版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
ICS27.100
F23
Recordnumber:36421-2012
ElectricPowerIndustryStandardofthe
People’sRepublicofChina
DL/T251—2012
MaintenanceCodefor±800kVDCOverheadTransmissionLine
±800kV直流架空輸電線路檢修規(guī)程
(EnglishTranslation)
Issuedate:2012-04-06Implementationdate:2012-07-01
IssuedbyNationalEnergyAdministration
Foreword
DL/TC12isinchargeofthisEnglishtranslation.IncaseofanydoubtaboutthecontentsofEnglishtranslation,
theChineseoriginalshallbeconsideredauthoritative.
ThisstandardwasproposedbyChinaElectricityCouncil.
ThisstandardwaspreparedbytheTechnicalCommitteeforStandardizationofHVDCTransmissionTechnology
inthePowerIndustry(DL/TC12).
PleasesendanyopinionsorsuggestionsputforwardduringtheexecutionofthisstandardtotheStandardization
ManagementCenterofChinaElectricityCouncil(No.1,Lane2,BaiguangRoad,Beijing,100761).
TranslationunitofEnglishversionofthisstandard:StateGridInternationalDevelopmentCo.,Ltd.
Maintranslatorsandeditorsofthisstandard:SunXiaolong,LiQiongjiu,GuoXuejian.
I
MaintenanceCodefor±800kVDCOverheadTransmission
Line
1Scope
1.1
Thiscodespecifiesthemaintenanceitems,content,andcycle,etc.of±800kVDCoverheadtransmissionlines.
1.2
Thiscodeisapplicableto±800kVDCoverheadtransmissionlines,auxiliarygroundingpolesandlines.
2NormativeReferences
Thefollowingreferenceddocumentsareindispensablefortheapplicationofthisdocument.Fordatedreferences,
onlytheeditioncitedapplies.Forundatedreferences,thelatesteditionofthereferenceddocument(includingany
amendments)applies.
GBJ50233Codeforconstructionandacceptanceof110~500kVoverheadtransmissionline
DL409Safetycodeofelectricpowerindustry(powerlines)
DL/T436Technicalguidelinesforhighvoltagedirectcurrentoverheadtransmissionlines
DL/T437Technicalguidelinesforhighvoltagedirectcurrentgroundingpoles
DL/T627Roomtemperaturevulcanizedsiliconrubberanti-pollutionflashovercoatingforinsulators
DL/T683Nomenclatureforfittingsmodel
DL/T741Operationregulationsforoverheadtransmissionlines
DL/T763Technicalrequirementsforpre-twistedfittingsforoverheadlines
DL/T881Technicalguideforliveworkingin±500kVDCtransmissionline
DL/T1069Guidelinesforrepairinggroundwiresofoverheadtransmissionlines
DL/T5092Technicalspecificationfordesignof110~500kVoverheadtransmissionline
DL/T5235Codeforconstructionandacceptanceof±800kVandunderDCoverheadtransmissionline
SDJ226Specificationforhydraulicconstructionprocessofoverheadtransmissionlineconductorand
lightningconductorprotectionline
3BasicRequirements
3.1
Theproductionmanagementdepartmentaswellastheoperationmaintenanceandoverhauldepartmentmust
strengthenthemanagementofequipmentoverhaul,earnestlycarryouttheoverhaulofequipment,andkeepthe
powertransmissionequipmentinasoundstate.
3.2
Equipmentmaintenanceinvolvesboth“inspectionandrepair”.Maintenanceshalladheretotheprinciplethat“the
equipmentwhichshallberepairedmustberepairedsufficiently”,analyze,concludeandsummarizetheequipment
defectsandallkindsofabnormalitiesfoundbyinspection,detectionandonlinemonitoringdevices.
3.3
Equipmentmaintenanceshalladoptliveworkingasfaraspossibletoreducetheequipmentmaintenanceoutage.
4
3.4
ThemaintenanceoperationmustbecarriedoutinaccordancewiththeprovisionsofDL409,andtheorganizational,
technicalandsafetymeasuresshallbeimplementedsufficiently.Theworkticketsystem,workpermitsystem,work
interruptionsystem,workguardianshipsystem,workterminationandpowerrecoverysystemshallbeexecutedina
strictmanner.
3.5
Equipmentmaintenanceshallactivelyapplyadvancedmaterials,processes,methodsandmaintenancetoolsand
instruments,andstrivetoimprovethequalityofmaintenance,shortenthemaintenanceperiod,ensurethesafetyof
maintenance,soastoprolongtheservicelifeofequipmentandimprovethesafeoperationlevel.
3.6
Themaintenancetoolsandinstrumentsmustbequalifiedproductsandusedwithinthevalidityperiodofinspection.
Theuse,storage,inspectionandtestofthetoolsandinstrumentsshallcomplywiththerequirementsofDL409.
3.7
Afterequipmentmaintenanceandemergencyrepair,ifthemodel,quantityandothertechnicalparametersofthe
equipmentarechanged,thetechnicalfilesofthecorrespondingequipmentshallbechangedintime.Itstechnical
datamanagementshallconformtothecorrespondingprovisionsinDL/T741.
3.8
Forpreventionandmaintenanceofspecialsections(specialsectionreferstothebig-spanlinesandthoselocatedin
heavily-pollutedarea,heavy-icearea,thunderstorm-pronearea,flooderosionarea,unfavorablegeologicalarea,
miningsubsidencearea,theft-pronearea,wire-gallopingarea,areavulnerabletoexternalforcedamage,
micro-climatearea,bird-strikearea,areaspanningwoodsorbamboogrove,anddenselypopulatedareas,etc.),
correspondingmeasuresshallbetakenintermsofmaintenancematerials,toolsandtechnologyaccordingtothe
characteristicsofthesectionwherethelineislocated.
3.9
Theoperationandmaintenancedepartmentshalldeterminetheplannedmaintenanceitemsaccordingtothephysical
statusoflineequipment,inspection,anddetectionresults,maintenancecycleandDL/T436requirements,andmake
quarterlyandmonthlymaintenanceplansaccordingtotheannualmaintenanceplanissuedbythesuperior,
conscientiouslymakepreparationsformaintenance,andstrictlyimplementthemaintenanceaccordingtotheplan.
3.10
Themaintenanceoftheequipmentshallbeconductedinaccordancewithstandardizedmanagementregulations
completewithmaintenanceitem,andtheoperationinstructionsthatconformtotheactualsituationandare
practicallyoperableshallbeprepared,studiedandobservedbythemaintenancepersonnelcarefully.
3.11
Thecomplexmaintenanceitemsshallbeinvestigatedbyworkticketsignerandresponsiblepersononsiteaccording
tothemaintenancecontent.Theon-siteinvestigationshallinspecttheequipmentcondition,operationenvironment,
dangerpoint,hazardsourceandcrossingsituationofthemaintenancesite,etc.,whichshallbedocumentedwell.
3.12
Forlarge,complexanddifficultmaintenanceitems,themaintenanceplanshallbepreparedandapprovedbythe
competentleader.
3.13
5
Personnelengagedinmaintenanceoperationsmustbehealthyphysicallyandmentally,toensurethemaintenance
itemcanbecompletedinasafeandsmoothmanner.
3.14
Priortomaintenanceonthepower-cutline,verifywhetherthelineislive.Afterconfirmingthepowerofthelineis
cut,thededicatedgroundwireof±800kVDCoverheadlineshallbeconnectedtothetowersatbothendsofthe
workingsection.Forworkingonaninsulatedoverheadgroundwire,thepersonalsecurityropesmustbehungto
preventinductiveelectricitybeforeworking.
3.15
Duringtheinterruptionmaintenance,theworkshouldbestoppedincaseofsevereweathersuchasthunder,rainor
galegreaterthanLevel5.
3.16
Forgroundpotentialworkonlivetowers,operatorsmustwearqualifiedelectrostaticprotectiveclothing(orscreen
clothes)ofthecorrespondingvoltagelevel.Forequipotentialworkonlivewire,theoperatormustwearqualified
screenclothesofcorrespondingvoltagegrade.
3.17
LiveworkshallbecarriedoutingoodweatherinaccordancewithDL409,DL/T881.Stopworkingincaseof
lightningorairhumiditygreaterthan70%.IntheeventgalegreaterthanLevel4,liveworkingshouldbestopped
too.
3.18
Attheendofrelevantmaintenanceitems,qualityinspectionmustbecarriedoutaccordingtotheprovisionsofDL/T
5235,andtheoperationcannotberesumeduntilitpassestheinspection.
4GroundWire(includingOPGW)
4.1GeneralRequirements
4.1.1
Groundwiresofdifferentmaterials,specificationsandtwisteddirectionsarestrictlyprohibitedtobeconnectedin
onetensioningsection.
4.1.2
Allkindsofgroundwireshallberepairedwithdifferentrepairmaterialsaccordingtothedegreeofdamage.Forthe
repairmethodandprocess,refertoDL/T1069.Allkindsofgroundwireshallmeettherelevantrequirementsof
electricalandmechanicalcharacteristicsafterrepair.
4.1.3
Ifthedamageofsingle-strandaluminumandaluminumalloywirereaches1/2ormoreofdiameter,itshallbe
regardedasbrokenstrand.
4.1.4
Nomorethanoneslicingsleeveandtworepairsleevesshallbeinstalledoneachgroundwirewithinonepitchafter
thegroundwireisrepaired.Thefollowingrequirementsshallbemetwhentensionisreleasedandgroundwireis
repaired:
4.1.4.1
Thedistancebetweenslicingsleeveorrepairsleeveandtensionwireclampshallnotbelessthan15m;
6
4.1.4.2
Thedistancebetweentheslicingsleeveorrepairsleeveandthesuspensionclampshallnotbelessthan5m;
4.1.4.3
Thedistancebetweenslicingsleeveorrepairsleeveandspacershallnotbelessthan0.5m;
4.1.4.4
Thedistancebetweenslicingsleeveandrepairsleeveshallnotbelessthan15m.
4.1.5
Toreplacethegroundwireoradjustsag,thestressshallbecalculated,andthetoolsandequipmentshallbecorrectly
selectedaccordingtothemodelofthegroundwireandthetractiontension.Aftersagadjustment,thegroundwire
shallmeettherequirementsofDL/T5235.
4.2Maintenanceitemofgroundwire(includingOPGW)
4.2.1Openthewireclampforinspection
4.2.1.1
Intheeventoflightningdamage,pollutionflashover,icecoveringofgroundwireandgallopingofgroundwireon
theline,thegroundwireclamp(suspensionclamp,spacer,etc.)intheabnormalsectionshallbeinspected
particularlyintime.
4.2.1.2
Whenthelinerunsunderheavyloadforalongtime,thewireclampshallbeopenedforspotcheckaccordingtothe
monitoringresults.
4.2.1.3
Thewireclampshallbeopenedforinspection(keyforspotcheck)every5years.Incaseofhugeheightdifference
orload,thewireclampshallbeopenedforinspection(keyforspotcheck)accordingtotheoperationcondition.
4.2.2Polishing
Iftheouteraluminumstrandofthewirehasslightabrasion,andthedamagedepthatthesameplaceislessthan1/4
ofthediameterofthesinglestrand,andthedamageofthecross-sectionalareaisnotgreaterthan2%ofthe
cross-sectionalareaoftheconductivepart,repairisnotrequired,andonlytheedgesandburrsofthedamagedpart
arepolishedwith0#sandpaper.
4.2.3Monofilamentwindingtreatment
4.2.3.1Incaseofthefollowingcircumstancesthatthedamageofthebrokenstrandofthegroundwirehas
reducedthecross-sectionalarea,singlewirewindingtreatmentshallbecarriedout.
a)Thedamagedcross-sectionalareaofaluminumstrandofaluminumcablesteelreinforcedisnotgreaterthan7%
ofthetotalcross-sectionalareaofaluminumstrand;thedamagedcross-sectionalareaofaluminumalloystrandsof
aluminumalloyconductorsteelreinforcedisnotgreaterthan7%ofthetotalcross-sectionalareaofaluminumalloy
strands;
b)Thedamagedcross-sectionalareaofaluminumstrandedwireandaluminumalloystrandedwireisnotgreater
than7%ofthetotalcross-sectionalarea;
c)1of19strandsofgalvanizedsteelstrandisbroken.
4.2.3.2Thetreatmentmethodofmonofilamentwindingisasfollows:
a)Smooththedamagedstrand;
b)Thewindingmaterialofthegroundwireshallbeadaptedtothematerialoftherepairedgroundwire,tightly
7
wound,andfullycoverthedamagedpart.Thelengthofonesidefromtheedgeofthedamagedpartshallnotbeless
than50mm.
4.2.4Repairpre-twistedwireorrepairsleevetreatment
4.2.4.1Inthefollowingcasesthatthecross-sectionalareaofgroundwireisreducedduetobrokenstrand,repair
pre-twistedwireorrepairsleeve.
a)Thedamagedcross-sectionalareaofaluminumstrandofaluminumcablesteelreinforcedis7%-25%ofthetotal
cross-sectionalareaofaluminumstrand,andthatofaluminumcablesteelreinforcedis7%-25%ofthetotal
cross-sectionalareaofaluminumstrand;
b)Thedamagedcross-sectionalareaofaluminumstrandedwireandaluminumalloystrandedwireis7%-17%of
thetotalcross-sectionalarea;
c)1of7strands,or2of19strandsofgalvanizedsteelwirearebroken.
4.2.4.2Externalprocessingmethodofrepairingpre-twistedwireisasfollows:
a)Handleandsmoothandpolishthedamagedstrand;
b)Thelengthofpre-twistedwireshallnotbelessthan3pitchesandconformtotheprovisionsofDL/T763:
c)Thepre-twistedwireshallbeinclosecontactwiththewire,itscentershallbelocatedatthemostserious
damage,andthedamagedpartshallbecompletelycovered.
4.2.4.3Repairsleevetreatmentmethodisasfollows:
a)Restorethedamagedstrandtotheoriginaltwistedstate
b)Therepairsleeveshallcoverthedamagedpartcompletely,itscentershallbelocatedatthemostserious
damagedpart,andbothendsshallexceedtheedgeofthedamagedpartbymorethan20mm;
c)Therepairsleeveshallbeconstructedbyhydraulicpressure,anditsoperationshallcomplywiththe
provisionsofSDJ226.
4.2.5Treatmentofelongatedrepairsleeves
4.2.5.1Inthefollowingcircumstancesthatthecross-sectionalareaofgroundwireisreducedduetobroken
stranddamage,elongatedrepairsleevesshallbeprocessed.
a)Thedamagedcross-sectionalareaofaluminumstrandofaluminumcablesteelreinforcedis25%~60%ofthe
totalcross-sectionalareaofaluminumstrand;thedamagedcross-sectionalareaofthealuminumalloystrandsofthe
steelcorealuminumalloystrandis25%~60%ofthetotalcross-sectionalareaofthealuminumalloystrands;
b)Thedamagedcross-sectionalareaofaluminumstrandedwireandaluminumalloystrandedwireis17%~25%of
thetotalcross-sectionalarea.
c)2of7strandsor3of19strandsofgalvanizedsteelstrandarebroken.
4.2.5.2Thetreatmentmethodofelongatedrepairsleeveisasfollows:
a)Restorethestrandatthedamagedparttotheoriginaltwistedstate;
b)TherepairprocessshallcomplywithrelevantprovisionsofDL/T1069.
4.2.6Cutoffandreconnect
4.2.6.1Inthefollowingcasesthatthegroundwirestrandsarebroken,itmustbecutoffandre-connected.
a)Thedamagedcross-sectionalareaofaluminumstrandofaluminumcablesteelreinforcedisgreaterthan60%or
moreofthetotalcross-sectionalareaofaluminumstrand;Thedamagedcross-sectionalareaofthealuminumalloy
strandsofaluminumalloyconductorsteelreinforcedisgreaterthan60%ormoreofthetotalcross-sectionalareaof
thealuminumalloystrands;
8
b)1ormorestrandsofthesteelcoreofaluminumcablesteelreinforcedisbroken;1ormorestrandsofsteelcore
ofthealuminumalloyconductorsteelreinforcedisbroken;.
c)3of7strandsor4of19strandsofgalvanizedsteelwirearebroken.
d)Thefittingdamageandbrokenstrandscausepermanentdeformationofsteelcoreorinneraluminumstrands
thatcannotberepaired.
4.2.6.2Cut-offandreconnectingcanbehandledasfollows:
a)Beforeusingtheslicingsleeveforrepair,thehydraulicequipmentandmaterialsshallbecarefullychecked,and
theirspecificationsshallbeconsistentwiththegroundwiretoberepaired;
b)Forcut-offandreconnectingthegroundwire,thesteelcorecanbeconnectedbymeansofbuttjointorlapjoint.
Clean-up,drawing-inwire,hydraulicoperationandqualityinspectionoftheslicingsleeveandthegroundwireshall
becarriedoutinstrictaccordancewiththeprovisionsofSDJ226.
5Tower
5.1Generalrequirements
5.1.1Theperformanceofpartsandcomponentsofthetowerreplacedoraddedshallnotbelowerthanthe
designvalues.
5.1.2ThetighteningtorqueofboltsshallconformtotheprovisionsofDL/T5235.
5.1.3Theanti-unloadingandanti-looseningmeasurestakenforthemaintainedtowersshallnotbelowerthan
theoriginaldesignstandards.
5.2Towermaintenanceitem
5.2.1Theanti-corrosionconstructionoftowersshallbecarriedoutinstrictaccordancewiththetechnological
proceduresof“rustremovalprimerfinish”.
5.2.2Anti-dismantlingandanti-looseningtreatmentrequirementsfortowers:Forallboltsbelow8mofthe
towerandallboltsbelowthecrossarmofthetowerinareaswheretheftoccursfrequently,takeanti-theftmeasures;
forotherbolts,takeanti-looseningmeasures.Theinstallationofanti-unloadingandanti-looseningboltsshallmeet
therequirementsofDL/T5092.
5.2.3Addandreplacetowercomponents.
5.2.3.1Toaddtowercomponents,theholespacingandholelayoutofmissingcomponentsshallbemeasuredon
site.Forthespecificationsoftowercomponents,refertothedesigndrawings.Boltsofcorrespondingspecifications
andmodelsshallbeaddedaccordingtotherequirementsofthedrawingsafterprocessing.Thecomponentsto
replaceshallnotbeuseduntilgalvanized.
5.2.3.2Boltsofnewlyreplacedoraddedtowerpartsshallbetightenedtothespecifiedtorque.
5.2.3.3Thetowercomponentswithdeformationgreaterthanthespecifiedlimitcanbecorrectedbymeansofcold
correction.
6Foundation
6.1Generalrequirements
Afterthefoundationisrenovatedorrepaired,thestandardshallnotbelowerthantheoriginaldesignvalues.
6.2Foundationmaintenance
6.2.1Thefoundationwithcementfallingoff,crackandtheexposedsteelbarsshallberepaired,andthe
9
foundationseriouslyscouredbyfloodshallbereinforced.
6.2.2Beforereformingthefoundation,mixtestshallbeconductedaccordingtotheconcretestrengthspecified
inthedesign,andthetestresultsshallnotbeappliedforconstructionuntiltheymeetthespecifiedrequirements.For
reformingthefoundation,chlorinesaltisstrictlyprohibitedtomixintoconcrete,anddifferenttypesofcementare
strictlyprohibitedtomixinthesamefoundation.
7Insulator
7.1Generalrequirements
7.1.1Toreplaceasingleinsulatororawholestringofinsulators,dedicatedtoolsshallbeused.
7.1.2Theinsulationresistanceofanewinsulatorshallbegreaterthan500MΩ.
7.1.3Thesaltdensityofinsulatorsshallbemeasuredonaregularbasistoguidethelineantifouling.
7.1.4ThedeviationofinsulatoralignmentdirectionofstraightlinepoleshallbehandledaccordingtoDL/T
5235.
7.2Insulatormaintenanceitems
7.2.1Check
7.2.1.1Checkwhetherthelockingpinsfallofforcorroded,andwhethertheironcapandsteelfeetareinclined,
cracked,deformedorcorroded.
7.2.1.2Checkwhetherthereisanytraceofflashover,crack,burnordamageonporcelainorglassinsulators.
7.2.1.3Theinspectioncontentsofcompositeinsulatorsareasfollows:
a)Checkthecorrosiondegreeoftheendaccessoriesandtheslipandgapofthejoints;
b)Checkwhethertherearedegumming,cracksandslippagearisingineachjoint;
c)Checkwhetherthesurfaceofshediscracked,pulverized,crackedandthecrackdepthisgreaterthan0.1mm;
d)Checkwhetherthematerialsofshedandsheathbecomehardandbrittle,andabletowithstand90°upanddown
bendingfor3timesrespectivelywithoutbreaking;
e)Checkwhethertheshedandsheathmaterialshaveleakageandcorrosiontraces,whethertheaccumulatedlength
isgreaterthan10%ofthecreepagedistanceoftheinsulatorandwhetherthecorrosiondepthisgreaterthan30%of
thethicknessofthematerialattheinvolvedposition;
f)Checkwhetherthehydrophobicityoftheshedandsheathmaterialsdecreases,andtheserioushydrophobicity
decreaseismanifestedbycontinuouswaterfilmonthesurfaceoftheshedandsheath.
7.2.2Cleanupporcelainandglassinsulators
7.2.2.1Porcelainandglassinsulatorsaregenerallycleanedintwoways:power-offcleaningandlivecleaning.
7.2.2.2Thepower-offcleaningofporcelainandglassinsulatorsshallbecarriedoutpiecebypiece.Theinsulators
seriouslyfouledcanbewipedandcleanedbyspecialcleaningagent.
7.2.2.3Theinsulatorsontowerswhicharedifficulttocleancanbedismantledandcleanedupontheground.
7.2.3Sprayinganti-pollutionflashovercoating
7.2.3.1InsulatorsinheavilycontaminatedareascanbepaintedwithRTVanti-pollutionflashovercoatingsto
preventlinefailureincurredbypollutionflashover.
7.2.3.2ThepaintedRTVanti-pollutionflashovercoatingshallbeuniformlyattachedtothesurfaceofthe
insulator,andthecoatingthicknessshallmeettherequirementsofDL/T627.Thecoatingthicknessshallbe0.2mm
~0.3mmforClassIandIIpollutionareas,0.4mm~0.5mmforClassIIIandIVpollutionareasandseveresand
10
areas,whichcanbecompletedbytwoormultipletimesofpainting.
7.2.3.3InsulatorsmustbecleanedbeforeapplyingRTVanti-pollutionflashovercoating,andthecoatingshallbe
preventedfromsprayingontotheironcapduringspraying.
7.2.3.4RTVanti-pollutionflashovercoatingshallberecoatedafteritexpires.Beforerecoating,thesurfaceof
RTVanti-pollutionflashovercoatingmustbecleaned.
7.2.4Replacement
7.2.4.1Thereplacementofasingleinsulatororawholestringofinsulatorscanbeconductedindifferent
operationmodes.Theselectedtoolsandinstrumentsmustbesafeandreliable,andprotectivemeasuresshallbe
takentopreventthegroundwirefromfallingoff.
7.2.4.2Thenewinsulatorsshallbeintact,thesurfaceoftheshedshallbeclean,andtheinsulationresistance
valueshallbegreaterthan500MΩ.
7.2.4.3Theironcap,insulatorandsteelpinoftheinsulatorstringshallbeonthesameaxis,withthecompleteand
intactlockingpins,andtheopeningdirectionconsistentwiththeoriginalline.
7.2.4.4Forreplacingcompositeinsulators,softropesshallbeusedforlifting.Tramplingandsqueezingthe
surfaceofcompositeinsulators’shedsarestrictlyprohibited.Theinstallationofgradingringsforcomposite
insulatorsmustmeettherequirements.
8Fittings
8.1Generalrequirements
8.1.1Thereplacedfittingsshallmeettheoriginaldesignrequirements,beofthesamemodel,conformto
provisionsinDL/T683,andgetreliablyconnected.
8.1.2Whenreplacingtheconnectingfittingsofthegroundwire,takeprotectivemeasurestopreventtheground
wirefromfallingoff.
8.1.3Duringlinemaintenance,burrorprotrusiononthesurfaceofthefittingsshallbepreventedandthe
galvanizinglayershallnotbedamaged.
8.2Maintenanceitemsoffittings
8.2.1Check
8.2.1.1Checkwhetherthefittingsoftheoverheadgroundwirearecorroded,worn,cracked,loosened,
non-weldedordeformed,whetherthejointsrotateflexibly;whethertheboltsandpinsofeachpartareloose,falling
offandwornout.
8.2.1.2Checkwhetherthedischargeclearanceoftheinsulatedoverheadgroundwirechanges,andthe
installationdistancedeviationshallnotbegreaterthan±2mm.
8.2.1.3Alongtheinsulatorstring,checktheconnectionofwirefittingsandinsulatorsonebyonetoseeifthereis
anyimproperconnection,lackofpin,andwhetherthepartsaredamaged,corroded,worn,crackedordeformed,etc.
8.2.1.4Checkwhetherthevibrationdamperoftheconductorisloose.Ifso,checkwhetherthegroundwireis
worn.
8.2.1.5Thecontactsurfaceofthealuminumdrainageboardshallbeflatandsmooth,andconductivegreaseshall
becoatedbetweenthecontactsurfaces;Checkthedrainageplate(thread)forburnsandbrokenstrands;Check
whetherthetensionhydraulicclampboltsareloose,orspringgasketispressedflat.
8.2.1.6Itisnecessarytoopenandinspectthegroundwireclampinsectionscoveredwithice,gallopingand
11
pollutionflashoverorinsectionswithalongoperatinglife.Checkalongthelinewhetherthewireandspacerare
damaged,burned,orbrokenbyvibration,andwhethertheboltsofspacerarelooseorclawsaremissing.
8.2.2Replacement
8.2.2.1Afterreplacementofballheadhangingring,socketclevisandspringpin,checkandconfirmwhethertheir
interactionisreliableandintact.
8.2.2.2Themaintainedsuspensioninsulatorstringshallbeverticaltotheground.Underspecialcircumstances,
themaximumoffsetvaluealongthelineisnotgreaterthan300mm.Theoffsetvalueofthecontinuousup-hilland
down-hillsuspensionclampshallmeetthedesignrequirements.
8.2.2.3Thediameteroftheclosingpinshallmatchtheaperturewithmoderateelasticity.Thethreadingdirection
ofbolts,piercingpinsandspringpinsofallkindsoffittingsshallmeettherequirementsofGBJ50233.
8.2.2.4Forvarioustypesofaluminumstrandedwires,whicharetightenedwithwireclampfittingsmadeof
differentmaterials,thesurfaceofaluminumstrandsshallbewoundbyaluminumarmourtape.
9GroundingDevice
9.1Generalrequirements
9.1.1Beforethemodificationofgroundingdevice,themodificationplanshallbedeterminedbasedongeology,
topographyandoperatingexperience,etc.
9.1.2Thegroundingresistancemeasuredafternaturalsettlementofbackfillsoilshallprevailaftermodification
ofthegroundingdevice.
9.1.3Thetopoftheverticalgroundingconductorshallbeatleast0.6mawayfromtheground,andtheparallel
distancebetweentwohorizontalgroundingconductorsshallnotbelessthan5m.
9.1.4Thegroundingconductorsshallbeweldedforconnection,andtheweldingsizeshallmeetrelevant
requirements.Anti-corrosionmeasuresshallbetakenattheweldjoints.
9.2Maintenanc
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五年度美團(tuán)團(tuán)購服務(wù)合同范本升級版8篇
- 二零二五年度高空作業(yè)腳手架租賃與施工總承包合同3篇
- 2025版協(xié)議離婚特殊規(guī)定及婚姻財產(chǎn)分割與子女撫養(yǎng)合同3篇
- 2025版臨時工特殊工種作業(yè)安全協(xié)議書4篇
- 2025年度酒店式公寓房間長期租賃服務(wù)協(xié)議3篇
- 2025年度個人企業(yè)全額承包經(jīng)營合作協(xié)議范本4篇
- 2025年度新能源電池殼體模具開發(fā)與加工服務(wù)協(xié)議4篇
- 2025年度文化創(chuàng)意園區(qū)場地租賃安全管理與文化創(chuàng)新合同4篇
- 水電消防工程2025年度施工及進(jìn)度管理合同2篇
- 2025新生入學(xué)教育法律協(xié)議書(定制版)2篇
- GB/T 16895.3-2024低壓電氣裝置第5-54部分:電氣設(shè)備的選擇和安裝接地配置和保護(hù)導(dǎo)體
- GJB9001C質(zhì)量管理體系要求-培訓(xùn)專題培訓(xùn)課件
- 二手車車主寄售協(xié)議書范文范本
- 窗簾采購?fù)稑?biāo)方案(技術(shù)方案)
- 基于學(xué)習(xí)任務(wù)群的小學(xué)語文單元整體教學(xué)設(shè)計(jì)策略的探究
- 人教版高中物理必修一同步課時作業(yè)(全冊)
- 食堂油鍋起火演練方案及流程
- 《呼吸衰竭的治療》
- 2024年度醫(yī)患溝通課件
- 2024年中考政治總復(fù)習(xí)初中道德與法治知識點(diǎn)總結(jié)(重點(diǎn)標(biāo)記版)
- 2024年手術(shù)室的應(yīng)急預(yù)案
評論
0/150
提交評論