1、金屬鎂一體化項(xiàng)目綜合辦公區(qū)水泵房及消防水池、生活泵房及換熱站及配電室、外管網(wǎng)工程施工方案編制人:審核人:審批人: 施工單位:湖北楚雄建筑工程有限公司目 錄1、 編制依據(jù)····································
2、·22、 工程概況·····································23、 施工技術(shù)方案·········
3、························2第1節(jié) 施工組織機(jī)構(gòu)························&
4、#183;·····2第2節(jié) 施工流水段的劃分··························3第3節(jié) 施工程序··············
5、83;···················4第4節(jié) 具體的分部分項(xiàng)工程························41、防腐工程···
6、···································42、模板工程··············
7、;························63、鋼筋工程························
8、3;·············214、混凝土工程···································&
9、#183;235、回填工程······································276、裝飾工程········
10、83;·····························297、砌體工程···················&
11、#183;··················33一、編制依據(jù)建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范JGJ130-2011高處作業(yè)安全技術(shù)規(guī)范JGJ80-91建筑施工腳手架實(shí)用手冊(cè)簡明施工計(jì)算手冊(cè)國家頒發(fā)的現(xiàn)行施工規(guī)程、規(guī)范及質(zhì)量驗(yàn)評(píng)標(biāo)準(zhǔn)國家標(biāo)準(zhǔn)建筑防腐蝕工程施工及驗(yàn)收規(guī)范(GB 502122002)建筑地基基礎(chǔ)工程施工質(zhì)量驗(yàn)收規(guī)范GB502022002湖北楚雄建筑工程有限公司的質(zhì)量管理體系文件、環(huán)境管理體系文件、職業(yè)
12、健康安全管理體系文件湖北楚雄建筑工程有限公司歷年工程項(xiàng)目施工經(jīng)驗(yàn)和公司施工綜合優(yōu)勢(shì)、施工方法施工圖紙二、工程概況格爾木市青海鹽湖工業(yè)股份公司金屬鎂一體化項(xiàng)目綜合辦公區(qū)水泵房及消防水池、生活泵房及換熱站附屬工程位于察爾汗鹽湖,結(jié)構(gòu)形式為框架、剪力墻結(jié)構(gòu),建筑層數(shù)為一層。建筑面積水泵房及消防水池70.8,高度為4.85m,生活泵房及換熱站403.75,高度為6.2m,合理使用年限為50年,建筑的耐火等級(jí)為二級(jí),抗震設(shè)防烈度為7度。該工程由中國建筑科學(xué)研究院設(shè)計(jì)??辈靻挝挥申兾骱斯I(yè)工程勘察院勘察,監(jiān)理單位由廣東國信工程監(jiān)理公司金屬鎂一體化監(jiān)理五部監(jiān)理。3、 施工技術(shù)方案第一節(jié)施工組織機(jī)構(gòu) 項(xiàng)目負(fù)責(zé)
13、人:董建新項(xiàng)目經(jīng)理:屠孝勝 技術(shù)負(fù)責(zé)人:丁華波施工經(jīng)理 李 建 新安保部部長李國強(qiáng)材料部經(jīng)理張又祥預(yù)算員張斌臣資料員程 益安全經(jīng)理李建勝質(zhì)檢經(jīng)理李柏橋第二節(jié)施工流水段的劃分1、施工區(qū)域的劃分 根據(jù)該項(xiàng)目的特點(diǎn):因項(xiàng)目施工面積大,主體為一層框架、剪力墻結(jié)構(gòu)。為保證施工工期,在施工過程中會(huì)呈現(xiàn)室內(nèi)工作與室外作業(yè)同時(shí)進(jìn)行,結(jié)構(gòu)施工與建筑裝飾施工共同展開。安裝工作與土建工作交叉作業(yè)的工作場(chǎng)面。因此,在施工過程須進(jìn)行施工區(qū)域的劃分與相互的有效分隔。(1) 主體結(jié)構(gòu)施工區(qū)域的劃分本工程主體結(jié)構(gòu)根據(jù)設(shè)計(jì)院提供的圖紙資料,以及主體結(jié)構(gòu)中采用的施工工藝,確定整個(gè)工程劃分為二個(gè)施工區(qū)域,兩個(gè)區(qū)域平行施工,形成二條
14、獨(dú)立的流水線。即水泵房及消防水池一個(gè)施工區(qū)域,另一個(gè)施工區(qū)域?yàn)樯畋梅?、換熱站及配電室。(2) 安裝工程施工區(qū)域的劃分結(jié)合主體結(jié)構(gòu)施工同時(shí)進(jìn)行調(diào)整,安裝工程施工區(qū)域也作相應(yīng)劃分為兩個(gè)施工區(qū),實(shí)行平行施工,形成兩條獨(dú)立的流水施工線。安裝工程施工中,應(yīng)先將關(guān)系到設(shè)備安裝的部位提前予以完善,便于安裝工程迅速插入展開作業(yè),充分協(xié)調(diào)以保證總工期,并達(dá)到成品保護(hù)的目的。2、 施工流水段的劃分(1) 水泵房及消防水池為一個(gè)施工段。(2) 生活泵房、配電室及換熱站為一個(gè)施工段。3、 安裝工程水電、消防、防雷接地引下線等管道、管線的預(yù)埋及安裝隨主體跟進(jìn)配合穿插施工。 第三節(jié)施工程序1、 土建安裝均自行完成,并與
15、專業(yè)隊(duì)相互友好協(xié)商,統(tǒng)籌安排。2、 遵行“先地下,后地上”、“先土建,后安裝”、“先主體,后圍護(hù)”、“先土建,后設(shè)備”等管理程序,在滿足施工工藝的前提下,盡量利用一切施工面,實(shí)行平面流水交叉作業(yè),使各項(xiàng)工作有序地交叉穿插進(jìn)行。3、 根據(jù)本工程的具體情況,總體施工程序是:地基處理 瀝青砼墊層 墊層面SBS防腐層 筏板基礎(chǔ) 基礎(chǔ)梁柱 基礎(chǔ)SBS防腐 砂夾石回填 主樓一層結(jié)構(gòu) 屋面結(jié)構(gòu) 砌筑 裝修(含屋面保溫防水、門窗、樓地面) 安裝 土建收尾 室外工程。 第四節(jié) 具體的分部分項(xiàng)工程防腐工程(一)施工前的準(zhǔn)備工作:1材料準(zhǔn)備:(1)落實(shí)材料供應(yīng)計(jì)劃,在現(xiàn)場(chǎng)監(jiān)理工程師參加的情況下,切實(shí)做好材料進(jìn)場(chǎng)的檢
16、驗(yàn)工作。具體施工驗(yàn)收程序見下圖:施工準(zhǔn)備 材料進(jìn)廠 檢查驗(yàn)收防腐施工工程質(zhì)量自檢IPMT及監(jiān)理檢查驗(yàn)收2.技術(shù)準(zhǔn)備: (1)公司選派優(yōu)秀的人員組建項(xiàng)目經(jīng)理部、組織過硬的施工隊(duì)伍,以把現(xiàn)場(chǎng)人員的政治思想工作做起來,人人以確保工程質(zhì)量達(dá)到優(yōu)良為中心思想,以施工圖為準(zhǔn),按國家驗(yàn)收標(biāo)準(zhǔn)施工,爭創(chuàng)優(yōu)質(zhì)安全文明工程。 (2)組織圖紙學(xué)習(xí)及專業(yè)技術(shù)會(huì)審,進(jìn)行設(shè)計(jì)交底,對(duì)圖紙上存在問題及特殊部位的施工方法、施工要求進(jìn)行答疑。(3)施工人員持證上崗,保證所有施工人員都能按有關(guān)操作規(guī)程,規(guī)范及有關(guān)工藝要求施工。3.施工管理準(zhǔn)備(1)我們將立即抓緊時(shí)間,組織指揮項(xiàng)目部做好如下施工管理準(zhǔn)備工作:(2)迅速按本工程施工
17、組織機(jī)構(gòu)圖的要求,組織主要領(lǐng)導(dǎo)和技術(shù)人員到位,進(jìn)行合同交底和技術(shù)交底。所有參加人員均須明確崗位職責(zé),分工到人,以確保工程的順利進(jìn)行。(3)要求在現(xiàn)在的基礎(chǔ)上進(jìn)一步做好施工組織設(shè)計(jì)工作,報(bào)建設(shè)單位及現(xiàn)場(chǎng)監(jiān)理審批;(二)施工方法:1、 工藝流程、 基礎(chǔ)及墊層防腐工程 (1)平整沙石底基層。 (2)制作瀝青混凝土鋪施瀝青混凝土中粒層。 (3)碾壓瀝青混凝土中粒層。 (4)制作瀝青砂漿鋪設(shè)瀝青砂漿。 (5)碾壓瀝青砂漿層。 (6)鋪施改性瀝青卷材SBS熱熔法粘貼一遍4mm。 (7)自檢、驗(yàn)收。、立面防腐工藝流程(1)二遍涂刷冷底子油。(2)二遍瀝青膠泥,厚3-5mm。(3)一遍熱熔法粘貼4mm厚SBS
18、。2、關(guān)鍵驗(yàn)收部分:(1)基層處理、陰陽角處理、基層清理。(2) 基層處理涂刷情況、邊角封邊,。(3)厚度、均勻度及密實(shí)度。 3、基層要求: (1)防腐基層不得有起砂、脫殼、裂縫、蜂窩麻面等現(xiàn)象。 (2)防腐基層不得有積水現(xiàn)象,且表面干燥含水率低于30%。 (3)涂刷冷底油:用長柄滾刷在已經(jīng)處理好的基層表面上涂層冷底子油,要均勻一致,不得有麻點(diǎn)、漏刷等缺陷。涂刷冷底油完畢后,必須經(jīng)過小時(shí)以后,干燥后方可進(jìn)行大面積10號(hào)瀝青膠泥刮涂施工,4mm厚聚酯胎SBS粘貼。(三)質(zhì)量標(biāo)準(zhǔn)1.所用防瀝青混凝土和改性瀝青卷材SBS及瀝青膠泥等材料符合設(shè)計(jì)要求和有關(guān)標(biāo)準(zhǔn)的規(guī)定。2.防腐層極其細(xì)部,必須符合設(shè)計(jì)要
19、求和施工規(guī)范的規(guī)定。3.筏板基礎(chǔ)防腐涂層卷材厚度為4mm厚SBS,筏板基礎(chǔ)防腐瀝青混凝土為150mm厚,瀝青膠泥為二遍3-5mm厚。(四)成品保護(hù) 1.施工現(xiàn)場(chǎng)要嚴(yán)禁煙火,要備有消防器材。 2.禁止穿有帶釘鞋或硬底皮鞋在鋪好的防腐層上走動(dòng)。防腐層上不得使用手推車等碾壓,經(jīng)常走人的地方要鋪跳板、蓋草袋等加以保護(hù)。 3. 做好的防腐層進(jìn)行其它作業(yè)時(shí),應(yīng)采取相應(yīng)的保護(hù)措施,避免刺破、損傷防腐層。 4.防腐層在未交驗(yàn)之前設(shè)專人看管,發(fā)現(xiàn)損壞及時(shí)修補(bǔ)。 5.防腐卷材層施工結(jié)束后,應(yīng)盡量減少在防腐層上面踩踏或其他物體沖擊破壞。(五)工程驗(yàn)收施工完畢由技術(shù)員、質(zhì)檢員按其標(biāo)準(zhǔn)首先認(rèn)真地對(duì)本防腐工程質(zhì)量作一次全
20、面檢驗(yàn),確認(rèn)質(zhì)量合格后,及時(shí)向現(xiàn)場(chǎng)監(jiān)理,質(zhì)量監(jiān)督部門匯報(bào),并要求對(duì)此項(xiàng)目進(jìn)行檢查驗(yàn)收,如質(zhì)量達(dá)到合格后,辦好驗(yàn)收手續(xù),記錄好有關(guān)技術(shù)資料與有效證件并存檔。 模板工程(一)施工準(zhǔn)備1、材料及主要機(jī)具: (1)膠合板塊:1830×920×15mm的多層膠合板 (2)支撐系統(tǒng):頂板平面支撐: 40×70×3000硬質(zhì)方楞木,其余均為Ø48×2.6的不同長度的鋼管,設(shè)置水平杠,掃地杠,剪刀撐。 (3) 脫模劑:油質(zhì)隔離劑。 (4) 工具:鐵木榔頭、手提鋸、活動(dòng)(套口)板子、水平尺、鋼卷尺、托線板、輕便爬梯、腳手板。2、作業(yè)條件: (1)模板設(shè)
21、計(jì): 確定所建工程的施工區(qū)、段劃分。根據(jù)工程結(jié)構(gòu)的形式、特點(diǎn)及現(xiàn)場(chǎng)條件,合理確定模板工程施工的流水區(qū)段,以減少模板投入,增加周轉(zhuǎn)次數(shù),均衡工序工程(鋼筋、模板、混凝土工序)的作業(yè)量。 確定結(jié)構(gòu)模板平面施工圖。在圖中標(biāo)志出各種構(gòu)件的型號(hào)、位置、數(shù)量、尺寸、標(biāo)高及相同或略加拼補(bǔ)即相同的構(gòu)件的替代關(guān)系并編號(hào),以減少配板的種類、數(shù)量和明確模板的替代流向與位置。 確定模板配板平面布置及支撐布置。根據(jù)施工圖對(duì)梁、板、柱等尺寸及編號(hào)設(shè)計(jì)出配板圖,應(yīng)標(biāo)志出不同型號(hào)、尺寸單塊模板平面布置,縱橫龍骨規(guī)格、數(shù)量及排列尺寸;柱箍選用的形式及間距;支撐系統(tǒng)的豎向支撐、側(cè)向支撐、橫向拉接件的間距。 軸線、模板線(或模邊借
22、線)放線完畢。水平控制標(biāo)高引測(cè)到預(yù)留插筋或其它過渡引測(cè)點(diǎn),并辦好預(yù)檢手續(xù)。 (2)模板承墊底部,模板內(nèi)邊線用13水泥砂漿,根據(jù)給定標(biāo)高線準(zhǔn)確找平。外柱的外邊根部,根據(jù)標(biāo)高線設(shè)置模板承墊木方,與找平砂漿上平交圈,以保證標(biāo)高準(zhǔn)確和不漏漿。 (4)柱子、梁模板鋼筋綁扎完畢;水電管線、預(yù)留孔洞。預(yù)埋件已安裝完畢,綁好鋼筋保護(hù)層墊塊,并辦完隱預(yù)檢手續(xù)。 (二)模板安裝及拆除工藝 1、柱模板安裝施工要點(diǎn): (1)首先將柱子四面模板就位組拼好。 (2)將模板四面按給定柱截面線就位,并使之垂直,對(duì)角線相等。 (3)用定型柱套箍固定,楔板到位,拉桿鎖牢。 (4)對(duì)模板的軸線位移、垂直偏差、對(duì)角線、扭向等全面校正
23、。 (5)按上述方法安裝一定流水段的模板,檢查安裝質(zhì)量。最后進(jìn)行群體的水平拉(支)桿及剪刀支桿的固定。 (6)將柱根模板內(nèi)清理干凈,封閉清理口。 2、梁模板安裝施工要點(diǎn)(1)在柱子混凝土上彈出梁的軸線及水平線(梁底桿引測(cè)用)并復(fù)核。(2)安裝梁模板支架之前,首層為砂夾石地面時(shí),應(yīng)平整夯實(shí),在專用支柱下腳要鋪設(shè)通長木腳手板,鋼管支柱一般采用雙排,間距以80-120cm為宜,支柱上連接48×2.75鋼管及梁卡具,支柱中間和下方加橫桿或斜桿。(3)在支柱上調(diào)整預(yù)留梁底模板的厚度,符合設(shè)計(jì)要求后,拉線安裝梁底模板,并拉直固定,跨度大于4m按1-3起拱。(4)在底模上綁扎鋼筋,經(jīng)驗(yàn)收合格后,清
24、楚雜物,安裝梁側(cè)模板,用梁卡具或安裝上下鎖口楞及外堅(jiān)楞,附以斜撐,其間距宜為75cm,當(dāng)梁高超過60cm時(shí),需要加腰楞,并穿對(duì)拉螺栓加固,梁側(cè)模上口拉線找直,用定型卡子固定。(5)復(fù)核檢查梁模尺寸,與相鄰梁柱模板連接固定,有模板時(shí),在梁上連接陰角模與模板拼接固定。3、剪力墻模板安裝(1)施工工藝 砼地板放線 剪力墻定位線焊接剪力墻定位筋模板安裝防水對(duì)拉絲桿安裝安裝加固(2)模板安裝采用拼板連接,木方釘掛其板上,對(duì)拉絲桿對(duì)拉間距為400mm,絲桿外采用水平鋼管對(duì)拉加固蝴蝶卡環(huán)連接。 (3)對(duì)拉絲桿焊接止水環(huán)時(shí),按350mm剪力墻扣除塑膠墊子30mm,止水環(huán)凈空尺寸為320mm,對(duì)拉絲桿采用12高
25、強(qiáng)絲桿焊接3mm厚的鐵片,40*40*3mm,鐵片中孔徑為12mm,兩邊鐵片為定位止水鐵片,中間鐵片為止水防水鐵片焊接,當(dāng)模板拆除時(shí),剝除塑料墊環(huán),折斷對(duì)拉絲桿與砼外表面以內(nèi),便于防止對(duì)拉絲桿對(duì)外墻防腐層SBS的破壞。(4)對(duì)拉絲桿折斷后,涂上防銹漆,用防水砂漿修補(bǔ)外皮,防止淡水滲漏。4、模板拆除施工要點(diǎn):(1)在混凝土強(qiáng)度能保證其表面及棱角不因拆除模板而受損后,方可拆除。(2)已拆除模板及支架的結(jié)構(gòu),在混凝土達(dá)到設(shè)計(jì)強(qiáng)度等級(jí)后,方允許承受全部使用荷載。當(dāng)施工荷載所產(chǎn)生的效應(yīng)比使用荷載的效應(yīng)不利時(shí),必須經(jīng)核算,加設(shè)臨時(shí)支撐。(3)模板拆除的順序和方法,應(yīng)按配模設(shè)計(jì)的規(guī)定進(jìn)行,若無設(shè)計(jì)規(guī)定時(shí),應(yīng)
26、遵循先支后拆、后支先拆,先拆不承重模板,后拆承重部分的模板,自上而下,支架先拆側(cè)向支撐,后拆豎向支撐等原則。(4)模板工程作業(yè)組織,應(yīng)遵循支模與拆模統(tǒng)由一個(gè)作業(yè)班組執(zhí)行作業(yè)。其好處是支模就考慮拆模的方便與安全,拆模時(shí),人員熟知情況,易找拆模關(guān)鍵點(diǎn)位,對(duì)拆模進(jìn)度、安全、模板及配件的保護(hù)都有利。(三)質(zhì)量標(biāo)準(zhǔn) 1、保證項(xiàng)目:模板及其支架必須有足夠的強(qiáng)度、剛度和穩(wěn)定性;其支承部分應(yīng)有足夠的支承面積。 檢查方法:對(duì)照模板設(shè)計(jì),現(xiàn)場(chǎng)觀察或尺量檢查。 2、基本項(xiàng)目 (1) 接縫寬度不得大于1.5mm。 檢查方法:觀察和用楔形塞尺檢查。 檢查方法:觀察和用尺量計(jì)算統(tǒng)計(jì)。 允許偏差 (mm)檢查方法 項(xiàng) 目單
27、層多層梁、柱軸線位移5尺量檢查標(biāo) 高±5用水準(zhǔn)儀或拉線和尺量檢查柱、梁截面尺寸+4 -5尺量檢查每層垂直度3用2m托線板檢查相鄰兩板表面高低差2用直尺和尺量檢查表面平整度5用2m靠尺和塞尺檢查預(yù)埋鋼板中心線位移3 埋管預(yù)留孔中心線位移3中心線位移2拉線和尺量檢查外露長度+10 0中心線位移10截面內(nèi)部尺寸+10 0每層垂直度3用2m托線板檢查(四)成品保護(hù) 1、預(yù)組拼的模板要有存放場(chǎng)地,場(chǎng)地要平整夯實(shí)。模板平放時(shí),要有木方墊架。立放時(shí),要搭設(shè)分類模板架,模板觸地處要墊木方,以此保證模板不扭曲不變形。不可亂堆亂放或在組拼的模板上堆放分散模板和配件。 2、工作面已安裝完畢的柱模板,不準(zhǔn)在
28、吊運(yùn)其它模板時(shí)碰撞,不準(zhǔn)在預(yù)拼裝模板就位前作為臨時(shí)椅靠,以防止模板變形或產(chǎn)生垂直偏差。工作面已安裝完畢的平面模板,不可做臨時(shí)堆料和作業(yè)平臺(tái),以保證支架的穩(wěn)定,防止平面模板標(biāo)高和平整產(chǎn)生偏差。 3、拆除模板時(shí),不得用大錘、撬棍硬碰猛撬,以免混凝土的外形和內(nèi)部受到損傷。(五)應(yīng)注意的質(zhì)量問題 1、梁、板模板:梁、板底不平、下?lián)希涣簜?cè)模板不平直;梁上下口漲模:防治的方法是,梁、板底模板的龍骨、支柱的截面尺寸及間距應(yīng)通過設(shè)計(jì)計(jì)算決定,使模板的支撐系統(tǒng)有足夠的強(qiáng)度和剛度。作業(yè)中應(yīng)認(rèn)真執(zhí)行設(shè)計(jì)要求,以防止混凝土澆筑時(shí)模板變形。模板支柱應(yīng)立在墊有通長木板的堅(jiān)實(shí)的地面上,防止支柱下沉,使梁、板產(chǎn)生下?lián)?。梁、?/p>
29、模板應(yīng)按設(shè)計(jì)或規(guī)范起拱。梁模板上下口應(yīng)設(shè)銷口楞,再進(jìn)行側(cè)向支撐,以保證上下口模板不變形。 2、柱模板: (1) 漲模、斷面尺寸不準(zhǔn):防治的方法是,根據(jù)柱高和斷面尺寸設(shè)計(jì)核算柱箍自身的截面尺寸和間距,以保證柱模的強(qiáng)度、剛度足以抵抗混凝土的側(cè)壓力。施工應(yīng)認(rèn)真按設(shè)計(jì)要求作業(yè)。 (2) 柱身扭向:防治的方法是,支模前先校正柱筋,使其首先不扭向。安裝斜撐(或拉錨),吊線找垂直時(shí),相鄰兩片柱模從上端每面吊兩點(diǎn),使線墜到地面,線墜所示兩點(diǎn)到柱位置線距離均相等,即使柱模不扭向。 (3) 軸線位移,一排柱不在同一直線上:防治的方法是,成排的柱子,支模前要在地面上彈出柱軸線及軸邊通線,然后分別彈出每柱的另一方向軸
30、線,再確定柱的另兩條邊線。支模時(shí),先立兩端柱模,校正垂直與位置無誤后,柱模頂拉通線,再支中間各柱模板。柱距不大時(shí),通排支設(shè)水平拉桿及剪刀撐,柱距較大時(shí),每柱分別四面支撐,保證每柱垂直和位置正確。(六)模板計(jì)算水泵房及消防水池、換熱站及生活泵房、外管網(wǎng)管溝,梁、板、柱、剪力墻模板設(shè)計(jì)計(jì)算書按施工組織設(shè)計(jì)和模板材料,對(duì)實(shí)際搭設(shè)進(jìn)行強(qiáng)度與穩(wěn)定性的驗(yàn)算:1、樓板模板計(jì)算模板板面采用15mm高強(qiáng)度組合板,龍骨采用40×70方木。(1)荷載計(jì)算:模板及支架自重 0.14KN/m2新澆砼 25 KN/m3(板厚度選100mm,110 mm、120 mm)鋼筋自重 1.10KN/m2施工人員及機(jī)具
31、2.50KN/m2100 mm厚板荷載標(biāo)準(zhǔn)值:F1 = 0.1425×0.11.102.50 = 6.24KNF2 = (0.1425×0.11.10)×1.202.50×1.40=7.988KN110 mm厚板荷載標(biāo)準(zhǔn)值:F3 = 0.1425×0.111.102.50 =6.49KNF4 =(0.1425×0.111.10)×1.202.50×1.40=8.288KN120 mm厚板荷載標(biāo)準(zhǔn)值:F5 = 0.1425×0.121.102.50 = 6.74KNF6 =(0.1425×0.12
32、1.10)×1.202.50×1.40=8.588KN(2)龍骨間距:新澆筑的砼均勻作用在膠合板上,單位寬度的面板可以視為梁,梁寬取250mm。板厚砼按110mm算: 抗彎強(qiáng)度驗(yàn)算: M=1/8·q1L12 FmM彎距設(shè)計(jì)值(N/mm)q1作用在頂板模板上的均布荷載(N/ mm)q1=F4×0.11=8.288×0.11=0.912KN/ mL次龍骨間距受彎應(yīng)力設(shè)計(jì)值(N/ mm2)W截面抵抗矩=1/6·bh2Fm模板的抗彎強(qiáng)度設(shè)計(jì)值:11N/mm2M q1L12·1/8= Fm 11N/mm2W bh2·1/6
33、8×11N/mm2×110mm×152mm2 2178000mm2L2 = = 6×2.372N/mm 14.232L = 220mm按模板的剛度要求,最大變形值為模板設(shè)計(jì)跨度的1/250 0.677×q1L´4 LW = 100EI 110E模板的彈性模數(shù)量(N/ mm2), E = 1×104N/ mm2 I模板的截面慣性矩(mm2) I=1/12·bh3=2.43×104(mm2) 100×3.122×104×1×104L´3 = L´=
34、223mm 0.677×2.43×110施工龍骨間距取110mmL´(223mm)滿足要求。2、梁模板計(jì)算:模板板面采用18mm高強(qiáng)度九合板,龍骨采用40×70方木。(1)底模驗(yàn)算:抗彎強(qiáng)度驗(yàn)算:A:荷載:底模自重5×0.04×0.45×1.2 = 0.108 砼 自 重11×0.45×0.8×1.2 = 4.752 鋼筋自重1.50×0.45×0.8×1.2 = 0.648 振搗荷載2.0×0.45×1.2 = 1.08 合 計(jì)q1 = 6.5
35、88 q2 = q1×0.9=5.929KNB:抗彎承載力驗(yàn)算:底模下的楞木間距為0.2m,按四等跨計(jì)算。按最不利荷載部之中結(jié)構(gòu)靜力表示得:彎矩系數(shù):KM = 0.121 剪力系數(shù):KN = 0.620 撓度系數(shù):KW = 0.967則M = Km×qL2 = 0.121×11.37×0.22 = 0.055×106N/mm= m/w= 0.055×106×6/(450×402) = 4.583N/mm2Fm = 13N/mm2.剪力強(qiáng)度驗(yàn)算:V=KNqL = 0.620×11.37×0.20
36、= 1.41KN剪應(yīng)力:T = 3N/(2bh)=3.0×1.36×103/(2×450×40) =0.113N/mm2FN = 1.4N/ mm2撓度驗(yàn)算:荷載不包括振搗砼載荷,則q1=11.556 q2=10.40KN/mW=KWqL4/(100EI)=0.967×10.40×2004/(100×9×103×450×403/12) =0.00745W=L/720=0.278mm(滿足要求)(2)側(cè)模驗(yàn)算:荷載驗(yàn)算:假設(shè)T=30, 1=1.2, 2= 1, V=2m/h,則: A:側(cè)壓力F1=
37、0.22VCTO12V0.5=0.22×25×200/(3015)×1.2×1.0×20.5=41.48KN/m F2=VCh=25×0.8=20.0KN/m取兩者較小值:F2=20.0KN/m乘以分項(xiàng)系數(shù):F=20.0×1.2=24.0KN/m2B:振搗砼時(shí)產(chǎn)生的荷載:4KN/m2 乘以分項(xiàng)系數(shù):4×1.4=5.6KN/m2 以上兩項(xiàng)合計(jì):24.05.60=29.6KN/ m抗彎強(qiáng)度驗(yàn)算:仍按四等跨計(jì)算,其Km,Kv,Kww同前,設(shè)側(cè)模50mm厚,則:m = KmqL2 = 0.121×11.37
38、15;6002=495.28×103KN/mm 立檔間距600mm= m/v=495.28×103×6/(600×402)=3.096N/ mm2 3.096N/ mm2Pm=13N/ mm2(滿足要求)抗剪強(qiáng)度檢算:V = 0.620ql = 0.620×11.37×600 = 4229.64N = 4.23KN剪應(yīng)力T=3V(2bh)= 3×4.230/(2×600×40)= 0.26N/ mm20. 26N/ mm2Fv = 1.4N/ mm2(滿足要求)撓度驗(yàn)算:取側(cè)壓力24KN/ m2化為線荷載
39、24.0×0.6 = 14.4KN/m乘以折減系數(shù)q = 0.90×14.40 = 12.96KN/m W = 0.967qL4/(100EL) =0.967×12.96×6004×12/(100×9×103×600×403) =0.564mm W = L/400 = 600/400 = 1.50mm(滿足要求).3、支撐驗(yàn)算采用48×2.50鋼管支架,間距最大為1200mm,最下一層地桿距地300mm,中間水平拉桿間距大于1200mm小于1800mm,支撐桿有效面積A=391 mm2(內(nèi)R =
40、 42.5mm)(1)抗壓強(qiáng)度驗(yàn)算:N = 8.06×2.12×1.20 = 20.50KN N = AF = 391×205 = 80.12KN 20.50KN滿足(2)穩(wěn)定性驗(yàn)算(按中心點(diǎn)最大偏心25 mm計(jì)算): IX =(D4d4)/64 =(484414)/64 = 1.22×105 mm4 IX = (IX /A)1/2 =(1.22×105/489)1/2 = 15.79 mm. IX = 1800/ix = 1800/15.79 = 114查Q235,b類截面軸壓穩(wěn)定系數(shù)IX = 0.453歐拉臨界應(yīng)力Nex = EA/ X2
41、= 2.06×105×489/1142=7751N初始偏心彎矩Mx = Ne = 16×103×25 = 4×104N·mm截面塑性發(fā)展系數(shù)Rx = 1.0受壓最大纖維毛截面抵抗距W1x = Ix/(D/2)=1.22×105/(48/2)=5083.30mm3N/xAßmxMx/(10.8N)/nex = 175.9MPa215Mpa(滿足要求)4、柱模板設(shè)計(jì)計(jì)算書(1)荷載計(jì)算:已知條件:柱混凝土計(jì)算高度h=2.9m;.新澆混凝土對(duì)模板側(cè)面的壓力標(biāo)準(zhǔn)值 50.00 KN/m2傾倒混凝土?xí)r產(chǎn)生的水平荷載 4.0
42、KN/m2c=25 KN/m3 混凝土自重設(shè)混凝土的入模溫度 T=15 t0=200/(T+15)=200/(15+15)=7設(shè)混凝土澆筑速度 V=32.0m/s 1=1.20 外加劑修正系數(shù) 2=1.00 塌落度修正系數(shù)F1=0.22ct012V1/2 =0.22×25×7×1.20×1.00×32.01/2=216.35 KN/m2F2=cH=25×2.0=50.00 KN/m2取F=50.00 KN/m2(2)柱模板計(jì)算:模板采用1.2cm厚木多層板,荷載折減系數(shù)取0.90按模板寬度:0.2m計(jì)算; 模板EI=316000000
43、0N·mm2模板W=54000mm3;按四邊固定板計(jì)算模板計(jì)算跨度l=0.300m模板允許應(yīng)力=20.0 N/mm2荷載荷載: q=0.90×(1.2×+1.4×) ×0.2 =0.90×(1.2×50.00+1.4×4)×0.2 =20.88KN/m用于計(jì)算彎矩 q=0.90××0.2 =0.90×50.00×0.2=9KN/m用于計(jì)算撓度(2)抗彎強(qiáng)度驗(yàn)算: M=0.0829ql2=0.0829×9×0.3002 =0.067KN·
44、m =M/W=0.067×106/54000 =1.24N/mm2<20.0N/mm2撓度驗(yàn)算: 允許撓度=1.5mm=0.0025×ql4/100EI =0.0025×9×(0.300×1000)4/(100×3160000000) =0.00058mm<=1.5mm5、 剪力墻模板設(shè)計(jì)計(jì)算書(一)墻模板荷載標(biāo)準(zhǔn)值計(jì)算 其中 - 混凝土的重力密度,取24.000kN/m3; t - 新澆混凝土的初凝時(shí)間,取4.000h; T - 混凝土的入模溫度,取25.000; V - 混凝土的澆筑速度,取2.500m/h; H -
45、模板計(jì)算高度,取3.000m; 1- 外加劑影響修正系數(shù),取1.200; 2- 混凝土坍落度影響修正系數(shù),取0.850。根據(jù)以上兩個(gè)公式計(jì)算的新澆筑混凝土對(duì)模板的最大側(cè)壓力F;分別計(jì)算得 34.062 kN/m2、72.000 kN/m2,取較小值34.062 kN/m2作為本工程計(jì)算荷載。計(jì)算中采用新澆混凝土側(cè)壓力標(biāo)準(zhǔn)值 F1=34.062kN/m2;(二)墻模板面板的計(jì)算面板為受彎結(jié)構(gòu),需要驗(yàn)算其抗彎強(qiáng)度和剛度。根據(jù)建筑施工手冊(cè),強(qiáng)度驗(yàn)算要考慮新澆混凝土側(cè)壓力和傾倒混凝土?xí)r產(chǎn)生的荷載;撓度驗(yàn)算只考慮新澆混凝土側(cè)壓力。 計(jì)算的原則是按照龍骨的間距和模板面的大小,按支撐在內(nèi)楞上的三跨連續(xù)梁計(jì)算
46、。面板計(jì)算簡圖1.抗彎強(qiáng)度驗(yàn)算跨中彎矩計(jì)算公式如下: 其中, M-面板計(jì)算最大彎距(N·mm); l-計(jì)算跨度(內(nèi)楞間距): l =250.0mm; q-作用在模板上的側(cè)壓力線荷載,它包括: 新澆混凝土側(cè)壓力設(shè)計(jì)值q1: 1.2×34.06×0.50×0.90=18.393kN/m; 其中0.90為按施工手冊(cè)取的臨時(shí)結(jié)構(gòu)折減系數(shù)。 傾倒混凝土側(cè)壓力設(shè)計(jì)值q2: 1.4×6.00×0.50×0.90=3.780kN/m; q = q1 + q2 =18.393+3.780=22.173 kN/m;面板的最大彎距:M =0.1&
47、#215;22.173×250.0×250.0= 1.39×105N.mm;按以下公式進(jìn)行面板抗彎強(qiáng)度驗(yàn)算: 其中, -面板承受的應(yīng)力(N/mm2); M -面板計(jì)算最大彎距(N·mm); W -面板的截面抵抗矩 : b:面板截面寬度,h:面板截面厚度; W= 500×12.0×12.0/6=1.20×104 mm3; f -面板截面的抗彎強(qiáng)度設(shè)計(jì)值(N/mm2); f=13.000N/mm2;面板截面的最大應(yīng)力計(jì)算值: = M/W = 1.39×105 / 1.20×104 = 11.549N/mm2;
48、面板截面的最大應(yīng)力計(jì)算值 =11.549N/mm2 小于面板截面的抗彎強(qiáng)度設(shè)計(jì)值 f=13N/mm2,滿足要求!2.抗剪強(qiáng)度驗(yàn)算計(jì)算公式如下: 其中,-面板計(jì)算最大剪力(N); l-計(jì)算跨度(豎楞間距): l =250.0mm; q-作用在模板上的側(cè)壓力線荷載,它包括: 新澆混凝土側(cè)壓力設(shè)計(jì)值q1: 1.2×34.06×0.50×0.90=18.393kN/m; 傾倒混凝土側(cè)壓力設(shè)計(jì)值q2: 1.4×6.00×0.50×0.90=3.780kN/m; q = q1 + q2 =18.393+3.780=22.173 kN/m;面板的最
49、大剪力:V = 0.6×22.173×250.0 = 3326.022N;截面抗剪強(qiáng)度必須滿足: 其中, -面板截面的最大受剪應(yīng)力(N/mm2); V-面板計(jì)算最大剪力(N):V = 3326.022N; b-構(gòu)件的截面寬度(mm):b = 500mm ; hn-面板厚度(mm):hn = 12.0mm ; fv-面板抗剪強(qiáng)度設(shè)計(jì)值(N/mm2):fv = 1.500 N/mm2;面板截面的最大受剪應(yīng)力計(jì)算值: T =3×3326.022/(2×500×12.0)=0.832N/mm2;面板截面抗剪強(qiáng)度設(shè)計(jì)值: fv=1.500N/mm2;面板
50、截面的最大受剪應(yīng)力計(jì)算值 T=0.832N/mm2 小于 面板截面抗剪強(qiáng)度設(shè)計(jì)值 T=1.5N/mm2,滿足要求! 3.撓度驗(yàn)算根據(jù)規(guī)范,剛度驗(yàn)算采用標(biāo)準(zhǔn)荷載,同時(shí)不考慮振動(dòng)荷載作用。撓度計(jì)算公式如下: 其中,q-作用在模板上的側(cè)壓力線荷載: q = 34.06×0.5 = 17.03N/mm; l-計(jì)算跨度(內(nèi)楞間距): l = 250mm; E-面板的彈性模量: E = 9500N/mm2; I-面板的截面慣性矩: I = 50×1.2×1.2×1.2/12=7.2cm4;面板的最大允許撓度值: = 1mm;面板的最大撓度計(jì)算值: = 0.677
51、215;17.03×2504/(100×9500×7.20×104) = 0.658 mm;面板的最大撓度計(jì)算值: =0.658mm 小于等于面板的最大允許撓度值 =1mm,滿足要求!(三)墻模板內(nèi)外楞的計(jì)算(一).內(nèi)楞(木或鋼)直接承受模板傳遞的荷載,按照均布荷載作用下的三跨連續(xù)梁計(jì)算。本工程中,內(nèi)龍骨采用木楞,寬度60mm,高度80mm,截面慣性矩I和截面抵抗矩W分別為:W = 60×80×80/6 = 64cm3;I = 60×80×80×80/12 = 256cm4;內(nèi)楞計(jì)算簡圖1.內(nèi)楞的抗彎強(qiáng)度
52、驗(yàn)算內(nèi)楞跨中最大彎矩按下式計(jì)算: 其中, M-內(nèi)楞跨中計(jì)算最大彎距(N·mm); l-計(jì)算跨度(外楞間距): l =500.0mm; q-作用在內(nèi)楞上的線荷載,它包括: 新澆混凝土側(cè)壓力設(shè)計(jì)值q1: 1.2×34.06×0.25×0.90=9.197kN/m; 傾倒混凝土側(cè)壓力設(shè)計(jì)值q2: 1.4×6.00×0.25×0.90=1.890kN/m,其 中,0.90為折減系數(shù)。 q =(9.197+1.890)/1=11.087 kN/m;內(nèi)楞的最大彎距:M =0.1×11.087×500.0×5
53、00.0= 2.77×105N.mm;內(nèi)楞的抗彎強(qiáng)度應(yīng)滿足下式: 其中, -內(nèi)楞承受的應(yīng)力(N/mm2); M -內(nèi)楞計(jì)算最大彎距(N·mm); W -內(nèi)楞的截面抵抗矩(mm3),W=6.40×104; f -內(nèi)楞的抗彎強(qiáng)度設(shè)計(jì)值(N/mm2); f=13.000N/mm2;內(nèi)楞的最大應(yīng)力計(jì)算值: = 2.77×105/6.40×104 = 4.331 N/mm2;內(nèi)楞的抗彎強(qiáng)度設(shè)計(jì)值: f = 13N/mm2;內(nèi)楞的最大應(yīng)力計(jì)算值 = 4.331 N/mm2 小于 內(nèi)楞的抗彎強(qiáng)度設(shè)計(jì)值 f=13N/mm2,滿足要求!2.內(nèi)楞的抗剪強(qiáng)度驗(yàn)算最大
54、剪力按均布荷載作用下的三跨連續(xù)梁計(jì)算,公式如下: 其中, V內(nèi)楞承受的最大剪力; l-計(jì)算跨度(外楞間距): l =500.0mm; q-作用在內(nèi)楞上的線荷載,它包括: 新澆混凝土側(cè)壓力設(shè)計(jì)值q1: 1.2×34.06×0.25×0.90=9.197kN/m; 傾倒混凝土側(cè)壓力設(shè)計(jì)值q2: 1.4×6.00×0.25×0.90=1.890kN/m,其 中,0.90為折減系數(shù)。 q =(9.197+1.890)/1=11.087 kN/m;內(nèi)楞的最大剪力:V = 0.6×11.087×500.0 = 3326.022
55、N;截面抗剪強(qiáng)度必須滿足下式: 其中, -內(nèi)楞的截面的最大受剪應(yīng)力(N/mm2); V-內(nèi)楞計(jì)算最大剪力(N):V = 3326.022N; b-內(nèi)楞的截面寬度(mm):b = 60.0mm ; hn-內(nèi)楞的截面高度(mm):hn = 80.0mm ; fv-內(nèi)楞的抗剪強(qiáng)度設(shè)計(jì)值(N/mm2):fv = 1.500 N/mm2;內(nèi)楞截面的受剪應(yīng)力計(jì)算值: =3×3326.022/(2×60.0×80.0)=1.039N/mm2;內(nèi)楞截面的受剪應(yīng)力計(jì)算值 =1.039N/mm2 小于 內(nèi)楞截面的抗剪強(qiáng)度設(shè)計(jì)值 fv=1.5N/mm2,滿足要求!3.內(nèi)楞的撓度驗(yàn)算根據(jù)
56、建筑施工計(jì)算手冊(cè),剛度驗(yàn)算采用荷載標(biāo)準(zhǔn)值,同時(shí)不考慮振動(dòng)荷載作用。 撓度驗(yàn)算公式如下: 其中, -內(nèi)楞的最大撓度(mm); q-作用在內(nèi)楞上的線荷載(kN/m): q = 34.06×0.25/1=8.52 kN/m; l-計(jì)算跨度(外楞間距): l =500.0mm ; E-內(nèi)楞彈性模量(N/mm2):E = 9500.00 N/mm2 ; I-內(nèi)楞截面慣性矩(mm4),I=2.56×106;內(nèi)楞的最大撓度計(jì)算值: = 0.677×8.52/1×5004/(100×9500×2.56×106) = 0.148 mm;內(nèi)楞的
57、最大容許撓度值: = 2mm;內(nèi)楞的最大撓度計(jì)算值 =0.148mm 小于 內(nèi)楞的最大容許撓度值 =2mm,滿足要求!(二).外楞(木或鋼)承受內(nèi)楞傳遞的荷載,按照集中荷載作用下的三跨連續(xù)梁計(jì)算。本工程中,外龍骨采用鋼楞,截面慣性矩I和截面抵抗矩W分別為:截面類型為圓鋼管48×3.5;外鋼楞截面抵抗矩 W = 5.08cm3;外鋼楞截面慣性矩 I = 12.19cm4;外楞計(jì)算簡圖1.外楞的抗彎強(qiáng)度驗(yàn)算外楞跨中彎矩計(jì)算公式: 其中,作用在外楞的荷載: P = (1.2×34.06+1.4×6)×0.25×0.5/2=2.77kN; 外楞計(jì)算跨度
58、(對(duì)拉螺栓水平間距): l = 500mm;外楞最大彎矩:M = 0.175×2771.69×500.00= 2.43×105 N·mm;強(qiáng)度驗(yàn)算公式: 其中, - 外楞的最大應(yīng)力計(jì)算值(N/mm2) M - 外楞的最大彎距(N·mm);M = 2.43×105 N·mm W - 外楞的凈截面抵抗矩; W = 5.08×103 mm3; f -外楞的強(qiáng)度設(shè)計(jì)值(N/mm2),f =205.000N/mm2;外楞的最大應(yīng)力計(jì)算值: = 2.43×105/5.08×103 = 47.741 N/mm
59、2;外楞的最大應(yīng)力計(jì)算值 =47.741N/mm2 小于 外楞的抗彎強(qiáng)度設(shè)計(jì)值 f=205N/mm2,滿足要求!2.外楞的抗剪強(qiáng)度驗(yàn)算公式如下: 其中,P-作用在外楞的荷載: P = (1.2×34.06+1.4×6)×0.25×0.5/2=2.772kN; V-外楞計(jì)算最大剪力(N);外楞的最大剪力:V = 0.65×2771.685 = 9.01×102N;外楞截面抗剪強(qiáng)度必須滿足: 其中, -外楞截面的受剪應(yīng)力計(jì)算值(N/mm2); V-外楞計(jì)算最大剪力(N):V = 9.01×102N; A -鋼管的截面面積(mm2
60、):A = 500mm2; fv-外楞的抗剪強(qiáng)度設(shè)計(jì)值(N/mm2):fv = 205N/mm2;外楞截面的受剪應(yīng)力計(jì)算值: =2×9.01×102/500.000=3.603N/mm2;外楞截面的受剪應(yīng)力計(jì)算值 =3.603N/mm2 小于 外楞截面的抗剪強(qiáng)度設(shè)計(jì)值 fv=205N/mm2,滿足要求!3.外楞的撓度驗(yàn)算 根據(jù)建筑施工計(jì)算手冊(cè),剛度驗(yàn)算采用荷載標(biāo)準(zhǔn)值,同時(shí)不考慮振動(dòng)荷載作用。撓度驗(yàn)算公式如下: 其中,P-內(nèi)楞作用在支座上的荷載(kN/m):P = 34.06×0.25×0.50/22.13 kN/m; -外楞最大撓度(mm); l-計(jì)算跨
61、度(水平螺栓間距): l =500.0mm ; E-外楞彈性模量(N/mm2):E = 206000.00 N/mm2 ; I-外楞截面慣性矩(mm4),I=1.22×105;外楞的最大撓度計(jì)算值: = 1.146×4.26×100/2×5003/(100×206000×1.22×105) = 0.121mm;外楞的最大容許撓度值: = 2mm;外楞的最大撓度計(jì)算值 =0.121mm 小于 外楞的最大容許撓度值 =2mm,滿足要求?。?)穿墻螺栓的計(jì)算計(jì)算公式如下: 其中 N - 穿墻螺栓所受的拉力; A - 穿墻螺栓有效面積 (mm2); f - 穿墻螺栓的抗拉強(qiáng)度設(shè)計(jì)值,取170 N/mm2;查表得:穿墻螺栓的型號(hào): M14 ;穿墻螺栓有效直徑: 11.55
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 水泥沙子采購合同
- 授權(quán)經(jīng)銷合同協(xié)議
- 農(nóng)業(yè)科技園區(qū)綜合開發(fā)合同
- 短期租賃服務(wù)意外免責(zé)協(xié)議
- 網(wǎng)絡(luò)信息技術(shù)支持協(xié)議
- 商場(chǎng)裝修合同與商場(chǎng)裝修合同
- 打井承包合同
- 手房轉(zhuǎn)讓買賣協(xié)議
- 新版不定期勞動(dòng)合同書(33篇)
- 瓦工貼磚施工合同
- 城市綠化與生態(tài)環(huán)境改善
- 2024-2025學(xué)年中小學(xué)校第二學(xué)期師德師風(fēng)工作計(jì)劃:必看!新學(xué)期師德師風(fēng)建設(shè)秘籍大公開(附2月-7月工作安排表)
- 《急性心力衰竭的急救處理》課件
- 2025年高壓電工作業(yè)考試國家總局題庫及答案(共280題)
- 2024年中國養(yǎng)老產(chǎn)業(yè)商學(xué)研究報(bào)告-銀發(fā)經(jīng)濟(jì)專題
- 印刷公司生產(chǎn)部2025年年度工作總結(jié)及2025年工作計(jì)劃
- 2025年中考語文一輪復(fù)習(xí):八年級(jí)下冊(cè)知識(shí)點(diǎn)梳理
- 高教版2023年中職教科書《語文》(基礎(chǔ)模塊)下冊(cè)教案全冊(cè)
- 肺斷層解剖及CT圖像(77頁)
- LeapMotion教程之手勢(shì)識(shí)別
- 靜脈導(dǎo)管的護(hù)理與固定方法
評(píng)論
0/150
提交評(píng)論