擋土墻施工組織設(shè)計(jì)重慶擋墻施工組織設(shè)計(jì)編制日期:二00九年二月目錄編制說明········································編制依據(jù)及原則··································2.1編制依據(jù)·····································2.2編制原則·····································三、工程治理目標(biāo)·····································四、工程概況·········································4.1工程地理位置·································4.2施工場(chǎng)地周圍環(huán)境·····························4.3工程地質(zhì)·····································4.4工程范疇及規(guī)?!ぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁ?.5工程要緊特點(diǎn)·································五、設(shè)備、人員動(dòng)員周期及材料組織供應(yīng)··················5.1人員、設(shè)備動(dòng)員周期····························5.2技術(shù)預(yù)備······································5.3材料組織供應(yīng)··································六、施工預(yù)備及臨時(shí)設(shè)施·······························6.1臨時(shí)房屋設(shè)施··································6.2水、電設(shè)施····································施工組織機(jī)構(gòu)的建立·······························7.1組織機(jī)構(gòu)設(shè)置·································7.2施工組織治理機(jī)構(gòu)的運(yùn)作························八、施工打算··········································工期進(jìn)度打算·································各施工隊(duì)伍人員構(gòu)成···························施工設(shè)備打算·································材料供應(yīng)打算及措施···························九、施工方法··········································9.1擋土墻構(gòu)造····································9.2填土施工要求··································9.3錨桿擋土墻施工································9.4施工工藝流程··································9.5扶壁式擋土墻施工······························9.6衡重式擋土墻施工······························十、工程質(zhì)量保證措施···································10.1技術(shù)保證措施·································10.2質(zhì)量治理措施·································10.3施工組織措施·································十一、安全保證措施:····································11.1安全施工要緊措施·····························11.2安全保證體系·································十二、文明施工,加強(qiáng)環(huán)?!ぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁぁ?2.1文明施工·····································12.2施工現(xiàn)場(chǎng)環(huán)境愛護(hù)····························12.3綠化工作措施·································十三、施工進(jìn)度保證措施:································13.1一樣保證措施·································13.2組織保證措施·································13.3技術(shù)保證措施·································13.4.經(jīng)濟(jì)保證措施··································13.5.合同保證措施··································十四、雨季施工技術(shù)措施·································十五、采納新工藝新技術(shù)成本節(jié)約措施·····················十六、施工現(xiàn)場(chǎng)平面布置圖·······························16.1施工總平面布置································16.2施工總平面布置······························· 施工組織設(shè)計(jì)編制說明在編制本標(biāo)的工程施工組織設(shè)計(jì)的過程中,我們認(rèn)真閱讀了招標(biāo)文件。在認(rèn)真閱讀和充分明白得設(shè)計(jì)意圖的基礎(chǔ)上,結(jié)合我公司的施工體會(huì),依照施工場(chǎng)地狀況,以信守合同、確保質(zhì)量工期、安全文明生產(chǎn)、連續(xù)注重環(huán)保、合理操縱工程造價(jià)為指導(dǎo)思想,通過細(xì)心研究形成了本施工組織設(shè)計(jì)要緊內(nèi)容,其中闡述了本工程實(shí)施時(shí)的施工設(shè)備、施工打算安排、施工技術(shù)方案、施工組織實(shí)施方法及順序,確保工程質(zhì)量和工期的要緊措施,以及安全、文明、環(huán)境愛護(hù)措施。在編制過程中,擇優(yōu)選擇施工方案,做到科學(xué)合理、經(jīng)濟(jì)方便,為工程施工統(tǒng)籌安排提供技術(shù)支持。編制依據(jù)及原則2.1編制依據(jù)1、重慶85萬噸/年甲醇裝置擋土墻工程招標(biāo)文件、設(shè)計(jì)圖紙及有關(guān)參考資料。2、我公司的施工現(xiàn)場(chǎng)考察及標(biāo)前有關(guān)會(huì)議精神。3、部頒《建筑地基基礎(chǔ)設(shè)計(jì)規(guī)范》、《建筑地基處理技術(shù)規(guī)范》、《混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范》、《建筑樁基技術(shù)規(guī)范》、《建筑邊坡工程技術(shù)規(guī)范》、《公路路基設(shè)計(jì)規(guī)范》及現(xiàn)行國家和重慶市相關(guān)標(biāo)準(zhǔn)及規(guī)范。2.2編制原則1、依照工程特點(diǎn)、自然條件及工期要求,在確保工程質(zhì)量與施工安全的前提下,采納科學(xué)合理的施工作業(yè)方法,籌劃人力安排,調(diào)配所需的機(jī)械設(shè)備,以滿足施工生產(chǎn)的需要,確保人力、物力充分發(fā)揮作用,使績(jī)效最大化。2、詳細(xì)辨別各分項(xiàng)工程之間的施工順序和相互制約關(guān)系,認(rèn)真研究,統(tǒng)籌安排,理清操縱因素與被操縱因素,形成連貫合理的施工工藝流程。3、對(duì)施工的重點(diǎn)工序和難點(diǎn)工序進(jìn)行科學(xué)分析、采納成熟的施工技術(shù)和體會(huì),做到切實(shí)可行、合理經(jīng)濟(jì)。4、依照各級(jí)政府部門質(zhì)量、安全、文明施工、環(huán)境愛護(hù)要求,建立各項(xiàng)保證體系前制定完善的保證措施,確保施工生產(chǎn)各項(xiàng)治理目標(biāo)的順利實(shí)現(xiàn)。5、充分利用我公司人力資源、機(jī)具設(shè)備、可動(dòng)員資源以及工程區(qū)域內(nèi)可利用的社會(huì)資源。三、工程治理目標(biāo)工期目標(biāo):90天質(zhì)量目標(biāo):工程一次驗(yàn)收合格率100%,合同履約率達(dá)100%。安全目標(biāo):執(zhí)行國家頒布的各種施工安全規(guī)程,杜絕傷亡、重大交通、火災(zāi)、機(jī)損等事故。環(huán)境目標(biāo):愛護(hù)環(huán)境,文明施工。依照國家有關(guān)政策,愛護(hù)好沿線自然生態(tài)環(huán)境,滅塵降噪,減少污染。掛牌上崗、文明施工。四、工程概況4.1工程地理位置本項(xiàng)目選址于重慶(長(zhǎng)壽)化工園區(qū)內(nèi),利用園區(qū)統(tǒng)一規(guī)劃的原四川染料廠閑置空地進(jìn)行建設(shè)。距重慶主城區(qū)約52公里,北距渝長(zhǎng)高速公路入口6km,距長(zhǎng)壽火車站約5km、晏家鐵路貨運(yùn)站約12km。本裝置共分兩個(gè)要緊部分,第一部分為工藝裝置,第二部分為原料氣預(yù)脫硫及相關(guān)配套公用工程系統(tǒng)。污水處理系統(tǒng)依靠能源公司現(xiàn)有設(shè)施依照裝置排污量進(jìn)行改造施工,不在界區(qū)內(nèi)新建。4.2施工場(chǎng)地周圍環(huán)境工程地點(diǎn)為原川染廠生產(chǎn)區(qū),鄰近有幾家化工廠,周圍樹木較多,鄰近有少量住戶。擋土墻區(qū)域?yàn)檠b置區(qū)的東南面,工程地點(diǎn)鄰近有一條永久道路可通至市政道路。場(chǎng)平施工差不多開工。4.3工程地質(zhì)改地區(qū)的地質(zhì)構(gòu)造為:地表是粘土夾卵石的沉積層,厚度為10~20m,地耐力為15~25t/m2,下層為第四紀(jì)沙溪廟祖巖層,其傾角小,穩(wěn)固性好,無不良地質(zhì)現(xiàn)象,地震烈度為六度。4.4工程范疇及規(guī)模本項(xiàng)目裝置區(qū)域范疇內(nèi)的擋土墻施工將結(jié)合地勢(shì),依照地質(zhì)報(bào)告及埋深構(gòu)造,分別采納衡重式擋土墻和扶壁式擋土墻,確定擋土墻的基槽開挖的深度和放坡,并最大限度減少土石方工程量。施工單位按照擋土墻的范疇進(jìn)行施工和回填,經(jīng)估算,本工程擋土墻分11段,總長(zhǎng)度約770米,其中衡重式條石擋墻長(zhǎng)約550米,平均高度約8米,扶壁式鋼筋混凝土擋墻約220米,平均高度約15米;另錨桿式擋土墻約100米。4.5工程要緊特點(diǎn)1、本工程土石方量大,施工作業(yè)面長(zhǎng),工期短,且各段分段施工采納不同類型的擋土墻施工。2、施工時(shí)要充分考慮在施工過程中對(duì)相鄰工廠生產(chǎn)和場(chǎng)平施工單位的阻礙,做好安全防范措施。3、本工程擋土墻分為衡重式條石擋土墻和扶壁式鋼筋混凝土擋土墻。4、施工時(shí)需組織好基槽開挖、堆放、運(yùn)輸、工程測(cè)量等作業(yè),做到安全文明施工。5、在擋土墻施工過程中要與場(chǎng)平施工單位緊密配合,確保擋土墻后填料對(duì)稱、平均回填和場(chǎng)平回填質(zhì)量。五、設(shè)備、人員動(dòng)員周期及材料組織供應(yīng)5.1人員、設(shè)備動(dòng)員周期1、我司有成套的施工設(shè)備,有豐富的工程施工體會(huì),擁有各類工程技術(shù)人員、施工治理人員和熟練的機(jī)械操作手和熟練的勞工隊(duì)伍。在簽署合同協(xié)議后在業(yè)主規(guī)定的進(jìn)場(chǎng)時(shí)刻內(nèi),組織人員、施工機(jī)械及設(shè)備進(jìn)場(chǎng)并展開作業(yè)。進(jìn)場(chǎng)后要緊工作是清理現(xiàn)場(chǎng)、接通施工點(diǎn)的水電、通訊,安裝機(jī)械、搭建臨時(shí)房屋、水池、作好混凝土、砂漿施工配合比等。2、各種專用設(shè)備、材料進(jìn)場(chǎng)采納汽車運(yùn)輸?shù)姆绞竭M(jìn)行,并安裝、調(diào)試完畢,能及時(shí)投入生產(chǎn)使用。3、在施工設(shè)備進(jìn)場(chǎng)的同時(shí),組織所有進(jìn)入該項(xiàng)目的工程技術(shù)人員和工程治理人員分批進(jìn)入施工現(xiàn)場(chǎng),開始項(xiàng)目經(jīng)理部的籌建工作。4、人員安排表序號(hào)人員人數(shù)備注1治理人員42技術(shù)人員63施工人員1005.2技術(shù)預(yù)備人員進(jìn)場(chǎng)后趕忙開展技術(shù)預(yù)備工作,技術(shù)預(yù)備工作分為內(nèi)業(yè)預(yù)備工作和外業(yè)預(yù)備工作。1、內(nèi)業(yè)預(yù)備1)、審核、分析設(shè)計(jì)圖紙,提供實(shí)施性施工圖紙。2)、臨時(shí)工程的設(shè)計(jì)與施工,包括料場(chǎng)建設(shè)、臨時(shí)用房修建、臨時(shí)施工便道的修建等。3)、編寫實(shí)施性施工組織設(shè)計(jì),對(duì)施工具體人員安排、機(jī)械設(shè)備配備、場(chǎng)地布置、施工工序、施工進(jìn)度都做具體周密的說明。4)、編制質(zhì)量打算,落實(shí)質(zhì)量治理體系、提出質(zhì)量治理標(biāo)準(zhǔn)、明確保證措施。5)、編制施工工藝標(biāo)準(zhǔn)及保證措施,一切要以技術(shù)規(guī)范、設(shè)計(jì)圖紙為準(zhǔn)則。6)、制定技術(shù)治理方法和實(shí)施細(xì)則,盡量作到細(xì)而準(zhǔn)。7)、進(jìn)行崗前培訓(xùn),著重培訓(xùn)職員的崗位職業(yè)技能、工程質(zhì)量意識(shí)、安全生產(chǎn)意識(shí)。2、外業(yè)預(yù)備1)、租賃項(xiàng)目部辦公和生活用房。2)、平坦臨時(shí)場(chǎng)地,清理施工現(xiàn)場(chǎng)。3)、測(cè)量操縱體系的建立。4)、各類實(shí)驗(yàn)儀器的配備。5)、各類施工設(shè)備的安裝和調(diào)試。5.3材料組織供應(yīng)1、水泥:擬采納水泥廠生產(chǎn)的合格水泥進(jìn)行施工,用汽車運(yùn)至施工現(xiàn)場(chǎng)。2、鋼材(鋼筋)擬從重慶市市區(qū)或就近購買,用汽車運(yùn)至施工現(xiàn)場(chǎng)。3、碎石、砂:擬從沿線各料場(chǎng)購買,用汽車運(yùn)至施工現(xiàn)場(chǎng)。其余小型材料就近組織購買,運(yùn)抵施工現(xiàn)場(chǎng)。六、施工預(yù)備及臨時(shí)設(shè)施6.1臨時(shí)房屋設(shè)施項(xiàng)目經(jīng)理部預(yù)備在現(xiàn)場(chǎng)鄰近租用民房。以方便與業(yè)主、監(jiān)理、當(dāng)?shù)卣嚷?lián)系。6.2水、電設(shè)施1、施工用水、用電沿線水源豐富,在工地修建蓄水池,通過潛水泵、輸水管送至施工點(diǎn)的方法解決。2、生產(chǎn)、生活用電生產(chǎn)用電采納化工園區(qū)內(nèi)的高壓電源。生活用電可取自當(dāng)?shù)鼐用裼秒娋W(wǎng)。生活用水則取自當(dāng)?shù)仫嬘盟c(diǎn)。在施工區(qū),生活用電可下接高壓線或自備發(fā)電機(jī)組供給,生活用水則取自當(dāng)?shù)仫嬘盟c(diǎn)或自備井供應(yīng)。3、混凝土拌和場(chǎng)在園區(qū)內(nèi)臨時(shí)平坦場(chǎng)地做混凝土攪拌場(chǎng)。4、交通、通訊項(xiàng)目經(jīng)理部安裝、機(jī),以便于和業(yè)主、監(jiān)理及當(dāng)?shù)卣3致?lián)系。每個(gè)施工隊(duì)用手機(jī)于與經(jīng)理部保持聯(lián)系,和諧工作,保持項(xiàng)目部與施工隊(duì)統(tǒng)一指揮、和諧。充分利用電腦、電子信箱,與外界進(jìn)行信息交換與溝通,獵取對(duì)本項(xiàng)目有用的信息。項(xiàng)目部配備行政車、材料采購車、生活用車各一臺(tái),解決各施工隊(duì)的交通、材料及平常生活問題。施工組織機(jī)構(gòu)的建立7.1組織機(jī)構(gòu)設(shè)置1、我公司高度重視本工程,一旦中標(biāo)本工程將列為我公司的重點(diǎn)工程,為優(yōu)質(zhì)按期完成本工程施工任務(wù),在全公司范疇內(nèi)抽調(diào)治理水平高、具有豐富施工體會(huì)的人員組成施工項(xiàng)目經(jīng)理部。項(xiàng)目經(jīng)理部下設(shè)六個(gè)職能部門,配備足夠數(shù)量且具有施工治理和施工體會(huì)的技術(shù)及各專業(yè)骨干,負(fù)責(zé)工程建設(shè)全過程的治理、組織、和諧,以確保各項(xiàng)工程治理目標(biāo)的實(shí)現(xiàn),按對(duì)項(xiàng)目法人的要求操縱工程進(jìn)度、質(zhì)量、安全和文明施工等。2、項(xiàng)目經(jīng)理部設(shè)項(xiàng)目經(jīng)理一人,總工程師一人,調(diào)度指揮一人,副經(jīng)理一人,項(xiàng)目部?jī)?nèi)設(shè)施工技術(shù)科、安全質(zhì)量科、打算財(cái)務(wù)科、物資設(shè)備科、測(cè)試中心、綜合辦公室六個(gè)職能部門。7.2施工組織治理機(jī)構(gòu)的運(yùn)作1、要緊治理人員配備、項(xiàng)目經(jīng)理部的項(xiàng)目經(jīng)理由本公司具有豐富施工體會(huì)、承擔(dān)過類似工程建設(shè)的工程師擔(dān)任,負(fù)責(zé)施工生產(chǎn)過程的組織、指揮及和諧工作。項(xiàng)目經(jīng)理部的副經(jīng)理和總工程師按各自分管責(zé)任,指派有豐富體會(huì)的人員擔(dān)任。、專業(yè)技術(shù)負(fù)責(zé)人,按照相關(guān)專業(yè),配備多人配合項(xiàng)目總工程師做好施工技術(shù)治理工作。2、治理職能部門及工作1)、項(xiàng)目經(jīng)理部的治理機(jī)構(gòu)為施工技術(shù)科、安全質(zhì)量科、打算財(cái)務(wù)科、物資設(shè)備科、測(cè)試中心、綜合辦公室六個(gè)職能部門。每個(gè)部門按責(zé)任制執(zhí)行,有條不紊開展工作。2)、項(xiàng)目經(jīng)理部的施工技術(shù)科、安全質(zhì)量科等部門派專人指導(dǎo)現(xiàn)場(chǎng)的相關(guān)工作,并與業(yè)主、監(jiān)理、設(shè)計(jì)院及有關(guān)單位、部門保持有效聯(lián)系,及時(shí)解決施工中顯現(xiàn)的各種問題。八、施工打算工期進(jìn)度打算1、本工程施工總工期為90天日歷天。2、開工日期以甲方下達(dá)的開工令為準(zhǔn),在規(guī)定的施工日歷天之內(nèi),全部工程應(yīng)完成,并通過驗(yàn)收。3、施工工期進(jìn)度打算:依照業(yè)主的要求,我公司將該工程的工期定為90天:1)、施工預(yù)備期:在接到業(yè)主的中標(biāo)通知書后一周內(nèi),我公司將組織人員進(jìn)入施工現(xiàn)場(chǎng)開始施工前期工作,作施工前的各項(xiàng)預(yù)備工作。估量在5天內(nèi)完成。2)、施工期:在預(yù)備工作完成后,將展開全面施工作業(yè),采納流水作業(yè)分隊(duì)分段施工,將按照事前制定的打算有條不紊的進(jìn)行各項(xiàng)工作,估量在77天內(nèi)完成。3)、施工收尾及交驗(yàn)期:主體工程完工后,在最后8天內(nèi)應(yīng)加緊其余零星工程的施工和工程的全面清理工作,以達(dá)到業(yè)要緊求的工程交工條件。4、我公司就上述工期節(jié)點(diǎn)要求,結(jié)合施工現(xiàn)場(chǎng)實(shí)際情形,對(duì)本工程施工打算進(jìn)行了科學(xué)合理的安排,依照我公司以往施工體會(huì),我們完全有能力在甲方指定的工期內(nèi)順利完成本工程。施工設(shè)備打算1、為滿足施工生產(chǎn),落實(shí)施工機(jī)械配置打算,以單位要緊領(lǐng)導(dǎo)掛帥,快速抽調(diào)足夠數(shù)量性能良好的機(jī)械設(shè)備運(yùn)抵施工現(xiàn)場(chǎng)。關(guān)于個(gè)別類型的機(jī)械,數(shù)量不足的,將采取新購或租賃的方法補(bǔ)齊。2、要緊機(jī)械設(shè)備配制序號(hào)機(jī)械名稱規(guī)格單位數(shù)量1內(nèi)燃空壓機(jī)V-3.5/3臺(tái)62混凝土振動(dòng)棒ZN35臺(tái)43混凝土攪拌機(jī)J500臺(tái)24抽水機(jī)ф100mm臺(tái)35履帶式挖掘機(jī)1m臺(tái)16自動(dòng)翻斗車5t臺(tái)47鋼筋切割機(jī)HGQ40臺(tái)28鋼筋彎曲機(jī)HGW40臺(tái)29全站儀NTS-202臺(tái)210經(jīng)緯儀M310378臺(tái)211水準(zhǔn)儀M214516臺(tái)212電焊機(jī)BX1-500臺(tái)28.3各施工隊(duì)伍人員構(gòu)成1、項(xiàng)目經(jīng)理部在選擇施工隊(duì)伍時(shí),注重進(jìn)場(chǎng)隊(duì)伍的施工信譽(yù)、人員的技術(shù)素養(yǎng)、配套情形及近時(shí)期的實(shí)際表現(xiàn),施工能力和施工質(zhì)量能否滿足需要。2、對(duì)進(jìn)場(chǎng)的隊(duì)伍實(shí)施動(dòng)態(tài)治理,不承諾擅自擴(kuò)充和隨意抽調(diào),以確保施工隊(duì)伍的素養(yǎng)和人員相對(duì)穩(wěn)固。3、未經(jīng)有關(guān)質(zhì)量、安全方面培訓(xùn)的操作工人不許上崗。凡進(jìn)場(chǎng)的隊(duì)伍必須配備一定數(shù)量的專職和諧質(zhì)量、安全的治理人員。材料供應(yīng)打算及措施1、本工程材料供應(yīng)由項(xiàng)目經(jīng)理部統(tǒng)一負(fù)責(zé)。材料供應(yīng)將采取統(tǒng)一采購、統(tǒng)一調(diào)運(yùn)的原則進(jìn)行,所有材料的供應(yīng)均應(yīng)符合業(yè)主提出的要求,并得到監(jiān)理工程師的同意。2、所有用于本工程的材料、物資和各種類型的物品,不管是天然狀態(tài)的、通過加工的或者是制造出來的均應(yīng)該是新的,并符合合同要求的類型和質(zhì)量。3、作為用于正式工程中的材料和制成品的樣品(包括材料樣品和工地現(xiàn)場(chǎng)制成品的樣品),經(jīng)監(jiān)理工程師批準(zhǔn)后,由施工單位妥善儲(chǔ)存至監(jiān)理工程師準(zhǔn)許其自行處置時(shí)為止。4、當(dāng)技術(shù)規(guī)范或有關(guān)的參照標(biāo)準(zhǔn)要求有材料生產(chǎn)商和供應(yīng)商的測(cè)試證明書時(shí),施工單位將提供每份證明書的原件或復(fù)印件。證明書對(duì)被證明的材料采納系列編號(hào)或參考編號(hào),使人一目了然。證明書中包括有關(guān)參考標(biāo)準(zhǔn)和技術(shù)規(guī)定條款所要求的內(nèi)容。5、施工單位將對(duì)全部材料的取樣和測(cè)試,施工工藝,設(shè)備和量測(cè)裝置進(jìn)行日常檢查,以操縱其質(zhì)量并保證它們與技術(shù)規(guī)定和批準(zhǔn)的試樣相一致。6、施工單位做材料與試樣的試驗(yàn),托付由監(jiān)理工程師批準(zhǔn)的、具有相應(yīng)資質(zhì)的試驗(yàn)單位來承擔(dān)。7、材料質(zhì)量是工程質(zhì)量的生命,為此必須嚴(yán)格操縱材料進(jìn)貨渠道,把好材料質(zhì)量關(guān),做好質(zhì)量自檢工作。九、施工方法9.1擋土墻構(gòu)造1、擋土墻一樣間隔10~20m應(yīng)設(shè)置一道變形縫(或伸縮縫)。當(dāng)墻身高度不一、墻后荷載變化較大或地基條件較差時(shí),應(yīng)采納較小的變形縫間隔。變形縫寬度20mm。縫內(nèi)沿墻的內(nèi)、外、頂三邊填塞瀝青麻筋或涂瀝青木板,塞入深度不宜小于200mm。2、在地基巖性變化處、墻高突變處和其他建(構(gòu))筑物連接處應(yīng)設(shè)沉降縫。3、擋土墻頂應(yīng)設(shè)置護(hù)欄,護(hù)欄高度及形式待總圖確定。9.2填土施工方法1、清除表土中的草根、雜物,將零亂的土堆、陡坎洼地推平碾實(shí)。2、填土與碾壓必須同時(shí)進(jìn)行,每次填土虛鋪厚度不應(yīng)超過0.35m,用10噸左右的壓路機(jī)碾壓6~8遍,每遍之間應(yīng)有10%的重疊寬度。3、擋土墻后2米范疇內(nèi)不得使用大型機(jī)械填筑。4、填土的壓實(shí)系數(shù)不小于0.94。5、填方土料及其它要求應(yīng)按《建筑地基基礎(chǔ)工程施工質(zhì)量驗(yàn)收規(guī)范》(GB50202—2002)有關(guān)規(guī)定執(zhí)行。9.3錨桿擋土墻施工方法1、錨桿制作1)、錨桿采納Φ28(材質(zhì)HRB335)鋼筋,隔離架每隔2.0m設(shè)置一個(gè),插入孔內(nèi)底端距孔底面50mm,錨桿在完整巖層內(nèi)的錨固長(zhǎng)度不小于4500mm。2)、錨桿制作前保證鋼筋平直,除油和除銹,直徑和長(zhǎng)度符合設(shè)計(jì)要求。3)、采納單面焊搭接,接頭焊接符合要求,搭接長(zhǎng)度不小于200mm。4)、錨桿長(zhǎng)度誤差不超過±200mm,角度誤差不超過±3o。5)、注漿管要比鋼筋長(zhǎng)l000mm,底端比鋼筋短200mm,用綁絲或膠帶與鋼筋綁在一起,保證既不脫掉,又能待注漿后拔出,注漿管中部可不綁扎。6)、自由段位于土層時(shí),可采納除銹、刷瀝青船底漆、瀝青玻纖布纏裹其層數(shù)許多于二層。7)、錨桿自由段外端應(yīng)埋入鋼筋砼面層內(nèi)50mm以上。2、錨桿組裝與安裝、錨桿連接時(shí),采納對(duì)焊或搭接焊時(shí)采納E50焊條,當(dāng)錨桿鋼筋直徑大于28mm時(shí),采納機(jī)械連接。、插入錨桿前必須每隔2m焊好錨桿支架,插入錨桿時(shí)應(yīng)將灌漿管與錨桿鋼筋同時(shí)放至鉆孔底部;注漿管端部距孔底宜為100mm。錨桿鋼筋放置于鉆孔中心,以保證錨桿鋼筋周圍砂漿厚度平均。、插入鉆孔的錨桿要求順直,并應(yīng)除銹,在土層和易滲水強(qiáng)風(fēng)化巖層的錨筋應(yīng)事先涂一層銹漆,并用兩層瀝青玻璃布包扎,包扎后在上面涂一層防腐漆,最后套防腐塑料管。3、注漿1)、成孔后插入Φ28mm錨桿鋼筋。錨桿要緩慢放入孔內(nèi),嚴(yán)禁猛推、猛拉。投入困難時(shí)要拔出錨桿,透孔后再投放。錨桿鋼筋露出坡面以外10Omm。2)、注漿管與錨桿鋼筋一起下入孔內(nèi),注漿管底端距孔底50~lOOmm。3)、按灰砂比1:1、水灰比0.4配制水泥漿。水、水泥及外加劑用量必須準(zhǔn)確。注漿充盈系數(shù)不得小于1。4)、不得使用結(jié)塊或過期失效水泥,漿液攪拌要充分、平均,無團(tuán)塊、異物。5)、注漿壓力0.35MPa。注漿前要先用清水疏通注漿管,注漿時(shí)待孔口退出凈水泥漿后暫停,用廢水泥袋封堵孔口,即完成一次注漿。待20min后,進(jìn)行二次補(bǔ)漿,并將注漿管,慢慢撥出,拔管時(shí)要邊拔邊注漿,直至將管全部撥出孔內(nèi),最后將孔口二次搗實(shí)。6)、為保證注漿飽滿,在孔口設(shè)止?jié){塞。注漿后保持壓力3~5min。7)、注漿管撥出后,趕忙用水沖洗潔凈并整理回收,將注漿泵、攪拌機(jī)沖洗潔凈。8)、要經(jīng)常檢查、愛護(hù)注漿設(shè)備,保持良好的工作性能。4、錨桿擋土墻施工采納向下逆作跳槽式分段施工,每段長(zhǎng)6m,高:土層和強(qiáng)風(fēng)化基巖層為2.5m,中風(fēng)化基巖層為4m;只有當(dāng)同一高度各段錨桿擋土墻施工完后,才承諾連續(xù)向下分段施工,每段錨桿施工完畢,再現(xiàn)澆肋柱及墻板。采納向下逆作施工時(shí)應(yīng)采取可靠措施防止擋土墻下滑。5、定位:孔位承諾偏差為±15mm;錨桿孔距誤差不超過150mm。
6、鉆孔:錨桿采納風(fēng)槍打眼,錨桿軸線于巖體主體結(jié)構(gòu)面或滑移面成大角度相交,鉆孔要符合以下要求:鉆孔圓而直,鉆孔方向盡量與巖層要緊結(jié)構(gòu)面垂直;錨桿孔徑要大于桿體直徑15mm。鉆孔深度要滿足下列要求:錨桿孔深承諾偏差為±50mm;鉆孔質(zhì)量和錨桿材料質(zhì)量是錨桿施工質(zhì)量的基礎(chǔ),確保每一根錨桿都能發(fā)揮支護(hù)的作用。
7、清孔:用高壓風(fēng)管將孔內(nèi)粉塵和雜物吹出。
8、砂漿制備:采納不低于42.5級(jí)且具有抗擊水腐蝕的化學(xué)穩(wěn)固性的一般硅酸鹽水泥,按施工配合比在拌合站統(tǒng)一拌合錨桿用砂漿。
9、錨桿預(yù)備:按設(shè)計(jì)要求截取桿體,并整直、除繡和除油。
10、注漿:孔深、孔徑驗(yàn)收合格后灌注水泥砂漿,一般水泥砂漿錨桿的施工要求如下:砂漿拌和平均,隨拌隨用,一次拌和的砂漿要在初凝前用完。砂漿質(zhì)量是確保粘結(jié)力和錨固力的核心,必須充分注意,嚴(yán)格操縱在初凝前用完,并要遵守以下規(guī)定:
1)、注漿開始或中途暫停超過30分鐘時(shí),要用水潤(rùn)滑注漿罐及其管路。
2)、注漿孔口壓力操縱在0.4~0.6Mpa之間;。
3)、注漿管要插至距離孔底5~10cm處,隨水泥砂漿的注入緩慢勻速拔出,直到注滿為止。
11、插錨桿:注漿終止后趕忙迅速將錨桿體插入,錨桿桿體插入孔內(nèi)的長(zhǎng)度不得短于設(shè)計(jì)長(zhǎng)度的95%。若孔口無砂漿流出,必須將錨桿體拔出重新注漿。
12、測(cè)量放樣:在錨桿施工完成后趕忙進(jìn)行,依照路塹設(shè)計(jì)開挖坡面放出基坑開挖邊線和邊坡平臺(tái)位置。
13、基坑開挖:采納鉆孔開挖,開挖時(shí)注意要使開挖斷面垂直于路塹邊坡坡面。
14、模板加工和安裝:模板采納鋼模板和木模板相結(jié)合,在制作廠加工和拼裝好后運(yùn)到現(xiàn)場(chǎng)安裝。
15、鋼筋綁扎:鋼筋在制作場(chǎng)地制作好后運(yùn)到現(xiàn)場(chǎng)綁扎。鋼筋綁扎前錨桿按要求進(jìn)行拉拔試驗(yàn),合格后才能進(jìn)行下步工序。
16、基坑、鋼筋、模板檢查:檢查項(xiàng)目按照驗(yàn)標(biāo)規(guī)定執(zhí)行。
17、混凝土制備和澆筑:混凝土在拌合站集中拌合,混凝土輸送車運(yùn)輸,使用插入式振動(dòng)棒進(jìn)行振搗。
18、養(yǎng)護(hù):混凝土的養(yǎng)護(hù)在混凝土澆筑12~24小時(shí)后進(jìn)行,養(yǎng)護(hù)時(shí)刻不得少于7天。
19、錨桿施工質(zhì)量的保證措施
1)、施工中,定期檢查電源線路和設(shè)備的電器部件,確保用電安全。
2)、噴射機(jī)、水箱、風(fēng)包、注漿罐等應(yīng)進(jìn)行密封性能和耐壓試驗(yàn),合格后方可使用。
3)、注漿施工作業(yè)中,要經(jīng)常檢查出料彎頭、輸料管、注漿管和管路接頭等有無磨薄、擊穿或松脫現(xiàn)象,發(fā)覺問題,應(yīng)及時(shí)處理。
4)、處理機(jī)械故障時(shí),必須使設(shè)備斷電、停風(fēng)。向施工設(shè)備送電、送風(fēng)前,應(yīng)通知有關(guān)人員。
5)、向錨桿孔注漿時(shí),注漿罐內(nèi)應(yīng)保持一定數(shù)量的砂漿,以防罐體放空,砂漿噴出傷人。
6)、非操作人員不得進(jìn)入正進(jìn)行施工的作業(yè)區(qū)。施工中,噴頭和注漿管前方嚴(yán)禁站人。
7)、施工操作人員的皮膚應(yīng)幸免與速凝劑、樹脂膠泥直截了當(dāng)接觸,嚴(yán)禁樹脂卷接觸明火。施工過程中指定專人加強(qiáng)觀看,定期檢查錨桿抗拔力,確保安全。8)、錨桿安設(shè)后不得隨意敲擊,其端部3天內(nèi)不得懸掛重物,在砂漿凝固前,確實(shí)作好錨桿防護(hù)工作,防止敲擊、碰撞、拉拔桿體和在加固下方開挖;粘結(jié)錨桿錨桿粘結(jié)用水泥砂漿強(qiáng)度達(dá)到80%以上后,才能進(jìn)行錨桿外端部彎折施工。
9)、錨桿材質(zhì)檢查:確保每批錨桿材料均附有生產(chǎn)廠商的質(zhì)量證明書,并按施工圖紙規(guī)定的材質(zhì)標(biāo)準(zhǔn)以及監(jiān)理人指示抽檢錨桿性能。
10)、注漿密實(shí)度試驗(yàn):選取與現(xiàn)場(chǎng)錨桿的錨桿直徑和長(zhǎng)度、錨孔孔徑和傾斜度相同的錨桿,采納與現(xiàn)場(chǎng)注漿相同的材料和配合比拌制的砂漿,并按與現(xiàn)場(chǎng)施工相同的注漿工藝進(jìn)行注漿,養(yǎng)護(hù)7天后剖管檢查其密實(shí)度;
11)、拉拔力試驗(yàn):按設(shè)計(jì)要求對(duì)邊坡支護(hù)錨桿,按作業(yè)分區(qū)在每300根錨桿中抽查三根進(jìn)行拉拔力試驗(yàn);如錨桿抗拔力達(dá)不到設(shè)計(jì)值,采納擴(kuò)大鉆孔直徑,增大早強(qiáng)砂漿與圍巖接觸面積加以解決。
12)、施工過程中,對(duì)錨桿孔的鉆孔規(guī)格(孔位、孔徑、孔深和傾斜度)進(jìn)行自檢,作好記錄。并配合監(jiān)理人員進(jìn)行抽驗(yàn);
13)、在監(jiān)理人現(xiàn)場(chǎng)參加各項(xiàng)試驗(yàn)和檢查,并將各項(xiàng)試驗(yàn)記錄和成果以及驗(yàn)收?qǐng)?bào)告經(jīng)監(jiān)理人驗(yàn)收,在簽認(rèn)合格后作為支護(hù)工程完工驗(yàn)收的資料。20、噴射混凝土施工及質(zhì)量要求1)、在邊坡進(jìn)行噴射混凝土前,先清理防護(hù)巖面雜物,清除浮石及松動(dòng)巖石。2)、埋設(shè)操縱噴射混凝土厚度的標(biāo)志,鋪設(shè)鋼筋網(wǎng)。網(wǎng)眼的大小符合圖紙規(guī)定,鋼筋網(wǎng)應(yīng)與錨桿聯(lián)結(jié)牢固,其與巖面的間隙為30mm。3)、噴射混凝土前先進(jìn)行試噴,確定噴射的技術(shù)參數(shù)以及施工操作順序,并請(qǐng)監(jiān)理工程師認(rèn)可后方可進(jìn)行大面積施工。4)、噴射混凝土配合比按照試驗(yàn)報(bào)告規(guī)定,速凝劑的參量由試驗(yàn)室通過試驗(yàn)后確定。5)、混合料在運(yùn)輸、存放過程中,應(yīng)嚴(yán)防雨淋、滴水及大塊石等雜物的混入,在裝入噴射機(jī)前應(yīng)過篩。6)、噴射混凝土應(yīng)分段、分片由下而上進(jìn)行。作業(yè)開始時(shí),應(yīng)先送風(fēng),后開機(jī),再給料;終止時(shí),待料噴完后,再關(guān)機(jī)。向噴射機(jī)供料時(shí)應(yīng)連續(xù)平均,機(jī)器正常運(yùn)轉(zhuǎn)時(shí),料斗內(nèi)應(yīng)保持足夠的存料。噴層厚度平均。7)、噴射開始時(shí),應(yīng)減小噴頭至受噴坡面的距離,并調(diào)劑噴射角度,以保證鋼筋網(wǎng)與巖面間混凝土的密實(shí)性。8)、噴射時(shí),應(yīng)保持混凝土表面平坦、呈潮濕光澤,無干斑或滑移流淌現(xiàn)象。9)、噴射完成后,視水泥種類及氣候情形,在7~14d內(nèi)應(yīng)加強(qiáng)養(yǎng)生。噴層周邊與未防護(hù)坡面的銜接處應(yīng)作好封閉處理。9.4施工工藝流程澆筑面板混凝土錨桿筋錨固安放面板鋼筋水泥漿拌制抗拔試驗(yàn)第二次注漿錨桿制作注澆管制作成束安放錨桿及注漿管清孔鉆孔澆筑面板混凝土錨桿筋錨固安放面板鋼筋水泥漿拌制抗拔試驗(yàn)第二次注漿錨桿制作注澆管制作成束安放錨桿及注漿管清孔鉆孔第一次注漿水泥砂漿拌制錨桿擋土墻施工工藝流程圖9.5扶壁式擋土墻施工方法1、開槽溝槽開挖前詳細(xì)調(diào)查現(xiàn)況管線位置,物探人員測(cè)定管線高程并現(xiàn)場(chǎng)挖探坑,對(duì)現(xiàn)有管線做明顯標(biāo)記,開槽時(shí)遇有管線處必須人工開挖,施工中,遇到不明管線,及時(shí)妥善愛護(hù),并通知有關(guān)部門處理。依照土質(zhì)情形,當(dāng)開挖深度小于4.0米時(shí),開挖放坡坡度1:0.5,當(dāng)開挖深度大于4.0米時(shí),開挖放坡坡度為1:0.75,挖槽時(shí)機(jī)械挖至距槽底標(biāo)高20cm時(shí)用人工清底,不得超挖,嚴(yán)禁擾動(dòng)槽底原狀土。2、基礎(chǔ)處理在設(shè)計(jì)基礎(chǔ)尺寸與基礎(chǔ)處理厚度均與地基承載力有關(guān),基礎(chǔ)處理的材料采納石灰粉煤灰穩(wěn)固砂礫,。如該基礎(chǔ)處理層以下的地基承載力不能滿足設(shè)計(jì)要求,應(yīng)采取換土等其他的處理措施,使其達(dá)到設(shè)計(jì)要求,基礎(chǔ)處理層以下的處理需要設(shè)計(jì)、監(jiān)理及甲方共同確認(rèn)后給出處理意見。3、擋墻基礎(chǔ)鋼筋成型1)、鋼筋表面應(yīng)潔凈、不得有銹皮,油漬、油漆等污垢;2)、鋼筋必須調(diào)直,調(diào)直后得鋼筋表面不得有使鋼筋截面減小得傷痕;3)、鋼筋曲成型后,表面不得有裂紋、鱗落或斷裂現(xiàn)象;4)、鋼筋得品種、等級(jí)、規(guī)格、直徑,各種尺寸經(jīng)抽驗(yàn)均符合設(shè)計(jì)要求;5)、綁扎成型時(shí),焊前不得有水銹、油漬;焊縫處不得有咬肉,裂紋、加渣,焊藥皮應(yīng)敲除潔凈。6)、綁扎或焊接成型的網(wǎng)片或骨架必須穩(wěn)固,杯槽處的鋼筋在澆注混凝土?xí)r不得松動(dòng)、變形。4、澆注擋墻基礎(chǔ)混凝土1)、混凝土配比必須符合設(shè)計(jì)強(qiáng)度要求。2)、混凝土要振搗密實(shí),杯槽位置更應(yīng)加強(qiáng)加細(xì)振搗,以防漏筋和顯現(xiàn)蜂窩狗洞。3)、預(yù)埋件按設(shè)計(jì)位置與基礎(chǔ)鋼筋焊接,以免振搗混凝土?xí)r發(fā)生變形和位移。5、澆注墻頂三角混凝土1)、測(cè)量人員按照設(shè)計(jì)的縱斷高程嚴(yán)格操縱模板高程。2)、模板內(nèi)側(cè)壓緊薄塑料條,嚴(yán)禁跑漿;3)、澆注前,將墻頂鑿毛刷素漿,以利混凝土上下結(jié)合。6、漿砌塊石擋土墻施工方法1)、由測(cè)量人員嚴(yán)格按照?qǐng)D紙進(jìn)行放線。2)、溝槽采納人工挖槽,底層進(jìn)行地基處理,基礎(chǔ)采納木模支搭現(xiàn)澆混凝土基礎(chǔ)。3)、墻體砌筑采納分段砌筑,位置依圖紙?jiān)O(shè)置在基礎(chǔ)變形縫位置,相鄰砌筑高差不宜超過1.2m??p板安裝應(yīng)位置準(zhǔn)確、牢固,縫板材料符合設(shè)計(jì)規(guī)定。4)、墻體每天連續(xù)砌筑高度不宜超過1.2m,相鄰擋土墻高差較大時(shí)先砌筑高墻段。砌筑中板縫不得移位變形。5)、在擋土墻高度大于50cm時(shí),設(shè)泄水孔,距地面25cm,間距3-5m,采納PVC管,管徑3cm;在泄水孔內(nèi)側(cè)用直徑2-5cm砂礫,堆成30cm圓弧狀,外包透水土工布。6)、擋土墻每隔10-15m應(yīng)設(shè)沉降縫,縫寬1cm,用油氈或木絲板填實(shí),沉降縫填土側(cè)一并設(shè)置20mm寬的乳化瀝青和油氈防水層。7)、擋土墻外露面留1-2cm勾縫,砌塊及勾凹縫處采納水泥砂漿。8)、擋土墻裝飾砌塊與一般砌塊之間采納專用夾子連接,使之成為一體。7、擋墻附屬工程1)、沉降縫擋土墻基礎(chǔ)分段長(zhǎng)度不大于16m,在基礎(chǔ)錯(cuò)臺(tái)處或分段處應(yīng)留沉降縫,基礎(chǔ)沉降縫刷2—3道乳化瀝青或貼2層油氈,填土一側(cè)墻面應(yīng)設(shè)三油兩氈防水層。2)、排水孔排水孔設(shè)置在兩墻面板之間,間距2米,排水管采納30mm的鍍鋅鋼管,漏出墻板外側(cè)10mm,墻內(nèi)側(cè)20mm,3%的橫坡??卓谶M(jìn)水處采納直徑2.5---7cm的礫石堆料,堆料直徑不小于50mm8、擋墻檢驗(yàn)的承諾偏差:現(xiàn)澆擋墻基礎(chǔ)承諾偏差表:序號(hào)項(xiàng)目承諾偏差(mm)檢驗(yàn)頻率1混凝土抗壓強(qiáng)度必須符合GBJ107-872斷面尺寸高±1020m寬±10杯口寬+2003杯槽軸線位移1020m4杯槽底面高程+5-1020m5蜂窩麻面不大于模板接觸面1%20m漿砌塊石擋土墻承諾偏差:項(xiàng)次檢驗(yàn)項(xiàng)目承諾偏差(mm)1平面位置502頂面邊棱直順度303豎直度或坡度0.5%H4頂面高程±205斷面尺寸不小于設(shè)計(jì)值3)、扶壁式擋土墻施工工藝流程:清理樁頂面綁扎鋼筋立底模板測(cè)量放樣清理樁頂面綁扎鋼筋立底模板測(cè)量放樣立側(cè)模板立側(cè)模板 混凝土拌制、運(yùn)輸土監(jiān)理檢測(cè)灌注混凝土混凝土拌制、運(yùn)輸土監(jiān)理檢測(cè)灌注混凝土制作混凝土試件養(yǎng)護(hù)制作混凝土試件養(yǎng)護(hù)9.6衡重式擋土墻施工澆注混凝土前,應(yīng)對(duì)支架、模板、鋼筋和預(yù)埋件進(jìn)行檢查,并做好記錄,符合設(shè)計(jì)要求后方可澆注。模板內(nèi)的雜物、積水和鋼筋上的污垢應(yīng)清理潔凈。模板如有縫隙,應(yīng)填塞嚴(yán)密,模板內(nèi)面應(yīng)涂刷脫模劑。澆注混凝土前,應(yīng)檢查混凝土的平均性和坍落度。自高處向模板內(nèi)傾卸混凝土?xí)r為防止混凝土離析,應(yīng)符合下列規(guī)定:1、從高處直截了當(dāng)傾卸時(shí),其自由傾落高度不宜超過2m,以不發(fā)生離析為度。2、當(dāng)傾落高度超過2m時(shí),應(yīng)通過串筒、溜管或振動(dòng)溜管等設(shè)施下落;傾落高度超過10m時(shí),應(yīng)設(shè)置減速裝置(在串筒的不同高度設(shè)多向擋板)。3、在串筒出料筒下面,混凝土堆積高度不宜超過1m.4、澆注混凝土使用插入式振動(dòng)器時(shí),移動(dòng)間距不應(yīng)超過振動(dòng)器作用半徑的1.5倍;與側(cè)模應(yīng)保持50-100mm的距離;插入下層混凝土50-100mm;每一處振動(dòng)完畢后應(yīng)邊振動(dòng)邊慢慢提出振動(dòng)棒;應(yīng)幸免振動(dòng)棒碰撞模板、鋼筋及其他預(yù)埋件。對(duì)每一振動(dòng)部位,必須振動(dòng)到該部位混凝土密實(shí)為止。密實(shí)的標(biāo)志是混凝土停止下沉,不再冒出氣泡,表面出現(xiàn)平坦、泛漿。5、混凝土的澆注應(yīng)連續(xù)進(jìn)行,如因故必須間斷時(shí),其間斷時(shí)刻應(yīng)小于前層混凝土的初凝時(shí)刻或能重塑的時(shí)刻。混凝土的運(yùn)輸、澆注及間歇的全部時(shí)刻不得超過表的規(guī)定,當(dāng)需要超過時(shí)應(yīng)預(yù)留施工縫。6、施工縫的位置應(yīng)在混凝土澆注之前確定,宜留置在結(jié)構(gòu)受剪力和彎矩較小且便于施工的部位,并應(yīng)按下列要求進(jìn)行處理:1)、應(yīng)鑿除處理層混凝土表面的水泥砂漿和松軟層,但鑿除時(shí),處理層混凝土須達(dá)到下列強(qiáng)度:①洗鑿毛時(shí),須達(dá)到0.5Mpa;②用人工鑿除時(shí),須達(dá)到2.5Mpa;③用風(fēng)動(dòng)機(jī)鑿毛時(shí),須達(dá)到10Mpa;2)、經(jīng)鑿毛處理的混凝土面,應(yīng)用水沖洗潔凈,在澆注層次混凝土前,對(duì)垂直施工縫宜刷一層水泥凈漿,對(duì)水平縫宜鋪一層厚度為10-20mm的1:2的水泥砂漿。3)、施工縫為斜面時(shí)應(yīng)澆注成或鑿成臺(tái)階狀。4)、施工縫處理后,須待處理層混凝土達(dá)到一定強(qiáng)度后才能連續(xù)澆注混凝土。需要達(dá)到的強(qiáng)度,一樣最低為1.2Mpa,當(dāng)結(jié)構(gòu)物為鋼筋混凝土?xí)r,不得低于2.5Mpa.7、在澆注過程中或澆注完成時(shí),如混凝土表面泌水較多,須在不擾動(dòng)已澆注混凝土的條件下,采取措施將水排除。連續(xù)澆注混凝土?xí)r,應(yīng)查明緣故,采取措施減少泌水。8、結(jié)構(gòu)混凝土澆注完成后,對(duì)混凝土裸露面應(yīng)及時(shí)進(jìn)行休整、抹平,待定漿后再抹第二遍并壓光或拉毛。當(dāng)裸露面面積較大或氣候不良時(shí),應(yīng)加蓋防護(hù),但在開始養(yǎng)生前,覆蓋物不得接觸混凝土面。9、澆注混凝土期間,應(yīng)設(shè)專人檢查支架、模板、鋼筋和預(yù)埋件等穩(wěn)固情形,當(dāng)發(fā)覺有松動(dòng)、變形、移位時(shí),應(yīng)及時(shí)處理。10、摻加片石技術(shù)要求:1)、片石摻加前應(yīng)清除表面的雜物、泥土等。2)、片石摻入量一樣不超過總圬工體積的25%,施工操縱在20%,摻入時(shí)不可亂投亂放,石塊應(yīng)分布平均,凈距不小于100mm,距結(jié)構(gòu)側(cè)面和頂面的凈距不小于150mm,石塊不得接觸預(yù)埋件,不可直截了當(dāng)接觸基底、模板。3)、施工完畢及時(shí)覆蓋養(yǎng)生15天
11、衡重式擋土墻施工工藝流程:衡重式擋土墻工程施工順序詳。否否是復(fù)核地勢(shì)及地質(zhì)情形基坑開挖地基處理回填基礎(chǔ)、墻身澆(砌)筑承載力檢測(cè)是否滿足要求圖4-1衡重式擋土墻工程施工順序圖十、工程質(zhì)量保證措施10.1技術(shù)保證措施1、扶壁式擋土墻下設(shè)C15素混凝土墊層,厚100mm,每邊寬出基礎(chǔ)100mm。2、擋土墻基底縱向坡度不宜大于5%。當(dāng)大于5%時(shí),應(yīng)在縱向?qū)⒒A(chǔ)做成臺(tái)階式。臺(tái)階高度不宜大于0.5m。3、基槽開挖后,嚴(yán)禁地表清潤(rùn)地基土,同時(shí)應(yīng)做好釬探工作。4、開槽后必須會(huì)同有關(guān)部門共同驗(yàn)槽,滿足設(shè)計(jì)要求后方可進(jìn)行下一步施工。5、鋼筋骨架應(yīng)符合規(guī)范要求,不得松脫和變形,經(jīng)檢驗(yàn)合格后方可入模。配制的骨料應(yīng)選擇良好的級(jí)配,粗骨料粒徑不應(yīng)大于40mm,且不超過最小斷面厚度的1/4;含泥量按重量計(jì)應(yīng)不超過1%;砂子的含泥量及云母含泥量按重量計(jì)不超過3%。6、截面尺寸應(yīng)符合設(shè)計(jì)要求,預(yù)埋件要按Sa2?級(jí)除銹,做到表面無銹跡、焊渣、毛刺、粉塵和水漬,并按要求涂裝;埋置時(shí)要做到表面平坦,標(biāo)高和位置準(zhǔn)確,其偏差應(yīng)符合有關(guān)施工及驗(yàn)收規(guī)范的要求。7、混凝土耐久性的差不多要求:環(huán)境類別最大水灰比最小水泥用量最低混凝土強(qiáng)度等級(jí)最大氯粒子含量最大堿含量二b類0.55275kg/m3C300.2%3.0kg/m38、混凝土的澆注環(huán)境溫度宜操縱在20℃9、混凝土應(yīng)振搗密實(shí),不得漏振,少振。保證構(gòu)件表面光滑平坦,無蜂窩、麻面、裂縫等。10、混凝土澆注完畢后,應(yīng)在12小時(shí)內(nèi)加覆蓋和澆水,澆水養(yǎng)護(hù)不得少于14晝夜。11、平均氣溫低于5℃12、拆模后,混凝土表面應(yīng)加覆蓋,防止陽光暴曬和寒潮突擊。13、鋼筋的接頭優(yōu)先采納焊接,除圖中注明者外,可采納搭接。14、鋼筋的錨固長(zhǎng)度和搭接長(zhǎng)度,除圖中注明者外,按下表采納:鋼筋種類HPB235HRB335錨固長(zhǎng)度/La搭接長(zhǎng)度Ll25d/35d30d/42d15、鋼筋搭接的接頭應(yīng)相互錯(cuò)開,同一連接區(qū)段內(nèi)受拉鋼筋接頭數(shù)量應(yīng)不大于總數(shù)量的25%。16、扶壁式擋土墻施工過程中要采取有效措施防止混凝土裂縫產(chǎn)生。17、墻后填料應(yīng)對(duì)稱平均進(jìn)行施工,施工時(shí)應(yīng)操縱填料對(duì)擋土墻的不利阻礙。填料施工,應(yīng)在砌體或混凝土強(qiáng)度達(dá)到設(shè)計(jì)強(qiáng)度的75%以上進(jìn)行。18、擋土墻上預(yù)埋Φ100(內(nèi)徑)泄水剛性套管向坑外傾斜5%,上下左右間距2M,并因交錯(cuò)設(shè)置。19、錨桿鉆孔定位尺寸偏差不應(yīng)大于20mm,錨桿的偏斜度不應(yīng)大于錨桿長(zhǎng)度的5%。鉆孔深度超過設(shè)計(jì)長(zhǎng)度不應(yīng)小于500mm。20、錨桿錨固段內(nèi)的錨桿孔不應(yīng)有水泥漿遺失,否則會(huì)降低錨桿受力性能及錨桿的耐腐蝕性,如有孔壁裂隙,可用較稀的水泥漿灌注孔內(nèi),24小時(shí)后,重新鉆孔。21、巖芯采取率:強(qiáng)風(fēng)化巖石不小于65%,中風(fēng)化巖石不小于80%,微風(fēng)化巖石不小于90%。22、噴射混凝土前應(yīng)清除巖面浮渣,清除鋼筋的污銹。23、在巖面噴射一層混凝土后鋪設(shè)鋼筋,鋼筋愛護(hù)層厚度為25,如遇較大巖腔可先用漿砌片石填平后再噴混凝土,混凝土采納干噴法,一次噴射厚度5~7,后一次噴射應(yīng)在前一層終凝后進(jìn)行,若間隔超過一小時(shí),應(yīng)用水把表面的浮膜和浮塵沖洗潔凈再噴。24、采納雙層鋼筋網(wǎng)時(shí),第二層鋼筋網(wǎng)應(yīng)在第一層鋼筋網(wǎng)被混凝土覆蓋后鋪設(shè)。25、噴射過程中回彈下落的骨料必須清除潔凈,禁止再用于噴射混凝土。26、噴射混凝土面層鋼筋網(wǎng)的接頭采納搭接加點(diǎn)焊,搭接長(zhǎng)度為一個(gè)網(wǎng)格邊長(zhǎng)。27、噴射混凝土的粗骨料最大粒徑不大于15mm。28、噴射混凝土施工時(shí)應(yīng)采取可靠措施防塵。29、鋼筋網(wǎng)噴射混凝土面層應(yīng)向上翻過邊坡頂部1.0~1.5m,以形成護(hù)坡頂。坡頂和坡腳應(yīng)做好防水。30、噴射混凝土支護(hù)錨桿應(yīng)采納全粘接錨桿。31、噴射混凝土應(yīng)做抗壓強(qiáng)度試驗(yàn),抗壓強(qiáng)度試驗(yàn)所需的試塊應(yīng)在工程施工中抽樣制取。噴射混凝土面板厚度的檢測(cè)可用鑿孔法或鉆孔法,厚度平均值應(yīng)大于設(shè)計(jì)厚度,最小值不應(yīng)小于設(shè)計(jì)厚度的90%。32、施工現(xiàn)場(chǎng)使用水泥堆放整齊,袋裝水泥堆放高度一樣不超過10包,堆寬以5-10袋為限,臨時(shí)露天堆放應(yīng)用用防雨蓬布遮蓋。
33、水泥貯存時(shí)刻一樣不超過3個(gè)月,對(duì)水泥質(zhì)量有懷疑和沒把握時(shí),使用前復(fù)查試驗(yàn),并按試驗(yàn)結(jié)果使用。
34、現(xiàn)場(chǎng)所用砂、水泥分開堆放整齊,不準(zhǔn)混雜,砂保持清潔,嚴(yán)禁混入泥土。
35、漿砌石砌筑砂漿必須具有時(shí)當(dāng)?shù)牧魈市院土己玫暮鸵仔?,以確保砌體灰縫充分填滿和壓實(shí)。
36、現(xiàn)場(chǎng)簡(jiǎn)易檢驗(yàn)方法為,用手捏成小團(tuán),以指封不出漿,松手后不松散為合格。
37、不同施工部位、結(jié)構(gòu)形式砌筑用砂漿標(biāo)號(hào)嚴(yán)格按照設(shè)計(jì)要求進(jìn)行操縱,漿砌石墻體砌筑嚴(yán)禁使用混合砂漿。
38、砌筑砂漿要定量分批做強(qiáng)度試驗(yàn),最多100m3砌體做一組評(píng)定砂漿強(qiáng)度試件。當(dāng)水泥品種、標(biāo)號(hào)或配合比等有變動(dòng)時(shí),均應(yīng)另做試件一組,并以此作為衡量砂漿質(zhì)量的依據(jù)。
39、截水墻立板與墻體板連接采納剛釘。
40、木板泄水孔鉆孔采納電鉆,鉆孔位置與木板連接縫要錯(cuò)開。41、一樣測(cè)量定位儀器選用經(jīng)緯儀,穿越大型沖溝陡坡上構(gòu)筑物定位測(cè)量選用全站儀,經(jīng)緯儀、全站儀須經(jīng)重新校驗(yàn)合格方可使用,開工前先進(jìn)行儀器報(bào)驗(yàn),要有校驗(yàn)合格證。
42、構(gòu)筑物測(cè)量定位工程坐標(biāo)及標(biāo)高引自管線藍(lán)圖設(shè)計(jì)樁點(diǎn)坐標(biāo)點(diǎn)。43、放線時(shí)采納經(jīng)緯儀測(cè)構(gòu)筑物各角點(diǎn)的位置,并埋設(shè)操縱樁作為施工位置依據(jù)及以后樁位傳遞的依據(jù),并現(xiàn)場(chǎng)畫出草圖以作記錄。44、漿砌石石墻采納交錯(cuò)組砌法,按石料形狀掛雙線分皮臥砌,第一層石塊大面向下平坦的一面朝下,上下石塊相互錯(cuò)縫,內(nèi)外搭接,擺鋪穩(wěn)固,分皮疊砌。
45、漿砌石應(yīng)用鋪漿漿法砌筑,灰縫應(yīng)飽滿,并插搗密實(shí),灰縫一樣為20-30mm,鋪漿厚度約40-60mm,較大間隙應(yīng)用碎石塊嵌于砂漿中,不承諾先填碎石在塞砂漿。
46、漿砌塊石不得形成水平或縱向通縫,不得有結(jié)搓。
47、用塊石填腹時(shí),水平灰縫寬度不得大于3cm,豎向灰縫不大于4cm,填腹石的灰縫應(yīng)彼此錯(cuò)開。
48、砌體表面的勾縫,無專門要求時(shí),應(yīng)在砌筑時(shí)留出2cm深的空縫,趕忙用水泥砂漿將縫勾完,否則應(yīng)待砌體砂漿凝固后,將空縫清洗潔凈再勾縫。
49、砌體表面勾縫采納平縫,勾縫所用砂漿標(biāo)號(hào)不低于砌筑砂漿標(biāo)號(hào)。
50、砌體砌筑一次性砌完,不承諾隨意留施工縫。51、漿砌塊石不得形成水平或縱向通縫,不得有結(jié)搓,砂漿飽滿。
52、砌體表面的勾縫,無專門要求時(shí),應(yīng)在砌筑時(shí)留出2cm深的空縫,趕忙用水泥砂漿將縫勾完,否則應(yīng)待砌體砂漿凝固后,將空縫清洗潔凈再勾縫。
53、砌體表面勾縫采納平縫,勾縫所用砂漿標(biāo)號(hào)不低于砌筑砂漿標(biāo)號(hào)。
10.2、質(zhì)量治理措施我司依照GB/T19000-2000建立了ISO9001:2000質(zhì)量治理體系,在所有承建項(xiàng)目均嚴(yán)格執(zhí)行相關(guān)的質(zhì)量治理規(guī)定,在施工項(xiàng)目上設(shè)置監(jiān)督質(zhì)量治理體系運(yùn)行的審核員、內(nèi)審員,確保質(zhì)量治理體系的有效運(yùn)行。項(xiàng)目經(jīng)理依照總公司的質(zhì)量治理體系內(nèi)容,在開工前,制定本工程的質(zhì)量目標(biāo)、質(zhì)量保證體系、質(zhì)量保證措施等內(nèi)容,并嚴(yán)格執(zhí)行。1、質(zhì)量目標(biāo)本工程施工滿足設(shè)計(jì)及相關(guān)技術(shù)規(guī)范要求,工程質(zhì)量一次驗(yàn)收合格率100%,優(yōu)良率90%以上,爭(zhēng)創(chuàng)精品工程。2、質(zhì)量治理保證體系(框圖)工作內(nèi)容經(jīng)理部技術(shù)負(fù)責(zé)人質(zhì)檢組施工技術(shù)組打算預(yù)算組分隊(duì)供應(yīng)組測(cè)量組施工準(zhǔn)備階段接收技術(shù)資料圖紙審查草擬施工方案編制施工規(guī)劃編制施工組織設(shè)計(jì)現(xiàn)場(chǎng)測(cè)量操縱網(wǎng)點(diǎn)施工圖紙?jiān)O(shè)計(jì)交底施工圖紙自審、會(huì)審施工方案技術(shù)交底編制創(chuàng)優(yōu)工程規(guī)劃施工階段建立工序治理點(diǎn)開展QC活動(dòng)組織技術(shù)攻關(guān)組織均衡施工工序交接治理班組自檢專檢聯(lián)檢材料檢驗(yàn)施工技術(shù)問題處理計(jì)量治理質(zhì)量信息治理質(zhì)量珍斷竣工驗(yàn)收工程資料整理創(chuàng)優(yōu)工程檢驗(yàn)工程質(zhì)量評(píng)定組織工程交工技術(shù)總結(jié)服務(wù)用戶回訪圖例決策主辦協(xié)同協(xié)辦參加督促執(zhí)行審批會(huì)審診斷3、質(zhì)量檢驗(yàn)體系(框圖)質(zhì)量檢驗(yàn)體系框圖4、技術(shù)治理體系(見框圖)5、質(zhì)量檢查程序工序班組自檢→現(xiàn)場(chǎng)質(zhì)檢員檢查→內(nèi)部監(jiān)理工程師檢查→現(xiàn)場(chǎng)監(jiān)理工程師檢查→下道工序
6、技術(shù)治理體系框圖工程監(jiān)理工程監(jiān)理總工程師總工程師測(cè)量組技術(shù)組質(zhì)檢組試測(cè)量組技術(shù)組質(zhì)檢組試驗(yàn)霜組土石方施工負(fù)責(zé)人施工負(fù)責(zé)人附屬結(jié)構(gòu)施工負(fù)責(zé)人道路及排水土石方施工負(fù)責(zé)人施工負(fù)責(zé)人附屬結(jié)構(gòu)施工負(fù)責(zé)人道路及排水
7、治理措施1)、全面開展質(zhì)量治理2)、積極開展勞動(dòng)競(jìng)賽3)、嚴(yán)格執(zhí)行監(jiān)理工程師指令4)、嚴(yán)把材料關(guān)8、技術(shù)措施1)、建立每個(gè)分項(xiàng)工程,每道工序,每個(gè)施工環(huán)節(jié)的質(zhì)量標(biāo)準(zhǔn)和技術(shù)標(biāo)準(zhǔn),并在施工中嚴(yán)格執(zhí)行。加強(qiáng)職工隊(duì)伍培訓(xùn),提高職工安全質(zhì)量和技術(shù)素養(yǎng)。2)、嚴(yán)格履行技術(shù)復(fù)核和質(zhì)量治理檢查制,對(duì)測(cè)量放樣應(yīng)進(jìn)行復(fù)核,測(cè)量資料及其它施工技術(shù)資料由專人保管、收集、整理,和施工同步。3)、組織強(qiáng)有力的施工隊(duì)伍及具有體會(huì)的工程技術(shù)人員及訓(xùn)練有素的技術(shù)人員參加施工。4)、開工前認(rèn)真批閱圖紙及各種技術(shù)文件,及時(shí)編制施工組織設(shè)計(jì)與質(zhì)量打算,進(jìn)行分項(xiàng)、分部工程劃分,分解創(chuàng)優(yōu)指標(biāo),提出創(chuàng)優(yōu)打算的實(shí)施期限。5)、編制各分項(xiàng)、分部工程施工實(shí)施細(xì)則,規(guī)范施工工期、方法、質(zhì)量標(biāo)準(zhǔn),檢測(cè)手段并嚴(yán)格實(shí)施。6)、嚴(yán)格履行技術(shù)復(fù)核和質(zhì)量治理檢查制,對(duì)測(cè)量進(jìn)行復(fù)核,符合制度方能放線。測(cè)量資料及其他施工技術(shù)資料必須有專人保管、收集、整理,且和施工同步。7)、認(rèn)真進(jìn)行工程技術(shù)、質(zhì)量及施工安全技術(shù)交底,施工順序進(jìn)度安排均要作交底,并作好書面記錄備查。8)、嚴(yán)格按照有關(guān)的施工規(guī)范及設(shè)計(jì)圖紙施工,工程質(zhì)量評(píng)定及隱藏工程驗(yàn)收,必須經(jīng)監(jiān)理工程師評(píng)定簽認(rèn)后,方可進(jìn)行下步工序施工。9)、施工中,如對(duì)結(jié)構(gòu)和其它緣故需進(jìn)行設(shè)計(jì)修改,必須在辦理工程聯(lián)系單、設(shè)計(jì)修改通知單后方可施工。10)、在保證建設(shè)監(jiān)理工程師充分履行職責(zé)和行使權(quán)力的前提下,建立項(xiàng)目經(jīng)理部?jī)?nèi)部監(jiān)理工程師制,各班組設(shè)質(zhì)量檢查員,實(shí)行質(zhì)量否決制度。與工程監(jiān)理緊密配合搞好質(zhì)量治理工作,做好事前質(zhì)量操縱,施工過程質(zhì)量操縱,竣工驗(yàn)收等工作。10.3施工組織措施1、以合同文件要求和設(shè)計(jì)圖紙為依據(jù),以技術(shù)規(guī)范為標(biāo)準(zhǔn),制定項(xiàng)目創(chuàng)優(yōu)規(guī)劃,確定各分項(xiàng)目的質(zhì)量治理目標(biāo)和各工序的質(zhì)量治理標(biāo)準(zhǔn),以工序質(zhì)量標(biāo)準(zhǔn)的實(shí)現(xiàn)來保證分項(xiàng)目質(zhì)量目標(biāo)的實(shí)現(xiàn),以分項(xiàng)質(zhì)量目標(biāo)的實(shí)現(xiàn)來保證工程項(xiàng)目質(zhì)量創(chuàng)優(yōu)目標(biāo)的實(shí)現(xiàn)。2、實(shí)行項(xiàng)目經(jīng)理質(zhì)量負(fù)責(zé)制和技術(shù)質(zhì)量雙向承包責(zé)任制,逐層簽定技術(shù)質(zhì)量責(zé)任狀,以激發(fā)全體參與項(xiàng)目施工人員的創(chuàng)優(yōu)積極性,促進(jìn)工程質(zhì)量的提高。3、加強(qiáng)教育,貫徹制度,科學(xué)治理,促進(jìn)創(chuàng)優(yōu)。在整個(gè)工程施工中力求做到“五不施工”(施工圖未復(fù)核、測(cè)量未復(fù)核、材料未實(shí)驗(yàn)或無合格證、技術(shù)未交底、隱藏工程未簽證不施工);“三不交接”(無自檢記錄、無施工記錄、無專職質(zhì)檢人員簽字不交接);“三教育”(工前培訓(xùn)、工中指導(dǎo)、工后講評(píng))。4、加強(qiáng)現(xiàn)場(chǎng)質(zhì)量操縱和質(zhì)量檢查。按照合同文件和技術(shù)規(guī)范的規(guī)定,設(shè)立工地試驗(yàn)站和質(zhì)量監(jiān)測(cè)站,配備滿足檢測(cè)需要的各種測(cè)試儀器設(shè)備,對(duì)工程所用的各種材料、設(shè)備和施工的各工序進(jìn)行有效的檢測(cè)操縱。5、施工中采納先進(jìn)的施工工藝和精良的施工設(shè)備,不斷優(yōu)化施工組織設(shè)計(jì)方案,推廣應(yīng)用“四新”成果,突破創(chuàng)優(yōu)難點(diǎn),采納先進(jìn)的技術(shù)和科學(xué)的治理相結(jié)合。大力組織“兩化”施工,使工程質(zhì)量一次成優(yōu)。6、虛心聽取和同意工程師及其代表的指導(dǎo)和監(jiān)督,堅(jiān)決執(zhí)行工程師及其代表的指示,及時(shí)落實(shí)工程師及代表的改進(jìn)意見。提供滿足工程師及其代表在現(xiàn)場(chǎng)檢測(cè)需要的人員和儀器設(shè)備,搞好與工程師及其代表的配合工作,同心同德創(chuàng)優(yōu)。7、作好各種試驗(yàn)、檢測(cè)記錄,為施工提供準(zhǔn)確可靠的各種數(shù)據(jù),收集整理工程質(zhì)量和施工技術(shù)資料,及時(shí)編制竣工文件。8、建立施工與建設(shè)、監(jiān)理、設(shè)計(jì)各方組成的質(zhì)量監(jiān)控網(wǎng)絡(luò),使整個(gè)工程在施工過程中始終處于受控狀態(tài)。9、工程預(yù)驗(yàn)收前,承包商組織有關(guān)人員按設(shè)計(jì)施工圖和施工標(biāo)準(zhǔn)的要求對(duì)其施工工程進(jìn)行全面的檢查,如有不符趕忙進(jìn)行整改。
10、當(dāng)全部工程完工并符合合同規(guī)定時(shí),承包商應(yīng)向業(yè)主或監(jiān)理申請(qǐng)交工驗(yàn)收。
11、承包商對(duì)業(yè)主或監(jiān)理組織的預(yù)驗(yàn)收提出的問題,應(yīng)在業(yè)主或監(jiān)理規(guī)定的期限內(nèi)整改完,再次提出交工申請(qǐng)。
12、交工資料由業(yè)主或監(jiān)理組織驗(yàn)收,驗(yàn)收后辦理交工資料交接手續(xù)。十一、安全保證措施11.1安全施工要緊措施1、成立環(huán)境愛護(hù)領(lǐng)導(dǎo)機(jī)構(gòu):項(xiàng)目部成立環(huán)境愛護(hù)委員會(huì),指定一名副經(jīng)理負(fù)責(zé)環(huán)境愛護(hù)工作的組織領(lǐng)導(dǎo)、規(guī)章制度的制訂和檢查落實(shí)。各工程隊(duì)成立環(huán)境愛護(hù)領(lǐng)導(dǎo)小組,隊(duì)主管領(lǐng)導(dǎo)任小組組長(zhǎng),各施工工長(zhǎng)及后勤保證部門負(fù)責(zé)人為成員,負(fù)責(zé)日常性的環(huán)境愛護(hù)工作的檢查和落實(shí)。2、積極與所在地聯(lián)成環(huán)境愛護(hù)網(wǎng)絡(luò),認(rèn)真聽取地點(diǎn)環(huán)保部門的意見,虛心同意其監(jiān)督和落實(shí)。3、依照本工程項(xiàng)目的作業(yè)特點(diǎn),制訂如下愛護(hù)措施:1)、在砌筑操作之前必須檢查操作環(huán)境是否符合安全要求,道路是否暢通,機(jī)具是否完好、牢固,安全設(shè)施和防護(hù)用品是否齊全,經(jīng)檢查符合要求后才可施工。2)、砌筑基礎(chǔ)時(shí),應(yīng)經(jīng)常檢查和注意基坑邊坡的土體變化情形,有無開裂、位移現(xiàn)象。堆放石材料應(yīng)離槽(坑)邊1m以上。3)、砌筑高度超過施工操作面1.2m以上時(shí)應(yīng)搭設(shè)腳手架。腳手架上堆放材料不得超過規(guī)定荷載值,同一塊腳手板上操作人員不得超過兩人。不準(zhǔn)用放不穩(wěn)固的工具或物品在腳手板上墊高操作,更不準(zhǔn)在未經(jīng)運(yùn)算和加固的情形下,在腳手板上再隨意疊搭一層腳手板。應(yīng)按規(guī)定搭設(shè)安全網(wǎng)。4)、在腳手架施工時(shí),堆放材料、施工機(jī)具等物品不得超過使用荷載,否則,必須通過驗(yàn)算并采取有效的加固措施后,方可堆放和施工。5)、不準(zhǔn)站在墻頂面上劃線、磚砌、刮縫、清理墻面和檢查大腳垂直度等工作;修石時(shí)應(yīng)面向墻面砍,并要注意防止碎石跳出傷人,垂直往上、往下人工投遞石料時(shí),要支搭站人用的寬度不小于0.6m的專用腳手架,并認(rèn)真?zhèn)鬟f,以防傷人。6)、不準(zhǔn)在墻頂上或腳手架上修鑿石材,以免墻體受到振動(dòng),阻礙墻體質(zhì)量或石塊掉下傷人。不準(zhǔn)將就在超過胸部的墻上砌筑片石,以免不宜操縱墻面垂直度、碰撞石墻或上石時(shí)失手掉下造成事故。不用的石塊不得由上往下投擲,運(yùn)石上下的坡道要加固定牢,并訂設(shè)防滑條、欄桿扶手等。7)、已砌好的山墻應(yīng)用臨時(shí)系桿(如檀條等)放置在各跨山墻上,使其連接穩(wěn)固,或采納其他加固措施,雨期每天下班前應(yīng)用防雨材料遮蓋,以防雨水沖掉砂漿,致使砌體倒塌。4、進(jìn)出場(chǎng)便道,經(jīng)常灑水養(yǎng)護(hù),幸免造成塵土飛揚(yáng),污染周圍環(huán)境。5、施工設(shè)備停置有序,材料堆放井井有條,環(huán)境衛(wèi)生專人打掃,施工營(yíng)區(qū)、生活區(qū)潔凈整齊。6、施工治理人員及現(xiàn)場(chǎng)施工人員均掛牌上崗。7、質(zhì)量員對(duì)現(xiàn)場(chǎng)所進(jìn)行的與質(zhì)量有關(guān)的活動(dòng)進(jìn)行觀看、監(jiān)督與檢查。檢查現(xiàn)場(chǎng)的施工工作是否按已批準(zhǔn)的程序進(jìn)行。8、現(xiàn)場(chǎng)檢查活動(dòng)是隨機(jī)的,無專門緣故,原則上每天都要進(jìn)行,對(duì)觀看發(fā)覺的不足或缺陷要作出記錄,并將不足或缺陷按重要性的不同以書面或口頭形式通知責(zé)任方。9、每周末,技術(shù)部要總結(jié)檢查情形,進(jìn)行講評(píng)和通報(bào),保證重點(diǎn)項(xiàng)目和重要過程不漏檢。10、項(xiàng)目工地每月召開一次由各部門和項(xiàng)目經(jīng)理參加的質(zhì)量小結(jié)會(huì)。技術(shù)部在會(huì)上向大伙兒匯報(bào)當(dāng)月質(zhì)量體系運(yùn)行情形,及時(shí)找出存在的問題,督促有問題的部門積極采取糾正措施,抓緊整改。11、現(xiàn)場(chǎng)發(fā)覺的所有質(zhì)量問題,其改正行動(dòng)都要按程序文件規(guī)定的格式記錄下來,且隨著工程進(jìn)展,逐步向下一時(shí)期移交,作為竣工狀態(tài)證明質(zhì)量達(dá)到要求的記錄文件。12、項(xiàng)目工地對(duì)質(zhì)量體系運(yùn)行中顯現(xiàn)與質(zhì)量治理文件有沖突或無法執(zhí)行的情形時(shí),要及時(shí)向公司報(bào)告,以求得問題的及時(shí)解決。13、施工現(xiàn)場(chǎng)平面布置符合有關(guān)安全衛(wèi)生規(guī)定,機(jī)具擺放整齊有序,各種標(biāo)志、標(biāo)識(shí)正確醒目,達(dá)到文明施工標(biāo)準(zhǔn)。14、如顯現(xiàn)危及或可能傷及人員的危險(xiǎn)時(shí),所有相關(guān)的工作應(yīng)停止直至危險(xiǎn)狀態(tài)得到排除。15、任何表現(xiàn)出不安全因素的設(shè)備和工具必須趕忙停止使用,直至處于安全狀態(tài)或從施工區(qū)域移出或更換。16、若現(xiàn)場(chǎng)發(fā)生事故,應(yīng)趕忙采取應(yīng)急措施并在第一時(shí)刻向業(yè)主提交書面報(bào)告,按業(yè)主和監(jiān)理的相關(guān)規(guī)定及本公司《事故處理程序》進(jìn)行事故的調(diào)查和處理。17、施工現(xiàn)場(chǎng)要緊道路應(yīng)符合標(biāo)準(zhǔn)要求,專門地況設(shè)蓋板、安全護(hù)欄。18、施工現(xiàn)場(chǎng)依照消防要求配置消防設(shè)施和器具,保持消防通道暢通。19、晚上施工時(shí),在獲監(jiān)理認(rèn)可后,項(xiàng)目部提供具有足夠照明強(qiáng)度的設(shè)備,確保安全生產(chǎn)。20、操縱箱電氣開關(guān)、閘刀等須放置在防雨棚或防雨罩,設(shè)漏電愛護(hù)器以防漏電。21、作業(yè)現(xiàn)場(chǎng)應(yīng)經(jīng)常打掃并保持清潔,垃圾應(yīng)集中堆放并及時(shí)清理、運(yùn)送至指定地點(diǎn)。22、熟悉與安全和健康有關(guān)的法律責(zé)任和義務(wù),熟悉項(xiàng)目部全面的、綜合的安全和健康程序的細(xì)節(jié)。23、對(duì)違反安全程序的有關(guān)人員將依據(jù)項(xiàng)目部相關(guān)規(guī)定,采取適當(dāng)?shù)膽吞幮源胧_`反安全規(guī)定并危及生命和財(cái)產(chǎn)安全的人員將被從施工隊(duì)伍中清除出去。24、施工人職員作前應(yīng)按規(guī)定穿戴好與作業(yè)相適應(yīng)的防護(hù)用品,檢查作業(yè)場(chǎng)地、施工機(jī)具及設(shè)備的完好情形,記錄每次檢查的日期、發(fā)覺的問題、所采取的補(bǔ)救措施等。25、施工人職員作中應(yīng)遵守崗位安全技術(shù)操作規(guī)程,做到文明施工。26、施工人員在工作前和工作中均不得食用酒精類飲料,不應(yīng)在禁止煙火的場(chǎng)所吸煙。27、在施工區(qū)域應(yīng)走指定通道,不應(yīng)跨過危險(xiǎn)區(qū),不應(yīng)在行駛的機(jī)動(dòng)車內(nèi)爬上跳下和攀登起重機(jī)吊鉤和吊運(yùn)中的物件。28、應(yīng)注意各種安全標(biāo)志,不應(yīng)隨便拆除或占用各種照明、信號(hào)、防雷等安全防護(hù)裝置、安全標(biāo)志和檢測(cè)外表等。29、發(fā)生事故應(yīng)及時(shí)搶救人員、財(cái)產(chǎn),愛護(hù)現(xiàn)場(chǎng)并向有關(guān)人員報(bào)告。執(zhí)行交接班制度。30、施工現(xiàn)場(chǎng)電氣作業(yè),由專職電工按規(guī)范操作。并負(fù)責(zé)作業(yè)區(qū)內(nèi)各種帶電設(shè)備及電線的漏電檢查,發(fā)覺問題趕忙整改。31、電氣設(shè)備操作人員,必須穿合格勞保服裝,戴標(biāo)準(zhǔn)絕緣手套,使用前必須對(duì)電氣設(shè)備進(jìn)行漏電試驗(yàn)。32、雨雪或潮濕天氣,一樣不在露天使用電氣設(shè)備,必要時(shí)采取適當(dāng)?shù)陌踩秒姶胧?3、施工現(xiàn)場(chǎng)用電設(shè)施應(yīng)在設(shè)備負(fù)荷線的首端處設(shè)置漏電愛護(hù)裝置。漏電愛護(hù)器應(yīng)裝設(shè)在開關(guān)箱內(nèi)。34、施工現(xiàn)場(chǎng)的配電室應(yīng)通風(fēng)良好,并采取防止雨雪和動(dòng)物入內(nèi)的措施。35、用電設(shè)備的金屬外殼(安全電壓除外)應(yīng)作愛護(hù)接地或愛護(hù)接零。潮濕或條件專門惡劣的施工現(xiàn)場(chǎng)的電氣設(shè)備應(yīng)采納愛護(hù)接零。36、配電屏(盤)上的各種配電線路應(yīng)有編號(hào)并標(biāo)明用途。配電線路修理時(shí)應(yīng)懸掛“禁止合閘,有人操作”警告標(biāo)志。停、送電必須有專人負(fù)責(zé)。37、搬運(yùn)石塊時(shí)要注意配合,步調(diào)和諧一致,互相用力平均,保證安全。38、石籠制作時(shí)注意安全,綁扎鐵絲時(shí)注意不要滑傷皮膚,鉤破衣服。39、修建施工便道應(yīng)保證足夠的寬度和強(qiáng)度,確保運(yùn)輸安全。40、人工開挖基槽時(shí)注意不要滑傷管子防腐層,人工鑿巖時(shí)要防止石塊崩傷操作人員。41、修建圍堰導(dǎo)流時(shí)圍堰應(yīng)有足夠的強(qiáng)度,防止被水沖垮。42、漿砌石護(hù)坡時(shí)應(yīng)把坡上的石塊清理潔凈,防止石塊清理不凈滑落傷人。43、攪拌機(jī)操作時(shí)應(yīng)遵守操作規(guī)程,嚴(yán)禁非崗位人員違章操作44、進(jìn)料便道、堆料場(chǎng)盡量利用施工作業(yè)帶或已有的鄉(xiāng)村砂石路等,沒有植被的砂石場(chǎng)和植被已被破壞的場(chǎng)地。45、施工時(shí)采取適當(dāng)措施保證現(xiàn)場(chǎng)道路、斜坡和其它對(duì)地面可不能形成障礙,造成水災(zāi),破壞植被。46、作業(yè)帶外被不慎砍伐的樹木要趕忙補(bǔ)救,只要安全性和可施工性承諾,平坦場(chǎng)地的工作人員應(yīng)盡量不破壞場(chǎng)地表面,不觸及原有的根系,植物能夠從地面切斷,為以后重新萌芽生長(zhǎng)制造條件。47、開挖管溝時(shí)要把表層土和底層土分開堆放,設(shè)置合適的溝渠排水和保持跨躍管溝的安全通道,以一種不阻礙其他土地使用的方式把管溝里過多的水抽到臨近的地區(qū)。48、回填管溝時(shí),應(yīng)盡量作到復(fù)原地表的原先形狀,使表面能正常排水。49、下層土和表層土回填應(yīng)與管溝內(nèi)兩側(cè)的土層匹配,儲(chǔ)存的表土不可在下層土回填之前填到管溝里面。50、在回填堆放挖出的土壤時(shí),不可把表層的草皮或表土除去。51、壓實(shí)管溝中的回填土,壓實(shí)程度要大體相當(dāng)于施工前狀態(tài),以盡量減少下沉。在管溝與水道交叉處和中斷的排水溝的兩岸壓實(shí)填土?xí)r注意,必要時(shí)采取適當(dāng)?shù)拇胧?,確保施工安全。52、在回填前需對(duì)大開挖的管溝用肉眼檢查,如發(fā)覺有動(dòng)物,則應(yīng)把它們弄出來,關(guān)于較大的動(dòng)物,可在夠壁挖一個(gè)斜坡,以便讓它能夠爬出來。53、取料場(chǎng)與任何水域保持最低限度的植被緩沖帶。54、取料場(chǎng)擴(kuò)展過程中移走的表土層必須適當(dāng)堆放,采取措施防止水土流失,把腐蝕局限在取料場(chǎng)范疇內(nèi),不得擅自擴(kuò)大作業(yè)面。55、除了指定的料場(chǎng),未經(jīng)當(dāng)?shù)赜嘘P(guān)部門許可在施工中不能隨意從河床或岸邊傾倒或挖取卵石、采砂及廢棄物。56、毀壞、遷移或清理樹木、植被不得超過工程施工所需的范疇,不得亂砍亂伐。
57、施工時(shí)臨時(shí)加寬加固的道路,施工完畢應(yīng)結(jié)合當(dāng)?shù)貙?shí)際情形,對(duì)阻礙環(huán)境的予以復(fù)原原貌。58、關(guān)于違反環(huán)保規(guī)章造成環(huán)境破壞,應(yīng)趕忙報(bào)告項(xiàng)目監(jiān)理,按照項(xiàng)目監(jiān)理的指示負(fù)責(zé)清理、回收和(或)采取復(fù)原措施。地表徑流向集合,沖溝上部設(shè)置環(huán)向節(jié)流排水溝,邊坡處沿管溝砌筑截水墻。59、穩(wěn)固性差的沖溝邊坡,軟土地基采納漿砌條(塊)石護(hù)坡。
60、在施工作業(yè)前,通過對(duì)風(fēng)險(xiǎn)和危害分析以及當(dāng)?shù)爻R姴?、傳染病和醫(yī)院狀況調(diào)查的基礎(chǔ)上,針對(duì)有毒蛇出沒的環(huán)境、使用機(jī)械設(shè)備、發(fā)電機(jī)排水等危險(xiǎn)因素,編制應(yīng)急預(yù)案和應(yīng)急程序,成立應(yīng)急小組,預(yù)備應(yīng)急物資,保證每位職員都熟悉應(yīng)急預(yù)案和緊急情形下的應(yīng)急行動(dòng)。61、如電源開關(guān)在鄰近、應(yīng)迅速關(guān)閉電源,否則用絕緣物體挑開電線或分離電器,使患者脫離電源;呼吸停止者,趕忙進(jìn)行人工呼吸;
心臟停跳者,進(jìn)行胸外心臟按壓;送醫(yī)院急救處理。62、處理損害的原則是第一搶救傷員的生命,對(duì)呼吸、心跳停止的傷員,應(yīng)就地趕忙進(jìn)行復(fù)蘇術(shù)。63、治療窒息。如遇嚴(yán)峻失血或胸部開放性損害,應(yīng)盡快止血或封閉胸部傷口;
64、治療休克和骨折固定。運(yùn)送四肢骨折傷員,必須用夾板固定傷肢,脊椎骨折須臥硬板床;
65、如動(dòng)脈出血,要上止血帶,每隔1小時(shí)放松一次,每次1—2分種,轉(zhuǎn)運(yùn)途中應(yīng)保持呼吸道暢通;
66、送醫(yī)院,預(yù)防感染,糾正電解質(zhì)代謝失調(diào),注射破傷風(fēng)抗毒素。67、急性中毒者,趕忙終止接觸毒物,毒物由呼吸道或皮膚侵入時(shí),要趕忙將病人撤離中毒現(xiàn)場(chǎng),移到空氣新奇的地點(diǎn),污染的衣服必須趕忙脫去,清洗接觸部位的皮膚;采取催吐、洗胃、導(dǎo)瀉等方法清除體內(nèi)尚未被吸取的毒物;清除皮膚上的毒物,脫去污染衣服,用大量溫水清洗皮膚毛發(fā);清除眼內(nèi)毒物,用清水完全清洗;清除傷口毒物;使用解毒劑并送醫(yī)院。11.2安全保證體系安全保證體系框圖安全安全法規(guī)技術(shù)負(fù)責(zé)人項(xiàng)目經(jīng)理(安全責(zé)任人)技術(shù)負(fù)責(zé)人項(xiàng)目經(jīng)理(安全責(zé)任人)項(xiàng)目安全規(guī)程技術(shù)措施項(xiàng)目安全規(guī)程技術(shù)措施現(xiàn)場(chǎng)安全負(fù)責(zé)人現(xiàn)場(chǎng)安全負(fù)責(zé)人各施工區(qū)各施工區(qū)糾正、整改糾正、整改1、建立安全生產(chǎn)責(zé)任制2、建立安全保證體系,健全各級(jí)各部門生產(chǎn)責(zé)任制,責(zé)任落實(shí)到人;3、各項(xiàng)施工任務(wù)都有明確的安全指標(biāo)和包括獎(jiǎng)懲方法在內(nèi)的保證措施,簽訂各級(jí)安全生產(chǎn)責(zé)任制。4、加強(qiáng)安全意識(shí)和技術(shù)教育1)、剛進(jìn)施工現(xiàn)場(chǎng)施工人員必須進(jìn)行安全技術(shù)教育;2)、工人變工種,必須進(jìn)行新工種的安全技術(shù)教育;3)、工人把握本工種操作技能,熟悉本工種安全技術(shù)操作規(guī)程;4)、認(rèn)真建立“職工勞動(dòng)愛護(hù)記錄卡”,及時(shí)做好記錄。5、安全保證的指導(dǎo)思想本工程施工現(xiàn)場(chǎng)和工程規(guī)模較大,施工人員多,專業(yè)交叉施工頻繁,不安全因素多。為切實(shí)保證施工過程安全無事故,將“安全第一,預(yù)防為主”指導(dǎo)思想落到實(shí)處,為實(shí)現(xiàn)這一指導(dǎo)思想,安全生產(chǎn)將在組織保證治理制度及防止損害事故、培訓(xùn)和教育等方面采取切實(shí)可行的相應(yīng)措施。6、建立以項(xiàng)目經(jīng)理部及安全監(jiān)察部門為主的安全領(lǐng)導(dǎo)組織,強(qiáng)調(diào)”管生產(chǎn)必須管安全”的生產(chǎn)原則,推行全員安全生產(chǎn)責(zé)任制.7、本項(xiàng)目設(shè)專職安全監(jiān)察部門,配合工班長(zhǎng)進(jìn)行施工過程中的安全治理工作。8、施工工班設(shè)兼職安全員,配合工班長(zhǎng)進(jìn)行施工過程中的安全治理工作.9、治理制度措施建立健全各項(xiàng)安全生產(chǎn)治理制度,在進(jìn)行施工技術(shù)交底時(shí),同時(shí)進(jìn)行安全交底。特種作業(yè)人員必須通過有關(guān)部門培訓(xùn),考試合格后持證上崗、建立定期安全檢查制度,建立相應(yīng)的考核措施,施工治理人員及各工種操作人員要佩戴不同的崗位標(biāo)識(shí);嚴(yán)禁違章指揮、違章作業(yè)、野蠻施工。10、施工過程安全措施施工過程中對(duì)安全教育、執(zhí)證上崗以及用電、樁基開挖的通風(fēng)、防坍塌、高空作業(yè)等嚴(yán)格按安全規(guī)程執(zhí)行,保證安全生產(chǎn)。11、消防安全保證措施為加強(qiáng)工程消防安全治理,貫徹“預(yù)防為主,防消結(jié)合”的消防方針,確保工程順利進(jìn)行,采取以下措施確保消防安全。12、重點(diǎn)防范的安全措施在本工程施工中,各環(huán)節(jié)的安全治理不容忽視,隨時(shí)采取措施改進(jìn)。本工程重點(diǎn)防護(hù)措施有以下幾項(xiàng),這在開工之前,必須完善安全措施。1)、防止觸電事故的發(fā)生,電工應(yīng)經(jīng)常檢查電器及線路安全,線路均配備標(biāo)準(zhǔn)配電箱。2)、為愛護(hù)行人和交通安全,施工現(xiàn)場(chǎng)出入口及重要部位實(shí)行封閉施工。采納鋼圍欄將施工現(xiàn)場(chǎng)封閉,既有利于文明施工,又減少相互干擾。3)、作好機(jī)械設(shè)備的安全防護(hù)措施。4)、做好防洪、防火、防盜、防爆炸事故等“四防”工作。防洪:施工場(chǎng)地開挖臨時(shí)排水溝,備好抽水設(shè)備。防火:電力線路和照明線路按規(guī)定布設(shè);生產(chǎn)和生活臨時(shí)用房除專門情形(試驗(yàn))一律不得使用電爐;不得亂丟煙頭;組建防火組織,定期檢查;在施工現(xiàn)場(chǎng)安放各種滅火器具。防盜:現(xiàn)場(chǎng)派專人保衛(wèi),加強(qiáng)與地點(diǎn)公安、聯(lián)防機(jī)關(guān)聯(lián)系,確保施工安全。防爆:易燃、易爆物品必須派專人治理,且與其它物品分開儲(chǔ)存;乙炔、氧氣瓶的存放應(yīng)設(shè)立單間儲(chǔ)存,并照防火規(guī)定距離及要求修建儲(chǔ)存庫房,庫房周圍應(yīng)設(shè)立明顯的防火標(biāo)志。一切無關(guān)人員嚴(yán)禁動(dòng)用乙炔、氧氣及進(jìn)入儲(chǔ)存庫房。13、其它需重點(diǎn)防范的安全措施1)、施工現(xiàn)場(chǎng)設(shè)置安全標(biāo)志,場(chǎng)內(nèi)的溝、坑等邊緣設(shè)安全護(hù)欄。場(chǎng)地狹小,行人和運(yùn)輸繁忙的路段設(shè)專人指揮交通。2)、工地上較高的建(構(gòu))筑物、臨時(shí)設(shè)施及重要庫房均應(yīng)架設(shè)避雷裝置。3)、施工測(cè)量釘樁要注意周圍行人的安全,不得對(duì)面使錘。鋼釬和其它工具不得隨意拋擲。4)、場(chǎng)內(nèi)道路應(yīng)經(jīng)常愛護(hù),保持暢通,場(chǎng)內(nèi)道路應(yīng)平坦順直。5)、現(xiàn)場(chǎng)架設(shè)的臨時(shí)線路必須用絕緣物支撐,不得將電線纏繞在鋼筋、樹木或腳手架上。6)、各種電器設(shè)備應(yīng)配有專用開關(guān),室外使用的開關(guān)、插座應(yīng)外裝防水箱并加鎖,在操作處加設(shè)絕緣墊層。7)、在三相五線制供電系統(tǒng)中,電器設(shè)備的金屬外殼應(yīng)作接地愛護(hù),其接地電阻應(yīng)不大于4。8)、各種電器設(shè)備的檢查修理,應(yīng)停電作業(yè);如必須帶電作業(yè)時(shí),應(yīng)有可靠的安全措施并派專人監(jiān)護(hù)。9)、工地安裝變壓器必須符合電業(yè)部門的要求,并設(shè)專人治理,施工用電要盡量保持三相平穩(wěn)。10)、現(xiàn)場(chǎng)的變(配)電設(shè)備處,必須備有滅火器材和高壓安全用具,非電工人員嚴(yán)禁接近帶電設(shè)備。11)、施工現(xiàn)場(chǎng)的臨時(shí)照明:室內(nèi)照明線路應(yīng)用瓷夾固定;電線接頭應(yīng)牢固,并用絕緣膠帶包扎,保險(xiǎn)絲應(yīng)按用電負(fù)荷量裝設(shè)。12)、檢修電氣設(shè)備時(shí)應(yīng)按下列要求進(jìn)行:電氣設(shè)備的檢修必須由電工進(jìn)行,他人不得任意操作。工作中如遇停電應(yīng)拉下開關(guān),切斷電源;檢修終止必須認(rèn)真檢查各項(xiàng)設(shè)備的情形,沒有專門,方可合閘。大型電氣設(shè)備檢修應(yīng)在切斷電源,設(shè)好防護(hù)后進(jìn)行,并在開關(guān)處設(shè)置警示標(biāo)牌,工作完成后方可拆除;如需進(jìn)行送電試驗(yàn)時(shí),必須在認(rèn)真檢查并與有關(guān)部門聯(lián)系后,方可進(jìn)行。13)、操作人員在工作中不得擅離崗位,不得操作與操作證不相符合的機(jī)械;不得將機(jī)械設(shè)備交給無本機(jī)種操作證的人員操作。14)、機(jī)械設(shè)備在施工現(xiàn)場(chǎng)停放時(shí),應(yīng)選擇安全的停放地點(diǎn),關(guān)閉好駕駛室(操作室),要拉上駐車制動(dòng)閘。十二、文明施工,加強(qiáng)環(huán)保12.1文明施工在施工現(xiàn)場(chǎng)治理中,采取各種措施,按現(xiàn)代化施工的客觀要求組織施工,使施工現(xiàn)場(chǎng)保持良好的施工環(huán)境和施工秩序。要緊措施有:
1、組織治理措施1)、建立健全治理組織機(jī)構(gòu)。施工現(xiàn)場(chǎng)應(yīng)成立以項(xiàng)目負(fù)責(zé)人為組長(zhǎng),生產(chǎn)、技術(shù)質(zhì)量、安全、消防、保衛(wèi)、材料、行政衛(wèi)生治理人員為成員的文明施工治理組織。2)、健全治理制度。包括:個(gè)人崗位責(zé)任制、經(jīng)濟(jì)責(zé)任制、檢查制度、獎(jiǎng)懲制度、會(huì)議制度和各項(xiàng)專業(yè)治理制度等;3)、健全治理資料。加強(qiáng)教育培訓(xùn)工作;推廣應(yīng)用新技術(shù)、新工藝、新設(shè)備和現(xiàn)代化治理方法,提高機(jī)械化作業(yè)程度。2、現(xiàn)場(chǎng)治理措施1)、對(duì)施工現(xiàn)場(chǎng)各生產(chǎn)要素(要緊是物的要素)的所處狀態(tài),不斷地進(jìn)行整理、整頓、清掃、清潔,并培養(yǎng)職員的素養(yǎng)及技術(shù),實(shí)現(xiàn)文明施工。2)、合理定置。將全工地施工期間所需要的物在空間上合理布置,實(shí)現(xiàn)人與物、人與場(chǎng)所、物與場(chǎng)所、物與物之間的最佳結(jié)合,使施工現(xiàn)場(chǎng)秩序化、標(biāo)準(zhǔn)化、規(guī)范化,表達(dá)文明施工水平。3)、目視治理。目視治理確實(shí)是用眼睛看的治理,亦可稱之為“看得見的治理”。它是利用形象直觀,色彩適宜的各種視覺感知信息來組織現(xiàn)場(chǎng)施工生產(chǎn)活動(dòng),達(dá)到提高勞動(dòng)生產(chǎn)率,保證工程質(zhì)量,降低工程的成本。目視治理是一種簡(jiǎn)便適用,透亮度高,便于職員自主治理,自我操縱,科學(xué)組織生產(chǎn)的一種有效的治理方式。4)、其要緊內(nèi)容與形式如下:①施工現(xiàn)場(chǎng)各項(xiàng)治理制度、操作規(guī)程、工作標(biāo)準(zhǔn)、施工現(xiàn)場(chǎng)治理實(shí)施細(xì)則等布告等應(yīng)用墻報(bào)、掛板等形式,展現(xiàn)清晰。②在定置過程中,以清晰的、標(biāo)準(zhǔn)化的視覺顯示信息落實(shí)定置設(shè)計(jì),實(shí)現(xiàn)合理定置。③施工現(xiàn)場(chǎng)的治理崗位責(zé)任人采納標(biāo)牌顯示,以更好地落實(shí)崗位責(zé)任制,激發(fā)崗位人員的責(zé)任心,并有利于群眾監(jiān)督。④在施工現(xiàn)場(chǎng)合理利用各種色彩、安全色、安全標(biāo)志等,并實(shí)行標(biāo)準(zhǔn)化治理,有利于生產(chǎn)和職員的安全。⑤將施工現(xiàn)場(chǎng)治理的各項(xiàng)檢查結(jié)果張榜公布。12.2施工現(xiàn)場(chǎng)環(huán)境愛護(hù)1、環(huán)境愛護(hù)是我國的一項(xiàng)差不多國策。在施工過程中,采取措施,按照國家、地點(diǎn)法規(guī)和行業(yè)、企業(yè)要求,采取措施操縱施工現(xiàn)場(chǎng)的各種粉塵、廢水、廢氣、固體廢棄物以及噪聲、振動(dòng)等對(duì)環(huán)境的污染和危害,同時(shí)要防止水土流失。愛護(hù)和改善施工環(huán)境,保證人們軀體健康,排除外部干擾,保證順利進(jìn)行。2、環(huán)境愛護(hù)的措施及具體做法:1)、實(shí)行環(huán)保目標(biāo)責(zé)任制2)、加強(qiáng)檢查和監(jiān)控工作3)、對(duì)要愛護(hù)和改善的施工現(xiàn)場(chǎng)環(huán)境,進(jìn)行綜合治理4)、嚴(yán)格執(zhí)行國家的法律、法規(guī),統(tǒng)籌安排,合理布置,綜合治理。5)、施工前應(yīng)制定施工期間環(huán)境愛護(hù)措施,防止大氣污染、水源污染和噪聲污染。6)、施工廢棄物采取措施集中外運(yùn)到指定地點(diǎn),幸免堵塞河溝、污染水源。如無法及時(shí)處理或運(yùn)走,則必須設(shè)法防止散失。7)、施工中所產(chǎn)生的污水或廢水,集中處理,不能隨意排放。8)、在運(yùn)輸和貯存施工材料時(shí),采取覆蓋、倉貯等措施防止漏失。9)、當(dāng)路線通過農(nóng)田灌溉區(qū)時(shí),采取必要臨時(shí)措施。如接邊溝,安設(shè)水管等以保證不阻礙或中斷農(nóng)田的排灌作業(yè)。10)、對(duì)工程范疇以外的土地及植被應(yīng)注意愛護(hù),未經(jīng)工程師批準(zhǔn),不得隨意堆置廢方和挖掘。3、保持作業(yè)帶范疇內(nèi)不遺留施工產(chǎn)生的垃圾和碎片。4、工現(xiàn)場(chǎng)的食物垃圾應(yīng)每天清晰掉。5、垃圾應(yīng)運(yùn)到施工場(chǎng)地以外適當(dāng)?shù)睦幚韴?chǎng)妥善處理。6、不得將垃圾處理到溝渠里,表土或土堆上。7、清理人員收拾垃圾、碎片、切斷的殘枝和施工預(yù)料進(jìn)行處理。把固體廢料和垃圾(非生物可降解的垃圾)收集起來在一個(gè)場(chǎng)外地點(diǎn)進(jìn)行處理。8、把固體廢料和垃圾(非塵物可降解的垃圾)收集起來在一個(gè)場(chǎng)外地點(diǎn)進(jìn)行處理。9、各種油料應(yīng)在容器內(nèi)存放,廢油應(yīng)及時(shí)回收集中儲(chǔ)存,嚴(yán)禁就地傾倒,油料對(duì)地面造成污
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年度毛石石材工程設(shè)計(jì)合同2篇
- 二零二五年度家庭和睦保障-夫妻暫時(shí)分居協(xié)議3篇
- 安全生產(chǎn)事故隱患排查監(jiān)管責(zé)任制度模版(2篇)
- 安全監(jiān)督副站長(zhǎng)崗位職責(zé)模版(2篇)
- 2025年運(yùn)動(dòng)會(huì)開幕式致辭稿(2篇)
- 二零二五年度水利工程車輛土石方運(yùn)輸與進(jìn)度款支付合同3篇
- 二零二五年度文化企業(yè)股東權(quán)益保護(hù)與公司運(yùn)營(yíng)協(xié)議書3篇
- 2025年外研銜接版第二冊(cè)地理下冊(cè)階段測(cè)試試卷
- 2024年綠色養(yǎng)生酒訂購協(xié)議書版B版
- 二零二五年度商場(chǎng)停車場(chǎng)智能化管理系統(tǒng)合同2篇
- 人教版八年級(jí)上冊(cè)生物期末必刷15道識(shí)圖題
- 任務(wù)13-1 火腿腸的加工
- SY-T 6966-2023 輸油氣管道工程安全儀表系統(tǒng)設(shè)計(jì)規(guī)范
- 學(xué)生公寓管理員培訓(xùn)
- 固體廢棄物循環(huán)利用項(xiàng)目風(fēng)險(xiǎn)管理方案
- 2024年中國電建集團(tuán)新能源開發(fā)有限責(zé)任公司招聘筆試參考題庫含答案解析
- 《中小學(xué)消防安全教育:森林防火》課件模板
- 會(huì)計(jì)師事務(wù)所審計(jì)專項(xiàng)方案
- 地方蠶絲被質(zhì)量整改方案
- 2024年北京社會(huì)管理職業(yè)學(xué)院高職單招(英語/數(shù)學(xué)/語文)筆試歷年參考題庫含答案解析
- 腦出血病人的護(hù)理
評(píng)論
0/150
提交評(píng)論