![外文翻譯-軟土質(zhì)條件下管樁施工的技術(shù)措施_第1頁(yè)](http://file4.renrendoc.com/view/0e707526f06a5969ea9fb31c49d58759/0e707526f06a5969ea9fb31c49d587591.gif)
![外文翻譯-軟土質(zhì)條件下管樁施工的技術(shù)措施_第2頁(yè)](http://file4.renrendoc.com/view/0e707526f06a5969ea9fb31c49d58759/0e707526f06a5969ea9fb31c49d587592.gif)
![外文翻譯-軟土質(zhì)條件下管樁施工的技術(shù)措施_第3頁(yè)](http://file4.renrendoc.com/view/0e707526f06a5969ea9fb31c49d58759/0e707526f06a5969ea9fb31c49d587593.gif)
![外文翻譯-軟土質(zhì)條件下管樁施工的技術(shù)措施_第4頁(yè)](http://file4.renrendoc.com/view/0e707526f06a5969ea9fb31c49d58759/0e707526f06a5969ea9fb31c49d587594.gif)
![外文翻譯-軟土質(zhì)條件下管樁施工的技術(shù)措施_第5頁(yè)](http://file4.renrendoc.com/view/0e707526f06a5969ea9fb31c49d58759/0e707526f06a5969ea9fb31c49d587595.gif)
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
PAGE11畢業(yè)設(shè)計(jì)(論文)外文資料翻譯院(系)建筑工程學(xué)院專(zhuān)業(yè)土木工程班級(jí)姓名學(xué)號(hào)軟土質(zhì)條件下管樁施工的技術(shù)措施摘要:高強(qiáng)度預(yù)應(yīng)力混凝土管樁(PHC)以其樁身混凝土的強(qiáng)度高,適應(yīng)性強(qiáng),具有較好的沖擊性能,穿透能力強(qiáng),承載力高,抗彎抗裂性能好,施工方便快捷,質(zhì)量穩(wěn)定,可靠度高,耐久性好等優(yōu)點(diǎn),被廣泛應(yīng)用到高層建筑基礎(chǔ)。本文討論了關(guān)于管樁施工中的技術(shù)措施。關(guān)鍵詞:管樁施工技術(shù)操作樁基處理1引言目前,高強(qiáng)度預(yù)應(yīng)力混凝土管樁已經(jīng)被應(yīng)用于房屋建筑和橋梁、碼頭和其他項(xiàng)目工程中。高強(qiáng)度的預(yù)應(yīng)力混凝土管樁(PHC)以其樁身混凝土的強(qiáng)度高,適應(yīng)性廣,具有較好的沖擊性能,穿透力強(qiáng),具有承載力高,抗彎抗裂性能好,施工快捷、方便,質(zhì)量穩(wěn)定可靠,耐久性好等優(yōu)點(diǎn),被廣泛應(yīng)用于高層建筑基礎(chǔ)。管樁屬于擠土樁,施工速度快,軟土地區(qū)大量施工后,土體超孔隙水壓力較大,開(kāi)挖時(shí)如果沒(méi)有很好的進(jìn)行控制,將會(huì)引起偏樁、斷樁等的質(zhì)量事故發(fā)生。因此,我們必須針對(duì)軟土的地質(zhì)特點(diǎn),在管樁施工、土方開(kāi)挖方面采取有效的技術(shù)措施,保證樁基質(zhì)量和挖土進(jìn)度。2工藝原理軟土具有天然含水量高、天然孔隙比大、壓縮性高、抗剪強(qiáng)度低、固結(jié)系數(shù)小、固結(jié)時(shí)間長(zhǎng)、靈敏度高、擾動(dòng)性大、透水性差、土層分布復(fù)雜、各層之間物理力學(xué)性質(zhì)相差較大,縱向、橫向的擠壓均容易產(chǎn)生變形。同時(shí),由于其含水量大,透水性差,受到擠壓容易產(chǎn)生較大的超孔隙水壓力,而且很難在短時(shí)間內(nèi)分散。其固結(jié)系數(shù)小、固結(jié)時(shí)間長(zhǎng)的特點(diǎn)又使得土體受到擾動(dòng)后很難迅速恢復(fù)。高強(qiáng)度預(yù)應(yīng)力混凝土管樁為擠土樁型,施工速度比較快,由此而造成施工區(qū)域內(nèi)的擠土效應(yīng)。管樁自身的抗壓強(qiáng)度較高,但是抗彎強(qiáng)度較低,不同土層間的水平力的作用容易引起樁身斷裂。因此,軟土地區(qū)管樁的施工對(duì)土方開(kāi)挖有著極大的影響。挖土的部署和采取的技術(shù)措施,都要圍繞“避免土體應(yīng)力釋放過(guò)快,避免土體施工荷載過(guò)大,合理控制土體的位移與應(yīng)力釋放”這樣的原則進(jìn)行。3操作要點(diǎn)3.1挖土部署1)軟土地區(qū)預(yù)應(yīng)力管樁基礎(chǔ)置換率一般為4%左右,土方開(kāi)挖前應(yīng)切實(shí)的了解以下情況,根據(jù)它來(lái)編制挖土施工方案,明確挖土部署和技術(shù)措施:a場(chǎng)地地質(zhì)情況,b周邊鄰近建(構(gòu))筑物及需保護(hù)管線情況,c圍護(hù)設(shè)計(jì),d樁長(zhǎng)、樁間距、置換率等樁基設(shè)計(jì)情況,e打樁順序、壓樁記錄等樁基施工情況。2)土方開(kāi)挖宜分皮進(jìn)行,每皮的厚度應(yīng)該控制在2m左右(土釘墻圍護(hù)結(jié)構(gòu)基坑根據(jù)土釘墻分層厚度控制),上皮挖除后再開(kāi)挖下皮??觾?nèi)分級(jí)挖土留設(shè)臺(tái)階,臺(tái)階寬度與臺(tái)階下挖土深度的比值應(yīng)在5以上??觾?nèi)土方坡道設(shè)置應(yīng)該避開(kāi)塘泥等軟弱區(qū)塊,坡道兩側(cè)土體的放坡系數(shù)不超過(guò)1:1.5時(shí)應(yīng)考慮噴射砼護(hù)坡,土質(zhì)特別差的應(yīng)加設(shè)Φ6.5@200×200鋼筋網(wǎng)片。應(yīng)盡量避免工程樁位于土方坡道兩側(cè)斜坡上,如果樁基較密無(wú)法避免應(yīng)考慮灌芯或噴錨加固,或改用鋼結(jié)構(gòu)橋作為土方坡道。3)禁止邊壓樁邊開(kāi)挖,開(kāi)挖和樁基全部完成間隔時(shí)間應(yīng)該超過(guò)15天(鉆打法10天以上)。4)承臺(tái)、地梁的位置如果土質(zhì)仍較差,宜采用人工挖土,避免挖機(jī)荷載及震動(dòng)對(duì)土體的影響。5)截樁安排應(yīng)該要提前考慮。開(kāi)挖前,要先對(duì)露出表面的樁進(jìn)行截除;開(kāi)挖過(guò)程中,應(yīng)根據(jù)挖土流程分段截除。6)挖機(jī)、車(chē)輛選擇盡量避免采用大型設(shè)備。應(yīng)盡量選擇小挖機(jī),如PC100以下??觾?nèi)運(yùn)土車(chē)輛避免使用10t大車(chē)。3.2挖土技術(shù)措施1)挖土應(yīng)逐層均勻進(jìn)行,樁兩側(cè)土體高差不大于1m。2)禁止挖機(jī)碰撞樁身。機(jī)械開(kāi)挖到樁頂30cm時(shí)樁兩側(cè)1m內(nèi)土體采用人工開(kāi)挖。3)挖機(jī)、土方車(chē)輛行走路線及兩側(cè)工程樁應(yīng)當(dāng)視具體情況采取噴錨、鋪路基箱、填塘渣、換土等加固措施。4)坡區(qū)及坡頂內(nèi)外側(cè)3米范圍內(nèi),管樁內(nèi)放入6米長(zhǎng)6Φ14的鋼筋籠,箍筋為Φ6@300,鋼筋籠頂標(biāo)高位于樁頂以下1米處,在鋼筋籠范圍內(nèi)灌入C20微膨脹混凝土。5)在場(chǎng)地軟硬土層交界的地方標(biāo)高上下2m范圍內(nèi),也可采取管樁內(nèi)加筋灌砼的措施。6)為了減少靜力壓樁的擠土效應(yīng)對(duì)土方開(kāi)挖的影響,選擇以下的措施:a設(shè)置袋裝砂井或塑料排水板,用來(lái)消除部分超孔隙水壓力,減少擠土現(xiàn)象。袋裝砂井的直徑一般為70~80mm,間距l(xiāng)~1.5m,深度10~12m。塑料排水板的深度、間距與袋裝砂井相同。b應(yīng)力釋放孔,直徑400,均勻布置,深度10m左右或?yàn)闃堕L(zhǎng)的0.8倍。3.3樁基問(wèn)題的處理1)開(kāi)挖后如果發(fā)現(xiàn)樁偏差、傾斜問(wèn)題,可根據(jù)動(dòng)態(tài)測(cè)試情況判定樁身的質(zhì)量,分別進(jìn)行處理。如果樁身沒(méi)有斷裂,可以用千斤頂推(拉)和灌芯的方法進(jìn)行處理。千斤頂推(拉)力不應(yīng)大于單樁水平承載力。如果樁身有裂縫,可以用接樁、補(bǔ)錨樁的方法進(jìn)行處理。如果樁身裂縫很深,而且樁傾斜較大,沉井接樁也不能實(shí)施。同時(shí),錨樁長(zhǎng)度25m承載力不夠。此時(shí),可以考慮在底板相應(yīng)位置留孔,等到底板完成后,在來(lái)打鉆孔樁。2)打進(jìn)管樁時(shí)的擠土作用會(huì)使附近已經(jīng)打好的樁和原有建筑物或周?chē)渌O(shè)施產(chǎn)生破壞。擠土程度的大小除了和樁的截面積以及某處與樁間的距離有關(guān)外,還和樁長(zhǎng)、樁型、打樁的速率以及打樁順序有較大關(guān)系。3)考慮到管樁施工產(chǎn)生的擠土效應(yīng)對(duì)土方開(kāi)挖情況的影響較大,為了做好預(yù)控制,提出一些關(guān)于管樁施工技術(shù)措施的建議:(1)樁機(jī)自重與場(chǎng)地軟弱土層承載力以ZYJ-500液壓靜力壓樁機(jī)作為例子,樁機(jī)重達(dá)506T,平面尺寸12m×8.4m,平均壓力為5T/m2。如果表層或者接近表層的土質(zhì)物理力學(xué)性能較差,樁機(jī)行走和施工時(shí)容易沉陷,不僅不利于施工,而且,表層的深陷導(dǎo)致深層土體的位移、周邊土體的隆起,容易引起管樁偏差、傾斜,甚至樁身斷裂。因此,在樁機(jī)選型和確定打樁路線時(shí),應(yīng)考慮到表層土地基承載力和軟弱下臥層地基沉降問(wèn)題。采用表層鋪設(shè)塘渣、枕木、路基箱等方式加固地基,分散樁機(jī)荷載。(2)減小擠土效應(yīng)的技術(shù)措施a根據(jù)工程的經(jīng)驗(yàn),白天打樁引起的土體位移增加值會(huì)在夜晚停止的時(shí)候大約有25%的下降,如果夜晚繼續(xù)打樁,擠土效應(yīng)引起的土體水平、豎向位移會(huì)一直增加不下降。因此,我們應(yīng)該避免24小時(shí)不停歇的打樁安排。b樁基置換率超過(guò)4%時(shí)可以用預(yù)鉆孔沉樁,孔徑大約比樁徑小50~100mm,深度根據(jù)樁距和土的密實(shí)度、滲透性來(lái)定,深度宜為樁長(zhǎng)的1/3~1/2(不超過(guò)12m),施工時(shí)應(yīng)隨鉆隨打。c工程周邊、分期施工的區(qū)塊周邊可以考慮應(yīng)力釋放孔、隔震溝、砂井等措施。(3)沉樁線路的選定沉樁線路應(yīng)盡量采取“走長(zhǎng)蛇形線路”,在鄰近建筑物或者需要保護(hù)管線的區(qū)域應(yīng)當(dāng)考慮“由近及遠(yuǎn)”的施工方向。由此,可以給超孔隙水壓力分散提供盡量長(zhǎng)的時(shí)間,避免其累積疊加,減小擠土影響。(4)壓樁的速度控制沉樁的速度最好控制在lm/min左右,使得各層的土體能夠正確反映其抗剪能力。當(dāng)?shù)鼗韺又写嬖诖髩K石頭等障礙物時(shí),要避免壓偏。4)施工現(xiàn)場(chǎng)應(yīng)當(dāng)準(zhǔn)備有應(yīng)急措施的砂袋、鋼管、鋼筋、水泥、注漿機(jī)、發(fā)電機(jī)等施工工具。地面出現(xiàn)裂縫采用灌漿修復(fù),避免地表水滲入,并及時(shí)組織項(xiàng)目部和有關(guān)專(zhuān)家查明裂縫產(chǎn)生原因。當(dāng)出現(xiàn)邊坡水平位移超過(guò)警戒值,要立即停止相應(yīng)范圍內(nèi)的土方開(kāi)挖,必要時(shí)采用回填或者設(shè)置臨時(shí)支撐松木樁鋼板樁加固,控制變形的發(fā)展??傊谲浫跬恋牡刭|(zhì)條件下,土方開(kāi)挖過(guò)程中施工部署和技術(shù)措施的合理安排,以及管樁施工減小擠土效應(yīng)的有效控制,能有效地避免造成土體的位移引起樁的偏移、斷樁、周邊道路、建筑物沉降等問(wèn)題,社會(huì)效益明顯。同時(shí),減少了樁基問(wèn)題的處理也降低了費(fèi)用。SoftsoilconditionsofthetechnicalmeasurespipeconstructionAbstractThehigh-strengthprestressedconcretepile(PHC)withitshighstrengthconcretepile,wideadaptabilityandgoodimpactresistance,penetration,withhighcapacity,flexuralcrackingperformance,constructionoffast,convenientstableandreliablequality,durability,etc.,andiswidelyusedinhigh-risebuildingfoundation.Thispaperdiscussesthetechnicalmeasuresinthepipeconstruction.
Keywords:pileconstruction;technicaloperations;piletreatment.
1IntroductionCurrently,high-strengthprestressedconcretepipehasbeenappliedtohousingconstructionandbridges,piersandotherprojects.High-strengthprestressedconcretepipe(PHC)withitshighstrengthconcretepile,wideadaptability,goodimpactresistance,penetration,withhighcapacity,flexuralcrackinggoodperformance,constructionspeed,convenience,qualityreliability,durabilityandgood,andiswidelyusedinhigh-risebuildingfoundation.Pipeissoilcompactionpiles,constructionspeed,alargenumberofinjectionsinsoftsoilarea,thesoilporewaterpressure,excavationwithouteffectivecontrol,willcausepartialpiles,suchasthequalityofthebrokenpileaccident.Therefore,wemustforthequalitycharacteristicsofsoftsoilinthepipeconstruction,earthexcavationtechniquesandadopteffectivemeasurestoguaranteetheprogressofpilefoundationandexcavation.
2ProcessPrinciple
Highwatercontentsoftsoilhasanatural,naturalvoidratio,highcompressibility,lowshearstrength,coefficientofconsolidation,consolidationforalongtime,highsensitivity,disturbanceofthelarge,poorpermeability,complexdistributionofsoillayer,thephysicalandmechanicalpropertiesbetweenthelayersofdifferencebetweenthelarger,vertical,horizontalsqueezeallpronetodeformation.Also,becauseofitslargewatercontent,poorpermeability,squeezedeasilyhaveagreaterexcessporewaterpressure,anddifficulttodisperseinashorttime.Thecoefficientofconsolidation,consolidationcharacteristicsofalongtimeanddisturbedthesoilafteritdifficulttoquicklyrecover.High-strengthprestressedconcretepipepiletosoilcompaction,construction,faster,andtheresultingsoilcompactionwithintheconstructionareaeffect.Pileitselfhighcompressivestrength,flexuralstrengthbutlowlevelsofpowerbetweenthedifferentroleofsoilpronetopilefracture.Therefore,theconstructionofsoftsoilontheearthexcavationpipehasagreatimpact.Excavationofthedeploymentandtechnicalmeasures,shouldbearound"toavoidexcessivesoilstressrelease,toavoidexcessiveconstructionloadofsoil,reasonablecontrolofsoildisplacementandstressrelease,"suchprinciples.
3OperatingPoints
3.1Excavatorsdeployed
1)Thebasisofsoftsoilprestressedconcretepipereplacementrateisgenerallyaround4%,beforeexcavationpracticalunderstandingofthefollowingcircumstancesunderwhichthepreparationofexcavationconstructionplan,deploy,andtechnicalmeasuresclearlydigging:asitegeologicalconditions,baroundadjacentbuilding(structure)andtheneedtoprotectthepipelinecase,cenclosuredesign,dpilelength,pilespacing,pilefoundationdesignexchangeratesituation,epilingorder,pilingrecordsandotherfoundationconstructionsituation.2)Excavationshouldbecarriedoutsub-skin,skinthicknessshouldbecontrolledineachofabout2m(soilnailingpitenvelopelayerunderthesoilnailwallthicknesscontrol),aftertheexcavationofexcavationundertheskinepithelium.Pitexcavationleavingingradedsteps,stepwidthandthedepthofexcavationoverthenextstepsshouldbe5ormore.Earthpitshouldbesettoavoidthepondscumrampsoweakblock,putthesoilonbothsidesoftherampslopecoefficientoflessthan1:1.5shouldbeconsideredinthesprayedconcreteslopeprotection,soilparticularlybadshouldbeaddedΦ6.5@200×200steelmesh.Shouldbeavoidedintheearthpilesonbothsidesoftherampslope,suchasdensepilecannotbeavoidedshouldbeconsideredorgunitereinforcedgrouted,orswitchtosteelbridgeastheearthworkramp.3)Edgeagainstedgepilingexcavation,excavationandpileintervalshouldbecompletedin15daysormore(morethan10daysdrillingplay).4)Caps,groundbeampositionifthesoilisstillpoor,theappropriateuseofartificialexcavation,avoiddiggingmachineloadingandvibrationeffectsonthesoil.5)Cutpilearrangementshouldthinkahead.Excavationbeforeexposingthesurfaceofthepileshouldbecutfirst;excavationprocess,theprocessshouldbebasedonsub-excavationcutoff.6)Diggingmachines,vehiclesshouldbechosentoavoidusinglargeequipment.Shouldtrytochooseasmalldiggingmachines,suchasPC100below.Vehiclestoavoidtheuseofearthpit10tcart.
3.2Technicalmeasuresdigging
1)Excavationshouldbecarriedoutlayerbylayerevenly,onbothsidesofthesoilpileheightshallnotexceed1m.2)Collisionagainstdiggingmachineshaft.Mechanicalexcavationtothetopofthepile1m30cmonbothsidesofthepilewiththesoilexcavated.3)Diggingmachines,movingvehicles,routesandbothsidesofthepile,asthecaseshouldbetakentosprayanchor,pavingthewayforthebasebox,pondresidue,suchasforsoilreinforcement.4)Topofthehillslopeareasandwithin3metersinsideandoutside,intothe6-meterlongpipe6Φ14withinthereinforcementcage,stirruptoΦ6@300,topelevationofthereinforcementcageislocatedat1mbelowtopofthepile,thereinforcementcagewithintheirrigationC20micro-expansionintotheconcrete.5)Softandhardlayeratthejunctionofthevenueupanddownelevationrangeof2m,butalsotakeconcreteirrigationpipewithinthereinforcementmeasures.6)Toreducestaticpilingofthesqueezingeffectontheimpactofexcavation,thechoiceofthefollowingmeasures:asetofsandbagsorplasticdrainwelltoremovepartoftheexcessporewaterpressure,reducesoilcompactionphenomenon.SandWickdiameterisgenerally70~80mm,spacingl~1.5m,thedepthof10~12m.Plasticdraindepth,spacingandthesameSandWick.bstressreleaseholes,diameterof400,uniformlyarrangedaroundthedepthof10mor0.8timesthepilelength.
3.3Handlingofpile
1)Pileafterexcavation,suchasfacedeviation,skewproblems,accordingtopiledynamictestingconditionstodeterminethequalityof,respectively,tobeaddressed.Ifthepilewithoutbreaking,jackcanbeusedtopush(pull)andthecoreofthemethodofirrigationtreatment.Jackpush(pull)forceshallnotbegreaterthanthehorizontalbearingcapacityofsinglepile.Iftherearecracksinthepile,canbeconnectedpiles,anchorpilesmakewayforprocessing.Ifdeepcracksinthepile,andpileinclinationlargercaissonpilecannotbeimplementedthen.Meanwhile,thelengthof25manchorpilebearingcapacityisnotenough.Atthispoint,considerthecorrespondingbottomholelocationtostayuntiltheflooriscompleted,settoplayboredpiles.
2)Pileintothesoilcompactionwhentherolewillhavetoplaywellneartheoriginalbuildingorthesurroundingpilesandotherfacilitieshavedestroyed.Inadditiontothesizeofsoilcompactionandthedegreeofcross-sectionalareaandsomewhereinthepileandthedistancebetweenpiles,butalsowiththepilelength,pile,pilingrateandmorerelatedtothepilingsequence.
3)Takingintoaccountthepipeconstructionsqueezingeffectgeneratedbythesituationontheimpactoflargeearthexcavation,inordertomakepre-control,tomakeafewsuggestionsontechnicalmeasurespipeconstruction:
(1)PileweightbearingcapacityofsoftsoilwiththesitetoZYJ-500asanexampleofhydraulicstaticpiledriver,piledriverweight506T,planesize12m×8.4m,theaveragepressureofabout5T/m2.Surfaceornearthesurface,suchasphysicalandmechanicalpropertiesofsoilispoor,whenthepiledriveriseasywalkingandinjectionsofsettlement,isnotconducivetoconstruction,andthatledtothedeepsurfaceofthedeepsoildisplacement,upliftofthesurroundingsoil,easilyleadpipepileoffset,tilt,orpilefracture.Therefore,inthepiledriver,routeselectionanddeterminethepilingshouldtakeintoaccountthelandsurfaceofthebaseloadcapacityandweakunderlyinglayeroffoundationsettlementproblems.Pondbylayingthesurfaceresidue,ties,roadbedfoundationreinforcementboxes,etc.,scatteredpiledriverload.(2)Effectoftechnicalmeasurestoreducesoilcompaction,accordingtoengineeringexperienceadayandpilingsoildisplacementcausedbytheaddedvaluewillstopatnightwhenabout25%ofthedecline,suchasthenightcontinuedpiling,compactingeffectofsoilcausedbythelevelofverticalwillalwaysincreaseindisplacementdoesnotcomedown.Therefore,weshouldavoidthe24-hournon-stoppilingarrangements.bpilereplacementrateofmorethan4%canbepre-boredpiling,pilediametersmallerthantheporesizeofabout50~100mm,depthofsoilasthepilespacinganddensity,permeability,dependingonthedepthofthepilelengthof1shouldbe/3to1/2(lessthan12m),constructionshouldbedrillingwiththefight.cprojectsaround,stageconstructionoftheblocksaroundtheholecouldbeconsideredstressrelease,isolationtrenches,sandwellsandothermeasures.(3)Pilepileselectedlinerouteshouldbetakento"takethelongsnake-likelines"intheadjacentbuildingorareashouldconsidertheneedtoprotectthepipeline,"fromnearandfar,"theconstructionofdirection.Asaresult,candissipateexcessporewaterpressuretoprovideaslongaspossible,toavoidtheaccumulationofsuperimposed,reducingthesqueezingeffect.(4)Pilepilingspeedcontrolspeedcontrolingenerallm/minisappropriate,toproperlyreflectthephysicallayersofsoilshearstrength.Existinthelocalbasesurfaceobstructionssuchaslargestones,itisnecessarytoavoidthepressureside.
4)Theconstructionsiteshouldbeequippedwithemergencymeasuresofsandbags,steel,steel,cement,groutingmachines,generatorsandotherconstructiontools.Groutingtorepaircracksinthegroundtopreventsurfacewaterinfiltration,andpromptlyorganizetheprojectdepartmentandexpertstoidentifycauseofthecracks.Whenthehorizontaldisplacementoftheslopeabovethewarningvalue,shouldimmediatelystoptheappropriaterangeofearthexcavation,backfill,or,whennecessary,temporarysteelsheetpilesofpinepilesupporttocontrolthedeformationdevelopment.
Insummary,weakgeologicalcondition,theprocessofconstructionofearthexcavationandtechnicalmeasurestodeployareasonablearrangement,andthepipeconstructionreducestheeffectivecontrolofsqueezingeffect,caneffectivelyavoidthepilesoildisplacementcausedbypartialshift,brokenpile,thesurroundingroads,buildingsettlementandotherissues,socialbenefits.Atthesametime,reducethepile'shandlingalsoreducesexpenses.
論大學(xué)生寫(xiě)作能力寫(xiě)作能力是對(duì)自己所積累的信息進(jìn)行選擇、提取、加工、改造并將之形成為書(shū)面文字的能力。積累是寫(xiě)作的基礎(chǔ),積累越厚實(shí),寫(xiě)作就越有基礎(chǔ),文章就能根深葉茂開(kāi)奇葩。沒(méi)有積累,胸?zé)o點(diǎn)墨,怎么也不會(huì)寫(xiě)出作文來(lái)的。寫(xiě)作能力是每個(gè)大學(xué)生必須具備的能力。從目前高校整體情況上看,大學(xué)生的寫(xiě)作能力較為欠缺。一、大學(xué)生應(yīng)用文寫(xiě)作能力的定義那么,大學(xué)生的寫(xiě)作能力究竟是指什么呢?葉圣陶先生曾經(jīng)說(shuō)過(guò),“大學(xué)畢業(yè)生不一定能寫(xiě)小說(shuō)詩(shī)歌,但是一定要寫(xiě)工作和生活中實(shí)用的文章,而且非寫(xiě)得既通順又扎實(shí)不可?!睂?duì)于大學(xué)生的寫(xiě)作能力應(yīng)包含什么,可能有多種理解,但從葉圣陶先生的談話中,我認(rèn)為:大學(xué)生寫(xiě)作能力應(yīng)包括應(yīng)用寫(xiě)作能力和文學(xué)寫(xiě)作能力,而前者是必須的,后者是“不一定”要具備,能具備則更好。眾所周知,對(duì)于大學(xué)生來(lái)說(shuō),是要寫(xiě)畢業(yè)論文的,我認(rèn)為寫(xiě)作論文的能力可以包含在應(yīng)用寫(xiě)作能力之中。大學(xué)生寫(xiě)作能力的體現(xiàn),也往往是在撰寫(xiě)畢業(yè)論文中集中體現(xiàn)出來(lái)的。本科畢業(yè)論文無(wú)論是對(duì)于學(xué)生個(gè)人還是對(duì)于院系和學(xué)校來(lái)說(shuō),都是十分重要的。如何提高本科畢業(yè)論文的質(zhì)量和水平,就成為教育行政部門(mén)和高校都很重視的一個(gè)重要課題。如何提高大學(xué)生的寫(xiě)作能力的問(wèn)題必須得到社會(huì)的廣泛關(guān)注,并且提出對(duì)策去實(shí)施解決。二、造成大學(xué)生應(yīng)用文寫(xiě)作困境的原因:(一)大學(xué)寫(xiě)作課開(kāi)設(shè)結(jié)構(gòu)不合理。就目前中國(guó)多數(shù)高校的學(xué)科設(shè)置來(lái)看,除了中文專(zhuān)業(yè)會(huì)系統(tǒng)開(kāi)設(shè)寫(xiě)作的系列課程外,其他專(zhuān)業(yè)的學(xué)生都只開(kāi)設(shè)了普及性的《大學(xué)語(yǔ)文》課。學(xué)生寫(xiě)作能力的提高是一項(xiàng)艱巨復(fù)雜的任務(wù),而我們的課程設(shè)置僅把這一任務(wù)交給了大學(xué)語(yǔ)文教師,可大學(xué)語(yǔ)文教師既要在有限課時(shí)時(shí)間內(nèi)普及相關(guān)經(jīng)典名著知識(shí),又要適度提高學(xué)生的鑒賞能力,且要教會(huì)學(xué)生寫(xiě)作規(guī)律并提高寫(xiě)作能力,任務(wù)之重實(shí)
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 個(gè)人借款合同簡(jiǎn)化版范本
- 個(gè)人設(shè)備抵押貸款合同范文
- 專(zhuān)業(yè)工業(yè)原料代購(gòu)代銷(xiāo)服務(wù)合同
- 前臺(tái)聘用合同2
- 試論我國(guó)行政合同救濟(jì)制度的完善
- 總公司與分公司承包經(jīng)營(yíng)合同書(shū)
- 水泥生產(chǎn)加工承攬合同三篇
- 挖掘機(jī)買(mǎi)賣(mài)合同參考模板
- 酒店業(yè)經(jīng)營(yíng)管理服務(wù)合同書(shū)
- 購(gòu)房轉(zhuǎn)讓合同協(xié)議
- (高清版)WST 408-2024 定量檢驗(yàn)程序分析性能驗(yàn)證指南
- (正式版)JBT 11270-2024 立體倉(cāng)庫(kù)組合式鋼結(jié)構(gòu)貨架技術(shù)規(guī)范
- DB11∕T 2035-2022 供暖民用建筑室溫?zé)o線采集系統(tǒng)技術(shù)要求
- 《復(fù)旦大學(xué)》課件
- 針灸與按摩綜合療法
- 煤礦井下安全避險(xiǎn)六大系統(tǒng)建設(shè)完善基本規(guī)范
- Photoshop 2022從入門(mén)到精通
- T-GDWJ 013-2022 廣東省健康醫(yī)療數(shù)據(jù)安全分類(lèi)分級(jí)管理技術(shù)規(guī)范
- 校本課程生活中的化學(xué)
- DB43-T 2775-2023 花櫚木播種育苗技術(shù)規(guī)程
- 《我的家族史》課件
評(píng)論
0/150
提交評(píng)論