1、文件類型Documenttype文件頁數(shù)Pages版次Version修訂說明Revisionnote受控編號(hào)ControllednumberGH201版Version1首次1st儲(chǔ)罐充水試壓方案TankHydro-testPlan22012年11月1日Nov.1,2012版次Edition日期Date編制Formulatedby審核Reviewedby批準(zhǔn)Approvedbyo中國化學(xué)工程第十三建設(shè)有限公司The13thConstructionCo.,Ltd.ofCNCE儲(chǔ)罐充水試壓方案TankHydro-testPlan3錄Contents1 適用范圍RangeofApplication22
2、 編制依據(jù)FormulationBasis23 工程概況General24 施工工序ConstructionProcedure35 施工步驟及方法ConstructionProcedureandMethod45.1 檢查內(nèi)容Checkthecontents:45.2 準(zhǔn)備工作Preparatorywork:45.3 充水試驗(yàn)應(yīng)符合下歹U規(guī)定Thehydro-testshallbeincompliancewithfollowingregulations55.4 水壓試驗(yàn)示意圖Hydro-testDiagram65.5 充水過程檢查InspectionforWaterFillingProcess7
3、5.6 充水試驗(yàn)方法Hydro-testmethod85.7 基礎(chǔ)沉降觀測(cè)FoundationSettlementObservation105.8 放水檢查InspectionforWaterDraining125.9 試壓技術(shù)要求TechnicalRequirementsforPressureTest136 質(zhì)量管理QualityManagement136.1 質(zhì)量保證體系QualityGuaranteeMeasures:136.2 質(zhì)量保證措施QualityGuaranteeMeasures:147 質(zhì)量管理QualityManagement157.1 安全保證體系Safetyassura
4、ncesystem:157.2 安全保證措施計(jì)戈UPlanningforsafetyassurancemeasures:16人力計(jì)戈UVII.PlanningforLaborForces18九機(jī)具準(zhǔn)備VII.PreparationsofMachinesandTools18十工作危險(xiǎn)源分析評(píng)估及預(yù)防Work-relatedHazardAnalysisEvaluationandPrevention19一.適用范圍RangeofApplication1.本方案適用于塞拉尼斯(南京)乙?;虚g體有限公司工業(yè)乙醇項(xiàng)目八期改造擴(kuò)建罐區(qū)4臺(tái)儲(chǔ)罐的充水試驗(yàn)的施工。Thisplanisapplicabletot
5、heexecutionofthehydro-testfor4tanksinthemodificationandexpansionofthetankfarmofCelaneseChinaFastProject.二.編制依據(jù)FormulationBasis1) 鋼制焊接常壓容器SteelWeldedAtmosphericPressureVesselsJB/T4735-19972) 立式圓筒形鋼制焊接油罐施工及驗(yàn)收規(guī)范CodeforConstructionandAcceptanceofWeldedSteelOilTankofVerticalBarrelShapeGB50128-20053) 石油化工
6、鋼儲(chǔ)罐地基與基礎(chǔ)施工及驗(yàn)收規(guī)范SpecificationforConstructionandAcceptanceofSteelStorageTankSubgrade&FoundationinPetrochemicalIndustrySH3528-934) 大型焊接低壓儲(chǔ)罐設(shè)計(jì)與建造DesignandConstructionofLarge,Welded,Low-pressureStorageTanksAPI620-20095) 塞拉尼斯技術(shù)要求及相關(guān)過程規(guī)定Celanesetechnicalrequirementsandrelatedprocessregulations.工程概況General序
7、號(hào)No.位號(hào)Item名稱Description規(guī)格Spec.設(shè)備凈重Netweightofequipment(t)Weightafterwaterfilling充水后重(t)水water(m3)設(shè)計(jì)壓力DesignpressureMpaFillingheight充水高度(m)1V-732產(chǎn)品罐Producttank()1095*975054.34930.6763-0.00154/0.0999.752V-733產(chǎn)品罐Producttank()10795*975054.34930.6763-0.00154/0.0999.753V-744倒液罐Off-spectank()10795*975054.3
8、4930.6763-0.00154/0.0999.754V-737清洗罐Cleaningtank8660*975035.84599.8488-0.00154/0.0999.75Waterdraining五.施工步驟及方法ConstructionProcedureandMethod儲(chǔ)罐已制作完成,且具備水壓試驗(yàn)條件,充水試驗(yàn)前應(yīng)對(duì)罐體進(jìn)行聯(lián)合檢查,罐體無損檢測(cè)機(jī)所有配件、附件安裝檢測(cè)完畢檢查合格后對(duì)罐體內(nèi)進(jìn)行清掃封閉人孔等,開始充水,進(jìn)行充水試驗(yàn)。充水過程中充水試驗(yàn)要求與土建基礎(chǔ)沉降觀測(cè)結(jié)合起來,設(shè)置專人對(duì)進(jìn)水和放水時(shí)間進(jìn)行監(jiān)控,發(fā)現(xiàn)異常情況應(yīng)及時(shí)處理,處理合格后方可繼續(xù)上水。充水試驗(yàn)結(jié)束后,罐
9、體內(nèi)的水應(yīng)按業(yè)主要求和排放位置及時(shí)排放。Beforethehydro-test,thetankshellshallbejointlyinspected.AfterNTDofthetankshell,andallfittingsandaccessoriesareinstalled,tested,inspectedandaccepted,cleanthetankinsideandclosethemanhole,fillwaterandtakethehydro-test.Duringwaterfilling,thehydro-testrequirementsshallbecombinedwithth
10、ecivilstructurefoundationsettlementobservation,personnelshallbespeciallyassignedformonitoringthefillinganddrainingtime,anyabnormalityshallbetreatedintime,nowatercanbefilledinbeforethetreatmentisaccepted.Aftercompletionofthehydro-test,thewaterinthetankshellshallbepromptlydrainedaccordingtotheownersre
11、quirementsandthelocationfordraining.5.1 儲(chǔ)罐制造完畢后,進(jìn)行充水試驗(yàn),并檢查下列內(nèi)容:Hydro-testwillbetakenafterthetankisfinishedinfabrication,andthefollowingcontentshallbechecked:1)罐底嚴(yán)密性。Tightnessofthetankbottom2)罐壁強(qiáng)度及嚴(yán)密性。Strengthandtightnessofthetankshell3)固定頂?shù)膹?qiáng)度及嚴(yán)密性。Strengthandtightnessofthefixedroof4)固定頂?shù)姆€(wěn)定性。Stability
12、ofthefixedroof5)基礎(chǔ)的沉降觀測(cè)。Settlementobservationforthefoundation5.2 壓力試驗(yàn)前,首先做好以下準(zhǔn)備工作:Thefollowingpreparationsshallbemadebeforethepressuretest:1)檢查罐外形尺寸、附件安裝是否符合要求。Checkifthetankoutlinedimensionandaccessoryinstallationsatisfyrequirements.2)充水前將罐內(nèi)雜物清理干凈后進(jìn)行封閉,罐壁上的接管均用臨時(shí)盲板封閉,人孔用人孔法蘭蓋封閉。Beforewaterfilling,c
13、leanoutsundriesinthetankandcloseit,closethenozzleonthetankshellwithtemporaryblind,andclosethemanholewiththemanholeflange.3)檢查罐管口、法蘭是否已焊接完,是否有漏焊部位。Checkifthetanknozzleandflangearefinishedinwelding,andiftheweldingonanypartismissed.4)接管補(bǔ)強(qiáng)圈用壓縮空氣氣密工作已做完,且合格。Theairtightworkofthecompressedairusedforthenozz
14、lereinforcingringhasbeencompletedandqualified.5)水源采用消防儲(chǔ)罐的低壓消防水,壓力為1.5MpaoThewaterissourcedfromthelowpressurefirewaterofthefiretank,andthepressureis1.5Mpa.6)沉降觀測(cè),儲(chǔ)罐選定4個(gè)沉降觀測(cè)點(diǎn)。Settlementobservation:4settlementobservationpointsareselectedfortanks.7)完成罐充水前沉降觀測(cè)點(diǎn)和基準(zhǔn)點(diǎn)的設(shè)置,并測(cè)量0水位時(shí)各測(cè)點(diǎn)的標(biāo)高。Setupsettlementobserva
15、tionpointsandreferencepointsbeforewaterfillingforthetank,andmeasuretheelevationofeverymeasuringpointwhenthewaterlevelis0.8)碳鋼儲(chǔ)罐試驗(yàn)應(yīng)采用潔凈水,試驗(yàn)用水溫不低于5C。TheCStanktestshalladoptcleanwater,andthewatertemperatureusedforthetestshallnotbelowerthan5C.9)V-737不銹鋼儲(chǔ)罐試驗(yàn)用水氯離子含量不得超過25mg/L。Thecontentofthechlorideioninw
16、aterusedforV-737SStanktestshallnotbemorethan25mg/L.10)完成罐充水前沉降觀測(cè)點(diǎn)和基準(zhǔn)點(diǎn)的設(shè)置,并測(cè)量0水位時(shí)各測(cè)點(diǎn)的標(biāo)高。Setupthesettlementobservationpointandthereferencepointbeforewaterfillingforthetank,andmeasuretheelevationofeverymeasuringpointwhenthewaterlevelis0.5.3 充水試驗(yàn)應(yīng)符合下列規(guī)定:Thehydro-testshallbeincompliancewithfollowingregul
17、ations:1)充水和放水過程中,打開放空孔,基礎(chǔ)避免浸水。Duringwaterfillinganddraining,openthe2)充水時(shí)嚴(yán)格控制上水、停水的進(jìn)程,隨時(shí)檢查水位。Duringwaterfilling,strictlycontroltheprocessofwaterfillingandwatercutoff,andcheckthewaterlevelanytime.3)當(dāng)?shù)谝慌_(tái)儲(chǔ)罐進(jìn)行充水試驗(yàn)時(shí),應(yīng)充水時(shí)快速充水到罐高的1/2,進(jìn)行沉降觀測(cè),當(dāng)不均勻沉降量小于5mm/天時(shí),繼續(xù)充水到罐高的3/4進(jìn)行觀測(cè),當(dāng)充水到(設(shè)計(jì)液位一1米)進(jìn)行正壓試驗(yàn),當(dāng)不均勻沉降量仍小于5mm/
18、天時(shí),繼續(xù)充水到最高操作液位,并保持48小時(shí)后進(jìn)行觀測(cè),當(dāng)沉降量無明顯變化即可放水,放水時(shí)做負(fù)壓試驗(yàn),當(dāng)沉降量有明顯變化,則保持最高操作液面,每天進(jìn)行定期觀測(cè),直至沉降穩(wěn)定為止。Whenthehydro-testistakenforthefirsttank,thewatershallbequicklyfilledtothepointof1/2ofthetankheightduringwaterfilling,observethesettlement,whentheunequalsettlementisstilllessthan5mm/day,goonfillinginwatertothepoi
19、ntof3/4ofthetankheightforobservation;whentheunequalsettlementisstilllessthan5mm/day,goonfillinginwatertothehighestoperatinglevel,andobserveitaftermaintaining48hrs,ifthesettlementdoesntobviouslychange,thewatercanbedrained,ifthesettlementobviouslychanges,keepthehighestoperatinglevel,andobserveitregula
20、rlyeveryday,untilthesettlementissteady.4)當(dāng)?shù)谝慌_(tái)儲(chǔ)罐罐基沉降量符合要求后,其余各罐充水試驗(yàn)時(shí)可取罐高的1/2和3/4進(jìn)行兩次觀硬U。Afterthefoundationsettlementofthefirsttankmeetsrequirements,whenthehydro-testistakenfortheresttanks,thesettlementwillbeobservedtwicerespectiveatthepointof1/2and3/4heightofthetank.5)基礎(chǔ)沉降觀測(cè)早、晚各觀測(cè)一次,每次的沉降數(shù)據(jù)做好統(tǒng)計(jì),并描繪出基
21、礎(chǔ)沉降變化圖,便于分析。罐基礎(chǔ)沉降允許值(均勻沉降值)Allowablevalueofthetankfoundationsettlement(equalsettlementvalue)儲(chǔ)罐位號(hào)TankNo.罐內(nèi)徑(mm)innerdiameteroftank任意直徑方向最終沉降差允許值(mm)AllowablevalueofthefinalsettlementdifferenceinanydiametricaldirectionV-73210668160mmV-73310668160mmV-74410668160mmV-7378534128mmReferencevalve:Allowablev
22、alueofthetankfoundationsettlement(equalsettlementvalue)Attachedtable1FloatingrooftankandinnerfloatingrooftankFixedrooftankValve31任A宜f令方向JH終況脩差汴呼低D22n,(HSD參考數(shù)值:基礎(chǔ)沉降型許可值附表1浮質(zhì)嶂與內(nèi)附丁更D(,】J任總應(yīng)使方向俄終歷降整許時(shí)優(yōu)Dn】,22cpM和OJJ06D22Otif任】口4。(JM值口hDi;(ifUiiKD4UD6。03)(14D5.4水壓試驗(yàn)示意圖:Hydro-testDiagram消防帶firehose臨時(shí)管線接入口T
23、emporarypipeaccess儲(chǔ)備瞿tank$108*6在罐區(qū)內(nèi)的泡沫消防臨時(shí)接入處,用臨時(shí)管線(閥Valve4108X6另一臺(tái)儲(chǔ)罐anothertank壓力表pressuregauge污水井drainwellInsidediameteroftankD(m)AllowablevalueofthefinalsettlementdifferenceinanydiametricaldirectionInsidediameteroftankD(m)Allowablevalueofthefinalsettlementdifferenceinanydiametricaldirection小108*6
24、接到儲(chǔ)罐泡沫降落槽接口上;Connectthetemporarypipe(小108*6totheaccessofthetankfoamdescendinggrooveatthetemporaryaccessoffoamfire-proofinthetankfarm.按上圖所示建立試壓系統(tǒng);Establishthepressuretestsystemaccordingtotheabovediagram.5.5充水過程檢查:InspectionforWaterFillingProcess1)進(jìn)水時(shí)專人看守進(jìn)水閥門,嚴(yán)格控制水源大小,同時(shí)找專人通過u型計(jì)觀察儲(chǔ)罐實(shí)際充水量并與進(jìn)水人員配合,過程為1/
25、2液位高度一3/4液位高度一滿水高度-1米一滿水高度Thesecurewaterwhentheinletvalve,strictcontrolofwaterthesizeof,atthesametimetofindsomeonethroughtheU-meterObservethethetanksactualchargewaterandinfluentpersonnelwiththeprocessfortheliquidleveloftheliquidlevel-1/23/4HeigM一一fullofwaterfullofwaterheight2)充水試驗(yàn)中應(yīng)加強(qiáng)基礎(chǔ)沉降觀測(cè),如基礎(chǔ)發(fā)生不允許
26、的沉降,應(yīng)停止充水,待處理后,方可繼續(xù)進(jìn)行試驗(yàn)。Dointensifysettlementobservationduringthehydro-test,ifunallowablesettlementarisesfromthefoundation,thewaterfillingshalltop,anddonotgoonthetestbeforetreatment.3)充水和放水過程中應(yīng)打開罐頂人孔Doopenthemanholeonthetankroofduringtheprocessofwaterfillinganddraining.4)充水過程中應(yīng)控制水的流速,水面上升的速度應(yīng)不超過0.9m
27、/h。Docontroltheflowspeedofwaterduringwaterfilling,andthespeedofwatersurfaceascentshallnotexceed0.9m/h.5)上水過程中在最高設(shè)計(jì)液位的50%和75%進(jìn)行罐體檢查。Duringwaterfilling,checkthetankbodyatthepointof50%and75%ofthehighestdesignlevel.充水水1P曲線1%Fillingwatertestcurvechart5.6 充水試驗(yàn)方法:Hydro-testmethod:1)罐底的嚴(yán)密性,應(yīng)以充水試驗(yàn)過程中罐底無滲漏為合格
28、,若發(fā)現(xiàn)滲漏,應(yīng)放水后進(jìn)行檢查補(bǔ)焊。Tightnessofthetankbottom:ifthetankhasnoleakageduringthehydro-test,itisacceptable,incaseofanyleakage,itshallbeinspectedandwelding-repairedafterwaterdraining.2)罐壁的強(qiáng)度及嚴(yán)密性試驗(yàn),應(yīng)以充水到設(shè)計(jì)最高液位并保持48h后,罐壁無滲漏、無異常變形為合格,發(fā)現(xiàn)滲漏時(shí)應(yīng)放水,使液面比滲漏處低300mm進(jìn)行修補(bǔ)。Strengthandtightnesstestforthetankshell:ifthetanksh
29、ellisfreeofleakage,abnormalityanddeformationafterthewaterisfilledtothehighestdesignlevelandmaintains48h,itisacceptable,incaseofanyleakage,thewatershallbedrainedtomakethewaterlevel300mmlowerthantheleakage.3)固定頂?shù)膹?qiáng)度及嚴(yán)密性試驗(yàn),打開閥門1,關(guān)閉閥門2,通過消防帶從罐頂部進(jìn)行上水,在上水至設(shè)計(jì)液面高度下1米處時(shí),用盲板封堵所有開孔,緩慢調(diào)節(jié)閥門1,緩慢上升,升壓至試驗(yàn)壓力(0.12Mpa)
30、時(shí),停止充水,進(jìn)行固定頂強(qiáng)度及嚴(yán)密性試驗(yàn),在罐頂涂以肥皂水檢查,試驗(yàn)后應(yīng)立即將罐頂孔開啟,與大氣相通,恢復(fù)至U常壓;Strengthandtightnesstestofthefixedroof:openValve1,closeValve2,andfillwaterfromthetanktopthroughthefirehose,whenthewaterisfilledtothepointof1mlowerthanthedesignlevel,blockallopeningsbyblinds,slowlyregulateValve1,thepressureslowlyrises,whenthep
31、ressurerisestothetestpressure(0.12Mpa),stopfillingwater,andconductthestrengthandtightnesstestforthefixedroof,applysoapywateronthetankroofforinspection,anddoopenthetankroofholeimmediatelyafterthetest,soastocontacttheatmosphereandrecovertonormalpressure.4)固定頂?shù)姆€(wěn)定性試驗(yàn),充水到設(shè)計(jì)最高液位時(shí),用盲板封堵所有開孔,打開閥門4、3,用放水方法進(jìn)行
32、固定頂?shù)姆€(wěn)定性試驗(yàn),緩慢降壓,達(dá)到試驗(yàn)負(fù)壓(-0.00162Mpa)時(shí),觀察罐頂(罐頂無異常變形為合格),試驗(yàn)后應(yīng)立即將孔開啟,與大氣相通,恢復(fù)到常壓;固定頂儲(chǔ)罐在充水到8754mm液位前,應(yīng)打開頂部人孑I。Stabilitytestforthefixedroof:whenthewaterisfilledtothehighestdesignlevel,blockallopeningswithblinds,openValve3andValve4,conductthestabilitytestofthefixedroofbywaterdraining,depressurizeditslowly,w
33、henitisuptothetestnegativepressure(-0.00162Mpa),observethetankroof(itisacceptableifthetankroofisfreeofabnormalityanddeformation),doopentheholeimmediatelyafterthetest,soastocontacttheatmosphereandrecovertonormalpressure.Theroofmanholeshallbeopenedbeforethewaterinthefixedrooftankisfilledtothelevel8754
34、mm.試驗(yàn)項(xiàng)目Testitem試驗(yàn)方法Testmethod合格標(biāo)準(zhǔn)Standardofacceptability罐底嚴(yán)密性tightnessoftankbottom充水試驗(yàn),觀察基礎(chǔ)周邊。Hydro-test,observetheperipheryofthefoundation.無滲漏為合格Itisacceptableifnoleakage.罐壁強(qiáng)度及嚴(yán)密性試驗(yàn)strengthandtightnesstestfortankshell充水至最圖設(shè)計(jì)液向,保持48h0Fillwatertothehighestdesignlevelandmaintain48h.無滲漏、無異常變形為合格Itisacc
35、eptableifnoleakageorabnormality.固定頂強(qiáng)度及嚴(yán)密性試驗(yàn)strengthandtightnesstestforthefixedroof罐內(nèi)充水到最高設(shè)計(jì)液位下1m,將所有開孔封閉,緩慢充水升壓,當(dāng)升至試驗(yàn)壓力時(shí),暫停充水,在罐頂涂以肥皂水檢查,試驗(yàn)后應(yīng)立即將罐頂孔開啟,與大氣相通,恢復(fù)到常壓Whenthewaterinthetankisf川edtothepointof1mlowerthanthedesignlevel,blockallopeningsbyblinds,slowlyfillwaterandboostpressure,whenthepressureri
36、sestothetestpressure,suspendthefillingofwater,applysoapywateronthetankroofforinspection,anddoopenthetankroofholeimmediatelyafterthetest,soastocontacttheatmosphereandrecovertonormalpressure.a)罐頂無異常變形Thetankroofisfreeofabnormalityanddeformation.b)未發(fā)現(xiàn)焊縫滲漏為合格Itisacceptableifnoleakageofweldedjointsisfoun
37、d.固定頂?shù)姆€(wěn)定性試驗(yàn)stabilitytestforthefixedroof充水到設(shè)計(jì)液位時(shí),用放水方法進(jìn)行試驗(yàn),緩慢降壓,達(dá)到試驗(yàn)負(fù)壓時(shí),觀察罐頂,試驗(yàn)后應(yīng)立即將孔開啟,與大氣相通,恢復(fù)到常壓。Whenthewaterisfilledtothedesignlevel,conductthetestbywaterdrainingmethod,depressurizeitslowly,whenitisuptothetestnegativepressure,doopentheholeimmediatelyafterthetestsoastocontacttheatmosphereandrecove
38、rtonormalpressure.罐頂尢異常發(fā)形Thetankroofisfreeofabnormalityanddeformation.5)當(dāng)考慮水的重復(fù)利用,第一臺(tái)罐水壓試驗(yàn)完畢后,緩慢打開閥3,將水直接排到第二臺(tái)罐里,待兩罐水位平衡后,關(guān)閉閥2,然后利用消防帶進(jìn)行上水;Inviewofrecyclingofwater,afterthefirsttankisfinishedinthehydro-test,slowlyopenValve3,directlydrainthewatertothesecondtank,afterthewaterlevelinthetwotanksisbalanc
39、ed,closeValve2,andthenfillwaterwiththefirehose.5.7 基礎(chǔ)沉降觀測(cè)FoundationSettlementObservation1)根據(jù)儲(chǔ)罐的體積和直徑,確定儲(chǔ)罐沉降觀測(cè)的點(diǎn)數(shù),見下圖。Makesurethenumberoftanksettlementobservationpointsaccordingtothevolumeanddiameterofthetank,seethefollowingdrawing.V-732/V-733markedraphofsertlemetifmarkedraphofsettkmentv744沉降標(biāo)識(shí)國mirke
40、dgraphofsettlementV-7374年布胭2)四臺(tái)儲(chǔ)罐分另1J選好基準(zhǔn)點(diǎn)為控制點(diǎn)。Referencepointsarerespectivelyselectedforthefourtanksascontrolpoints.3)空罐(上水前,第一次)一1/2液位高度(第二次)一3/4液位高度(第三次)一滿水高度(1小時(shí)第四次)一滿水高度-1米(第五次)一滿水高度(48小時(shí)后,第六次)一空罐(放水后,第七次)Emptytank(beforewaterfilling,thefirsttime)1/2waterlevel(thesecondtime)3/4waterlevel(thethir
41、dtime)fullwaterlevel(1hr,thefourthtime)fullwaterlevel(after48hrs,thefifthtime)empty(afterwaterdraining,thesixthtime)4)水壓試驗(yàn)過程中,應(yīng)緊密跟蹤罐體每次的沉降量,檢查其是否符合規(guī)范允許值。Duringthehydro-test,closelytrackthesettlementofthetankbodyeverytime,andcheckiftheysatisfythespecifiedallowablevalue.5)儲(chǔ)罐基礎(chǔ)沉降允許值:充水高度為:H/2(H為罐高),沉降量
42、5mm/d,充水高度為:3H/4,沉降量仍5mm/d,充水到最高液位后,保持48h觀測(cè),總沉降量25mm.Allowablevalueofthetankfoundationsettlement:thewaterfillinglevel:H/2(Histheheightofthetank),thesettlement5mm/d,thewaterfillingheightis3H/4,thesettlement5mm/d,afterthewaterisfilledtothehighestlevel,observeitfor48h,andthetotalsettlement25mm.6)為方便測(cè)出罐
43、內(nèi)液位的實(shí)際高度,從罐壁管口上接出一臨時(shí)閥門,并將軟管接從低接管接到罐頂,為防止塑膠管滑落,采用柔性材料將其臨時(shí)綁扎到腳手架靠里側(cè)。Inordertomeasuretheactualheightofthewaterlevelinthetank,extendatemporaryvalvefromthetanknozzle,andconnectthehosetothetankrooffromthelowernozzle,inordertopreventplasticpipefromsliding,bindittotheinnersideofthescaffoldtemporarilywithfle
44、xiblematerial.5.8 放水檢查InspectionforWaterDraining1)放水停留時(shí)間應(yīng)符合土建專業(yè)設(shè)計(jì)文件的要求Waterdrainingdetentiontimeshallbeincompliancewiththerequirementsofdesigndocumentsofthecivilworkdiscipline.2)儲(chǔ)罐試壓完畢后,放水應(yīng)排放到指定位置(罐區(qū)圍堰內(nèi)部排水溝),不可就地排放使基礎(chǔ)浸水;Afterthetankpressuretestisfinished,thewatershallbedrainedtothespecifiedposition,
45、andcannotbedrainedlocallyforfearoffoundationsoaking.3)罐內(nèi)應(yīng)徹底地進(jìn)行清掃,除去銹蝕,底板不應(yīng)有顯著的變形和明顯凸凹,各附件應(yīng)符合圖樣要求,且無異?,F(xiàn)象。Thetankshallbecompletelycleaned,rustshallberemoved,andbottomplatesshallbefreeofsignificantdeformationandobviousunevenness,allaccessoriesshallbeincompliancewithdrawingrequirements,andbefreeofanyabn
46、ormality.4)放水后及時(shí)將罐內(nèi)的積水和雜物清掃干凈,應(yīng)打開所有的管口和人孔,以加強(qiáng)罐內(nèi)的空氣流通,當(dāng)罐內(nèi)水吹干后,及時(shí)檢查,并用抹布清除干凈罐內(nèi)的水漬。Cleanupaccumulatedwaterandsundriesinthetankinpromptlyafterwaterdraining,allnozzlesandmanholesshallbeopened,soastostrengthenventilationinthetank,afterthewaterinthetankisdried,inspectitintimeandremovewaterstaininthetankwit
47、hrags.5.9 試壓技術(shù)要求TechnicalRequirementsforPressureTest1 .一般要求generalrequirements1)試壓工作開戰(zhàn)前,施工技術(shù)人員必須對(duì)參加試壓的所有人員進(jìn)行技術(shù)交底,安全交底,嚴(yán)格遵守安全鄉(xiāng)己律和操作規(guī)程。Beforestartofthepressuretest,technicalpersonnelofconstructionshallgivetechnicalandsafetypresentationtoallpressuretestparticipants,andabidebysafetydisciplinesandoperati
48、ngregulationsstrictly.2)劃定危險(xiǎn)區(qū),并安排人員負(fù)責(zé)警戒,禁止無關(guān)人員進(jìn)入。Dividedangerouszones,andarrangepersonstoberesponsibleforalert,andnoentryforunrelatedpersonnel.2 .試驗(yàn)時(shí)白要求testrequirements1)水壓試驗(yàn)時(shí),嚴(yán)禁對(duì)罐身、接口進(jìn)行敲打或修補(bǔ)缺陷,嚴(yán)禁帶壓修理,泄壓后再進(jìn)行修補(bǔ),缺陷消除后重新試壓。Duringthehydro-test,neitherknockthetankbodyornozzlenorrepairdefects,repairwithpr
49、essureisprohibited,andnorepairbeforepressurerelease,repeatthepressuretestafterremovalofdefects.2)罐頂穩(wěn)定性試驗(yàn)時(shí),確保安全裝置良好。Duringthestabilitytestforthetankroof,ensurethesafetydeviceisgood.3)負(fù)責(zé)降壓的操作人員必須控制升壓的速度,進(jìn)水,泄壓注意防空。Operatorswhoareresponsibleforreducingpressuremustcontrolthespeedofboostingpressure,wateri
50、nflowandpressurerelief,andpayattentionnottoemptying.4)水壓試驗(yàn)后,試壓用水必須由管道排放至指定地點(diǎn),不得就地排放。Afterthehydro-test,thewaterusedforpressuretestshallbedrainedtothespecifiedlocationthroughthepipe,donotdrainitlocally.6.質(zhì)量管理QualityManagement6.1 質(zhì)量保證體系QualityGuaranteeMeasures1項(xiàng)目經(jīng)理部質(zhì)量保證體系見施工組織設(shè)計(jì)。Forthequalityguarantee
51、systemoftheprojectmanagerdepartment,seetheconstructionorganizationdesignplease.2作業(yè)層質(zhì)量保證體系。Qualityguaranteesystemoftheoperationlevel施工班組長(zhǎng)(兼職質(zhì)檢員)施工班組6.2質(zhì)量保證措施QualityGuaranteeMeasures1)試驗(yàn)時(shí)每臺(tái)儲(chǔ)罐應(yīng)裝設(shè)1塊壓力表,1塊真空表,試驗(yàn)壓力以裝設(shè)在設(shè)備最高處的壓力表讀數(shù)為準(zhǔn)。Duringthetest,eachtankshallbeprovidedwithonepressuregaugeandonevacuumgauge
52、,andthetestpressureshallbebasedonthereadingofthepressuregaugemountedonthehighestpointoftheequipment.1.53倍。Thepressuregauge2)壓力表須經(jīng)校準(zhǔn),精度不低于1.5級(jí),量程為最大被測(cè)壓力的shouldbecalibrated,theprecisionshallnotbelowerthanGrade1.5,andthemeasuringrangeis1.5-3timesofthegreatestpressuremeasured.3)有專人看護(hù)壓力表,嚴(yán)禁超過規(guī)定的試驗(yàn)壓力。Pers
53、onnelshallbespeciallyassignedtowatchthepressuregauge,thetestpressureagainstregulationsisforbidden.4)嚴(yán)格控制上水、進(jìn)水、放水的過程,以避免超壓或抽空。Strictlycontroltheprocessofwaterfilling,waterinflowandwaterdraining,soastoavoidoverpressureoremptying.七.安全管理XSafetyManagement7.1 安全保證體系Safetyassurancesystem7.1.1 項(xiàng)目經(jīng)理部安全保證體系見施
54、工組織設(shè)計(jì);Forthesafetyassurancesystemoftheprojectmanagerdepartment,seetheconstructionorganizationdesignplease.7.1.2 作業(yè)層安全保證體系;SafetyassurancesystemoftheoperationlevelResponsibleEngineeroftheFull-timeSafetyInspectorconstructionConstructionShiftLeader(Part-timeSafetyInspector)Constructionshifts7.2 安全保證措施計(jì)
55、戈UPlanningforsafetyassurancemeasures7.2.1 一般要求:Generalrequirements:1壓力試驗(yàn)的各項(xiàng)準(zhǔn)備工作必須經(jīng)過我方質(zhì)量部門的自檢合格,安全工作經(jīng)過HSE經(jīng)理同意后方可開始進(jìn)行試壓工作。Allpreparationsforthepressuretestshallbeself-inspectedbyourqualitydepartmentandacceptable,andthepressuretestcannotbeconductedbeforethesafetyworkisapprovedbyHSEmanager.2所有參與壓力試驗(yàn)人員要進(jìn)
56、行崗位分工,責(zé)任明確;Allpressuretestparticipants,dutyshallbedividedwithclearresponsibility.3試壓時(shí)用警戒繩將儲(chǔ)罐圈出安全范圍,無關(guān)人員不得擅自靠近,以防止突發(fā)事故。Duringthepressuretest,thealertropeshallbeusedtoringthesafetyrangeofthetank,andunrelatedpersonnelshallnotapproachwithoutauthorization.4試壓時(shí)隨時(shí)注意環(huán)境溫度的變化,監(jiān)視壓力表的讀數(shù),防止發(fā)生超壓現(xiàn)象。Duringthepressuretest,payattentiontothevariationoftheambienttemperatureanytime,soastoavoidoverpressure.5試壓過程中,如發(fā)現(xiàn)有異常響聲、壓力下降或加壓裝置發(fā)生故障燈不正?,F(xiàn)象時(shí),應(yīng)立即停止試驗(yàn),并查明原因。Duringthepressuretest,incaseofanyDuringtheabnormalnoise,pressuredroporabnormalityarisenfro
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 黑土坡治理施工方案
- aq2006尾礦庫安全技術(shù)規(guī)程
- 玻璃橋維護(hù)施工方案
- 2025年蘭考三農(nóng)職業(yè)學(xué)院?jiǎn)握新殬I(yè)傾向性測(cè)試題庫審定版
- 2025年黃河交通學(xué)院?jiǎn)握新殬I(yè)適應(yīng)性測(cè)試題庫及參考答案
- 2025年重慶市樂山市單招職業(yè)適應(yīng)性測(cè)試題庫帶答案
- 2025年大慶醫(yī)學(xué)高等專科學(xué)校單招職業(yè)適應(yīng)性測(cè)試題庫參考答案
- 2025年哈爾濱傳媒職業(yè)學(xué)院?jiǎn)握新殬I(yè)技能測(cè)試題庫新版
- 5 g k h 教學(xué)設(shè)計(jì)-2024-2025學(xué)年語文一年級(jí)上冊(cè)統(tǒng)編版
- 環(huán)境科學(xué)與工程環(huán)境保護(hù)法規(guī)及案例分析試卷解析
- 2022年湖北省中小學(xué)教師高級(jí)職稱專業(yè)水平能力測(cè)試模擬題
- 住房公積金補(bǔ)償協(xié)議書
- 社會(huì)救助綜合信息管理平臺(tái)
- 中小學(xué)校傳染病預(yù)防控制工作管理規(guī)范及常見傳染病預(yù)課件
- 住宅項(xiàng)目實(shí)體樣板展示工藝策劃圖文并茂
- 數(shù)控車床操作培訓(xùn)課件
- 設(shè)備安裝工程監(jiān)理方案
- 工程經(jīng)濟(jì)學(xué)-邵穎紅-第五版-課后作業(yè)
- 湖北省中小學(xué)教師水平能力測(cè)試題
- 碩士研究生專業(yè)研究方向證明(模板)
- 遼寧職業(yè)技術(shù)學(xué)院?jiǎn)握小堵殰y(cè)》考前特訓(xùn)復(fù)習(xí)題庫(含答案)
評(píng)論
0/150
提交評(píng)論