船舶維修保養(yǎng)計劃課件_第1頁
船舶維修保養(yǎng)計劃課件_第2頁
船舶維修保養(yǎng)計劃課件_第3頁
船舶維修保養(yǎng)計劃課件_第4頁
船舶維修保養(yǎng)計劃課件_第5頁
已閱讀5頁,還剩18頁未讀 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

1、M.V: 輪 年度維修保養(yǎng)計劃表 ( )部Annual Maintenance Plan ( Dept.)格式:SMR-GEN012編號:部 門 長Head of Dept.: 制表日期Date of made out: 船 長Captain: 審核日期Date of audited 機務(wù)主管Superintendent: 審批日期Date of approved Remark: 1. in triplicate, one for head of department, one for captain, one for superintendent;2. Please take a mark

2、on month column; 3. Please submit this form to superintendent before 30th November every year 4. This form should be in hand over list when C/E and C/O sign off; 備注: 1.本表一式三份,一份部門長留底,一份船長,一份機務(wù)主管;2. 檢修項目在計劃月份中打“”;3.于每年11月30日上報機務(wù)主管;4.本表列入交接項目。Vessel_輪_annual maintenance plan年度維修保養(yǎng)計劃表( )部 department 頁次

3、: 1/5序號No.檢 查 內(nèi) 容(inspection content)月度month檢修負責(zé)人Inspect in charge養(yǎng)護負責(zé)人Maintain in charge養(yǎng)護周期period備注remark123456789101112一大副分管項目( the items in charged of C/O)1船殼外板和主甲板銹蝕損傷情況,除銹、油漆保養(yǎng)Check vessel hull and deck rusty condition,chipping,painting and maintaining大副C/O水手長bosun3個月3 months2各層甲板及其欄桿、護欄(鏈)、上下

4、扶梯銹蝕損傷情況,除銹、油漆保養(yǎng) Check rusty condition for each deck,guardrail or guardchain, gangway guardrail,chipping,painting and maintenance.大副C/O水手長Bosun3個月3 months3舷墻及欄桿銹蝕損傷情況,除銹、油漆保養(yǎng)Check bulwark and guardrail rusty condition,chipping,painting and maintain大副C/O水手長Bosun3個月3 months4貨艙、頂邊艙的骨材(包括肋骨、強肋骨、縱骨、縱樑等)、

5、艙壁(包括水密隔艙壁)、扶強材、斜坡板、肘板、內(nèi)底板銹蝕、損傷、變形、焊縫和涂層情況,除銹、油漆保;Stiffeners for cargo hold,top side ballast tank(include rib, vertical girder),cargo hold wall(include watertighting partition),supporter,heel plate,elbow plate,cargo hold bottom rusty condition,scathe,deform,weld line coat condition checking,chipping

6、,painting and maintaining.大副C/O水手長Bosun3個月3 months5艏尖艙、艉尖艙、雙層底壓載艙、錨鏈艙、深水艙的骨材(包括肋骨、強肋骨、縱骨、縱樑等)、艙壁(包括水密隔艙壁)、扶強材、肘板、各層平臺銹蝕、損傷、變形、焊縫和涂層情況;All stiffeners and tanks walls regarding to FPT,APT,ballast tanks,anchor chain tanks and F.W tanks,tanks top flats to be checked;rusty,damaged deformed,welded line an

7、d coat condition to be checked.大副C/O水手長/木匠Bosun/carpenter6個月6 months6日用淡水艙、爐水艙、隔離空艙的骨材(包括肋骨、強肋骨、縱骨、縱樑等)、艙壁(包括水密隔艙壁)、扶強材、肘板、各層平臺銹蝕、損傷、變形、焊縫和涂層情況All stiffeners and tanks walls regarding to daily F.W tanks,boiler water tank,insulating tanks to be checked,all tanks flats rusty,damaged deformed,welded li

8、ne and coat condition to be checked.大副C/O水手長/木匠Bosuncarpenter二年Two years7錨、錨鏈環(huán)、錨鏈筒、錨鏈卸克、錨鏈轉(zhuǎn)環(huán)、連接鏈環(huán)、制鏈器、鏈節(jié)標志,錨機底座、離合器、剎車裝置、傳動齒輪、操縱平臺、纜繩卷筒護欄等常規(guī)檢查、活絡(luò)加注牛油,外表清潔上油除銹油漆保養(yǎng)Anchor,anchor chain ring,anchor chain entry socket,anchor chain shackles,connecting chain ring,anchor chain stopper,chain length markers,w

9、indlass foundation,clutch,braker,driving gear,operation station,mooring rope roller,and its guardrail to be checked routinely,activated,greased,cleaning,chipping and painting.大副C/O水手長/木匠BosunCarpenter3個月3 months8絞纜機底座、離合器、剎車裝置、傳動齒輪、操縱平臺、纜繩卷筒護欄等常規(guī)檢查、活絡(luò)加注牛油,外表清潔上油除銹油漆保養(yǎng)Foundation for winch,clutch,brak

10、e apparatus,driving gear,operation station,mooring rope roller and guardrails to be checked frequently,activated and greased,chipped,cleaned and painted.大副C/O水手長/木匠Bosuncarpenter3個月3 months9舷梯機座、舷梯、滑車、鋼絲繩、卸克、橫擔(dān)等常規(guī)檢查、活絡(luò)加注牛油,外表除銹油漆保養(yǎng)Foundation for gangway,gangways,pulleys,wires,shackles,steps to be in

11、spected frequently,activated and greased,chipped and painted.大副C/O水手長/木匠BosunCarpenter3個月3 months10絞纜機剎車測試 The brake test of mooring winches大副C/O水手長/木匠Bosuncarpenter每年Each year11各層甲板的纜樁、導(dǎo)纜孔、導(dǎo)纜鉗、導(dǎo)纜輪、羊角、地令等常規(guī)檢查,活絡(luò)、除銹、油漆保養(yǎng)each deck mooring rope bollard,mooring ropes guiders,mooring rope clamp,mooring r

12、ope wheels,sheep hooks,lashing eyes to be checked,activated,chipping and painting.大副C/O水手長Bosun3個月Months12各貨艙,泵艙(間)、SLOP(油輪)艙下艙扶梯銹蝕損傷情況All cargo holds,pump rooms,ladders to cargo hold to be checked,rusty condition,damage condition to be inspected.大副C/O水手長Bosun每航次Each voyage13污水井及其蜂窩巢(油輪的貨油泵、掃艙泵和艏壓載泵

13、進口濾器)清潔、疏通Bildge wells and its beehive(filters) to be cleaned and dredged.大副C/O木匠/水手長Bosuncarpenter每航次Each voyage14油輪惰性氣體控制盤Oil tanker inert gases control set(for oil tanker,no applicable)大副C/O水手長Bosun每航次Each voyage15油輪惰性氣體甲板水封Oil tanker inert gases deck water seal(for oil tanker,no applicable)大副C/O

14、水手長Bosun每航次Eachvoyage16油輪惰性氣體控制閥Oil tanker inert gases control valve(for oil tanker,no applicable)大副C/O水手長Bosun每航次Each voyage17測氧儀、測爆儀檢查保養(yǎng)效用試驗Oxygen detector or explosion detector to be checked and efficiency confirmed大副C/O大副C/O每航次Each voyage 頁次: 2/5 序號檢 查 內(nèi) 容inspection content月度month檢修負責(zé)人Inspect in

15、 charge養(yǎng)護負責(zé)人Maintain in charge養(yǎng)護周期period備注remark12345678910111218各層甲板的通風(fēng)筒、透氣管(帽)、防火網(wǎng)、測量管常規(guī)檢查,外表除銹油漆保養(yǎng),Ventilators,vent pipe(cap),fire damper,sounding pipes on each deck to be checked routinely,chipped,cleaned and painted.大副C/O水手長/木匠Bosuncarpenter3個月3 months19煙囪及防火網(wǎng)檢查,外表除銹油漆保養(yǎng)Funnel and its fireproof

16、 nets to be checked,chipped,cleaned and painted.大副C/O水手長Carpenter3個月320各層甲板和艙室(間)的水密門、水密門窗、百葉窗,生活區(qū)內(nèi)的門(自閉門)、窗、蓋,機艙天窗、泵房天窗檢查,外表除銹油漆保養(yǎng)、標識Watertight doors,watertight windows,shutters on each deck and cabins,all doors(auto-shut down doors) windows,covers on living area,E/R skylight,pump room skylight to

17、be checked,chipped.cleaned and painted.大副C/O水手長/木匠BosunCarpenter3個月3 months21舵機間、冷藏機間、空調(diào)機間、應(yīng)急發(fā)電機間(或蓄電池間)、應(yīng)急消防泵間、艏艉側(cè)推器間的圍壁、天花板、地板(地板格柵)的清潔、除銹、油漆保養(yǎng)Steering gear room,refrigerator room,air condition room,emergency alternator(battery room),emergency fire pump room,abow thrusters room wall,ceiling,floors

18、 to be cleaned,chipped and painted.大副C/O水手長bosun1個月month22艙蓋和艙口圍的框架、圍板、扶強材、肘板、滾輪及輪軸等檢查銹蝕、損傷、變形、焊縫、水密情況,活絡(luò)加注牛油、外表除銹油漆保養(yǎng)Frames or stiffeners on hatch covers and hatch coaming,rollers and its shafts to be checked,condition for rusty,scathe,deform,weld line,watertight to be checked,activated and greased

19、,chipped and painted.大副C/O水手長/木匠Bosuncarpenter1個月1 month23桅桿、旗桿、燈桅、大桅、將軍柱的加強肘板、固定鋼絲繩、地令等檢查,外表除銹活絡(luò)油漆保養(yǎng)Stiffeners,secure wires and lashing eyes for masts,light mast and main mast to be checked,cleaned,chipped,activated and painted.大副C/O水手長Bosun1個月1month24油輪的貨油泵間、艏泵間的骨材(包括肋骨、強肋骨、縱骨、縱樑等)、艙壁(包括水密隔艙壁)、扶強材

20、、肘板、各層平臺(或格柵)銹蝕、損傷、變形、焊縫和涂層情況(for oil tanker,no applicable)Stiffeners(rib stiffeners,vertical stiffeners and girders) for oil tanker cargo oil pump room,forecastle pump room,each flats rusty condition,damage conditiondeform and weld line and coat condition to be checked大副C/O水手長bosun3個月3month25甲板消防管、

21、液壓管、空氣管、電纜管、燃油加裝管、大型固定滅火系統(tǒng)管系,貨油裝卸管、掃洗艙管、蒸汽管、絕熱保護(油輪)檢查,外表除銹油漆保養(yǎng) Fire fighting pipes,hydraulic oil pipes vent pipes cables pipes,bunkering pipes,fixed extinguishing gas pipes system,cargo oil load and unload pipes to be checked,cleaned,chipped and painted.大副C/O水手長bosun3個月3month26甲板艙室(包括滅火系統(tǒng)艙室、起貨機配電室、

22、艏樓各艙室、油輪的貨油泵控制室等)的圍壁、天花板、地板(地板格柵)的清潔、除銹、油漆保養(yǎng)Enclose walls for deck cabin(include extinguisher system room,derrick pump room,forecastle each cabins),ceiling,floors to be cleaned,chipped and painted.大副C/O水手長bosun3個月3 month27移動式角梯、橋板,舷旁出水口孔活動擋板檢查修理保養(yǎng)Portable ladders,bridge board,scupper mobile baffling

23、s to be maintained.大副C/O一級水手AB3個月328各種軟繩梯(包括引水梯)檢修保養(yǎng)All kind of jacobs ladder(include pilot ladder)to be maintained大副C/O水手長Bosun3個月329各種帆布制品(包括艙蓋、救生艇、繩梯、分羅經(jīng)、風(fēng)斗罩等)檢查、修補、保管All kind of tarpaulin produces(include hatch covers,lifeboat,rope ladder,ventilator entry cover ,repeat compass cover etc)to be in

24、spected,patched and stored大副C/O水手長Bosun3個月3month30防鼠檔、各種靠把(碰墊)、撇纜、止纜索檢修保管Rat guards,all kind of fenders,heaving rope and stop rope to be maintained and stored.大副C/O水手長Bosun3個月3month31拖帶設(shè)備及屬具:拖樁、拖鉤、拖弓拖曳絞車外殼等檢查除銹油漆保養(yǎng)Towing equipments and its accessorial:towing bitts(bollard),towing hooks,etc to be ins

25、pected,chipped,painted and maintenance.大副C/O水手長Bosun3個月3month32外接船殼防護裝置Proventing equipments installed around vessel hull outside to be inspected大副C/O電機員E/E1個月monthly33廚房設(shè)備、冰庫、餐廳衛(wèi)生清潔Kitchen equipments,refrigerating room,mess-rooms to be cleaned大副C/O廚工chef經(jīng)常often 頁次: 3/5 序號檢 查 內(nèi) 容inspection content月度

26、month檢修負責(zé)人InspectIn charge養(yǎng)護負責(zé)人MaintainIn charge養(yǎng)護周期period備注remark12345678910111234各油水艙(柜)道門檢查水密情況Manholes watertight condition for all oil and water tanks to be checked 大副C/O木匠carpenter1個月Monthly35駕駛臺的操舵?zhèn)鲃舆B接機構(gòu),太平舵及操縱裝置檢查加油潤滑Steering gear operating system all junction structure,steering gear and its

27、 operation apparatus to be inspected and greased.大副C/O一級水手AB每航次voyage36駕駛臺的海圖室、電羅經(jīng)室、電報房、變流機間、蓄電池間等清潔油漆保養(yǎng)Chart room on bridge,gyro compass room,telegraph room,transducer room and battery room to be cleaned,greased and maintained大副C/O一級水手AB1個月Monthly37開關(guān)艙鋼絲繩、艙口壓條、木楔清潔上油檢查除銹油漆保養(yǎng)Wires for hatch covers,s

28、teel plates for hatch coaming,chockes to be inspected and maintained大副C/O一級水手AB1個月Monthly38甲板部工具保管整理All tools for deck department to be safekeeped and sorted well大副C/O水手長Bosun經(jīng)常Often39木匠工具保管整理Tools for carpenter to be safekeeped and sorted well大副C/O木匠Carpenter經(jīng)常Often40貨艙燈、水密插座箱檢查保養(yǎng)Lights for cargo h

29、olds,electrical outlet watertight box to be maintained大副C/O水手長Bosun1個月Monthly41貨艙污水系統(tǒng)、壓載水系統(tǒng)的閥門(甲板上)檢查活絡(luò)上油Bildge system for cargo hold,all valves on deck for ballast tanks system to be inspected,activated and greased.大副C/O木匠carpenter1個月Monthly42甲板落水管、生活區(qū)淡水管、衛(wèi)生海水管、下水道等檢查,清通除銹油漆Scuppers on deck,F.W pip

30、es on living area,S.W pipes for sanitation,all sewers to be inspected and dredged,outside cleaned and painted.大副C/O水手長/木匠BosunCarpenter1個月Monthly43航行燈、大桅照明燈、錨燈等檢查水密、換燈泡、油漆Watertighting condition for navigation light,mast illuminating lights,anchor light to be checked,bulbs renewed if out of order.大副

31、C/O一級水手AB每航次voyage44各層外走廊燈、強光工作燈燈具清潔油漆Covers or frame for hallway lights on each floor,strong ray working lightsTo be cleaned and maintained大副C/O水手長Bosun1個月monthly45油輪裝卸設(shè)備:接地電纜、輸油軟管、悶蓋、紙柏床及螺絲存放通等檢查清潔( for oil tanker ,no applicable)大副C/O水手長/木匠Bosuncarpenter每航次voyage46油輪大艙閥門、甲板裝卸油管閥門、貨油泵和掃艙泵、艏壓載泵進出口閥門

32、以及貨油泵和掃艙泵軸承位等檢查活絡(luò)加油油漆標識(for oil tanker,no applicable)大副C/O水手長/木匠Bosuncarpenter每航次Voyage47貨油艙液位報警系統(tǒng);alarm system of level for cargo oil tanks(for oil tanker,no applicable)大副C/O電機員E/E每航次Voyage48油輪洗艙機及附屬設(shè)備清潔檢修(for oil tanker,no applicable)大副C/O水手長Bosun1個月Monthly49油輪排油監(jiān)控系統(tǒng)(ODM系統(tǒng))清潔、模擬試驗(for oil tanker,n

33、o applicable)大副電機員E/E每航次voyage50防油污器材檢查維護保養(yǎng)Oil pollution prevention appliance to be inspected and maintained大副/輪機長C/O C/E水手長/木匠BosunCarpenter1個月monthly51各種技術(shù)資料、技術(shù)圖紙收集整理歸檔All technical instruction and blueprint in charge to be sorted and collected,inventory大副C/O大副C/O最新有效In effect52系纜用的鋼絲繩、尼龍纜檢查,清潔上油涼

34、曬Wires for mooring rope,nylon ropes to be inspected,cleaned and greased大副C/O水手長Bosun1個月monthly53甲板及生活區(qū)各種管系閥門檢查活絡(luò)上油All pipes and valves on deck and living area to be inspected and greased大副C/O木匠Carpenter1個月monthly54系固設(shè)備:固定立柱、活動立柱、地令、眼板、滑車、卸扣、法蘭、鋼絲繩、鋼絲扣、綁扎鏈條、屬具Lashing equipments:fixed stanchion,portab

35、le stanchion,lashing eyes,eyes plates,pulleys,shackles,flanges.wires,wire buckles,lashing chain and its accessorials to be inspected and maintained.大副C/O水手長/木匠Bosuncarpenter每航次voyage55起貨設(shè)備及屬具:桅柱及轉(zhuǎn)盤、操縱室、吊桿本體,支撐架,吊貨、千斤及邊蓋卷筒,吊貨平臺,桅房內(nèi)部及機器地板,各類鋼絲、滑車,吊貨鉤頭及卸扣,所有牛油嘴等。養(yǎng)護內(nèi)容包括:(1)除銹、油漆,(2)清潔、活絡(luò),(3)限位檢查、運行測試、整理

36、卷盤、檢查操縱室及擋風(fēng)玻璃,(4)修理、恢復(fù)、換新。Cargo Gears:post jib and wheel,operator cabin,derricks orcranes boom,supporters,luffing or slewing inch,cargo winches,platform,posthouse,chair-seat,glasses and inner floorsunder winches,cargo runner,luffing wire and slewing wire or guides,guys,blocks,cargo hooks,sheaves,and

37、 all grease nipples etc.Maintenance content including: (1)derusting,painting,(2)cleaning,moveable-making,(3)limit switch inspection,running test,clear up,fix up seat and glasses,(4)repairing,fair up,renewal.大副C/O水手長/木匠Bosuncarpenter每航次voyage56系固設(shè)備:固定鐵立柱、活動鐵立柱、活動木立柱、地鈴、眼板、鋼絲(中層鋼絲、地腳鋼絲、上層鋼絲)、鏈條、卸扣、滾輪卸

38、扣、開口滑車、花籃螺絲、卡拉拇、鐵線、白棕繩、拉緊器。養(yǎng)護內(nèi)容包括:(1)除銹、油漆,(2)清潔、活絡(luò)、加油,(3)檢查、整理、存放保管,(4) 修理、恢復(fù)、換新。Deck Securing Devices or Materials:fixed stanchions,moveable stanchions,wood stanchions,deck rings,lashing wires,chains,shackles,roller shackles,blocks,turnbuckles,clamp,secure machine,iron,manila ropes etc.Maintenance

39、 content including: (1)derusting,painting,(2)cleaning,greasing,moveable-making,(3)inspection,clear up,store in places,(4)repairing,fair up,renewal.大副C/O水手長/木匠Bosuncarpenter每航次voyage57加油活絡(luò):(1)起貨機各類卷筒、滑車、轉(zhuǎn)軸、馬達部位,(2)錨機、前后絞纜機,(3)上述(1)、(2)齒輪、剎車,(4)救生艇及艇架,(5)舷梯、伙食吊及引水舷梯,(6)上述(1)、(3)、(4)鋼絲,(7)艙蓋、千斤頂、緊固件、滾輪

40、及鉸鏈等,(8)水密門把手,(9)貨艙通風(fēng)筒、各類鵝頸通風(fēng)筒鉸鏈及開關(guān)把手,(10)壓載水閥、污水閥及各類測量孔、蓋,(11)集油槽螺絲或旋塞,(12)導(dǎo)纜輪、樁、桿等。養(yǎng)護內(nèi)容包括:(1)清潔、活絡(luò)、牛油嘴加油,(2)疏通、更換牛油嘴,(3)各類鋼絲加油(4)除銹、油漆。Greasing Points: (1)derrick or crane winches,blocks,sheaves,twistler,motor part,(2)windlass,capstan,(3)above gears and brakes,(4)lifeboats winches and davits sheav

41、es,(5)gangway,provision crane,pilot gangway winches and sheaves,(6)varies wires or fallings,(7)hatch covers,high-jack,cleat,roller,guider and hinges,(8)water-tight doors,(9)hold vents,gooseneck or wall vents,(10)ballast valves,bilges valves,and its sounding caps,screws,(11)save-all plugs,screws,(12)

42、hawser leader,roller,etc.Maintenance content including: (1)cleaning,greasing,moveable-making,(2)go-through,renewal nipples,(3)varies wire greasing, (4)derusting,painting.大副C/O水手長/木匠Bosuncarpenter每航次voyage58貨艙浸水報警系統(tǒng)和艏排水系統(tǒng)(針對散貨船)檢查效用試驗;For bulk carrier ship,the ingress water system(cargo holds) and de

43、-water system to be carry out check and test in good order.大副C/O水手長/電機員Bosun/E/E每個月Monthly 頁次: 4/5 序號檢 查 內(nèi) 容inspection contents月度month檢修負責(zé)人InspectIn charge養(yǎng)護負責(zé)人MaintainIn charge養(yǎng)護周期period備注remark123456789101112以說明書為基礎(chǔ),并結(jié)合具體實際情況而定。Based on instruction,made a decision according to actual status.二二副分管項

44、目items in charged by 2nd officer1駕駛臺磁羅經(jīng)、電羅經(jīng)、計程儀、水壓計程儀等清潔保養(yǎng)Magnetic compass,gyro compass,distance instrument,etc to be cleaned and maintained二副2/O二副2/O3個月three month2六分儀、望遠鏡、傾斜儀、天文鐘、時鐘、子母鐘、風(fēng)速儀、氣壓表、秒表等清潔保養(yǎng)按時上弦、對時;Sextant telescope,clinometer, astronomical clock,clock,anemometers ,marine aneroid barome

45、ters,stop watches to be cleaned and maintained,keep their accurating.二副2/O二副2/O經(jīng)常often3信號旗、信號桿、信號繩及附屬設(shè)備檢查保養(yǎng)Signal flag, holyard and its accessorials to be maintained二副2/O一級水手AB1個月month4航行燈、錨燈、信號燈(架)、船名燈、通訊燈、通話管、電話、電警報器、警鐘(聲響信號)檢查保養(yǎng)Navigation lights,anchor light,signal lights(frame),vessel name light

46、,communication lights,talk pipe,telephone,ele-alert,alarm to be inspected and maintained.二副2/O一級水手AB1個月monthly5電車鐘、車鐘及傳動設(shè)備和防護罩清潔Engine telegraph and its transmission apparatus and shelter to be cleaned二副2/O一級水手AB經(jīng)常often6氣笛、電笛、自動霧笛檢查、拉索、滑輪檢查潤滑Ele-horn,piston horn and auto-fog whistle(bell) to be checked and greased二副2/O一級水手AB1個月Month7雷達、船用對講機、定位儀、GPS、AIS、NAVTEX、打印機、船用內(nèi)部電話、DSC、測深儀檢查維護清潔保養(yǎng)Radar,walkie-talkie,GPS,AIS,NAVTEX,printer,intercom,DSC,depth(echo) sounder to be inspected and cleaned and maintained二副2/O二副2

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論