




版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領
文檔簡介
SafetyAnalysisontheStructureofanExistingMetroStationImpacted
bytheConstructionofanAdjacentBuilding
LihengMaa,QinghuaiLiangb,LiuYifancandHeMingrand
BeijingJiaotongUniversity,Beijing,China
amaliheng1984@,bqhliang@,c
liuyifan@
,
dhemingran@
Keywords:metrostation;adjacentconstruction;foundationexcavation;safetyassessment.
Abstract.Structuraldeformationsoftheexistingmetrostationcausedbyadjacentbuildingconstructionshouldbecontrolledstrictlysoastokeepthenormaloperationoftheexistingmetrostationandguaranteethesafetyofthestationstructure.BasedonafoundationpitexcavationandbuildingprojectwhichisadjacenttoanexistingmetrostationinBeijing,a3Dfiniteelementmodeloffoundationpit,metrostationandsurroundingsoilisestablished.Then,thestructuraldeformationsofthemainbodystructure(railarea),thepassagewayandthefirefightingpassagewayindifferentconstructionstagesareobtained.Thecontrolvaluesofthestationstructuredeformationduringbuildingconstructionprocessareproposedaccordingtothecalculationresults.
Introduction
Withthelarge-scaledevelopmentandutilizationofurbanundergroundspaceandtherapidconstructionofurbanrailtransitfacilities,moreandmorehousingprojectsareconstructednearbytheexistingmetrostation.Foundationpitexcavationandnewhousingloadcanaffectthesurroundingsoils,causingstressredistribution,breakingtheinitialequilibriumstateandleadingtodeformationofthestation[1].Inordertoensurethesafetyoftheexistingstation[2],itisnecessarytoassessthestructuralsafety,andchoosethedeformationcontrolvaluesbeforetheconstructionbegins.What’smore,thestructuraldeformationofstationmustbecontrolledstrictlyduringthewholeprocessofconstruction.Manyscholarshadstudiedonthisproblem,andgotsomebeneficialresults[3-6].
Basedonafoundationpitexcavationandbuildingconstructionproject,whichisadjacenttoaexistingmetrostationinBeijing,a3-Dfiniteelementmodelisestablishedinthispaper.Throughmodelingthewholeprocessofconstruction,thedeformationsofmulti-partsofstationstructuralatdifferentconstructionstagesaregotten,andthedeformationcontrolvaluesareproposed,whichisimportanttoensurethesafetyoftheproject.
EngineeringSituation
JIAOMENXIundergroundstationofBeijingmetroline4islocatedatthecrossroadsoftheMAJIAPUXIroadandtheSHILIUZHUANGroad.Thestationrunsnorth-south,andisdouble-layeredandthree-spanned.Thelongitudinalspanofthestation’smainbodyis193.4m,thealtitudeofthestation’sbottomplateis23.5mwhichisabout6mbelowtheground.ThematerialforprimarystationsupportisC20earlystrengthshotcrete;thesecondaryliningmaterialisC35waterproofconcrete,ofwhichtheimpermeabilitygradeisS10;thematerialofcolumnsandjointareaisC50concrete;thebackfillingplainconcreteofstationbottomplateisC15.
Theplanningbuildingisnearbythesoutheastpassageway,three-layerframestructure,oneundergroundlayerandtwoabove-groundlayers.Theplanningfoundationpitis34.5mlong,17.5mwide,and5mdeep.Bothretainingwallsandcantileverpilesforfoundationpitsupportingareneededintheexcavationoperationfortherestrictionofthesurroundingroads,buildingsandarea.Thecantileverpiles,whicharemadeofC25concrete,and0.6mindiameter,8.0minlength,5.0minanchoragelength,1.0minpilespacing,isboredpile.AsshowninFig.1,thereare84cantileverpilesintotal,whicharedistributedaroundthefoundationpit.Theretainingwallsarebrickwallof2.0mhighand240mmthick.Thesectionsizeofconstructionalcolumnsofretainingwallis240mmX240mm,andthecolumnspacingis3.0m.Thewholeconstructionprocesscanbedividedintothreemainsteps:foundationpitexcavationfretainingpileandretainingwallconstructionfnewbuildingconstruction.
Asthehorizontaldistancefromexcavationfoundationpittosoutheastfirefightingpassagewayisonly6.8m,andthefoundationpitlocatesintheprotectedareaoftheurbanrailtrafficaccordingtorelevantregulations,safetyassessmentoftheconstructionprojectisneeded.ThespecificlocationoftheexcavationpitisshowninFig.2.
ScopeofAssessment
The“UrbanRailTransitOperationManagementMethod[7]mentioned“thefollowingareasshouldbesetastheurbanrailtransitprotectedareas:(a)within50mawayfromundergroundstationsandtunnels;(b)within30mawayfromgroundandelevatedstations,aswellasrailwayline;(c)within10mawayfrompassageways,ventilationshaftandotheraccessorystructureofstation."Accordingtotheaboveregulations,theassessmentscopeofthisprojectincludesexcavationpit,thesoutheastpassagewayandfirefightingpassagewayofthemetrostation,andthesouthpartofthestation.Thesizeoftheassessmentareais82mx95.75m,whichisshowninFig.2.Thenorthpartofthestationandtheotheraccessorystructuresarefarawayfromtheexcavationpit,andareseparatedbydeformationjointsbetweenthesestructureswhicharerelativelyindependent,hence,theassessmentmodeldoesnotcontainthesestructures.
ModelandCalculationParameters
HypothesisofModel.Thefollowingassumptionsaredemandedinfiniteelementmodelingcalculation:
Thesurfaceandallthesoilbelowarelayersdistributed,horizontalandhomogeneous.
Thesoilgravityisreckonedinthecalculationofinitialgroundstress;thetectonicstressofsoilisignored.
TheconstitutivemodelofsitesoilisDrucker-Pragermodel.
Soilparametersofthemodelusethemeasuredvaluesofgeologicsurveyreport.
ThematerialstrengthofJIAOMENXIstationreachesthedesigningstrength,andthematerialstrengthdoesn’treduce.
Thematerialofstationstructureiselastic-plasticmaterial.Allthepartsofstationstructureandthesoillayersconformtotheprincipleofdeformationcompatibility.
CalculationParameters.Accordingtothegeologicalsurveyreport,theterrainofconstructionsiteisflat.Groundsurfaceisartificialaccumulationlayerof2.20mto2.80minthickness,themaincomponentsofwhichisclayeysiltandsandysilt.Recentlydepositedlayerisbelowtheartificialaccumulationlayer,whichcontainssandysilt,clayeysilt,finesandandgravel.Undertherecentlydepositedlayerisquaternarysedimentlayerofgravel.ThemeasuredsoilparametersofthegeologicalsurveyreportareshowninTable1.
Groundwaterwasn’tfoundbythedrillingdepthof20.0maccordingtothegeologicalsurveyreport.AccordingtothehydrogeologydataofBeijing,theburieddepthofgroundwaterisabout25mbelowthegroundintherecent3?5years.Becausetheburieddepthofgroundwaterisdeeperthanthedepthofexcavationpit,sotheinfluenceofgroundwaterisn’tconsidereinthisconstructionproject
FiniteElementModel.ANSYSsoftwareandthree-dimensionalfiniteelementmethodareusedinnumericalsimulationandmodeling.Boundaryconditionsofthestructuremodelstrictlyaccordwiththerequirementsofthetunnelmechanics.Thesurroundingsoilandstructurecaninteractwitheachother.TheSOLID45elementisusedtosimulatethestructureofthemainbody,passageway,firefightingpassageway,surroundingsoil,retainingpileandretainingwall;thegroundsurfaceofthewholemodelisfreeboundary,andtheotherfiveboundariesarenormalconstraint.Thesizeofthewholemodelis82mx95.75mx17m,asshowninFig.3.Fig.4showsthemodelofexcavationpitandthestationstructure,Fig.5showsthemodelofretainingpileandwall.
CalculationResultsandAnalysis
CalculationResultsofInitialSelf-weightStressField.Inordertosimulatetheundisturbedsoilofwhichsettlementhasbeencompletedastheinitialstateofexcavationsimulation,initialself-weightstressfieldneedtobeconstructedinfiniteelementmodelingcalculation.Thecalculationresultsofinitialself-weightstressfieldareshowninfigure6andfigure7.Themaximumsettlementofthewholemodelis7.29mm,whichincludesthefoundationpit,metrostationandsurroundingsoil.Thedistributionofsettlementishorizontal,alongthedirectionofsoillayer.Thesettlementdecreaseswiththedepth.Themaximumsettlementpositionisnearground.
InfluenceofFoundationPitExcavation.Afterthefoundationpitexcavation,thedeformationamplitudesofeachpartofthemodelareshowninTable2,andthedisplacementcontourplotsofthemaximumdeformationdirectionofeachpartarelistedinTable3.
Table2andTable3showthatthemaximumdeformationofthewholemodelisvertical,whichappearsonthesurroundingsoiloffoundationpit,andtheamplitudeis3.9mm.Themaximumdeformationofthemainbodyofstation(railarea)islateral,whichappearsonthejointpositionthatconnectedtofirefightingpassageway,andtheamplitudeis0.04mm.Themaximumdeformationofthepassagewayislateral,whichappearsonthepositionthatclosetothegroundandonthesideoffoundationpit,theamplitudeis0.37mm.Themaximumdeformationofthefirefightingpassagewayisvertical,whichappearsontheperipheralpositionandthepositionthatnearthefoundationpit,theamplitudeis0.23mm.Apparently,theinfluencesofexcavationtothepassagewayandfirefightingpassagewayislargerthantothemainbody,theinfluencetomainbody(railarea)isverysmall.
InfluenceofRetainingPileandRetainingWall.Aftertheretainingpileandretainingwallconstructioncomplete,thedeformationamplitudeandthedisplacementcontourplotsofthemaximumdeformationdirectionofeachmodelpartareshowninTable4andTable5.Itisknownthatthemaximumdeformationofthewholemodelislateral,whichappearsonthesurroundingsoilofretainingwall,andtheamplitudeis3.11mm.Themaximumdeformationofthemainbodyofstation(railarea)islateral,whichappearsontheperipheralpositionandthejointpositionthatconnectedtofirefightingpassageway,theamplitudeis0.04mm.Themaximumdeformationofthepassagewayislateral,whichappearsonthepositionthatclosetothegroundandonthesidenearthefoundationpit,theamplitudeis0.62mm.Themaximumdeformationofthefirefightingpassagewayislateral,whichappearsonperipheralpositionthatnearthefoundationpit,theamplitudeis0.17mm.Whenretainingpileandretainingwallconstructioncomplete,thedeformationofthepassagewayandthefirefightingpassagewayislargerthanthemainbody.Thedeformationofthemainbody(railarea)isverysmall,stillremainsat0.04mm.
TheTable6andTable7showthatthemaximumdeformationofthewholemodelisvertical,whichappearsonthesurroundingsoilofthenewbuilding,andtheamplitudeis4.29mm.
Themaximumdeformationofthemainbody(railarea)isvertical,whichappearsontheperipheralpositionandthepositionthatconnectedtofirefightingpassageway,theamplitudeis0.009mm.Themaximumdeformationofthepassagewayislateral,whichappearsonthepositionthatclosetothegroundandonthesidenearthenewbuilding,theamplitudeis0.87mm.Themaximumdeformationofthefirefightingpassagewayisvertical,whichappearsonperipheralpositionandthepositionthatnearthenewbuilding,theamplitudeis0.14mm.
Apparently,theinfluenceofbuildingloadtothepassagewayandthefirefightingpassagewayislargerthantothemainbody.Thedeformationamplitudeofmainbody(railarea)isverysmallwithonly0.009mm.
SuggestionsonDeformationControlValues
Thedeformationcontrolvaluesofstationisproposedbasedonthecalculationresultsabove,theengineeringexperienceandfieldmonitoringdataofothersimilarprojects,andtheneedofsafetymargin.Thealarmvaluesare80%ofcontrolvalues,andtheprecautionvaluesare70%ofcontrolvalues,whichareshowninTable8.
Conclusions
Duringthewholeprocessofconstruction,themaximumdeformationofstationmainbody(railarea)is0.04mm.Themaximumdeformationappearsonthepositionthatconnectedtofirefightingpassageway,whichhasacertaindistanceawayfromtherail.Atthesametime,thedeformationamplitudeofthestationmainbody(railarea)isverysmallandthesafetymarginisenough,sothethirdpartymonitoringforstationmainbodyisnotnecessary.
Themaximumdeformationofthepassagewayis0.87mm,whichisthemaximumdeformationofthewholestationstructure.Thepassagewayisclosetothefoundationpit,sothethirdpartymonitoringforstationmainbodyissuggestediftheconditionspermit.
Themaximumdeformationofthefirefightingpassagewayis0.23mm,whichisthecloseststructuretothefoundationpit,sothethirdpartymonitoringforstationmainbodyissuggestediftheconditionspermit.
Thedeformationcontrolvaluesofstationareproposedasfollows:0.05mmformainbody;0.9mmforaccesschannel;0.9mmforfirefightingpassageway.Thealarmvaluesare80%ofcontrolvalues,andtheprecautionvaluesare70%ofcontrolvalues.
Whenthedeformationamplitudereachestheprecautionvalues,w
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- T/ZHCA 604-2023消毒產(chǎn)品中激素含量的測定液相色譜-串聯(lián)質(zhì)譜法
- 2025西北工業(yè)大學輔導員考試試題及答案
- 2025遼寧職業(yè)學院輔導員考試試題及答案
- 2025貴州水利水電職業(yè)技術學院輔導員考試試題及答案
- 2025貴陽信息科技學院輔導員考試試題及答案
- 2025牡丹江師范學院輔導員考試試題及答案
- 2025白城師范學院輔導員考試試題及答案
- 食堂食品衛(wèi)生管理
- 新疆水發(fā)準水建設開發(fā)有限公司招聘筆試題庫2025
- T/YWEISA 001-2022裝配式不銹鋼水處理構筑物安裝技術規(guī)程
- 2025年電信工程師考試卷及答案
- 英語系學生學習總結模版
- 2024年蘇州科技大學輔導員考試真題
- 湖南省煙草專賣局(公司)筆試試題2024
- 2025-2030年中國聚四氟乙烯(PTFE)行業(yè)市場現(xiàn)狀供需分析及投資評估規(guī)劃分析研究報告
- 2024年玉門市市屬事業(yè)單位考試真題
- 2025云南中考:語文必考知識點
- 2025小米SU7事件高速爆燃事故輿情復盤
- 玻璃體積血試題及答案
- 會議系統(tǒng)維保服務方案投標文件(技術方案)
- 遼寧點石聯(lián)考2025屆高三5月份聯(lián)合考試-政治試卷+答案
評論
0/150
提交評論