1、惡劣天氣應(yīng)急Severe Weather Response一、目的Pure對(duì)惡劣天氣做出有效的應(yīng)急Take effective response for severe weather二、適用范圍Scope程序適用于百威英博中國(guó)的新建施工項(xiàng)目。This procedure app s for new projects of ABInBev in china.三、安全和環(huán)境說(shuō)明 Safety and Environment Illumination無(wú) None四、相關(guān)文件Reference無(wú) None五、職責(zé) Responsibility六、定義和縮寫(xiě)Definition and Abbrevia
2、tion惡劣天氣:包括暴雨、暴雪及高溫Severe weather includes rainstorm, snowstorm and high temperature七、活動(dòng)描述Activity1.基本原則Basic Rule1.1 項(xiàng)目組應(yīng)成立臺(tái)風(fēng)應(yīng)急小組,建立聯(lián)系。項(xiàng)目經(jīng)理是應(yīng)急小組。The PMT should have severe weather response team, project manager is theleader, and should have contacts list.1.2 項(xiàng)目ES 團(tuán)隊(duì)負(fù)責(zé)收集惡劣天氣的信息及傳遞,可從、當(dāng)?shù)貦C(jī)構(gòu)及相關(guān)上獲取.如:中國(guó)
3、氣象局Site Eis responsible fetting and passing information of severe施工安全Construction Safety日期 Date: August 10, 2011章節(jié): Chapter惡劣天氣 Severe Weather Response版本Ver:文件號(hào):No.ABInBev-ES-PS-010Page 1of 10Owner 所有者:Tony Chen Approved 批準(zhǔn):Sam Cao, Roger Kingweather, the information can be get from media, localernm
4、ent dept andrelated website, such as:http/1.3 項(xiàng)目ES 團(tuán)隊(duì)要將惡劣天氣信息盡快告知各承包商Site Eshould pass the severe weather message to contractors ASAP2.暴雨等級(jí)及指南 Rainstorm Level and Guideline2.1應(yīng)急指南 Guideline施工安全Construction Safety日期 Date: August 10, 2011章節(jié): Chapter惡劣天氣 Severe Weather Response版本Ver:文件號(hào):No.ABInBev-ES-P
5、S-010Page 2of 10Owner 所有者:Tony Chen Approved 批準(zhǔn):Sam Cao, Roger King圖 例含 義Signal PictureMeaning防 御 指 南Guideline6 小時(shí)內(nèi)降雨量將達(dá)到 50mm 以上,或者已達(dá) 50mm 以上且降雨可能持續(xù)The rainfall will exceed 50mm in 6 hours, or the rainfall has exceeded 50mm and the rain will continue特別關(guān)注天氣變化,采取防御措施;Pay attention to the weather fore
6、cast做好低洼、易受淹地區(qū)的排水防澇工作;Drain the water in the low-lying area檢查排水系統(tǒng);Check the drainage system檢查配電系統(tǒng);Check theer distribution system停止室外帶電作業(yè)。Stop the outdoor electrical work3 小時(shí)內(nèi)降雨量將達(dá)到 50mm 以上,或者已達(dá) 50mm 以上且降雨可能持續(xù)The rainfall will exceed 50mm in 3 hours, or the rainfall has exceeded 50mm and the rain wi
7、ll continue停止戶外作業(yè)(包括所有帶電作業(yè)),盡可能停留在室內(nèi)或者安全場(chǎng)所避雨;Stop outdoor work, include the electric al work, stay indoor or in safe location檢查排水系統(tǒng)Check the drainage system做好低洼、易受淹地區(qū)的排水防澇工作;Drain the water in the low-lying area密切監(jiān)視災(zāi)情,切斷室外電源,應(yīng)對(duì)措施;Theer supply for outdoor should be shut down檢查配電系統(tǒng)Check theer distribu
8、tion system做好低洼、易受淹地區(qū)的排水防澇工作;Drain the water in the low-lying area施工現(xiàn)場(chǎng)停止所有作業(yè),立即. Stop all work on site, and evacuate切斷現(xiàn)場(chǎng)電源;Shut down theer supply on site3 小時(shí)內(nèi)降雨量將達(dá)到 100mm 以上,或者已達(dá) 100mm 以上且降雨可能持續(xù)The rainfall will exceed 100mm in 3hours, or the rainfall has exceeded100mm and the rain will continue施工安全
9、Construction Safety日期 Date: August 10, 2011章節(jié): Chapter惡劣天氣 Severe Weather Response版本Ver:文件號(hào):No.ABInBev-ES-PS-010Page 3of 10Owner 所有者:Tony Chen Approved 批準(zhǔn):Sam Cao, Roger King2.2過(guò)程中奔跑No running when evacuating2.3各承包商需對(duì)各孔洞及可能積水的低洼進(jìn)行標(biāo)識(shí)及All contractors should fence and warn the hole and low-lying2.4暴雨過(guò)后
10、,現(xiàn)場(chǎng)項(xiàng)目組織所有承包商進(jìn)行檢查,檢查后才能重新開(kāi)始作業(yè),檢查內(nèi)容包括以下內(nèi)容:After rainstorm, prior to work, an inspection must beanized and proceeded byPMT. The inspection should include: 檢查配電系統(tǒng),確保配電系統(tǒng)安全性Check theer distribution system 檢查所有帶電設(shè)備,確保設(shè)備完好Check all electrical equipment 檢查排水系統(tǒng)Check drainage system 檢查所有可能積水的低洼及孔洞,并采取處理措施Chec
11、k all hole and low-lying 檢查所有腳手架等登高工具Check the scaffolding3.暴雪等級(jí)及指南 Snowstorm Level and Guideline3.1應(yīng)急指南 Guideline施工安全Construction Safety日期 Date: August 10, 2011章節(jié): Chapter惡劣天氣 Severe Weather Response版本Ver:文件號(hào):No.ABInBev-ES-PS-010Page 4of 10Owner 所有者:Tony Chen Approved 批準(zhǔn):Sam Cao, Roger King圖 例含 義Si
12、gnal PictureMeaning防 御 指 南Guideline12 小時(shí)內(nèi)降雪量將達(dá)到 4mm 以上,或者已達(dá) 4mm 以上且降雨持續(xù). 可能對(duì)交通或者農(nóng)牧業(yè)有影響。The snowfall will exceed 4mm inBlue12 hours, or the snowfall has exceeded 4mm and the snow will continue. And it may affect the traffic, agriculture and livestock farming做好現(xiàn)場(chǎng)積雪清掃Clean the snow on site做好現(xiàn)場(chǎng)防滑作業(yè)Take
13、action for slip risk加固一些可能被降雪壓垮的建筑物,如臨時(shí)棚架等Reinforce the buildings which may be roller by the snow檢查配電系統(tǒng)Checker distribution system停止室外帶電作業(yè)Stop the outdoor electrical work12 小時(shí)內(nèi)降雪量將達(dá)到 6mm 以上,或者已達(dá) 6mm 以上且降雨可能持續(xù). 可能對(duì)交通或者農(nóng)牧業(yè)有影響。The snowfall will exceed 6mm in12 hours, or the snowfall has exceeded 6 mm a
14、nd the snow willYellowcontinue. And it may affect the traffic, Agriculture and livestock farming做好現(xiàn)場(chǎng)積雪清掃Clean the snow on site做好現(xiàn)場(chǎng)防滑作業(yè)Take action for slip risk做好防凍措施Take action for preventing freeze加固一些可能被降雪壓垮的建筑物,如臨時(shí)棚架等Reinforce the buildings which may be roller by the snow檢查配電系統(tǒng)Checker distributio
15、n system停止室外帶電作業(yè)Stop the outdoor electrical work檢查排水系統(tǒng)Check drainage system施工安全Construction Safety日期 Date: August 10, 2011章節(jié): Chapter惡劣天氣 Severe Weather Response版本Ver:文件號(hào):No.ABInBev-ES-PS-010Page 5of 10Owner 所有者:Tony Chen Approved 批準(zhǔn):Sam Cao, Roger King6 小時(shí)內(nèi)降雪量將達(dá)到 10mm 以上,或者已達(dá) 10mm 以上且降雨可能持續(xù). 可能對(duì)交通或
16、者農(nóng)牧業(yè)有較大影響。The snowfall will exceed 10mm inOrange6 hours, or the snowfall has exceeded 10mm and the snow will continue. And it may affect the traffic, agriculture and livestock farming做好防凍措施Take action for preventing freeze加固一些可能被降雪壓垮的建筑物,如臨時(shí)棚架等Reinforce the buildings which may beroller by the snow檢查
17、配電系統(tǒng)Checker distribution system關(guān)閉室外電源Shut down the outdoorer supply停止室外作業(yè)Stop the outdoor work檢查排水系統(tǒng)Check drainage system6 小時(shí)內(nèi)降雪量將達(dá)到 15mm 以上,或者已達(dá) 15mm 以上且降雨可能持續(xù). 可能對(duì)交通或者農(nóng)牧業(yè)有較大影響。The snowfall will exceed 15 mm inRed6 hours, or the snowfall has exceeded 15 mm and the snow will continue. And it may aff
18、ect the traffic, agriculture and livestock farming關(guān)閉電源系統(tǒng)Shut downer supply on site停止作業(yè)Stop work on site3.Evacuation施工安全Construction Safety日期 Date: August 10, 2011章節(jié): Chapter惡劣天氣 Severe Weather Response版本Ver:文件號(hào):No.ABInBev-ES-PS-010Page 6of 10Owner 所有者:Tony Chen Approved 批準(zhǔn):Sam Cao, Roger King3.2 暴雪過(guò)
19、后,需對(duì)現(xiàn)場(chǎng)進(jìn)行清掃After snowstorm, the site should be cleaned3.3 暴雪過(guò)后,現(xiàn)場(chǎng)項(xiàng)目組織所有承包商進(jìn)行檢查,檢查后才能重新開(kāi)始作業(yè),檢查內(nèi)容包括以下內(nèi)容:After snowstorm, prior to work, an inspection must beanized and proceeded byPMT. The inspection should include: 檢查建筑物,確保穩(wěn)定性Check the buildings to ensure the stability 檢查配電系統(tǒng),確保配電系統(tǒng)安全性Check theer dist
20、ribution system 檢查所有帶電設(shè)備,確保設(shè)備完好Check all electrical equipment 檢查排水系統(tǒng)Check drainage system 檢查可能結(jié)冰的孔洞及低洼處Check the hole and low-lying where my be freezed 檢查所有腳手架等登高工具Check the scaffolding4.高溫等級(jí)及指南 High Temperature Level and Guideline施工安全Construction Safety日期 Date: August 10, 2011章節(jié): Chapter惡劣天氣 Severe
21、 Weather Response版本Ver:文件號(hào):No.ABInBev-ES-PS-010Page 7of 10Owner 所有者:Tony Chen Approved 批準(zhǔn):Sam Cao, Roger King圖 例含 義Signal PictureMeaning防 御 指 南Guideline長(zhǎng)時(shí)間戶外或者高溫條件業(yè)It is forbidden to work outdoor for long time戶外作業(yè)需采取防護(hù)措施Measure must be took for outdoor work提供防暑降溫飲品Drink must be provided for workers防
22、火措施Take action for preventing fire連續(xù)三天日最高氣溫將在 35以上。 The highest temperature exceeds 35 for three days24 小時(shí)內(nèi)最高氣溫將升至 37以上。 The highest temperature exceeds 37 in 24 hours避免中午高溫時(shí)段的戶外活動(dòng)It is forbidden to work at noon when the temperature is high.應(yīng)注意防范因用電量過(guò)高,電線、變壓器等電力設(shè)備負(fù)載大而火災(zāi);Check the er distribution sys
23、tem, Check the capacity of er supply, cable, transformer戶外作業(yè)需采取防護(hù)措施Measure must be took for outdoor work注意作息時(shí)間,保證睡眠Sleng should be enough準(zhǔn)備一些常用的防暑降溫藥品及飲品; Medicine and drink for high temperature should be provided防火措施Take action for preventing fire施工安全Construction Safety日期 Date: August 10, 2011章節(jié): Chapter惡劣天氣 Severe Weather Response版本Ver:文件號(hào):No.ABInBev-ES-PS-010Page 8of 10Owner 所有者:Tony Chen Approved 批準(zhǔn):Sam Cao, Roger King若地方部門(mén)對(duì)于高溫作業(yè)有更詳細(xì)的要求,則必須同時(shí)遵守地方要求When the localernment department has more detailed requirement about the hightemperat
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年度技術(shù)合作項(xiàng)目終止及解除合同書(shū)
- 2025年度農(nóng)村水井承包合同與農(nóng)業(yè)灌溉用水權(quán)流轉(zhuǎn)及監(jiān)管協(xié)議
- 2025年度特殊年齡段勞動(dòng)者用工協(xié)議及權(quán)益保障
- 2025年度個(gè)體商戶勞動(dòng)合同(家政服務(wù)行業(yè)合作)
- 5G通信借款居間合同模板
- 2025年度分紅股收益確認(rèn)與分配協(xié)議
- 2025年度影視作品著作權(quán)許可及廣告植入合作合同
- 2025年度分手協(xié)議書(shū)模板:分手后共同債務(wù)承擔(dān)協(xié)議
- 2025年度房屋拆除與建筑垃圾清運(yùn)一體化服務(wù)合同
- 2025年度企業(yè)導(dǎo)師帶徒技能傳承服務(wù)協(xié)議
- (中職)電子技術(shù)基礎(chǔ)與技能(電子信息類)教案
- 汪小蘭有機(jī)化學(xué)課件(第四版)3
- 減少電力監(jiān)控系統(tǒng)告警信息上傳方法的研究(QC成果)
- 如何發(fā)揮好辦公室協(xié)調(diào)、督導(dǎo)、服務(wù)職能
- 交易商協(xié)會(huì)非金融企業(yè)債務(wù)融資工具發(fā)行注冊(cè)工作介紹
- 《人與環(huán)境》課程教學(xué)大綱
- 班組長(zhǎng)管理能力提升培訓(xùn)(PPT96張)課件
- 深圳市城市用地分類表
- 內(nèi)蒙古自治區(qū)小額貸款公司試點(diǎn)管理實(shí)施細(xì)則
- 勞務(wù)分包入住生活區(qū)承諾書(shū)
- 直系親屬關(guān)系證明(存根)(共1頁(yè))
評(píng)論
0/150
提交評(píng)論