G107鄭州境改線項(xiàng)目孟莊至龍湖連接線第一標(biāo)段填土路基試驗(yàn)段

總結(jié)報(bào)告編制:_復(fù)核:中國(guó)建筑第七工程局有限公司G107鄭州境改線項(xiàng)目孟莊至龍湖連接線一標(biāo)項(xiàng)目經(jīng)理部7鄭州境改線項(xiàng)目孟莊至龍湖連接線一口7鄭州境改線項(xiàng)目孟莊至龍湖連接線一口填方路基試驗(yàn)段總結(jié)報(bào)告測(cè)點(diǎn)高程進(jìn)行碾壓前的測(cè)量,并將結(jié)果與土方填筑前高程進(jìn)行對(duì)比得出試驗(yàn)段松鋪厚度,具體數(shù)據(jù)見下表。松鋪厚度檢測(cè)匯總表單位:m樁號(hào)距中線距離松口高程填前高程松口厚度K21+820左16163.458163.2150.243左8163.430163.1950.235右8163.369163.2130.256右16163.419163.1650.254K21+840左16163.511163.2700.241左8163.509163.2700.239右8163.529163.2900.239右16163.505163.2550.250K21+860左16163.599163.3450.254左8163.612163.3650.256右8163.562163.3250.237右16163.568163.3250.243K21+900左16163.612163.3710.241左8163.600163.3610.239右8163.575163.3360.239右16163.621163.3710.2505、經(jīng)試驗(yàn)人員現(xiàn)場(chǎng)檢測(cè),填料的含水量為12.8%(最佳含水量為10.9%),滿足要求。2臺(tái)振6、檢查松鋪層的松鋪厚度以及含水量符合要求后,開始用2臺(tái)振動(dòng)壓路機(jī)進(jìn)行組合碾壓,碾壓時(shí)遵循先輕后重、先慢后快的原則沿著與動(dòng)壓路機(jī)進(jìn)行組合碾壓,碾壓時(shí)遵循先輕后重、先慢后快的原則沿著與路基中線平行的方向往返碾壓,先碾壓路基外側(cè),最后碾壓路基內(nèi)側(cè)。碾壓方式采取第一遍靜壓,第二遍輕振,第三至第八遍高頻重振,最后一遍靜壓。7、壓實(shí)過程中,從第四遍開始每碾壓一遍檢測(cè)一次控制點(diǎn)的壓實(shí)度,檢測(cè)結(jié)果如下表:壓實(shí)度檢測(cè)記錄表(%)樁號(hào)第四遍樁號(hào)第五遍樁號(hào)第六遍K21+80993.4K21+80594.0K21+80695.1K21+81594.5K21+81595.1K21+81596.2K21+82293.4K21+82095.6K21+82595.1K21+83595.1K21+82594.5K21+84095.1K21+84593.4K21+83094.0K21+85594.5K21+85094.0K21+83794.5K21+86094.5K21+85693.4K21+84095.1K21+86594.0K21+86994.5K21+85594.0K21+87095.6K21+87594.0K21+87593.4K21+87595.1K21+89594.5K21+89595.1K21+88596.2平均值94.0平均值94.5平均值95.1

樁號(hào)第七遍樁號(hào)第八遍K21+80597.3K21+80597.3K21+81596.7K21+81596.7K21+82096.7K21+82098.4K21+82595.6K21+82596.2K21+83097.3K21+83298.4K21+83595.1K21+85097.8K21+84596.2K21+85596.2K21+85597.3K21+86597.8K21+87597.8K21+87597.3K21+88595.6K21+89596.2平均值96.6平均值97.2壓實(shí)度檢測(cè)記錄表(%)8、碾壓第四遍、第五遍、第八遍后相應(yīng)的表面高程詳見下表。

表一:碾壓第四遍后高程樁號(hào)□□□□□□m)□□□□□(m)填前高程(m)口實(shí)厚度(cm)K21+820左16163.423163.21520.8左8163.400163.19520.5右8163.429163.21321.6右16163.372163.16520.7K21+840左16163.475163.27020.5左8163.475163.27020.5右8163.508163.29021.8右16163.461163.25520.6K21+860左16163.546163.34520.1左8163.571163.36520.6右8163.528163.32520.3右16163.537163.32521.2K21+900左16163.574163.37120.3左8163.570163.36120.9右8163.550163.33621.4右16163.579163.37120.8

表二:碾壓第五遍后高程樁號(hào)□□□□□□m)□□□□□(m)填前高程(m)口實(shí)厚度(cm)K21+820左16163.420163.21520.5左8163.396163.19520.1右8163.427163.21321.4右16163.370163.16520.5K21+840左16163.473163.27020.3左8163.471163.27020.1右8163.506163.29021.6右16163.459163.25520.4K21+860左16163.545163.34520.0左8163.569163.36520.4右8163.525163.32520.0右16163.525163.32520.0K21+900左16163.571163.37120.0左8163.565163.36120.4右8163.548163.33621.2右16163.577163.37120.6

表三:碾壓第八遍后高程樁號(hào)□□□□□□m)□□□□□(m)填前高程(m)口實(shí)厚度(cm)K21+820[16163.417163.21520.2[8163.390163.19519.5[8163.424163.21321.1[16163.366163.16520.1K21+840[16163.470163.27020.0[8163.465163.27019.5[8163.502163.29021.2[16163.457163.25520.2K21+860[16163.543163.34519.8[8163.567163.36520.2[8163.523163.32519.8[16163.523163.32519.8K21+900[16163.569163.37119.8[8163.560163.36119.9[8163.546163.33621.0[16163.574163.40120.3五、結(jié)果及分析結(jié)論1)、在第四遍碾壓完成后十個(gè)檢測(cè)點(diǎn)的壓實(shí)度平均達(dá)到93%以上,94%以上,第七遍碾壓完成后十個(gè)檢測(cè)點(diǎn)的壓實(shí)度平均達(dá)到94%以上,第七遍碾壓完成后十個(gè)檢測(cè)點(diǎn)的壓實(shí)度平均達(dá)到96%以上,為增強(qiáng)壓實(shí)效果,在達(dá)第五遍碾壓完成后十個(gè)檢測(cè)點(diǎn)的壓實(shí)度平均達(dá)到1)1)、虛鋪厚度應(yīng)控制在93區(qū)土方的平均壓實(shí)厚度為1.20。94區(qū)土方的平均壓實(shí)厚度為1.22。96區(qū)土方的平均壓實(shí)厚度為1.24。2)、此類土最佳含水量為水量以上1~2%的范圍內(nèi)。3、采用的施工機(jī)械組合到要求的基礎(chǔ)上多振壓一遍,最后一遍靜壓,碾壓完畢。2、試驗(yàn)段技術(shù)數(shù)據(jù)總結(jié)25cm以內(nèi)20.8cm,最終試驗(yàn)得到松口系數(shù)為20.5cm,最終試驗(yàn)得到松口系數(shù)為20.2cm,最終試驗(yàn)得到松口系數(shù)為11.5%,施工中現(xiàn)場(chǎng)含水量控制在最佳含根據(jù)試驗(yàn)段結(jié)果,用自卸車上土之后,先用推土機(jī)粗平,再用平地機(jī)精平后,然后用振動(dòng)壓路機(jī)先靜壓一遍,再輕振一遍,然后高頻重振。碾壓采用“先輕后重,先慢后快,先外側(cè)后內(nèi)側(cè)”的原則,其填土壓實(shí)度滿足規(guī)范要求。為保證路基表面整體外觀及碾壓效果,最后增加一遍靜壓收面。4、粘土填筑大面積施工注意事項(xiàng):1)、為保證路基填筑質(zhì)量,施工過程中注意對(duì)含水量的控制(控制在最佳含水量以上1-2個(gè)百分點(diǎn)),當(dāng)含水量過大時(shí),采用旋耕耙進(jìn)行翻曬,當(dāng)含水量過小時(shí),用灑水車灑水濕潤(rùn)并用旋耕耙攪拌均勻;

2)、碾壓時(shí)應(yīng)保證重疊碾壓2)、碾壓時(shí)應(yīng)保證重疊碾壓1/2輪寬,保證無(wú)漏壓無(wú)死角,確保碾壓均勻;3)、施工過程中,必須做好臨時(shí)排水措施,防止受到雨水沖刷。后附:路基土方試驗(yàn)段成果報(bào)告圖試驗(yàn)段壓實(shí)度試驗(yàn)記錄高程測(cè)

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論