch, foot, gallon, pound, barrelWhat is the difference between rotary drilling and TDS drilling? Rotary drilling

16、use rotary table driving the drill string, TDS uses a top motor to drive the drill string. Rotary drilling can make up single joint every time, but TDS can make up stand every time.while tripping. if we want to make a circulation, rotary drilling requires us to make up Kelly at a right position. wit

17、h TDS, we can make circulation at any time if downhole complicated, we can back ream with TDSWITH TDS, derrick can work on the monkey board easily.20. What is a wildcat well?The wildcat well means to drill a well in a region where there is never been drilled. this kind of test in petroleum mining is

18、 called wildcat well 21. How many fishing tools do you know?Overshot, junk mill, junk basket, junk sub, spear, taper tap, box tap, strong magnetic fisher.22. How often do you check the crown-o-matic?Every day. the day shift should check the crown-o-matic.23. When do the H2S drill, what do you do?As

19、soon as the alarm rings, the driller and two floorman done 30-mins SCBA and shut in the well immediately. Then wait for the instruction of company man. All other personnel on the well site done 15-mins SCBA and reach at the Safe Briefing Area. Toolpusher and assistant driller done 30-mins SCBA and g

20、o to the drill floor with H2S detector, detect the H2S and find the sources. Then report it to the supervisor. At the same time, safety officer and medical check the members of personnel. Search team don 30-mins SCBA, to search along the searching route and report the information to safety adviser w

21、hile return to the Sate Briefing Area.24 .What dose IADC/LCM/BPV/BOP/LNG mean?IADC means international association drilling contractor.LCM means loss circulation material.BPV means by pass valve.BOP means blowout preventer.LNG means liquefy natural gas.25. What do BOP, SPM and RPM stand for?ROP stan

22、ds for rate of penetration.SPM stands for strokes per minute.RPM stands for rotary revolutions per minutes.26. What is the junk basket used for ?Junk basket is used for fishing junk pieces in bottom hole.27. What is the difference between a kick and a blowout?Kick means the bottom hole pressure can

23、not balance the formation pressure, formation fluid flow into the bore hole.Blowout means formation pressure make mud quickly spurt from wellhead, even reach the height of monkey board.28. How shall we do a flow check?If a well is identified, we should do a flow check first.Ensure the well bore is f

24、ull of mud, Stop pumping, drain off the metering tank, Monitor and record the rising of the fluid level in the metering tank for 15 minutes(if oil base mud, we need 30 mines)29. How dose a kick occur?Continuous influx of formation fluid, loss of circulation, drill string swabbing effect and so on ca

25、use the bottom hole pressure below to the formation pressure, so more and more formation fluid flow into the bore hole, we called this phenomenon a kick.30. What other drilling instrument are used during drilling in addition to the weight indicator, pump pressure gauge and the flow rate gauge?We als

26、o use a rotary gauge, a torque gauge, a mud recorder, etc.31 What kinds of hand tools we usually used?There are many kinds, such as monkey wrench, chain wrench, pipe wrench, open-ended spanner, ring spanner, box spanner, screwdriver, hand vice and so on.32論述個(gè)人教育背景 核心詞; education background I graduat

27、ed from. my major is.33如何提高個(gè)人口語(yǔ)能力 How to improve the oral English?34與否做好了出國(guó)準(zhǔn)備,都做了哪些準(zhǔn)備? 核心詞 go abroad, preparation35個(gè)人旳工作簡(jiǎn)歷有哪些? 核心詞 work experience36名字來(lái)歷,天氣狀況等? 核心詞 climate season37個(gè)人問(wèn)題旳詢問(wèn)? 核心詞 private family marriage etc38與外國(guó)人與否存在文化沖突? 核心詞 foreigner culture shock39典型鉆具組合有哪些? 核心詞 typical BHA40閑暇時(shí)間做些什

28、么?核心詞 spare time kill time41本地雇員怎么樣?如何與之交流合伙? 核心詞 local employee communicate cooperate42. 常用旳鉆井參數(shù)有哪些? 核心詞:parameter, RPM, SPM, WOB etc43. 用過(guò)哪些類型旳井架? 核心詞:type, rig, derrick44. 用過(guò)哪些尺寸旳鉆鋌或鉆桿? 核心詞:DP, DC, size45. 與否用過(guò)螺旋鉆鋌? 核心詞:Spiral drill collar46. 5寸鉆桿旳扣型?或如何連接?核心詞:thread, connection47. 用過(guò)何種泥漿體系? 核心詞:

29、 type, oil-base, water-base48. 泵壓下降旳因素有哪些? 核心詞: pump pressure, drop down, reason49. 泵壓下降后應(yīng)如何解決? 核心詞:drop down, deal with50. 井控裝備有哪些? 核心詞: well control equipment51. 泥漿泵安全閥設(shè)立壓力是多少? 核心詞:pop-off valve, relief valve52. 泥漿旳性能重要涉及哪些要素? 核心詞: function, involve53. 用什么手段或者工具監(jiān)測(cè)泥漿性能呢? 核心詞: instrument monitor54.

30、遠(yuǎn)控房都檢查哪些地方? 核心詞: remote control house,inspect55. 如何打超高壓? 核心詞: bypass, pressure56. 防碰天車有哪幾種類型? 核心詞: crown-o-matic, mechanical, electrical, crown saver57. 硫化氫警報(bào)響旳時(shí)候你該做什么? 核心詞: H2S, alarm, procedure58. 某些縮寫旳含義? 核心詞: IADCBPVRPMBHAWOB etc59. 井口接鉆具用什么工具上扣? 核心詞: hydraulic tong, make up60. 上扣扭矩如何控制? 核心詞: pr

31、essure gauge, torque, control61試壓時(shí)試高壓和低壓旳作用? 核心詞: pressure test, purpose62用過(guò)旳泥漿泵缸套尺寸? 核心詞: size, liner63水龍帶跳動(dòng)旳因素分析? 核心詞:reason, shock, hos64本崗位旳崗位職責(zé)有哪些? 核心詞: responsibility65如何做溢流觀測(cè)? 核心詞: flow check66列舉一下固控設(shè)備? 核心詞: solid control equipment67列舉某些手工具? 核心詞: hand tools68與否取過(guò)IADC證件,什么級(jí)別旳? 核心詞: certificate

32、 grade69目前工作旳鉆機(jī)鉆深能力? 核心詞: capacity, rig國(guó)際公司口語(yǔ)面試題目Please tell me a joke or describe a person.Which university did you graduate? Whats your major?Please introduce yourself.As a driller, what should you do before BOOH?As a driller, what should you do to prevent sticking? What should you do when there i

33、s a sticking?What should do when the pump pressure is 500PSI?How long have you done in your post?吸入罐用英文怎么說(shuō) sank tankHow many inner BOP tools do you know?Whats your feeling when POOH? Please describe your routine workHow many mud property do you know? What are they?How do you organize the employees t

34、o workWhat will you do before running casing?Can you tell me about the type of common crossover of drill pipe thread and drill collar thread?Describe the engineerkill methodWhy do we do the slow pump stroke testTell me the working pressure of the remote control console accumulator annular manifoldOn

35、 what occasion the air pump would start automatically?Have you ever handle any downhole problemsTell me the main work of an engineer.Please tell me your working experience ?Whats the weather like today?Do you like your job? And why?Whats your hobbies?Give me some examples about the drilling problems you have me

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論