




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
Room-and-pillarMining
房柱采礦法Room-and-pillarminingissuitableforflatornearlyhorizontaltabulardeposits.Iftheorebodiesaremoderatelyinclined(>30°),itisimpracticaltoutilizetiredmobileequipment,resultinginreducedproductivity.Ifthecompetenceofthehangingwalland/ortheoreisinsufficient,additionallaborisalsorequiredforgroundcontrol,whichislikelytocutproductivityandraiseauxiliarycosts.房柱采礦法適用于水平或近水平狀礦床。如果礦石適度的傾斜(>30°)是利用移動設(shè)備不累,導(dǎo)致生產(chǎn)率降低。如果掛壁和/或礦石的能力不足的,額外的勞動也是地面控制要求,這可能降低生產(chǎn)力和提高輔助費(fèi)用。Alters改變,更改,修改Liberate釋放,解放Contaminant污染物;致污物Potential潛能,可能性,電勢Migration移動;遷移;移民Tailing尾礦,殘?jiān)麳ydraulically水力地,液壓地insolution不斷溶解preventedfrom阻止Valley-fill山谷排土場Cross-valley交叉山谷Impoundment蓄水;扣留Sidehill山坡ridge山脈;山脊;屋脊,田梗Heaped堆積;聚集,盛滿的Dickedpond凸形池塘Incisedpond凹形池塘Configuration配置,結(jié)構(gòu),外形Eliminate消除;排除Upstream向上游,逆流地,上游部門Downstream順流而下,下游的,順流的Embankment堤壩,路堤,堤防Subsequently隨后,其后,后來dischargeof卸下,瀉下,泄下Diversion轉(zhuǎn)移,消遣,分散注意力Dam水壩,筑壩finecoal粉煤Slurries泥漿(slurry的復(fù)數(shù)),料漿,釉漿liealong傾斜,傾向一側(cè)Impound蓄水,沒收;拘留dike堤防,堤壩,開溝排水fine-grained細(xì)粒的,高密度coarse-grained粗粒的,稀密度Heap矸石堆(廢石、渣石)Homogeneous同種的,均勻的Tipping傾倒的,傾翻的onthefront目前Phase階段Facility設(shè)備,靈巧,容易,設(shè)施Substantial大量的;實(shí)質(zhì)的groundwatertable地下水位
accumulation積聚,堆積物permeability滲透性Weathering風(fēng)干Inwashing冰川邊緣沉積,巨厚沖積層beresponsiblefor對……負(fù)責(zé),是……的原因Tragic悲劇的,悲痛的,不幸的takeintoaccount考慮;重視;體諒phreaticsurface淺層地下水面;潛水面mechanism機(jī)制,機(jī)理,途徑dispersion散布,驅(qū)散,[數(shù)]離差Consideration考慮,原因,關(guān)心,代價Reclamation開墾;收回;再利用;矯正Alike相同的;相似的summarize總結(jié);概述Bedrock根底;基巖;基本原理Circular圓形的;循環(huán)的;間接的mostlikely最可能Equations方程,方程式,均勢,均等Infinite無限的,無窮的,無數(shù)的,極大的parallelto平行于;與……平等flowslide崩瀉,流動滑塊,流滑Competent足夠的;勝任的Inclined趨向于…的,使…傾向Deformations丑化,歪曲,畸形,變形,殘廢Consolidation固結(jié)indicativeof表明,說明Accompany
陪伴,伴隨;伴奏Instead相反地,反而
Behavior行為,性能,反應(yīng),舉止cumbersome笨重的,難處理的,累贅的,沉重的arc弧形Decay[di'kei]
腐朽slicesmethod條分法,切片分析法limitingequilibriumanalysis極限平衡分析法Inferred推測二、復(fù)合難句1、Tailingis
thatproductwhich,afterminingandprocessingtoremovetheeconomicproducts,isdiscarded尾礦是那種經(jīng)過開采并加工提取有經(jīng)濟(jì)價值的產(chǎn)品后被廢棄的產(chǎn)物。
2、Processingmayrangefromsimplemechanicalsortingtocrushingandgrinding
followedbyphysicalorchemicalprocessing加工程序是先經(jīng)過簡單的機(jī)械分類然后壓碎、碾磨,接下來是物理或化學(xué)加工加工處理過程可能包括從簡單的機(jī)械分揀到破碎,再到隨后的物理或化學(xué)加工處理的碾磨等工序。3、Solidminewasteusuallyconsistsof①wasterockfromminedevelopmentoroverburden,②stockpilesoflow-gradeoreororewithunfavorablemillingmineralogy,③leachdumpsorheaps,and④millingwaste固體廢料通常包括①礦山生產(chǎn)或表土剝離中產(chǎn)生的廢石,②儲存的低品質(zhì)礦石或礦物學(xué)上不宜碾磨的礦石,③過濾廢渣或過濾殘堆,以及④碾磨后的廢渣。
4、Bothproductsareremovedfromtheiroriginallocation,brokenupandplacedinpilesinwhichtheconditionsofoxidation,seepage,leachinganderosiondifferconsiderablyfromthoseattheiroriginallocation兩種產(chǎn)物都是從原來的地方運(yùn)來,經(jīng)過碾碎,然后堆放在與原始位置極不相同的氧化、滲透、浸析、腐蝕環(huán)境中。
5、Thisconsiderablyincreasesthepotentialforwindorwatererosionofsurfacematerialsandtheirtransportintotheenvironment.這樣就極大地增強(qiáng)了它們的表面物質(zhì)及其在進(jìn)入環(huán)境的運(yùn)輸途中受到風(fēng)蝕和水蝕的可能性。6、Wheretheextractionprocessconsiderablyalterstheoreand
wherechemicalsareaddedtoliberatesomeofthecontaminantsintheore,thepotentialforpollutionmigration
isincreased.提取加工過程極大地改變了礦石的性能,并且加入化學(xué)物質(zhì)就會釋放礦石內(nèi)部的污染物,這樣就增大了污染轉(zhuǎn)移的可能性。7、Ifthetailingsorminewastesarehydraulicallyplaced,thensomeofthesecontaminantsmaybeinsolution
andthesolutionsarepartof(成為…的一部分)
theminewasteproductthat
mustbepreventedfromenteringtheenvironment如果把尾礦或廢礦放置在水力環(huán)境中,那么其中的一些污染物就會不斷溶解而且溶液成為必須禁止排放的礦山廢品的一部分。
8、Thelayoutofwastestructurescanbeinoneormoreofthefollowingformsdependingonthetypeofwaste,thepurposeofthewastestructure,andthephysicalconstraintsatthesite根據(jù)廢料類型、排土場建造的目的、場地物理?xiàng)l件的不同,排土場的建造可按如下一種或多種形式布局9、Constructionbeginsattheupstream
endofthevalleyanddumpingproceeds(收益、收入)
alongthedownstreamface.
該建筑起于上游,止于山谷,傾倒物則沿著山谷順勢而下。
10、Thistypeofembankment
canalsobestarted
asacross-valleystructurewheretheareaissubsequentlyfilled
upstream.這種類型的排土場筑堤也可以象橫跨山谷排土場那樣開始,隨后再往上填。11、Across-valleystructurecrossesthevalleybottom,butthevalleyisnotcompletelyfilledupstream.
橫跨山谷排土場跨越谷底,但是這個山谷并不能完全填滿至上游。12、Thestructureisusuallydesignedtocontrolthestorageand/or
dischargeoffloodflows.
這種構(gòu)筑物通常用于控制洪水的儲存或排泄
13、Ifthestructureisnotdesignedtoretainwater,thenawaterdiversionsystemmustbeinstalledtoprovidedrainagearoundit.
如果這種構(gòu)筑物不是用來蓄水的,那么必須在其周圍修建一個水體分流改向的系統(tǒng)用于排水。
14、Thistypeofstructureistypicallyused
asaretentiondam(水壩)
forfinecoalorwasteslurries(泥漿)這種類型的構(gòu)筑物通常用作粉煤和廢漿的留壩15、As
withacrossvalleystructure,asidehillembankment
mustcontrolthestorageand/ordischargeoffloodflowsif
itistoretainwaterorslurries.正如橫跨山谷結(jié)構(gòu)那樣,如果坡上堤壩用于儲存水或廢漿,那它必須要控制洪水的貯存和排泄。
16、Allotherwastefacilityslopesareusuallydesignedwithsubstantialfactorsofsafetyandthereisusuallylittleriskoffailure.所有其他廢料設(shè)施的邊坡通常都是在考慮了大量安全因素(或安全上的實(shí)質(zhì)因素)的情況下進(jìn)行設(shè)計(jì)的,通常少有滑坡的危險。17、Increasesinthegroundwatertable
duetogroundwateraccumulationandduetochangesinthepermeabilityofthedumpmaterialsresultingfrom
weatheringandthein-washingoffines.地下水位的上升是由于地下水積聚和因風(fēng)干作用及細(xì)料的巨厚沉積作用而使排土場材料滲透性發(fā)生改變而導(dǎo)致的18、Thisisamajormechanismforlongtermdispersionofminewastecontaminantsandhasbecomeanimportantconsiderationinthedesignoflongtermreclamationforwastedumpsandtailingsimpoundmentsalike.這是礦山廢料污染物長期分散的主要機(jī)理,而且已成為設(shè)計(jì)排土場廢料長期回收利用的重點(diǎn)考慮因素,尾礦攔蓄工程設(shè)計(jì)類似于此。19、Thevariousfailuremodes
that
occurinminewasteembankmentshavebeen
sumarizedbyCaldwellandMoss(1984)who
reviewthemethodsofanalysis評論分析方法的考德威爾和莫斯于1984年已經(jīng)總結(jié)出發(fā)生在礦山排土場的各種滑坡形式。
20、Thismodeoffailureis
mostlikelytooccurincresttippedembankmentsandis
bestevaluatedbytheequationsdescribingthestabilityofaninfiniteslope這種滑坡形式最可能發(fā)生在頂部傾斜的堤壩處,最好使用描述無限邊坡穩(wěn)定性的方程來評估。21、Unusuallyhighwatertablesintheembankmentearthquakesorthedecayoforganicmaterialbeneath(在……之下)
thedumpmaystartsuchafailure通常,堤壩下的高水位、地震或排土場下有機(jī)物的腐爛等都可能導(dǎo)致(啟動)這樣的滑坡。
22、Circular
arcfailurethroughthedumpmaterialismostcommonwherethedumpmaterialcontainsasignificantpercentageoffinegrainedsoil通過排放物而發(fā)生的圓弧形滑坡是排放物中細(xì)粒土百分比含量極高的地方最常見的。
23、Someofthesedeformations
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 賣場合作合同范本
- 代購訂貨拿貨合同范本
- 泰州潔凈手術(shù)室施工方案
- 2025江西省建筑安全員C證考試題庫
- 農(nóng)具合同范本
- 儀器生產(chǎn)安裝合同范本
- 二年級口算題目練習(xí)集100道
- 二年級口算練習(xí)題100道
- 2025陜西省建筑安全員-B證考試題庫及答案
- 出海服務(wù)合同范本
- 商場扶梯安全培訓(xùn)
- 《全科醫(yī)學(xué)概論》課件-以家庭為單位的健康照顧
- 自來水廠安全施工組織設(shè)計(jì)
- 《跟單信用證統(tǒng)一慣例》UCP600中英文對照版
- 《醫(yī)院應(yīng)急培訓(xùn)》課件
- 提高教育教學(xué)質(zhì)量深化教學(xué)改革措施
- 招標(biāo)代理機(jī)構(gòu)遴選投標(biāo)方案(技術(shù)標(biāo))
- 證件使用協(xié)議書(2篇)
- KTV商務(wù)禮儀培訓(xùn)
- 三級安全教育試題(公司級、部門級、班組級)
- 2024年《論教育》全文課件
評論
0/150
提交評論