版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
ICS27.100
F24
RecordNo.42617-2014
DL
StandardsforElectricPowerIndustryofthePeople’s
RepublicofChina
DL/T1257-2013
Drum-Screen
ReleasedonNovember28,2013ImplementedonApril1,2014
ReleasedbyNationalEnergyAdministration
DL/T1257-2013
II
DL/T1257-2013
Drum-Screen
1.Scope
Thestandardhasstipulatedtheclassification,technicalrequirement,inspectionmethods,and
inspectionrules,etc.fordrum-screens.
Thestandardappliestothedesign,manufacturingandacceptanceofdrum-screensthat
removesuspendedsolidsfromwaterbyrotatingscreen.
2.NormativeReferencesNormativecitationdocuments(缺“文件”一詞
的翻譯)
Thefollowingdocumentsareindispensabletothestandard.Foralldatedreferences,the
versionswithonlythedatespecifiedapplytothestandard.Forallundatedreferences,thelatest
version(includingallmodificationlists)appliestothestandard.
GB/T9439GreyIronCastings
GB/T11352CarbonSteelCastingsforGeneralEngineeringPurpose
GB/T13384GeneralSpecificationsforPackingofMechanicalandElectricalProduct
GB50205CodeforAcceptanceofConstructionQualityofSteelStructures
JB/T4385.1GeneralSpecificationsforOpenDieForgingsonHammer
JB/T8098MethodsofMeasuringandEvaluatingNoiseofPumps
3.BasicRequirementforProductClassification
3.1Classification
Drum-screenshallbeclassifiedbasedonthedesignandmethodofwaterintake,whichshall
beasfollows:
a)Lightdesignlightdesigncategory(缺“類別”一詞的翻譯):theextreme
designwaterleveldifferencebetweentheinsideandoutsideofdrum-screenshallnotbemorethan
1.0m.
b)Mediumdesign:theextremedesignwaterleveldifferencebetweentheinsideandoutside
ofdrum-screenshallnotbemorethan1.5m.
c)Heavydesign:theextremedesignwaterleveldifferencebetweentheinsideandoutsideof
drum-screenshallnotbemorethan2.0m.
d)Singlesidedwaterintake:watershallflowintothedrum-screenfromonesideofit.
e)Doublesidedwaterintake:watershallflowintothedrum-screenfrombothsidesofit.
f)Waterintakefrominsidethescreen:watershallflowinfrominsidethedrum-screenand
flowoutwardafterbeingfilteredthroughmeshes.
g)Waterintakefromoutsidethescreen:watershallflowinfromoutsidethedrum-screenand
flowinwardafterbeingfilteredthroughmeshes.
3.2ModelLabeling
SeeFig.1forthemodellabelingandconnotationofdrum-screen.
1
DL/T1257-2013
ScreenNominalDiameter(m)xNominalWidth(m)
Single(Double)SidedWaterIntakeorDischarge
WaterIntakefromInside(Outside)
Initialletterof“screen”inChinesePinyin
Initialletterof“drum”inChinesePinyin
Fig.1Drum-ScreenModelLabeling
3.3StructuralForm
SeeFig.2fortheschematicdiagramofstructuralformofdrum-screen(GWNSmodelas
example).
1—Rinsingsystem;2—Maintenanceplatform;3—Actuator;4—Lubricatingsystem;5—Drum
skeleton;6—Mainshaftassembly;7—Sealingdevice;8—Cathodicproductionprotection
system;9—Controldevice
Fig.2SchematicDiagramofStructuralFormofGWNSDrum-Screen
3.4BasicParameters
2
DL/T1257-2013
a)Diameter:therangeofdiameterofthecircleoutsidetheframeworkofdrum-screenis
2200mm-2800mm.
b)Width:therangeofwidthofwaterchamberofdrum-screenis800mm-7000mm.
c)Meshdiameter:thedimensionsofmesharedeterminedbasedonthesizeofsmallest
contaminanttobefilteredbythedrum-screen,andtherangeincludes0.5mmx0.5mm,1mmx
1mm,2mmx2mm,3mmx3mm,4mmx4mm,6.43mmx6.43mm,φ3mm,φ4.2mm,φ5mm,
φ6mmandφ8mm.
d)Differenceofwaterlevelbetweeninsideandoutsidethescreen(Δh).
Lowspeed:Δhshallbelessthan100mm;
Mediumspeed:Δhshallbelessthan200mmbutnotlessthan100mm;
Highspeed:Δhshallnotbemorethan200mm;
Alarm:Δhshallnotbelessthan300mm.
e)Linearspeedofscreenboard.
1)Doublespeeddrum-screen:
Lowspeed:5m/min(errorbeing±20%);
Highspeed:15m/min(errorbeing±20%).
2)Triplespeeddrum-screen:
Lowspeed:2.5m/min(errorbeing±20%)
Mediumspeed:10m/min(errorbeing±20%)
Highspeed:20m/min(errorbeing±20%)
f)Maximumallowableflowvelocitythroughthescreenis0.6m/s.
g)Rinsinghydraulicpressure:0.17MPa-0.3MPa.
Note:theparametersarerecommendedbasicparameters.Asfornon-standarddesign,user
requirementshallprevail.
4.TechnicalRequirement
4.1Thedrum-screenshallmeetthestandardandbemanufacturedaccordingtothedrawingsand
technicaldocumentsbyestablishedprocedures.
4.2TheironcastingsshallcomplywithGB/T9439.
4.3ThesteelcastingsshallcomplywithGB/T11352.
4.4TheforgingsshallcomplywithJB/T4385.1.
4.5TheweldmentsshallcomplywithGB50205.
4.6Theantisepticpainttreatmentonthedrum-screenshallcomplywiththeprovisionsonsteel
structurepaintinginGB50205.
4.7Partsofthesamespecificationshallbetotallyinterchangeable.
4.8Auto-controlofthedrum-screenisrealizedviathewaterleveldifference.Theregulardesignis
doublespeedortriplespeed:ingeneral,whenthewaterleveldifferenceislessthan100mm,it
runsinlowspeed;whenthewaterleveldifferenceisnotlessthan100mmbutlessthan200mm,it
runsinlowormediumspeed;whenthewaterleveldifferenceisnotlessthan200mm,itrunsin
highspeed;whenthewaterleveldifferencereaches300mm,thealarmgoesoff.
4.9Drum-screenwithadiameterofmorethan3mshallbedetachable.
4.10Materialsusedinseawaterorpoorwaterqualityenvironmentshallbeproperlychosenbased
onthechlorideionconcentration.Whendrum-screenmadeofcarbonsteelisused,antiseptic
3
DL/T1257-2013
paintingshallbemadeandcathodicprotectiontechnologywillbeadopted.
4.11Thedesignclassificationoflight,mediumandheavyandsafetyparametersofthemainbody
aredeterminedbasedonuser’swaterquality,workingsystemandotherrequirements.
4.12Therangeofbackwashwatervolumeforthedrum-screenisdeterminedas22m3/h~245m3/h
andtherangeofhydraulicpressure0.17MPa~0.3MPabasedonuser’swaterquality,working
systemandotherrequirements.
4.13Themotorprotectionclass,insulationclassandotherrequirementsaredeterminedbasedon
whethertheuserequipmentislaidoutindoorsoroutdoors.
4.14Alloilandwaterpipesshallbewashedcleanandkeptunblockedwithoutleakage.
4.15Thetransmissionsshallbeabletorotateflexiblyandconvenientlywithoutjammingafter
assembly.
4.16Thelengthofparalleldeviationbetweenthecenterlineofmainshaftandthehorizontalplane
shallnotbemorethan0.1mmevery1000mmafterthedrum-screenisinstalled.
4.17Thetoothcrestrunoutofbiggearringshallnotbemorethan1/4ofgearmoduleafterthe
drum-screenisinstalled.
4.18Therunoutonbothend-facesofthedrum-screenshallnotbemorethan0.0005D(D
representsthenominaldiameterofthedrum-screen).
4.19Rawmaterials,purchasedpartsandoutsourcedpartsshallbeaccompaniedbythequality
certificatesfromthemanufacturer.Asforimportedparts,certificateoforiginandinspectionreport
arealsorequired.
4.20Therunningnoiseofthedrum-screen(includingthemotor)shallnotbehigherthan85dB
(A).
5.InspectionMethods
5.1TheironcastingsshallbeinspectedaccordingtoGB/T9439.
5.2ThesteelcastingsshallbeinspectedaccordingtoGB/T11352.
5.3TheforgingsshallbeinspectedaccordingtoJB/T4385.
5.4TheweldmentsshallbeinspectedaccordingtoGB50205.
5.5Theantisepticpaintingtreatmentofdrum-screenshallbeinspectedaccordingtoGB50205.
5.6ThewaterlevelrecorderinArticle4.8ofthestandardshallbeinspectedaccordingtorelevant
standardsofthemanufacturer.
5.7Articles4.16,4.17and4.18ofthestandardhadbetterbeinspectedbytheregularmethodsfor
universalmeasuringinstruments.
5.8Thedrum-screenshallbeassembledandgothroughverticalno-loadtestbeforeleavingfactory.
Thetransmissionsystemshallcomplywiththestandard.Theradialrunoutshallbemeasured
accordingtoArticle4.17ofthestandard.TheaxialrunoutshallbemeasuredaccordingtoArticle
4.18ofthestandard.
5.9ThepurchasedpartsandoutsourcedpartsinArticle4.19ofthestandardincludingautomatic
backwashfilterandwasherpumpshallbeinspectedaccordingtorelevantstandardsofthe
manufacturer.
5.10Themainshaftsealofthedrum-screenshallgothroughtightnesstestinthefactoryandthe
leakageshallnotbemorethan0.2L/day.
5.11Therunningnoiseofthedrum-screen(includingthemotor)shallbemeasuredaccordingto
JB/T8098.
5
DL/T1257-2013
6.InspectionRules
6.1EachproductshallpasstheinspectionconductedbytheQCdepartmentofthemanufacturing
plantandbeaccompaniedbyproductqualitycertificatebeforeleavingfactory.
6.2Productsshallbeassembledinthemanufacturingplantbeforeleavingfactory.Meanwhile,one
productshallbepickedfromeachbatchforverticalno-loadtest.
6.3Productinanyofthefollowingsituationsshallgothroughtypetest:
a)Trialproduction,typeapprovalandidentificationofnewproduct;
b)Majorimprovementofstructure,processandmaterial;
c)Thequalitysupervisionauthoritymakesarequest.
7.Labeling,PackagingandTransportation
7.1Onerustproofnameplateshallbefixatedonnotablelocationofeachdrum-screen,atleast
includingthefollowingcontent:
a)Productnameandmodel;
b)Drum-screendiameterandwidth;
c)Completemachinequality;
d)Screenboardvelocity;
e)Ex-factorynumber;
f)Dateofmanufacture;
g)Nameofmanufacturingplant.
7.2TheproductpackageshallcomplywithGB/T13384.
7.3Accompanyingtechnicaldocumentsinclude:
a)Productqualitycertificate;
b)Packinglist;
c)Generaldrawing;
d)Basicdrawing;
e)Installationdrawing;
f)Installationandoperationmanual.
4
1
2
5
7
-
2
D
0
L
1
/
3
T
People’sRepublicofChina
StandardsforElectricPowerIndustry
Drum-Screen
DL/T1257-2013
*
PublishedandReleasedbyChinaElectricPowerPress
(100005,19BeijingStationWestStreet,DongchengDistrict,Beijinghttp://www.cepp.sgcc.
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025版駕校學(xué)員個(gè)性化培訓(xùn)合同2篇
- 二零二五年度二手房買賣合同范本(含稅費(fèi)結(jié)算)3篇
- 成都職業(yè)技術(shù)學(xué)院《GlobalBusinessEnvir(外)》2023-2024學(xué)年第一學(xué)期期末試卷
- 成都藝術(shù)職業(yè)大學(xué)《油氣儲(chǔ)層保護(hù)技術(shù)》2023-2024學(xué)年第一學(xué)期期末試卷
- 二零二五年度二人合伙文化演出合作協(xié)議范本2篇
- 2024消防中控室值班信息共享與保密合同
- 2024年度紙張銷售合同范本:原紙采購與加工合作協(xié)議3篇
- 二零二五年度二人合伙醫(yī)療健康投資合作協(xié)議2篇
- 2025版酒店特色食材采購與質(zhì)量控制合同協(xié)議3篇
- 2025年能源企業(yè)股權(quán)部分轉(zhuǎn)讓與綠色發(fā)展合同3篇
- GIS組合電器概述
- 水廠分布式光伏項(xiàng)目(設(shè)備采購)實(shí)施組織方案及售后服務(wù)方案
- 污水處理廠技術(shù)副廠長競聘報(bào)告
- 2021年機(jī)務(wù)檢修試題庫
- 一年級學(xué)生英語學(xué)科評語
- 來料檢驗(yàn)員工作總結(jié)
- 工商企業(yè)管理專業(yè)教學(xué)資源庫申報(bào)書-專業(yè)教學(xué)資源庫備選項(xiàng)目材料
- 急診科副主任個(gè)人工作述職報(bào)告
- 硬件工程師年終總結(jié)報(bào)告
- 音樂盛典策劃方案
- 學(xué)校新媒體管理制度規(guī)章
評論
0/150
提交評論