1、PAGE PAGE 16 第 頁Construction & Organization DesignFor * Lingang 500MW Blade and Nacelle Project*風電臨港500MW 葉片和機艙項目施工組織設(shè)計目錄 Index TOC o 1-3 h z u HYPERLINK l _Toc235970742 第1部分施工組織設(shè)計總說明 PAGEREF _Toc235970742 h 1 HYPERLINK l _Toc235970743 1.1工程概況 Generals PAGEREF _Toc235970743 h 2 HYPERLINK l _Toc23597
2、0744 1.1.1項目情況 Condition PAGEREF _Toc235970744 h 2 HYPERLINK l _Toc235970745 1.1.2建筑結(jié)構(gòu)概況 General of Building Structure PAGEREF _Toc235970745 h 3 HYPERLINK l _Toc235970746 1.1.3地質(zhì)情況 Geological Condition PAGEREF _Toc235970746 h 6 HYPERLINK l _Toc235970747 1.1.4水紋及周圍道路情況 Water wave and peripheral road
3、and underground pipelines PAGEREF _Toc235970747 h 6 HYPERLINK l _Toc235970748 1.1.5安全文明施工目標 Safety and civilized construction objectives PAGEREF _Toc235970748 h 7 HYPERLINK l _Toc235970749 1.1.6工程特點、難點及對策 Project difficulty and countermeasure PAGEREF _Toc235970749 h 8 HYPERLINK l _Toc235970750 1.2工程
4、目標 Project Objective PAGEREF _Toc235970750 h 10 HYPERLINK l _Toc235970751 1.2.1質(zhì)量目標 Quality Objective PAGEREF _Toc235970751 h 10 HYPERLINK l _Toc235970752 1.2.2工期目標 Schedule Objective PAGEREF _Toc235970752 h 11 HYPERLINK l _Toc235970753 1.2.3安全、文明施工目標 Safety, Civilized Construction Goal PAGEREF _Toc
5、235970753 h 11 HYPERLINK l _Toc235970754 1.3施工大型機械的配備 PAGEREF _Toc235970754 h 11 HYPERLINK l _Toc235970755 Preparation of large equipment for construction PAGEREF _Toc235970755 h 11 HYPERLINK l _Toc235970756 1.4工程施工設(shè)想 Construction Consideration PAGEREF _Toc235970756 h 12 HYPERLINK l _Toc235970757 1.
6、5編制依據(jù) Reference PAGEREF _Toc235970757 h 13 HYPERLINK l _Toc235970758 第2部分施工進度計劃 PAGEREF _Toc235970758 h 1 HYPERLINK l _Toc235970759 2.1進度計劃編制說明 Description of Schedule Preparation PAGEREF _Toc235970759 h 2 HYPERLINK l _Toc235970760 2.2施工流水段劃分 PAGEREF _Toc235970760 h 2 HYPERLINK l _Toc235970761 Divis
7、ion of Streamlined Construction Section PAGEREF _Toc235970761 h 2 HYPERLINK l _Toc235970762 2.2.1施工流水段劃分的原則 Principle of the Division of Streamlined Construction Section PAGEREF _Toc235970762 h 2 HYPERLINK l _Toc235970763 2.2.2流水段劃分 Division of Streamlined Section PAGEREF _Toc235970763 h 3 HYPERLINK
8、 l _Toc235970764 2.3施工總進度計劃 General Construction Schedule PAGEREF _Toc235970764 h 3 HYPERLINK l _Toc235970765 2.3.1總工期安排 General Schedule Arrangement PAGEREF _Toc235970765 h 3 HYPERLINK l _Toc235970766 2.3.2主要節(jié)點工期 Key Milestone Dates PAGEREF _Toc235970766 h 3 HYPERLINK l _Toc235970767 2.4施工進度計劃表 Con
9、struction Schedule PAGEREF _Toc235970767 h 4 HYPERLINK l _Toc235970768 2.5工期保證措施 Measures to Guarantee Schedule Time PAGEREF _Toc235970768 h 4 HYPERLINK l _Toc235970769 2.5.1進度目標體系的要求 Requirement of Progress Objective System PAGEREF _Toc235970769 h 4 HYPERLINK l _Toc235970770 2.5.2成立工期保證領(lǐng)導班子 Establi
10、shment of Leading Team to Guarantee Scheduled Time PAGEREF _Toc235970770 h 5 HYPERLINK l _Toc235970771 2.5.3設(shè)備的保障 Equipment Guarantee PAGEREF _Toc235970771 h 6 HYPERLINK l _Toc235970772 第3部分施工機械配備 PAGEREF _Toc235970772 h 1 HYPERLINK l _Toc235970773 3.1施工機械的選擇及布置 Option and Arrangement of Constructio
11、n Equipment PAGEREF _Toc235970773 h 2 HYPERLINK l _Toc235970774 3.2主要施工機械設(shè)備一覽表 Schedule List of Main Construction Equipment PAGEREF _Toc235970774 h 3 HYPERLINK l _Toc235970775 3.3施工機械配備明細表 Deployment Breakdown of Construction Equipment PAGEREF _Toc235970775 h 4 HYPERLINK l _Toc235970776 第4部分施工平面布置 P
12、AGEREF _Toc235970776 h 1 HYPERLINK l _Toc235970777 4.1施工總平面布置 General Construction Layout Plan PAGEREF _Toc235970777 h 2 HYPERLINK l _Toc235970778 4.1.1材料堆場及加工場布置 Arrangement of Material Laydown Area and Working Shed PAGEREF _Toc235970778 h 6 HYPERLINK l _Toc235970779 4.2施工用水、用電方案 Construction Water
13、 and Electricity Plan PAGEREF _Toc235970779 h 7 HYPERLINK l _Toc235970780 4.2.1臨時用電布置 Temporary Electrical Consumption PAGEREF _Toc235970780 h 7 HYPERLINK l _Toc235970781 4.2.2臨時用水布置 Temporary Water Consumption PAGEREF _Toc235970781 h 8 HYPERLINK l _Toc235970782 4.3施工現(xiàn)場平面布置圖(見附圖)Construction Site La
14、yout Plan (See attached diagram) PAGEREF _Toc235970782 h 9 HYPERLINK l _Toc235970783 4.4施工現(xiàn)場臨時用水、用電布置圖。見附圖Temporary Water and Electrical Distribution on Jobsite, see attached diagram PAGEREF _Toc235970783 h 9 HYPERLINK l _Toc235970784 第5部分施工方案 PAGEREF _Toc235970784 h 1 HYPERLINK l _Toc235970785 5.1施
15、工流程 Construction Flow PAGEREF _Toc235970785 h 1 HYPERLINK l _Toc235970786 5.1.1鋼筋混凝土工程施工流程 Construction Process of Reinforced Concrete Engineering PAGEREF _Toc235970786 h 1 HYPERLINK l _Toc235970787 5.1.2鋼結(jié)構(gòu)工程施工流程 Construction Process of Steel Structure Work PAGEREF _Toc235970787 h 2 HYPERLINK l _To
16、c235970788 5.2施工總體設(shè)想方案 General Construction Consideration Plan PAGEREF _Toc235970788 h 1 HYPERLINK l _Toc235970789 5.2.1工程總體施工組織設(shè)想 Consideration for Organization of Overall Construction PAGEREF _Toc235970789 h 1 HYPERLINK l _Toc235970790 5.2.2基礎(chǔ)結(jié)構(gòu)工程施工設(shè)想 Consideration for Foundation Structure Constru
17、ction PAGEREF _Toc235970790 h 2 HYPERLINK l _Toc235970791 5.2.3主體結(jié)構(gòu)工程施工設(shè)想 Consideration for Main Structure Construction PAGEREF _Toc235970791 h 2 HYPERLINK l _Toc235970792 5.3工程測量及測量復核方案 Engineering Survey and Review Check Plan PAGEREF _Toc235970792 h 3 HYPERLINK l _Toc235970793 5.3.1施工測量方案 Construc
18、tion Survey Plan PAGEREF _Toc235970793 h 3 HYPERLINK l _Toc235970794 5.3.2建立固定的觀測路線 Establishment of Fixed Observing Route PAGEREF _Toc235970794 h 7 HYPERLINK l _Toc235970795 5.3.3沉降觀測 Settlement Observation PAGEREF _Toc235970795 h 7 HYPERLINK l _Toc235970796 5.3.4測量復核 Review Check of Measurement PA
19、GEREF _Toc235970796 h 8 HYPERLINK l _Toc235970797 5.4基礎(chǔ)及主體工程 Foundation and Main Work PAGEREF _Toc235970797 h 9 HYPERLINK l _Toc235970798 5.4.1施工準備 Construction Preparation PAGEREF _Toc235970798 h 9 HYPERLINK l _Toc235970799 5.4.2樁基礎(chǔ)施工 Pile Foundation Construction PAGEREF _Toc235970799 h 10 HYPERLIN
20、K l _Toc235970800 5.4.3土方開挖工程 Earth Excavation Work PAGEREF _Toc235970800 h 16 HYPERLINK l _Toc235970801 5.4.4樁頭連接施工 Pile Head Splicing Construction PAGEREF _Toc235970801 h 21 HYPERLINK l _Toc235970802 5.4.5鋼筋工程 Reinforcement Work PAGEREF _Toc235970802 h 22 HYPERLINK l _Toc235970803 5.4.6模板工程 Formwo
21、rk PAGEREF _Toc235970803 h 32 HYPERLINK l _Toc235970804 5.4.7混凝土工程 Concrete Work PAGEREF _Toc235970804 h 38 HYPERLINK l _Toc235970805 5.4.8后澆帶的施工 Post-concreting area construction PAGEREF _Toc235970805 h 53 HYPERLINK l _Toc235970806 5.5外腳手架工程 External scaffolding work PAGEREF _Toc235970806 h 56 HYPE
22、RLINK l _Toc235970807 5.5.1外腳手架的選擇 Option of external scaffolding PAGEREF _Toc235970807 h 56 HYPERLINK l _Toc235970808 5.5.2腳手架搭設(shè)施工 Erection of scaffolding PAGEREF _Toc235970808 h 56 HYPERLINK l _Toc235970809 5.5.3注意事項 Points for Attention PAGEREF _Toc235970809 h 60 HYPERLINK l _Toc235970810 5.6鋼結(jié)構(gòu)工
23、程 Steel Structure Engineering PAGEREF _Toc235970810 h 65 HYPERLINK l _Toc235970811 5.6.1鋼構(gòu)工程概況 Overview of Steel Structure Engineering PAGEREF _Toc235970811 h 65 HYPERLINK l _Toc235970812 5.6.2本鋼構(gòu)工程特點 Features of the Steel Structure Engineering PAGEREF _Toc235970812 h 67 HYPERLINK l _Toc235970813 5.
24、6.3施工方法與技術(shù)措施Construction Methods and Technical Measures PAGEREF _Toc235970813 h 67 HYPERLINK l _Toc235970814 5.7安裝工程Installation Project PAGEREF _Toc235970814 h 79 HYPERLINK l _Toc235970815 5.7.1通風及空調(diào)安裝工程 Ventilation and Air Conditioner Installation Project PAGEREF _Toc235970815 h 91 HYPERLINK l _To
25、c235970816 5.7.2給水排水工程Water Supply and Sewerage Engineering PAGEREF _Toc235970816 h 112 HYPERLINK l _Toc235970817 5.7.3消防工程Fire Engineering PAGEREF _Toc235970817 h 135 HYPERLINK l _Toc235970818 5.7.4電氣工程Electric Engineering PAGEREF _Toc235970818 h 149 HYPERLINK l _Toc235970819 5.7.5通信工程 Communicatio
26、n Engineering PAGEREF _Toc235970819 h 165 HYPERLINK l _Toc235970820 5.8裝飾工程 Decoration Engineering PAGEREF _Toc235970820 h 182 HYPERLINK l _Toc235970821 5.8.1裝飾工程施工程序 Construction procedure for decoration engineering PAGEREF _Toc235970821 h 182 HYPERLINK l _Toc235970822 5.8.2屋面工程 Roof Engineering PA
27、GEREF _Toc235970822 h 183 HYPERLINK l _Toc235970823 5.8.3抹灰工程 Plastering Engineering PAGEREF _Toc235970823 h 185 HYPERLINK l _Toc235970824 5.8.4吊頂工程Suspended Ceiling Engineering PAGEREF _Toc235970824 h 188 HYPERLINK l _Toc235970825 5.8.5墻面、頂棚乳膠漆飾面Emulsion Varnish Surface of Wall and Ceiling PAGEREF
28、_Toc235970825 h 190 HYPERLINK l _Toc235970826 5.8.6激光整平機施工廠房地坪Factory Terrace Construction by means of Laser Levelling Machine PAGEREF _Toc235970826 h 193 HYPERLINK l _Toc235970827 5.9室外綠化及道路工程 Outdoor afforestation and civil engineer PAGEREF _Toc235970827 h 206 HYPERLINK l _Toc235970828 5.9.1綠化工程概況
29、 Introduction to afforestation project PAGEREF _Toc235970828 h 206 HYPERLINK l _Toc235970829 5.9.2工程特點 Project features PAGEREF _Toc235970829 h 207 HYPERLINK l _Toc235970830 5.9.3主要施工方案和技術(shù)措施Main construction program and technical measures PAGEREF _Toc235970830 h 207 HYPERLINK l _Toc235970831 5.10與分包
30、協(xié)作和管理 Cooperation with Subcontractors and Management PAGEREF _Toc235970831 h 241 HYPERLINK l _Toc235970832 第6部分質(zhì)量、安全、文明施工保障措施Section 2 Quality, Safety and Civilized Construction Guarantee Measures PAGEREF _Toc235970832 h 1 HYPERLINK l _Toc235970833 6.1質(zhì)量保證措施Quality Guarantee Measures PAGEREF _Toc235
31、970833 h 1 HYPERLINK l _Toc235970834 6.1.1總承包質(zhì)量管理組織機構(gòu)Institutional Framework of Quality Management Of General Contractor PAGEREF _Toc235970834 h 1 HYPERLINK l _Toc235970835 6.1.2質(zhì)量控制過程與階段Quality Control Process and Stage PAGEREF _Toc235970835 h 2 HYPERLINK l _Toc235970836 6.1.3質(zhì)量因素控制Quality Factor C
32、ontrol PAGEREF _Toc235970836 h 4 HYPERLINK l _Toc235970837 6.1.4質(zhì)量控制方法 Quality Control Method PAGEREF _Toc235970837 h 6 HYPERLINK l _Toc235970838 6.1.5工程材料、設(shè)備控制Engineering Material and Equipment Control PAGEREF _Toc235970838 h 7 HYPERLINK l _Toc235970839 6.1.6施工工序的質(zhì)量控制Quality Control of Construction
33、 Procedure PAGEREF _Toc235970839 h 8 HYPERLINK l _Toc235970840 6.2安全保證措施 Safety Guarantee Measures PAGEREF _Toc235970840 h 10 HYPERLINK l _Toc235970841 6.2.1安全目標 Safety Objective PAGEREF _Toc235970841 h 10 HYPERLINK l _Toc235970842 6.2.2安全實施依據(jù) Safety Implementation Reference PAGEREF _Toc235970842 h
34、10 HYPERLINK l _Toc235970843 6.2.3安全、消防保證總體措施 General Safety and Fire Control Guarantee Measures PAGEREF _Toc235970843 h 12 HYPERLINK l _Toc235970844 6.2.4安全生產(chǎn)管理組織機構(gòu) Organization Chart for Management of Safety in Production PAGEREF _Toc235970844 h 13 HYPERLINK l _Toc235970845 6.2.5安全設(shè)施及其管理措施 Safety
35、facilities and other control measures PAGEREF _Toc235970845 h 14 HYPERLINK l _Toc235970846 6.2.6各級安全生產(chǎn)責任制 Safety in production responsibility at all levels PAGEREF _Toc235970846 h 18 HYPERLINK l _Toc235970847 6.2.7各項安全管理措施 Safety Control Measures for Each Work PAGEREF _Toc235970847 h 25 HYPERLINK l
36、_Toc235970848 6.2.8模板工程安全管理措施 Safety Control Measures for Formwork PAGEREF _Toc235970848 h 27 HYPERLINK l _Toc235970849 6.2.9施工用電安全措施 Safety Measures for Construction Electricity PAGEREF _Toc235970849 h 32 HYPERLINK l _Toc235970850 6.2.10施工機具 Construction Equipment and Tools PAGEREF _Toc235970850 h
37、35 HYPERLINK l _Toc235970851 6.2.11防臺防汛 Typhoon and Flood Control PAGEREF _Toc235970851 h 38 HYPERLINK l _Toc235970852 6.2.12項目部安全檢查制度 Project management safety inspection system PAGEREF _Toc235970852 h 40 HYPERLINK l _Toc235970853 6.3文明施工措施 Civilized construction measures PAGEREF _Toc235970853 h 42
38、 HYPERLINK l _Toc235970854 6.3.1場容場貌 Field appearance and image PAGEREF _Toc235970854 h 42 HYPERLINK l _Toc235970855 6.3.2材料堆放管理 Material laydown management PAGEREF _Toc235970855 h 43 HYPERLINK l _Toc235970856 6.3.3文明建設(shè)措施 Civilized construction measures PAGEREF _Toc235970856 h 44 HYPERLINK l _Toc235
39、970857 6.3.4強化工地衛(wèi)生建設(shè) Strengthening of field sanitation building PAGEREF _Toc235970857 h 45 HYPERLINK l _Toc235970858 6.3.5地下管線及周邊防護措施 Underground pipeline and peripheral protection measures PAGEREF _Toc235970858 h 46 HYPERLINK l _Toc235970859 第7部分項目人員配備 PAGEREF _Toc235970859 h 1 HYPERLINK l _Toc2359
40、70860 7.1項目組織管理體系 Project organization management system PAGEREF _Toc235970860 h 1 HYPERLINK l _Toc235970861 7.2項目主要管理人員配備 Provision of Key Project Management Personnel PAGEREF _Toc235970861 h 1 HYPERLINK l _Toc235970862 7.3施工隊伍的組建和勞動力的配備 Establishment of construction team and mobilization of labor
41、force PAGEREF _Toc235970862 h 8 HYPERLINK l _Toc235970863 7.3.1施工隊伍組建 Establishment of construction team PAGEREF _Toc235970863 h 8 HYPERLINK l _Toc235970864 7.3.2勞動力人員動態(tài)分布圖 Labor personnel dynamic distribution chart PAGEREF _Toc235970864 h 8 HYPERLINK l _Toc235970865 7.3.3勞動力配備 Provision of Labor Fo
42、rce PAGEREF _Toc235970865 h 9 HYPERLINK l _Toc235970866 第8部分LEED項目施工實施方案 PAGEREF _Toc235970866 h 1 HYPERLINK l _Toc235970867 8.1LEED項目施工實施方案 LEED Project Construction Execution Plan PAGEREF _Toc235970867 h 2 HYPERLINK l _Toc235970868 8.1.1節(jié)水 Water Conservation PAGEREF _Toc235970868 h 2 HYPERLINK l _
43、Toc235970869 8.1.2節(jié)能 Energy Saving PAGEREF _Toc235970869 h 3 HYPERLINK l _Toc235970870 8.1.3節(jié)材 Material Saving PAGEREF _Toc235970870 h 3 HYPERLINK l _Toc235970871 8.1.4使用綠色建材 Utilization of green building materials PAGEREF _Toc235970871 h 4 HYPERLINK l _Toc235970872 8.1.5垃圾管理 Rubbish and wastes cont
44、rol PAGEREF _Toc235970872 h 4 HYPERLINK l _Toc235970873 8.2節(jié)能型工地實施方案 Energy-saving Site Execution Plan PAGEREF _Toc235970873 h 7 HYPERLINK l _Toc235970874 8.2.1組織措施Organization Measures PAGEREF _Toc235970874 h 8 HYPERLINK l _Toc235970875 8.2.2技術(shù)措施 Technical Measures PAGEREF _Toc235970875 h 10第1部分 施工
45、組織設(shè)計總說明 第 PAGE 1頁Section I General Description of Construction & Organization Design施工組織設(shè)計總說明Section IGeneral Description of Construction and Organization Design本章內(nèi)容提要:Headlines of This Section:工程概況 Generals工程目標 Objectives施工大型機械設(shè)備 Large Equipment for Construction工程施工設(shè)想 Construction Consideration編制依據(jù)
46、 Reference工程概況 Generals項目情況 Condition工程名稱:*風電臨港500MW 葉片和機艙項目Project Name: * Lingang 500MW Blade and Nacelle Project建設(shè)單位:風力發(fā)電葉片*(上海)有限公司Building Company: * WIND POWER BLADE (SHANGHAI) Co. LTD.設(shè)計單位:Design Company:管理顧問:Administrative Consultant: 建設(shè)地點:上海*新城*園區(qū)*路以西、*路以南地塊。Construction site: site locates
47、west to *Road and south to*Road, both roads are within * Zone of *, *District, Shanghai.工程規(guī)模:Project Scale項目占地總面積為34771.04m2,該工程總建筑面積約為40770.05m2本工程項目由1#、2#生產(chǎn)廠房、衛(wèi)門噴漆間、垃圾間及自行車棚,室外道路及綠化工程等。The project has an area of 34771.04m2 in total and a building area of 40770.05m2. The project comprises the const
48、ructions of 1# and 2# production buildings, guardhouses, spraying shop, garbage house and bicycle shed, as well as outdoor roads and greening engineering.建筑結(jié)構(gòu)概況 General of Building Structure項目名稱Project Name建筑面積Building Area建筑層數(shù)及總高度No. of Building Level and Total Height結(jié)構(gòu)類型Structure Type基礎(chǔ)形式Foundatio
49、n Form1#生產(chǎn)廠房1#Production Building241081(局部partial 2,3)17.3鋼結(jié)構(gòu)鋼筋砼框架Steel structureRC frame樁基承臺基礎(chǔ)Bearing platform for pile foundation2 號生產(chǎn)廠房Production area 2#15311.151(局部partial2 )14.3鋼結(jié)構(gòu)鋼筋砼框架Steel structureRC frame樁基承臺基礎(chǔ)Bearing platform for pile foundation噴漆間及垃圾房Paint Shop &Garbage House1088.8019.3鋼結(jié)
50、構(gòu)框架混凝土Steel structureRC frame承臺基礎(chǔ)Bearing platform for pile foundation門衛(wèi)1Guardhouse189.65 1 3.3鋼筋砼框架RC Frame承臺基礎(chǔ)Bearing platform for pile foundation門衛(wèi)2Guardhouse289.6513.8鋼筋砼框架RC Frame承臺基礎(chǔ)Bearing platform for pile foundation自行車棚Bicycle Shed82.8012.7鋼結(jié)構(gòu)Steel Structure獨立基礎(chǔ)Single footing1號建筑:1號生產(chǎn)廠房 1# b
51、uilding: 1# production building1號生產(chǎn)廠房占地面積為18793.10。生產(chǎn)區(qū)為單層鋼結(jié)構(gòu)建筑,屋面為輕鋼壓型鋼板屋面,內(nèi)天溝,虹吸式排水,防水等級二級。其中機艙生產(chǎn)區(qū)包括大件裝配區(qū)域和小件裝配區(qū)域,層高17m,檐口高度17m,占地面積4917,建筑面積為4917,柱網(wǎng)尺寸為(6m24)(8m4);葉片生產(chǎn)區(qū)為完整大空間車間,層高15.2 m,檐口高度15.2 m,占地面積4908,建筑面積4908,柱網(wǎng)尺寸為(6m24)(8m4);原材料儲藏區(qū)為單層鋼結(jié)構(gòu),局部二層6m+6m,屋面為輕鋼壓型鋼板屋面,內(nèi)天溝,虹吸式排水,防水等級二級。其中收貨區(qū)、技術(shù)室、裝料間層
52、高6m,二層為管理辦公區(qū),層高6m,占地面積819,一層面積819,二層面積670,柱網(wǎng)尺寸為(6.6m3)(8m4);原材料儲藏單層區(qū)域包括機艙倉庫、葉片倉庫和環(huán)氧倉庫,層高為15.2 m,檐口高度15.2 m,占地4703,建筑面積4703,柱網(wǎng)尺寸為(6m24)(8m4)。1# production building has an area of 189793.10m2. The production area comprises single-storey building with steel structure, the roof uses light steel profiled
53、 sheet roof with siphon drainage internal gutter in a Grade II Waterproof. Its nacelle production area includes both assembly shops of big and small parts, of which the floor height is 15.2m, cornice height is 17m, the area is 4917m2, construction area is 4917m2 and net post size is (6m*24)*(8m*4).
54、The blade production area is a workshop with integral bulk space, of which the floor height is 15.2m, the cornice height is 15.2m, the area is 4908m2, the construction area is 4908m2 and the net post size is (6m*24)*(8m*4). The roof of raw material storage area is single-storey structure and its par
55、tial 6m+6m roof in the second floor uses light steel profiled sheet roof with siphon drainage internal gutter in a Grade II Waterproof level. The floor height of receiving area, technical room and charging room is 6m, the second floor is used as office area with 6m floor height, the whole building h
56、as an area of 819m2 in total including 819m2 for the first floor and 670m2 for the second, as well as (6.6m*3)*(8m*4) net post size.2號建筑:2號生產(chǎn)廠房 2# building: 2# production building2號生產(chǎn)廠房占地面積為14635.64,建筑面積為15311.15。其中機艙生產(chǎn)區(qū)和葉片生產(chǎn)區(qū)為鋼結(jié)構(gòu),屋面為輕鋼壓型鋼板屋面,虹吸式排水,外排水,層高13.5 m,占地面積為12669,建筑面積為12669,柱網(wǎng)尺寸為(6m61)(8m4)
57、,機艙生產(chǎn)區(qū)檐口高度14 m,葉片生產(chǎn)區(qū)檐口高度14 m。 2# production building has an area of 14635.64m2 and construction area of 15311.15m2. Its nacelle production area and blade production area comprise steel structure and their roof use light steel profiled sheet roofs with external siphon drainage, including 13.5m roof h
58、eight, 12669m2 roof area, 12669m2 construction area and (6m*61)*(8m*4) net post size, as well as 14m cornice height in both nacelle and blade production areas.3號建筑:噴漆間及垃圾房 3# building: spraying room and garbage house噴漆間及垃圾房占地面積1023.80,建筑面積1088.80,屋面為輕鋼壓型鋼板屋面,內(nèi)天溝,外排水。噴漆間為單層鋼結(jié)構(gòu)建筑,層高9 m,占地面積為700,建筑面積為7
59、00,柱網(wǎng)尺寸為(8m4)21m;管理用房、垃圾房和化學品庫為單層鋼結(jié)構(gòu)建筑,層高為6 m,占地面積為323,建筑面積為323,柱網(wǎng)尺寸為(6m8)6m。 Spraying room and garage house have a floor area of 1023.80m2 and construction area of 1088.80m2, their roofs use light steel profiled sheet roofs with internal gutter but external drainage. The spraying room comprises sin
60、gle-storey structure, including 9m floor height, 700m2 floor area, 700m2 construction area and (8m*4)*21m net post size. Management room, garbage house and chemical storage comprises single-storey structure, including 6m floor height, 323m2 floor area, 323m2 construction area and (6m*8)*6m net post
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 小學學校章程
- 肇慶醫(yī)學高等專科學?!豆沤y繪與制圖》2023-2024學年第一學期期末試卷
- 區(qū)塊鏈技術(shù)應用前景定量分析報告
- 財稅規(guī)劃報告模板
- DB2201T 66.5-2024 肉牛牛舍建設(shè)規(guī)范 第5部分:育肥牛
- 專業(yè)案例(動力專業(yè))-專業(yè)案例(動力專業(yè))押題密卷2
- 二零二五年酒店客房租賃及場地使用規(guī)則協(xié)議3篇
- 陽泉師范高等??茖W?!豆こ虦y量綜合實訓》2023-2024學年第一學期期末試卷
- 二零二五版房地產(chǎn)項目整合營銷策劃合同3篇
- 二零二五年快餐連鎖餐飲外包合作協(xié)議書2篇
- 建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范-2
- 監(jiān)理單位組織結(jié)構(gòu)圖
- 身份證地區(qū)對應碼表
- 牙齦癌護理查房課件
- (完整版)鋁礬土進口合同中英文
- 《庖丁解牛》獲獎課件(省級公開課一等獎)-完美版PPT
- 化工園區(qū)危險品運輸車輛停車場建設(shè)標準
- 6月大學英語四級真題(CET4)及答案解析
- 氣排球競賽規(guī)則
- 電梯維修保養(yǎng)報價書模板
- 危險化學品目錄2023
評論
0/150
提交評論