1、 工程造價(jià)英語(yǔ)文獻(xiàn)翻譯 作者: 日期: 2 Abstract Project cost management is the basic contents to determine reasonable and effective control of the project cost. Described the current stage of the project cost management situation on the strengthening of the various stages of construction cost management of the impor
2、tance of and raised a number of key initiatives. Keywords:cost of the construction project cost management status investment decision phase of the design phase of the implementation phase of the cost management in a market economy. Even under the WTO and Chinas accession to the world community, Chin
3、as construction industry how to effectively control construction cost of the construction and management of an important component part. However, the current budget for the construction projects - estimate, budget, Super budget accounts for the super three is still widespread and that eventually led
4、 to a serious loss of control of project investment. Project cost management is the basic contents to determine reasonable and effective control of the project cost. As the project cost to the project runs through the entire process, stage by stage can be divided into Investment Decision stage, the
5、design and implementation phases. The so-called Project Cost effective control is the optimization of the construction plans and design programs on the basis of in the building process at all stages, use of certain methods and measures to reduce the cost of the projects have a reasonable control on
6、the scope and cost of the approved limits. Engineering and cost management work of the current status of project cost management system was formed in the 1950s, 1980s perfect together. Performance of the country and directly involved in the management of economic activities. Provisions in the design
7、 stage to different estimates or budget preparation as well as government; Nothing relevant departments to formulate a budget, content, methods and approval, the budget will provide the fixed cost of equipment and materials and fixed price of the budget preparation, approval, management authority, a
8、nd so on. 3 With the historical process, after recovery, reform and development, formed a relatively complete budget estimate of quota management system. However, as the socialist market economic development, the systems many problems have also exposed. Generally speaking, the budget estimate is bas
9、ed on direct participation in the management of national economic activity as a precondition. enterprise is not the actual economic entities. Due to the characteristics of the planned economy, and, at the time under the conditions of productivity, will inevitably become a shortage in the economy. In
10、 severe shortage of commodities under the conditions, as long as a certain level of investment, will be certain outputs. In this environment, the project planning and technical argumentation there can be no economic analysis. State control of the project cost constitute key factors equipment and mat
11、erials prices, wages and taxes of artificial distribution. In this relatively stable economic environment, the budget estimate for the system approved project cost, help the government to carry out investment plans to play a major role. As the socialist market economic system established, requires u
12、s to predict project investment and control. In recent years, international investment project developed to the requirements of prior pre-control and in the middle of control. China, the traditional practice in an objective light on the cause decision-making, implementation heavy, light the economy
13、and technology, First, the consequences of victimization,Due to the technical personnel of the project technical and economic concepts and a weak awareness of cost control, cost management makes the quality difficult to raise. Project Cost control is difficult to achieve long-term goals. Second, the
14、 various stages of the project management view of the above circumstances, My first academia in the 1980s made the whole process of cost management and control concept, building departments will study the feasibility of projects and the budgets and final accounts to two extended at the request of th
15、e corresponding regulations put our cost management concepts and methods referred to a new height. 4 Our task now is to be modern and cost management in line with Chinas national conditions of the market economy system goal, learn from the advanced experience of the developed countries, and establis
16、h sound market economic laws of project cost management system, efforts to increase the project cost levels. An investment decision-making phase of the project cost management construction project investment decision-making stage is proposed project proposals; conduct a feasibility study to determin
17、e investment estimation and the final preparation of design task. At this stage, the projects technical and economic decision-making, of the construction project cost of the project after the completion of the economic benefits have a decisive influence, The construction cost is an important stage c
18、ontrol. Chinas current stage of the project cost for the project management for the purpose of clearing price, and focusing only on the construction process of cost control, neglected before the start of the project investment decision-making stage of cost control. Investment decision-making phase o
19、f investment projects is estimated an important basis for decision-making. It has a direct impact on national economic and financial analysis of the results of the reliability and accuracy. Because of this phase is the preliminary work of projects, the information can not be fully, comparable works
20、more or less that information accumulated relatively small, estimated inadequate and unscientific. Makes project cost management and cost workers is difficult at this stage do something. The various stages of the project cost control in the decision-making phase project cost control. Right project p
21、lanning phase of the cost, many owners have the wrong understanding that the lower the cost the better. Cost control is not a unilateral issue, and should be a number of factors, a combination of practical, comprehensive consideration. The construction project investment decision-making stage, the p
22、rojects technical and economic decision-making, Cost of the project after the completion of the project and the economic benefits, with a decisive role in project cost control is an important stage, rationally define and control the direction of the project cost of accurate positioning and building
23、Optimization guiding role. 5 In the decision-making phase of the most important is to do a good job feasibility study, the work is done well, returns on investment and can form a good proportion. Otherwise, invest more, less effective, resulting in loss of control and waste of investment. At present
24、, some of the projects planned the owners of departure from the subjective desires of a feasibility study on the lack of scientific proof. Feasibility Study untrue, false or engineering functions obtaining the approval of their superiors, actually put into the feasibility study will be awarded in th
25、e study for the project after the smooth functioning buried a lot of hidden problems, lead to insufficient follow-up funds for the project and had to extend the time limit so that the project could not have planned the use of cost-effective, even become hopeless completion of the beard works. Theref
26、ore, in order to phase in the investment decision-making effectively control construction costs, we must do the following aspects: Implementation of the construction project and corporate accountability, Construction of the project from planning to implementation of the entire process and the use of
27、 the funds to repay responsibilities to the people. in addition to establishing a legal system and the project supervision matching mechanism by the departments in charge of the industry and supervision departments for setting up a monitoring group to oversee the use of funds. A realistic approach t
28、o market analysis, to avoid the blindness of the project decision-making, reduces and reduces investment risk. Fully consider building projects in the future market competitiveness, design task more scientific and reliability. Capital financing must have a formal commitment document, the parties mus
29、t do investment funds in place, and funds must have documents to ensure that the project can be approved after the scheduled implementation. To the various loan conditions should be carefully analyzed to minimize the burden of interest and repayment pressure. 6 To strengthen the engineering geology,
30、 hydrology, geology and land, water, electricity, transport, environmental projects such as external conditions for the work of depth to make the investment estimate there are sufficient grounds. Taking extensive investigation and research, comparison of similar projects, seriously functional analys
31、is, multi-program comparison and choice. After full technical appraisal and economic evaluation, and the final technologically advanced, functional and reliable. Reasonable economic projects, thus calculate a more accurate and realistic estimation of the amount of investment, so that the project cos
32、t from the start positioning in a more reasonable level. The design phase of the project cost control for a long time, Chinas building control very effective, - investment projects is not uncommon, this will affect owners of investment returns, it adds to the owners and within budget, as well as dif
33、ficulties in fund owners, the impact on the future management or the owners make payments in arrears, and so on. Hence, the control of the project cost is of great significance, however the project cost is the primary means of control design, Currently most of the property owners in the design stage
34、 seldom works on cost control, and they found that the cost of the design will not have a great impact, it is wrong, on the contrary, Design phase of the project cost control is the most important step. Because it determines engineering design, construction methods, materials and equipment types, mo
35、dels of the project cost is of critical significance, design optimization phase of the program or minor changes, project cost will have a significant impact, Design phase of the project cost control of the total project cost of 70%. Following is how to control the project from design to create the L
36、aw: As the owners must design, the design selected on the quality level is a direct impact on the quality of product design level, and the design quality products in the level of direct influence on the pricing of the works. Different design units on the same project design are different. the same i
37、tem of different design institute works between certain aspects of the project cost on the existence of differences between, We assume that with a design from two different design institute to design, Construction plans after the completion of a requested advisory unit cost to do the 7 budget, certa
38、inly different design institute the total cost of the project is absolutely not the same, and most of the difference between the two over 10% even more than 30%, and not necessarily high cost than the design of low cost, and good design is often low cost, We all know that different people have diffe
39、rent design styles and different levels, the design works naturally, therefore chosen to design units is the control on the first step. Through tender to select the design of the units is a good method, the tender documents to elaborate on this particular aspect of the requirements, cost control tar
40、gets, and so on. Otherwise, in the subsequent design process design units will put an increase in the cost of the design requirements; through tendering the project design into the market, compared to select the best design units. Promoting the design bidding and design optimization campaign mode de
41、sign units assessed by experts using scientific group France, in accordance with applicable, economic, aesthetic principles and advanced technology, reasonable structure to meet building energy efficiency and environmental requirements, comprehensive assessment of the merits of the program design, s
42、election of the best determination of the successful program. Successful investment program estimated to be close to the general construction project scope of investment. This means two design contracts will help design the program of choice and competition to ensure that the selected design advance
43、d technology, unique novelty, adaptability, as well as to control the cost of the project. Design units should strive to improve their quality of the project design clever idea, contemporary reducing the project cost on to rack their brains to improve design quality, strive to put the design phase o
44、f the project cost control approval of the investment ceiling. Strengthening the design stage of the design phase to strengthen supervision of the Commissioner to determine a reasonable design, mature technology, reduction in the construction phase major design changes and changes in the program, in
45、 the effective control of the project cost will play a role. 1 to the design of the project if the project supervision to get involved, excluding unfavorable factors may generally is 8 excluded from the 80% errors. In the entire process of building cost control, construction began at best to save an
46、d invest 20%, the key lies in the construction phase of the identification and control costs. Supervision of the design phase include : Design Institute under the design drawings and notes help owners deal with different design options for the economy, capital expenditure to develop the preliminary
47、estimates, to ensure that the investment can be most effectively utilized. With the owners of the Commissioner include: According to the Design Institute to provide design drawings and notes to help owners deal with different design options for the economy, capital expenditures to develop the prelim
48、inary plan to ensure that investment can be most effectively used; with the owners of different design options, the need to calculate their own materials and equipment to conduct a cost analysis and study, to the design staff costs, to assist them in the investment limit within limits designed to sa
49、ve and invest. To seek a one-time small investment and economic good design program made the most rational economic indicators. Design actively promote the so-called cap limit design, even with the approval of the design task and investment estimates, guarantee the functional requirements of the pre
50、mise. The preliminary design and control budget, according to the preliminary approval of the total budget for the design and construction design control. Limits, and every one professional, each of whom have a design threshold of a target. In the design process, designers should progress to more pr
51、ograms, design optimization, ensuring that the design is technically advanced and reasonable, innovative, stylish, and do not break the limit investment objectives, thus eliminating the engineering design raise the factor of safety and design standards, or only consider the technical feasibility of
52、the program, rather than economic rationality phenomenon, the project cost to ensure effective control. Also known as the value of value engineering analysis, is a modern scientific management technique, is a new techno-economic analysis, is the product of functional analysis to conserve resources a
53、nd reduce the cost of the purpose of an effective method. It made up for the traditional cost management simply focus on cost 9 reduction and quality management only emphasizes improving the quality deficiencies, construction is conducive to resolving the long-standing long period, a lot of wastage,
54、 poor quality, high-cost problems. Value Engineering laws generally divided into three steps: assessment of the design of object technology and economic Score; Calculation of the target group of technical and economic indicators; calculate the geometric design of the object, on average; from compari
55、son choose the best design. 1985 summary, project cost control is a whole process of control, it should be said that every link is no room for complacency, and each one links are also important. With Chinas entry into the WTO, China was the main investment diversification, investment side of cost reduction, cost control, improves returns on investment increasing attention. Therefore, changes to the origina
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 市場(chǎng)推廣居間合同模板
- 項(xiàng)目可行性研究報(bào)告的框架
- 農(nóng)民土地流轉(zhuǎn)及規(guī)模經(jīng)營(yíng)實(shí)施方案
- 涵洞施工安全措施
- 建筑規(guī)范設(shè)計(jì)
- 三農(nóng)村基層民主決策機(jī)制完善方案
- 光伏發(fā)電項(xiàng)目可研報(bào)告
- 三農(nóng)創(chuàng)業(yè)項(xiàng)目策劃手冊(cè)
- 2025年燃?xì)廨斉湓O(shè)備項(xiàng)目建議書(shū)
- 植物園綠化養(yǎng)護(hù)方案
- GB/T 20878-2007不銹鋼和耐熱鋼牌號(hào)及化學(xué)成分
- 部編版小學(xué)語(yǔ)文三年級(jí)下冊(cè)書(shū)法教案設(shè)計(jì)(全冊(cè))
- 胎動(dòng)不安課件
- 雙重預(yù)防體系建設(shè)全套文件非煤礦山
- 文件袋、檔案袋密封條模板
- 皮內(nèi)注射技術(shù)操作考核評(píng)分標(biāo)準(zhǔn)
- 新東方詞匯亂序版
- 加油站重大風(fēng)險(xiǎn)清單
- 大唐大慈恩寺三藏法師傳白話本(整理壓縮版)
- ?;芳佑图託庹救?xì)馄髽I(yè)安全隱患排查手冊(cè)
- 某電廠330MW機(jī)組八級(jí)熱力系統(tǒng)及管道通流部分的設(shè)計(jì)
評(píng)論
0/150
提交評(píng)論