下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、GFEDCBADraftedCheckedReviewedFANGCHENGGANG NUCLEAR POWER PLANT PHASE I (21000MW)BLX17GRE008S40B45GNTURBINE ERNING SYSTEM (GRE) SYSTEM DESIGN MANUALCHAPTER A BCSHANGHAI ELECTRIC POWER GENERATION EQUIPMENT SHANGHAITURBINEcontains proprietary information owned by Shanghai Electric Power Generation Equi
2、pment Co,. . Shanghai Turbine Works. Use this solely for the purpose given. Do not reproduce, disclose or use otherwise without written consent of Shanghai Electric GenerationEquipment.ShanghaiTurbine No.:COMPILING 自控中編: 校海審核 :_審標(biāo) 準(zhǔn)化:簽RATIFIED 批 Shanghai Electric Power Generation Equipment Co.Shangh
3、ai Electric Power Generation Equipment Co.SYSTEM (GRE)ChapterSheet PAGE 1ofCHAPTER8MAINTENANCEANDPERIODICTESTThe Turbine Controller (STC) requires very little routine maintenance. In most cases any faults or failures which may occur are alarmed and the action in this event is to replace the faulty i
4、tem with a spare. The alarm reporting has been designed to be sufficiently extensive that the failed component can in most cases be readily identified.RoutineMaintenanceon TurbineControllerRoutine maintenance on the STC cubicle is limited to a few simple checks. These include such items as checking
5、the p r in the engineers printer and replacing when necessary, checking indicating lamps for continued operation and seeing that the ventilation fans are working smoothly and quietly. The cubicle lights should also be checked for correct operation.There is no requirement to replace any of the electr
6、onic components in the STC cubicle on a routine basis.FaultRectificationon TurbineControllerRoutineMaintenanceonElectro-HydraulicActuatorsShanghai Electric Power Generation Equipment Co.Shanghai Electric Power Generation Equipment Co.SYSTEM (GRE)ChapterSheet PAGE 3ofTestingandcommissioning and perio
7、dic tests in accordance with Testing Manual.Maintenance and repair of the I&C turbine/generator has to be performed according to maintenance manual.The turbine control system will be subject to extensive testing after manufacturing. The test procedure will demonstrate following aspects:Functionality
8、ofallcontrolcircuitsasBehavioroftheturbinecontrolsysteminregardstoreliabilityandsafetyin case of internal failures.MeasuringofresponsetimeofeachcontrolThetestsduringcommissioningshalldemonstrate theIntegrationoffielddevicesintotheturbinecontrolActuationofactuatorsfromtheturbinecontrolSignalexchangew
9、ithotherDemonstrationofoverallfunctionalityforallcontrolcircuitsandoperation In-Service tests and The in-service program given in the Testing Manual defines periodic inspections for all important turbine controller components.The following internal test functions are implemented in the turbine contr
10、ol systemtoensurepermanentlyreliableoperationoftheturbinecontrolAutomatic testing of signal exchange between turbine controller and instrumentation and control systemAnother control valve function monitoring feature is included in the position controllers of the turbine controller. In case of valve
11、sticking the valve position doesnot followthe position set-point and a warning signal is created. For testing of the HP stop and LP stop and control valves with active turbine trip signals the turbine trip logic can be switched off via two dedicated maintenance key switches. The two maintenance key
12、switches are installed inside the turbine protection cabinet (see System Design Manual GSE). As protection of the turbine against impermissible startup of the turbine with activated maintenance key switches, the locking of the protection systembythemaintenancekeyswitchesisautomaticallyoverriddenbyoneof the following signals:Main pressure upstream main stop valves is not below minimum valueTurbinespeedisnotbelowminimumTo verify the turbine protection functions after the de-activation (switch off) of the maintenance key switches a visible check of the maintenance key swi
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 課題申報(bào)參考:近代上海國立音樂院-國立音專學(xué)刊的歷史敘事及其文化意義闡釋研究
- 2025年《學(xué)習(xí)師德學(xué)習(xí)教育法規(guī)》心得體會(huì)例文(5篇)
- 2025年度個(gè)人二手房交易安全保障協(xié)議3篇
- 二零二五版羅馬柱歷史文化遺址保護(hù)合同4篇
- 二零二五版藥店?duì)I業(yè)員藥品配送及聘用合同4篇
- 2025版投資經(jīng)理借貸雙方合作協(xié)議書3篇
- 二零二五年度國際藝術(shù)品拍賣交易合同3篇
- 二零二五年度出差工作成果評(píng)估與獎(jiǎng)勵(lì)合同3篇
- 2025年度戶外景觀設(shè)計(jì)施工與后期養(yǎng)護(hù)合同4篇
- 2025版投標(biāo)文件制作及審核服務(wù)合同模板3篇
- 中央2025年國務(wù)院發(fā)展研究中心有關(guān)直屬事業(yè)單位招聘19人筆試歷年參考題庫附帶答案詳解
- 2024年09月北京中信銀行北京分行社會(huì)招考(917)筆試歷年參考題庫附帶答案詳解
- 外呼合作協(xié)議
- 小學(xué)二年級(jí)100以內(nèi)進(jìn)退位加減法800道題
- 保險(xiǎn)公司2025年工作總結(jié)與2025年工作計(jì)劃
- 2024年公司領(lǐng)導(dǎo)在新年動(dòng)員會(huì)上的講話樣本(3篇)
- 眼科護(hù)理進(jìn)修專題匯報(bào)
- GB/T 33629-2024風(fēng)能發(fā)電系統(tǒng)雷電防護(hù)
- 深靜脈血栓(DVT)課件
- 2023年四川省廣元市中考數(shù)學(xué)試卷
- GB/T 19885-2005聲學(xué)隔聲間的隔聲性能測定實(shí)驗(yàn)室和現(xiàn)場測量
評(píng)論
0/150
提交評(píng)論