1、Terms of EPC Contract of Construction建筑工程總承包協(xié)議Part I. Commercial Terms 第一部分 專用條款Contractor provided a quotation covering complete supply of all materials, tools, equipments, labor for design, land testing and construction and necessary coordination services for the complete General Works. Both parti

2、es agrees on the final contract price on the basis of quotation from Contractor.承包人提供的報(bào)價(jià)書包括了設(shè)計(jì)、地質(zhì)勘察和工程xx所需要的材料、工具、設(shè)備、人力以及對總包工程必要的溝通協(xié)調(diào)服務(wù)工作等內(nèi)容?;诔邪降膱?bào)價(jià),各方商定了最終協(xié)議總價(jià)。1、The Lump-sum Contract Price 協(xié)議總價(jià)金額Amount(大寫Upper case): The Lump Sum Prices shall be the Contract Price and shall be fixed, and not subj

3、ect to rise and fall in the duration of this Contract (except the material rise exceeds 20%), and shall be deemed to be full inclusive prices for the finished Works as described below and unless specifically stated, otherwise shall include without limitation. 此協(xié)議總價(jià)應(yīng)當(dāng)是協(xié)議價(jià)格,此價(jià)格是固定的,并在整個(gè)協(xié)議期間不再上下浮動(除材料的

4、價(jià)格漲幅超過20%的情況)。此價(jià)格將囊括以下描述的工作費(fèi)用(除特別說明外,否則將全部包括)。a) All labor, supervision and administration costs, including wages, allowances, holidays, insurances, welfare and other payments, taxes and expenses payable in respect of labour in accordance with statutory requirements.所有的人工、監(jiān)督管理、行政費(fèi)用,包括工資、津貼、假日、保險(xiǎn)、福利和

5、其他費(fèi)用、稅金及根據(jù)法令要求支付的勞動力費(fèi)用。b) Material costs 材料費(fèi)用c) Consumables of any type either directly or indirectly related to construction與施工直接或間接關(guān)于的各種耗材。d) Manufacturing and installation equipments for Construction, including construction machinery, equipments, tools, scaffolding, and other appliances施工用制造和安裝設(shè)備

6、,包括施工機(jī)械、設(shè)備、工具、腳手架及其他器具。.e) All Transport, haulage and cranage activities related to the Works during construction period 施工期間與工程相關(guān)的所有運(yùn)輸、托運(yùn)和吊運(yùn)工作。.f) Temporary works essential for Completion of Works 履行工程所必需的臨時(shí)工程。g) Temporary storages, workshops, work shed, change rooms, Site set-up, consumables and t

7、he like requirements.時(shí)倉庫、車間、工棚、更衣室、工地建立、消耗品和類似需要。h) Temporary site facilities including electricity, tap water, communications and the like as required.臨時(shí)設(shè)備包括電力、自來水、通訊和所需的此類的服務(wù)。i) Health and welfare facilities 健康和福利設(shè)備。j) In Compliance with all statutes and Contract Safety regulations, carrying out a

8、ll Works accordingly, including all necessary notification, liaison, and work in full co-operation with other contractors all along.遵守所有法令和協(xié)議安全規(guī)定,按要求照此執(zhí)行所有工作,其中包括所有必要的通知、聯(lián)絡(luò),并自始至終保持與其他承包人的合作。k) Providing and testing the samples of material and equipments (except where particular items are specificall

9、y stated to be the responsibility of the Owner).提供材料和設(shè)備樣品及測試(由發(fā)包人負(fù)責(zé)的特殊項(xiàng)目除外)。l) Watching, lighting, security, safety measures. 看守、照明、保安和安全措施。m) Insurance (other than those specified as being provided by The Owner.)保險(xiǎn)(除了那些特別指出由“發(fā)包人”提供的保險(xiǎn))。n) Overhead administration charges and profit日常行政費(fèi)用和利潤。o) Allow

10、ances for inclement weather and all other contingent expenses, liabilities, risks and services and responsibilities in accordance with the specifications and the conditions of Contract, which are to be borne by the Contractor.考慮狂暴天氣和所有其它偶然費(fèi)用、責(zé)任、風(fēng)險(xiǎn)和服務(wù)及根據(jù)技術(shù)說明上的責(zé)任和協(xié)議條件應(yīng)由承包人承擔(dān)的各種開支因素。p) All costs associ

11、ated with Quality Assurance and Quality Control and associated inspections. 涉及質(zhì)量保證,質(zhì)量監(jiān)控及檢查的所有關(guān)于費(fèi)用。q) All relevant taxes as described below 所有關(guān)于的稅收The Lump Sum Prices cover major design and construction activities, including all minor associated Works described or inferred from the Specifications, Dr

12、awings or other Contract Documents. Lump Sum costs have been agreed to apply without variation for those Works described unless amendment to design departs significantly from the intent.總價(jià)包括了工程的主要設(shè)計(jì)和施工行為,并包括技術(shù)說明,圖紙或其他協(xié)議資料文件描述或推斷的所有關(guān)于的相關(guān)工作。經(jīng)同意,總價(jià)適用于所描述的工作,不作改變除非設(shè)計(jì)變更離開原設(shè)計(jì)意圖。2、The Prices for Variation

13、Works 增項(xiàng)工作的費(fèi)用確定The prices stated in this part will apply for Variation works, such as requirement of the Owner, design changes, unexpected change even by experienced Contractor. Any such Variation in Scope of Works or Design changes will be instructed by Owner and will be detailed on a written Chang

14、e Order. These rates shall be fixed and firm and not subject to rise and fall for the duration of this Contract.此部分所設(shè)定的價(jià)格將適用于發(fā)包人要求或設(shè)計(jì)的改動以及有經(jīng)驗(yàn)的承包商也無法預(yù)計(jì)的工作變更。任何此類范圍或設(shè)計(jì)的改動應(yīng)由發(fā)包人提出指令,并有書面變更指令作詳細(xì)說明。這些價(jià)格應(yīng)當(dāng)是固定不變的,不應(yīng)在此協(xié)議中上下浮動。It should be the contractor to put forward the application of increasing cost for u

15、nexpected variation even by experienced contractor, and shall be confirmed by The Owner.有經(jīng)驗(yàn)的承包商也無法預(yù)計(jì)的工作變更則由承包人提出增加費(fèi)用申請,并由發(fā)包人確認(rèn)。In case of different Unit Rates in the documents for identical or similar type of Work, the lowest rate shall apply. Items of Works undertaken as Lump Sums or later ordered

16、or agreed as Lump Sum Works, shall not be re-measured.在資料文件中若相似的工作有不同的單價(jià),將依照最低的價(jià)格執(zhí)行。包括協(xié)議總價(jià)中固定執(zhí)行的工作項(xiàng)目,或者以后所要求作為協(xié)議總價(jià)下的固定工作的項(xiàng)目將不再重新算量。The contractor shall execute the variation works caused by the special requirements in contract scope, and carry out the corresponding contract obligation, even the pric

17、e condition is not defined yet.承包人應(yīng)執(zhí)行工作范圍中特殊要求的工作變更并相應(yīng)履行此變更工作的協(xié)議義務(wù),即使在價(jià)格條款沒有達(dá)成協(xié)議之前。3、Taxes 稅款Contract Price is inclusive of all taxes and charges associated with Contractors Works.協(xié)議價(jià)包括了所有與承包人工程關(guān)于的稅費(fèi)。4、Terms of Payment 付款條款A(yù)ll payment will be released within 15 working days upon the approval of the

18、milestone and the receiving of the invoice.所有付款在節(jié)點(diǎn)確認(rèn)并收到發(fā)票后15個(gè)工作日內(nèi)支付。5、Payment Schedule 工程款支付The Payment schedule is as below(Base value is the contract price):節(jié)點(diǎn)付款根據(jù)如下進(jìn)度支付(基數(shù)為協(xié)議價(jià)):The Owner shall pay 10% of Lump-sum Contract price as the down payment within 15days after signing the contract.協(xié)議簽訂后15日

19、內(nèi),發(fā)包人支付協(xié)議總額10預(yù)付款。Design completion, audited, planning and construction certificate obtained: 10%設(shè)計(jì)履行,審圖履行,規(guī)劃許可證以及施工許可證取得: 10%Piling and foundation work completion and accepted by authorities 20%打樁及基礎(chǔ)履行并驗(yàn)收: 20%Structure Work (steel structure and RC) completion and accepted by authorities 20%結(jié)構(gòu)履行(包括鋼結(jié)

20、構(gòu)和鋼筋混凝土結(jié)構(gòu))履行并驗(yàn)收: 20%Weathertight Building and floor completion 20% 建筑物封閉,地面履行: 20%Commence the installation of Electricity 5%電力設(shè)備進(jìn)場開始安裝: 5%Auxiliary project, such as electricity, streetlight, fire-fighting, road, landscape, sewage, etc. completion, office decoration finished 5%配套工程如電力、路燈、消防、道路、綠化景觀、

21、排污等履行;辦公樓裝飾履行:%Final acceptance by The Owner and authorities 5%最終發(fā)包人和政府部門通過竣工驗(yàn)收: 5%6、Retention payment 尾款(保修金)5% of the payment, as the project warranty money, will be paid off within 7 days upon the completion of one year warrantee period, starting from the official acceptance.5的工程尾款作為工程保修金,在項(xiàng)目竣工驗(yàn)收

22、滿一年后7天內(nèi)付清。7、 Payment for Variation Works 增項(xiàng)工程付款A(yù)greed payment of Variations Works will be paid in ninety-seven per cent (95%) of its respective value of such completed Works, and the rest amount - being three per cent (5%) - will be paid within 7 days upon the completion of one year warrantee period

23、.經(jīng)確認(rèn)變更費(fèi)用或增項(xiàng)工程費(fèi)用等其工作履行后支付95%,余下的5在項(xiàng)目竣工驗(yàn)收滿一年后7天內(nèi)支付。8、 Completion of Works 工作履行(1) When the Works are substantially completed, Owner shall issue a Certificate of Inspection and Acceptance. The issuance of this Certificate shall not relieve Contractor from his obligation hereunder to complete the Works.

24、當(dāng)工作實(shí)質(zhì)上履行后,發(fā)包人提供驗(yàn)收證明。此驗(yàn)收證明并不代表承包人可以不用承擔(dān)工作履行后應(yīng)該承擔(dān)的義務(wù)。(2) When Contractor is of the opinion that the Works are Substantially Complete, Contractor shall submit to Owner a written request of inspecting the Works so as to determine whether Substantial Completion has been achieved. Upon such request, Owner

25、 must respond within twenty five (25) days of its receipt with either (i) a Certificate of Substantial Completion or (ii) an explanation of the reasons why the Works are not Substantially Complete, including a list of open items necessary to achieve Substantial Completion (Outstanding Works). Owner

26、shall advise Contractor of the time reasonably required to complete Outstanding Works., which shall be no more than two (2) months.當(dāng)承包人認(rèn)為工作確實(shí)已經(jīng)履行,應(yīng)提供書面的要求遞交發(fā)包人,要求進(jìn)行工作驗(yàn)收。根據(jù)其要求,發(fā)包人必須在25天內(nèi)做出答復(fù)、實(shí)際工作履行確認(rèn);、實(shí)際工作未履行,并同時(shí)呈交未履行的理由和原因,包括必須履行工作的條款清單(未履行的工作),發(fā)包人通知承包人在合理的時(shí)間內(nèi)履行未履行的工作,但是一般不超過2個(gè)月。(3) When, in the opi

27、nion of Owner, the Works are properly completed in all respects including any Outstanding Works, Owner shall issue a Final Completion Certificate.當(dāng)發(fā)包人認(rèn)為在各方面工作已被完全履行,發(fā)包人應(yīng)頒發(fā)最終完工證明。(4) In the event of an emergency or if the Contractor fails to diligently perform the Outstanding Works, Owner may complet

28、e such Works, either by its own forces or by other contractors. Owner may deduct such costs from any payments due and owing to the Contractor. If such costs exceed the amount due to the Contractor, the Contractor shall immediately pay such excess to Owner.如因突發(fā)事件或承包人未能履行其未履行工作時(shí),發(fā)包人可以自己或雇傭其他承包人來履行此項(xiàng)工作

29、,發(fā)包人將從承包人的未付費(fèi)用中扣除此筆費(fèi)用。如此費(fèi)用超出了未付款的總額時(shí),承包人應(yīng)立即支付超出部分的費(fèi)用至發(fā)包人。(5) Owner shall have the right to take possession of or use any completed or partially completed part of the Works. Upon making such a determination, Owner shall notify the Contractor of its intent to take possession and/or use of a portion of

30、 the Works. Prior to such possession or use, Owner shall furnish the Contractor an itemized list of Work remaining to be performed or corrected on such portions of the Work as are to be possessed or used by the Owner, provided that failure to list any item or Work shall not relieve the Contractor fr

31、om responsibility for compliance with the terms of the Contract. Such possession or use shall not be deemed an acceptance of all Works under the Contract.發(fā)包人有權(quán)接管或使用任何竣工或部分竣工的建筑物,發(fā)包人應(yīng)告知承包人其接管或使用此已達(dá)到發(fā)包人竣工要求的部分;在發(fā)包人接管或使用前,發(fā)包人應(yīng)向承包人提供關(guān)于將被接管、使用工程的缺陷清單,承包人進(jìn)行相應(yīng)整改。如未在此缺陷清單上列出的缺陷工程,承包人也應(yīng)按此協(xié)議的要求履行其責(zé)任,進(jìn)行整改;發(fā)包人的

32、部分接管或使用并不視為本協(xié)議下整個(gè)工程已通過驗(yàn)收。9、Invoice 發(fā)票Contractor shall provide with each invoice to the Owner a formal Tax receipt indicating that all taxes for the amount being invoiced has been paid.承包人須向發(fā)包人提供正式完稅發(fā)票。10、General conditions of Contract 協(xié)議通用條件Both parties shall confirm and state the acceptance of the

33、General Conditions of Contract. These conditions are included herein as Part III of this Contract Document.各方確定并申明接受此協(xié)議通用條款,此條款已羅列在此協(xié)議第三部分。11、Contract Period 工期11.1 Schedule 進(jìn)度表Contractor shall begin the Works on the date defined in Contractors Time Schedule contained in Part VII or on a later mutua

34、lly agreed date, and shall thereafter perform the Works continuously and diligently.承包人將按第七部分的進(jìn)度計(jì)劃要求,或由各方協(xié)議的開工日期開始現(xiàn)場工作,現(xiàn)場開工后,承包人應(yīng)保證工程施工的連續(xù)性。11.2 Notice of Mobilization and Locations for Temporary Installations 進(jìn)場通知和臨時(shí)設(shè)備點(diǎn)Notice shall be provided to the Owner seven (7) days before date of mobilization

35、, along with proposed locations for material storage, these locations will require the Owners approval prior to placement.進(jìn)場前7天,承包人向發(fā)包人提xx知,及材料堆放位置,這些位置須事先征得發(fā)包人同意。11.3 Liquidated damage for delay 延誤損失賠償Contractor has offered pricing for his best Contract period according to the number of calendar da

36、ys in Schedule taking into consideration those requirements for transport, public holidays, and weather conditions. A detailed working Time Schedule in bar chart form has been provided by Contractor in his proposal. This Time Schedule has been accepted by the Owner. If the Contractor fails to comply

37、 with the completion date, then The Owner may recover such sums by deducting the amount of such damages from any payables due to the Contractor, and which shall not be recoverable. The payment or deduction of such liquidated damages shall not relieve the Contractor from his obligations to complete t

38、he Works or any other obligation or liability under the Contract. The following rate per Day shall apply as fixed, agreed liquidated damages payable by the Contractor due to delay in the Completion of the Works: 0.2% of the total Contract Price for each Day of delay. The total amount payable due to

39、delay in Completion of the Work shall not exceed 10% of the Contract Price. If the completion of the Works is delayed for reasons proven by the Contractor and accepted by Owner to be beyond the control of the Contractor, then the Contractor shall be granted such extension of time as may be reasonabl

40、e. In any event the Contractor is obliged to immediately notify Owner in writing of the occurrence and cause of any such delay and also to make every effort to mitigate the consequences of such delay.承包人已考慮了運(yùn)輸、公共假日和天氣狀況等要求,根據(jù)進(jìn)度表中的天數(shù),確立了最佳工期,并報(bào)了價(jià)。承包人應(yīng)制定詳細(xì)的施工進(jìn)度條形圖,該進(jìn)度已由發(fā)包人認(rèn)可。承包人如未能如期竣工,發(fā)包人可從給承包人的應(yīng)付款中扣

41、除,并且此款未能退。損害賠償并未能免除承包人完工或協(xié)議中其它責(zé)任。承包人誤工損害每天賠償率固定為,每耽誤一天,扣協(xié)議總價(jià)的千分之二。誤工應(yīng)付金額不得超過協(xié)議總價(jià)的10%。如工期的延誤是由于非承包人原因造成的,則應(yīng)給承包人合理的延期。任何情形下,如有延誤,承包人應(yīng)立即書面通知發(fā)包人,并采取所有措施減輕后果。12、Insurance 保險(xiǎn)Contractor has responsible to take insurance with coverage of all construction risks. Contractor is to provide insurance document fo

42、r accidents and casualty of his employees, all vehicles on or entering Site, in compliance with P.R.C. regulations.承包人有責(zé)任將所有施工風(fēng)險(xiǎn)進(jìn)行保險(xiǎn),須根據(jù)中國關(guān)于法律條款提供意外事件和職工或員工意外險(xiǎn)的保單和所有進(jìn)入現(xiàn)場的車輛保險(xiǎn)單。13、Fees and Penalties 雜費(fèi)及罰金Contractor shall pay all statutory fees associated with its Works including any fines imposed due

43、 to Contractors non-conformance with the State laws and local laws.承包人應(yīng)支付與工程關(guān)于的所有政府費(fèi)用,包括罰款。14、Site Cleaning 工地清潔Contractor shall engage cleaning staff throughout the construction period responsible for maintaining clean and tidy work areas at all times. Contractor shall ensure that installed product

44、s and structure are maintained in a new/good condition at all times. Contractor shall be responsible to remove all rubbish, packaging, dunnage, offcuts or any other material from the Site at the end of each working month. All passage ways and areas requiring access will be maintained free from obstr

45、uctions at all times. If Contractor does not comply with above requirements. Owner has the right to undertake Works at Contractors costs.承包人保證在整個(gè)施工期內(nèi)工地保持整潔。承包人應(yīng)確保要安裝之產(chǎn)品及構(gòu)件在任何時(shí)候均為新的好的狀態(tài)。承包人將負(fù)責(zé)把所有的垃圾、包裝物、廢料或從工地上來的其他材料在每個(gè)工作月的月底進(jìn)行清理。所有的經(jīng)過路線和區(qū)域有障礙,要隨時(shí)清理。如承包人沒有履行如上的要求,發(fā)包人有權(quán)力采取行動按實(shí)際進(jìn)行處理,費(fèi)用由承包方承擔(dān)。The Contra

46、ctor shall take all reasonable means to protect the environment (both on and off the Site) and to limit damage and nuisance to people and property resulting from pollution, noise and other results of his operations. The Contractor shall ensure that emission, surface discharges and effluent from the

47、Contractors activities shall not exceed the values indicated by local authority, and shall not exceed the values prescribed by applicable Laws.承包人應(yīng)采取任何合理的手段保護(hù)環(huán)境(包括現(xiàn)場內(nèi)外),并減少由于污染、噪聲以及其他由于承包人的營運(yùn)而致使的對于人員和財(cái)產(chǎn)的損毀和擾亂。承包人應(yīng)確保由于承包人的活動而造成的材料散發(fā),表面排放,滲漏等等不應(yīng)超出當(dāng)?shù)卣畽C(jī)關(guān)的規(guī)定也不應(yīng)超出相關(guān)法律的規(guī)定。15、Safety Remedial Measures 安全補(bǔ)救措

48、施15.1 Remedy for Safety Non Conformance 危險(xiǎn)施工的補(bǔ)救(由誰來進(jìn)行以下項(xiàng)目的監(jiān)督)The Contractor has confirmed his acceptance of the Safety Conditions as provided in this document and which are to be adhered to when undertaking all Works associated with this Contract. These conditions are included herein as Part IV of t

49、his Contract Document. Non-conformance with safety requirements will attract a fine to be deducted from Contract Price as follows:承包人確認(rèn)接受本資料文件中的安全施工規(guī)定,并在施工中遵守執(zhí)行。安全施工規(guī)定見本協(xié)議的第四部分。違反安全施工規(guī)定要罰款,按下列方法從協(xié)議中扣:15.2 Warranty for Defective Works 不符合要求產(chǎn)品的補(bǔ)救Non-conforming product shall be replaced with the agreed

50、 quality and type. Owner reserves the right to select alternative products in the event that the original selections as specified in this Contract become unavailable. The Contractor shall make these selections available at the originally agreed unit rate or lump sum price for supply. Contractor warr

51、ants that he shall, at his own cost and expense (including cost of removal, transportation and installation and any other expenses associated therewith), within the Warranty Periods as specified, promptly repair or replace any item failing to comply with the scope of Works or any other provisions of

52、 this Contract (Defective Works). In the event that the Contractor fails to supply or replace the products with the agreed type, then the Owner shall take over that portion of supply and provide the product for the Contractors installation. The Owner may recover such sums by deducting the amount of

53、such replacements from any monies due to the Contractor. The payment or deduction of such replacements shall not relieve the Contractor from his obligations to complete the Works or any other obligation or liability under the Contract. Where Contractor undertakes to renewal or replacement of defecti

54、ve items, the Warranty Period applicable to that item shall be extended for the time from Owners request to remedy the defect up to the date of Owners written acceptance of renewal or replacement of the defective item. Where Contractor does not renew or replace defective items to the satisfaction of

55、 Owner, the latter may carry out such remedies, either by its own forces or by other contractors. Owner may deduct the costs arising therefrom from any payments due and owing to the Contractor. If such costs exceed the amount due the Contractor, the Contractor shall immediately upon demand pay such

56、excess to Owner.不符合要求的產(chǎn)品應(yīng)被質(zhì)量和類型達(dá)到要求的產(chǎn)品所替代。若協(xié)議中最初所規(guī)定的產(chǎn)品無法取得,發(fā)包人保留選擇替代產(chǎn)品的權(quán)利。承包人應(yīng)以最初規(guī)定的單價(jià)或總價(jià)來實(shí)現(xiàn)發(fā)包人的選擇。承包人應(yīng)保證如未能履行協(xié)議中定義的工作范圍或本協(xié)議中的其它條款(如缺陷工程),在規(guī)定的工程保修期內(nèi),迅速地進(jìn)行整改或替換,并自行承擔(dān)其相關(guān)費(fèi)用(包括不合格工程的拆除、運(yùn)輸、安裝及由此造成或產(chǎn)生的相關(guān)費(fèi)用)。如承包人未能提供或替換協(xié)議規(guī)定的產(chǎn)品型號,發(fā)包人將接管此部分產(chǎn)品的采購,并可從承包人的協(xié)議總價(jià)中扣除此接管部分產(chǎn)品的采購價(jià)格再加10%。此項(xiàng)款的扣除,并不意味著承包人將免于繼續(xù)履行其協(xié)議規(guī)定承擔(dān)的

57、責(zé)任和義務(wù)。承包人承擔(dān)損毀項(xiàng)目的更新和更換,保質(zhì)期內(nèi)的對每個(gè)項(xiàng)目的計(jì)算用從發(fā)包人要求修復(fù)損毀項(xiàng)到發(fā)包人書面接受損毀的項(xiàng)的更新和更換為止。如承包人不對損毀項(xiàng)進(jìn)行更新和更換來滿足發(fā)包人要求,發(fā)包人可以自己承擔(dān)或讓其他承包人來承擔(dān)。發(fā)包人將在總價(jià)格中扣除承包人的從中引起的任何花費(fèi)。如這些花費(fèi)超過了承包協(xié)議總額,承包人必須立即根據(jù)要求將超額部分付給發(fā)包人。16、Sample Submission 樣品提供Contractor shall provide main materials, equipments and related data to Owner according to drawings

58、and requirements. 承包人應(yīng)根據(jù)圖紙及規(guī)范要求提供主要材料及設(shè)備的樣品和相關(guān)資料文件資料給發(fā)包人。17、Government Facilities 政府設(shè)備Contractor shall be responsible to protect and maintain the condition of Roads and Curbs, Drain and Valve Covers, Hydrants, Poles and any External Facility or Perimeter Item of the Site. Any reparation works requir

59、ed at the end of the Contracted Works will be undertaken in the most professional fashion and in accordance with the instructions of the Owner Representative and at the cost of the Contractor.承包人有責(zé)任維護(hù)及修理修繕道路、窨井、水管、消火栓及其他外部或者廠區(qū)四周的公共設(shè)備。任何在協(xié)議執(zhí)行后仍需要修理修繕的工作要依照發(fā)包人的指令履行,其費(fèi)用由承包人承擔(dān)。18、Storage 倉儲Contractor sh

60、all provide a working plan indicating preferred locations for material storage. This plan shall be submitted to the Owner Representative for his review and approval. Contractor shall inspect each piece of material delivered and fill out the provided acceptance form of material. In the event that mat

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論