




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認(rèn)領(lǐng)
文檔簡介
1、變電站外文翻譯外文文獻英文文獻變電站的綜合概述附錄英文翻譯A comprehensive overview of substationsAlong with the economic development and the modern industry developments of quick rising, the design of the power supply system become more and more completely and system. Because the quickly increase electricity of factories, it al
2、so increases seriously to the dependable index of the economic condition, power supply in quantity. Therefore they need the higher and more perfect request to the power supply. Whether Design reasonable, not only affect directly the base investment and circulate the expenses with have the metal depl
3、etion in colour metal, but also will reflect the dependable in power supply and the safe in many facts. In a word, it is close with the economic performance and the safety of the people. The substation is an importance part of the electric power system, it is consisted of the electric appliances equ
4、ipments and the Transmission and the Distribution. It obtains the electric power from the electric power system, through its function of transformation and assign, transport and safety. Then transport the power to every place with safe, dependable, and economical.As an important part of power s tran
5、sport and control, the transformer substation must change the mode of the traditional design and control, then can adapt to the modern electric power system, the development of modern industry and the of trend of the society life.Electric power industry is one of the foundations of national industry
6、 and national economic development to industry, it is a coal, oil, natural gas, hydropower, nuclear power, wind power and other energy conversion into electrical energy of the secondary energy industry, it for the other departments of the national economy fast and stable development of the provision
7、 of adequate power, and its level of development is a reflection of the countrys economic development an important indicator of the level. As the power in the industry and the importance of the national economy, electricity transmission and distribution of electric energy used in these areas is an i
8、ndispensable component.。Therefore, power transmission and distribution is critical. Substation is to enable superior power plant power plants or power after adjustments to the lower load of books is an important part of power transmission. Operation of its functions, the capacity of a direct impact
9、on the size of the lower load power, thereby affecting the industrial production and power consumption.Substation0變電站外文翻譯外文文獻英文文獻變電站的綜合概述system if a link failure, the system will protect the part of action. May result in power outages and so on, to the production and living a great disadvantage. The
10、refore, the substation in the electric power system for the protection of electricity reliability, sensitivity and other indicators.Power plants and substations are connected user link in the middle, transformation and distribution of electric energy to play the role. According to the different task
11、s substation can be divided into step-up transformer step-down transformer substation and two broad categories. Step-up substation built on the general power plant, the general step-down transformer near the load center built on the low.Voltage can also be divided according to medium voltage substat
12、ion (60 kV and below), high-voltage substations (110 220 kV), EHV Substation (330 765 kV) and Ultra High Voltage Substation (1000 kV and above). In electric power system according to their status as a hub substation can be divided into the middle substation substations and terminals. This requires a
13、 substation part of economic rationality, the second part of safe and reliable, the only way to the normal operation of substation work services for the national economy. There are step-up transformer step-down transformer substation and two broad categories.Substations have been equipped with vario
14、us protection devices, these devices are based on lower short-circuit load to a maximum load conditions, such as configuration settings and, therefore, in the event of the failure was similar to the specific circumstances under to judge by the system should automatically trip protection, and now the
15、 protection of the whole trip has been a very short time, the lifting of the fault, the system will automatically reclosing devices and the gateway to restore power quickly. This is to protect the lower the load is very favorable. This will not only protect the safety of the load equipment is in fav
16、or of extending the service life and reduce equipment investment, and improved reliability of electricity supply, which is to improve the efficiency of industrial and agricultural production is very effective.Substations have been equipped with various protection devices, these devices are based on
17、lower short-circuit load to a maximum load conditions, such as configuration settings and, therefore, in the event of the failure was similar to the specific circumstances under to judge by the system should automatically trip protection, and now the protection of the whole trip has been a very shor
18、t time, the lifting of the fault, the system will automatically reclosing devices and the gateway to restore power quickly. This is to protect the lower the load is very favorable. This will not only protect the safety of the load equipment is in favor of extending the service life and reduce equipm
19、ent investment, and improved reliability1變電站外文翻譯外文文獻英文文獻變電站的綜合概述of electricity supply, which is to improve the efficiency of industrial and agricultural production is very effective.Increase in the efficiency of industrial products means lower product costs, increase market competitiveness, which wi
20、ll enable enterprises to increase for the national economy and make a greater contribution to development.Electricity supply reliabilityand other fields, can improve peoples quality of life,improve their living conditions.Analyse change to give or get an electric shock a mission for carrying and cus
21、tomers carries etc. circumstance, choose the address, make good use of customerdata proceed then carry calculation, ascertain the correct equipment of the customer. At the same time following the choice of every kind of transformer, then make sure theline method of the transformer substation, then c
22、alculate the short-circuit electriccurrent, choosing to send together with the electric wire method and the style of the wire, then proceeding the calculation of short-circuit electric current. This first step of design included:(1) ascertain the total project (2) load analysis(3) the calculation of
23、 the short-circuit electric current (4) the design of an electric shock the system design to connect with system and the choice of line project (5) the choice and the settle of the protective facility (6) the contents to defend the thunder and protection of connect the earth. Along with the high and
24、 quick development of electric power technique, electricpower system then can change from the generate of the electricity to the supply thepower.Design the task this time is aim at intensity of mastering of every subjectknowledge of this speciality reflecting, and of test this speciality, s study re
25、sanalyze the tend of load department according to all parameter of load about system and circuit on task book. It expounds the necessity to this situation from the rspect of increasing load. Then through to the generalization of planning to build the transformer substation and the analysis of the lo
26、ad materials, safe, economy and dependability are considered, has confirmed the mainly wiring form of 10kV. Calculated and supplied power in the range and confirmed TV stations number of the main voltage transformer through load finally, capacity and type, capacity and type of using the voltage tran
27、sformer stand surely at the same time, finally, the result of calculation of calculating that and short out according to the electric current of largest lasting job, make the circuit to protect, the voltage transformer is protected, the bus bar is protected, prevent the thunder from protecting.This
28、graduation project take the 10kV transformer substation as the main design object, this 10kV transformer substation is the local important transformer substation, is2變電站外文翻譯外文文獻英文文獻變電站的綜合概述the electrical power system 10kV voltage rank important part. This transformer substation is equipped with 2 ma
29、in transformers, in the station the host wiring divides into 10kV,and 0.4 kV two voltages ranks.This design first chapter is an introduction, mainly elaborated the transformer substation in electrical power system status. Designs the transformer substation the principle and the goal as well as the t
30、ransformer substation basic situation. Second chapter is shoulders the computation and the transformer choice, carries on the load computation according to the known transformer substation load material to the transformer substation. Through the load which obtains had determined the host changes the
31、 capacity and a number, the host change the pattern, the winding wiring way, the accent press the way and the host changes the impedance. Third chapter is the transformer substation electricity host wiring design, separately through to 10kV side electricity host wiring drawing up, chooses the stable
32、st reliable wiring way. Fourth chapter is the short class computation, first determined short-circuits the spot, calculates various parts reactance, then to respectively short-circuits separately to carry on the computation, obtains respectively short-circuits the short-circuit current. Fifth chapte
33、r is the electrical equipment choice, the electrical equipment including the generatrix, the circuit breaker, the isolator, the electric current and the voltage transformer, the fuse. Sixth chapter is the power distribution equipment, mainly carries on the design to the transformer substation power
34、distribution equipment. Seventh chapter is anti-radar with the earth, this chapter has carried on the choice to the arrester, as well as has determined the earth way. Through to the 10kV transformer substation design, causes me has to the electrical engineering and its the automated specialized bran
35、ch curriculum to be comprehensive, system grasping, strengthened apply theory to reality the ability, raised the project consciousness, exercised me independently to analyze and the solution electric power project design question ability.key words substation ,load ,transmission system , distribution
36、 high voltage network ,correction equipment.3變電站外文翻譯外文文獻英文文獻變電站的綜合概述變電站的綜合概述隨著經(jīng)濟的發(fā)展和現(xiàn)代工業(yè)建設(shè)的迅速崛起,供電系統(tǒng)的設(shè)計越來越全面、系統(tǒng),工廠用電量迅速增長,對電能質(zhì)量、技術(shù)經(jīng)濟狀況、供電的可靠性指標(biāo)也日益提高,因此對供電設(shè)計也有了更高、更完善的要求。設(shè)計是否合理,不僅直接影響基建投資、運行費用和有色金屬的消耗量,也會反映在供電的可靠性和安全生產(chǎn)方面,它和企業(yè)的經(jīng)濟效益、設(shè)備人身安全密切相關(guān)。電力工業(yè)是國民經(jīng)濟的一項基礎(chǔ)工業(yè)和國民經(jīng)濟發(fā)展的先行工業(yè),它是一種將煤、石油、天然氣、水能、核能、風(fēng)能等一次能源轉(zhuǎn)換成
37、電能這個二次能源的工業(yè),它為國民經(jīng)濟的其他各部門快速、穩(wěn)定發(fā)展提供足夠的動力,其發(fā)展水平是反映國家經(jīng)濟發(fā)展水平的重要標(biāo)志。由于電能在工業(yè)及國民經(jīng)濟的重要性,電能的輸送和分配是電能應(yīng)用于這些領(lǐng)域不可缺少的組成部分。所以輸送和分配電能是十分重要的一環(huán)。變電所是使電廠或上級電站經(jīng)過調(diào)整后的電能書送給下級負(fù)荷,是電能輸送的重要部分。其功能運行情況、容量大小直接影響下級負(fù)荷的供電,進而影響工業(yè)生產(chǎn)及生活用電。若變電所系統(tǒng)中某一環(huán)節(jié)發(fā)生故障,系統(tǒng)保護環(huán)節(jié)將動作??赡茉斐赏k姷仁鹿?,給生產(chǎn)生活帶來很大不利。因此,變電所在整個電力系統(tǒng)中對于保護供電的可靠性、靈敏性等指標(biāo)十分重要。變電所是聯(lián)系發(fā)電廠和用戶的中間
38、環(huán)節(jié),起著變換和分配電能的作用。根據(jù)變電所任務(wù)的不同,可將變電所分為升壓變電所和降壓變電所兩大類。升壓變電所一般建在發(fā)電廠,降壓變電所一般建立在靠近負(fù)荷中心的低點。根據(jù)電壓等級還可分為中壓變電所 (60 千伏及以下)、高壓變電所( 110220 千伏)、超高壓變電所( 330765 千伏)和 特高壓變電所( 1000 千伏及以上)。按其在電力系統(tǒng)中的地位可分為樞紐變電所、中間變電所和終端變電所。這就要求變電所的一次部分經(jīng)濟合理,二次部分安全可靠,只有這樣變電所才能正常的運行工作,為國民經(jīng)濟服務(wù)。變電所有升壓變電所和降壓變電所兩大類。升壓變電所通常是發(fā)電廠升壓站部分,緊靠發(fā)電廠。降壓變電所通常遠
39、離發(fā)電廠而靠近負(fù)荷中心。下面的所設(shè)計得就是 10KV降壓變電所。變電所的主要設(shè)備有電力變壓器, 母線和開關(guān)設(shè)備等。變電所內(nèi)都裝設(shè)有各種保護裝置,這些保護裝置是根據(jù)下級負(fù)荷地短路、最大負(fù)荷等情況來整定配置的,因此,在發(fā)生類似故障是可根據(jù)具體情況由系統(tǒng)自動做出判斷應(yīng)跳閘保護,并且,現(xiàn)在的跳閘保護整定時間已經(jīng)很短,在故障解除后,系統(tǒng)內(nèi)的自動重合閘裝置會迅速和閘恢復(fù)供電。這對于保護下級各負(fù)荷是十分有利的。這樣不僅保護了各負(fù)荷設(shè)備的安全利于延長是使用壽命,降低設(shè)備投資,而且提高了供電的可靠性,這對于提高工農(nóng)業(yè)生產(chǎn)效率是十分有效的。工業(yè)產(chǎn)品的效率提高也就意味著產(chǎn)品成本的降低,市場競爭力增大,進而可以使企業(yè)效益提高,為國民經(jīng)濟的發(fā)展做出更大的貢獻。 生活用電等領(lǐng)域的供電可靠性,可以提高人民生活質(zhì)量,改善生活條件等。4變電站外文翻譯外文文獻英文文獻變電站的綜合概述變電所是電力系統(tǒng)的一個重要組成部分,由電器設(shè)備及配電網(wǎng)絡(luò)按一定的接線方式所構(gòu)成, 他從電力系統(tǒng)取得電能,通過其變換、分配、輸送與保護等
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 東南大學(xué)成賢學(xué)院《古代文學(xué)》2023-2024學(xué)年第一學(xué)期期末試卷
- 技能就業(yè)政策培訓(xùn)課件
- 達州中醫(yī)藥職業(yè)學(xué)院《馬克思主義哲學(xué)經(jīng)典著作選讀》2023-2024學(xué)年第一學(xué)期期末試卷
- 課件制作培訓(xùn)講義教案
- 第五單元復(fù)習(xí)課件-2023-2024學(xué)年九年級語文上冊同步課堂統(tǒng)編版
- 文言專題整-理10篇(一)
- 第五單元 二戰(zhàn)后的世界變化 單元復(fù)習(xí)課件
- 刑法自學(xué)考試試題及答案
- 采茶廠茶葉篩分粒徑標(biāo)準(zhǔn)控制制度
- 農(nóng)民技術(shù)培訓(xùn)與農(nóng)村社區(qū)發(fā)展考核試卷
- 中醫(yī)醫(yī)院中醫(yī)師帶徒協(xié)議模板范文
- 專業(yè)技術(shù)人員職務(wù)聘任書
- GB 29415-2013耐火電纜槽盒
- 創(chuàng)業(yè)板答題標(biāo)準(zhǔn)20題答案
- 《密碼法》培訓(xùn)只是講座PPT課件(帶內(nèi)容)
- 如何解讀血常規(guī)報告
- 區(qū)域消防安全風(fēng)險評估規(guī)程DB50-T 1114-2021
- 站用電400V系統(tǒng)定期切換試驗方案
- 初中數(shù)學(xué)北師大八年級下冊(2023年修訂) 因式分解岷陽王冬雪提公因式法教學(xué)設(shè)計
- 免疫調(diào)節(jié)治療在腦卒中的運用課件
- 金屬非金屬礦山安全規(guī)程
評論
0/150
提交評論