《水電工程招標(biāo)設(shè)計(jì)報(bào)告編制規(guī)程》_第1頁
《水電工程招標(biāo)設(shè)計(jì)報(bào)告編制規(guī)程》_第2頁
《水電工程招標(biāo)設(shè)計(jì)報(bào)告編制規(guī)程》_第3頁
《水電工程招標(biāo)設(shè)計(jì)報(bào)告編制規(guī)程》_第4頁
《水電工程招標(biāo)設(shè)計(jì)報(bào)告編制規(guī)程》_第5頁
已閱讀5頁,還剩162頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡介

ICS27.140

P59

備案號:Jxxxx-2021N

中華人民共和國能源行業(yè)標(biāo)準(zhǔn)

PNB/Txxxxx-2022

代替DL/T5212-2005

水電工程招標(biāo)設(shè)計(jì)報(bào)告編制規(guī)程

Specificationforcompilingtenderdesignreport

ofhydropowerproject

(征求意見稿)

2022-xx-xx發(fā)布2022-xx-xx實(shí)施

國家能源局發(fā)布

國家能源局

公告

2022年第x號

依據(jù)《國家能源局綜合司關(guān)于下達(dá)2018年能源領(lǐng)域行業(yè)標(biāo)準(zhǔn)制

(修)訂計(jì)劃及英文版翻譯出版計(jì)劃的通知》(國能綜通科技〔2018〕

100號)有關(guān)規(guī)定,經(jīng)審查,國家能源局批準(zhǔn)《xxxxxxxxxx》等xxx

項(xiàng)行業(yè)標(biāo)準(zhǔn),其中能源標(biāo)準(zhǔn)(NB)xx項(xiàng),電力標(biāo)準(zhǔn)(DL)xxx項(xiàng)和

石油天然氣標(biāo)準(zhǔn)(SY)xxx項(xiàng),現(xiàn)予以發(fā)布。

附件:行業(yè)標(biāo)準(zhǔn)目錄

國家能源局

2022年x月x日

附件:

行業(yè)標(biāo)準(zhǔn)目錄

序號標(biāo)準(zhǔn)編號標(biāo)準(zhǔn)名稱代替標(biāo)準(zhǔn)采標(biāo)號批準(zhǔn)日期實(shí)施日期

...

水電工程招標(biāo)設(shè)計(jì)DL/T

xxNB/Txxxxx-20222022-xx-xx2022-xx-xx

報(bào)告編制規(guī)程5212—2005

...

NB/T5212—2022

前言

根據(jù)《國家能源局綜合司關(guān)于下達(dá)2018年能源領(lǐng)域行業(yè)標(biāo)準(zhǔn)制(修)訂計(jì)

劃及英文版翻譯出版計(jì)劃的通知》(國能綜通科技〔2018〕100號)的要求,規(guī)

程編制組經(jīng)廣泛調(diào)查研究,認(rèn)真總結(jié)實(shí)踐經(jīng)驗(yàn),并在廣泛征求意見的基礎(chǔ)上修訂

本規(guī)程。

本規(guī)程統(tǒng)一了水電工程招標(biāo)設(shè)計(jì)報(bào)告的編制原則、程序、工作內(nèi)容和深度,

對招標(biāo)設(shè)計(jì)報(bào)告的編寫體例、內(nèi)容等做出了規(guī)定。

本規(guī)程的主要技術(shù)內(nèi)容包括:總則、基本規(guī)定、綜合說明、水文泥沙、工程

地質(zhì)、工程規(guī)模、工程布置及建筑物、機(jī)電及金屬結(jié)構(gòu)、消防設(shè)計(jì)、工程分標(biāo)規(guī)

劃、施工組織設(shè)計(jì)、建設(shè)征地和移民安置、環(huán)境保護(hù)與水土保持、勞動安全與工

業(yè)衛(wèi)生、工程投資、財(cái)務(wù)分析等。

本規(guī)程修訂的主要技術(shù)內(nèi)容包括:

本規(guī)程代替了《水電工程招標(biāo)設(shè)計(jì)報(bào)告編制規(guī)程》DL/T5212-2005。

——將“范圍”一章修改為“總則”,并提出了制定本規(guī)程的目的、規(guī)程的適用

范圍、主要依據(jù)、作用和執(zhí)行相關(guān)標(biāo)準(zhǔn)的要求;

——將“規(guī)范性引用文件”一章修改為“引用標(biāo)準(zhǔn)名錄”,修改并補(bǔ)充了有關(guān)標(biāo)

準(zhǔn)名稱,列入“本規(guī)程用詞說明”章之后;

——將“總則”一章修改為“基本規(guī)定”;

——將“概述”一章修改為“綜合說明”;

——“工程地質(zhì)”章增加了水庫移民安置區(qū)工程地質(zhì)條件評價(jià)和水庫專項(xiàng)工

程地質(zhì)條件條款;

——“工程布置及建筑物”章增加了“過魚建筑物”節(jié),補(bǔ)充了相應(yīng)的設(shè)計(jì)內(nèi)容

要求;

——“施工組織設(shè)計(jì)”章增加了“標(biāo)準(zhǔn)化工地建設(shè)及智慧工地建設(shè)”節(jié),將原

“料源規(guī)劃與土石方平衡”一節(jié)修改為“料源選擇與料場開采”;補(bǔ)充了渣場布置、

防洪排水及建筑物布置設(shè)計(jì)條款。

——將“建設(shè)征地和移民安置”章的“執(zhí)行概算”一節(jié)修改為“補(bǔ)償費(fèi)用”;簡化

1

NB/T5212—2022

了“建設(shè)征地和移民安置”章的有關(guān)編制內(nèi)容。

——將“環(huán)境保護(hù)設(shè)計(jì)”一章修改為“環(huán)境保護(hù)與水土保持”,將“環(huán)境保護(hù)措

施設(shè)計(jì)”、“環(huán)境監(jiān)測設(shè)計(jì)”、“環(huán)境管理計(jì)劃”、“實(shí)施進(jìn)度計(jì)劃”四節(jié)內(nèi)容合并調(diào)整

為“環(huán)境保護(hù)”節(jié);增加了“水土保持”節(jié);刪除了原“分標(biāo)規(guī)劃”、“投資概算”兩節(jié)。

——“勞動安全與工業(yè)衛(wèi)生”章增加了“安全設(shè)施”、“職業(yè)病防護(hù)設(shè)施”、“治安

反恐防范設(shè)施”、“應(yīng)急設(shè)施”、“標(biāo)識標(biāo)志”、“實(shí)施方案”、“附圖、附件”七節(jié),并

補(bǔ)充了相關(guān)內(nèi)容規(guī)定。

——“工程投資”章刪除原“一般要求”節(jié);“主體標(biāo)招標(biāo)設(shè)計(jì)概算”、“招標(biāo)設(shè)計(jì)

概算”兩節(jié),修改為“標(biāo)段招標(biāo)設(shè)計(jì)概算”、“招標(biāo)設(shè)計(jì)總概算”兩節(jié),并調(diào)整了相

應(yīng)條款內(nèi)容。

本規(guī)程由國家能源局負(fù)責(zé)管理,由水電水利規(guī)劃設(shè)計(jì)總院提出并負(fù)責(zé)日常管

理,由能源行業(yè)水電勘測設(shè)計(jì)標(biāo)準(zhǔn)化技術(shù)委員會負(fù)責(zé)具體技術(shù)內(nèi)容的解釋。執(zhí)行

過程中如有意見或建議,請寄送水電水利規(guī)劃設(shè)計(jì)總院(地址:北京市西城區(qū)六

鋪炕北小街2號,郵編:100120)。

本規(guī)程主編單位:水電水利規(guī)劃設(shè)計(jì)總院

中國電建集團(tuán)華東勘測設(shè)計(jì)研究院有限公司

本規(guī)程主要起草人員:待補(bǔ)充

本規(guī)程主要審查人員:待補(bǔ)充

2

NB/T5212—2022

目次

前言·····························································································1

1總則··································································································1

2基本規(guī)定····························································································2

3綜合說明····························································································5

3.1工程特性···················································································5

3.2勘測設(shè)計(jì)過程、項(xiàng)目核準(zhǔn)或?qū)徟闆r···············································5

3.3項(xiàng)目建設(shè)條件及建設(shè)管理要求························································5

3.4主要設(shè)計(jì)成果·············································································5

3.5附圖、附表及附文·······································································6

4水文泥沙····························································································7

4.1水文氣象基本資料·······································································7

4.2徑流··························································································7

4.3洪水··························································································7

4.4泥沙··························································································7

4.5施工期水文預(yù)報(bào)和運(yùn)行期水情自動測報(bào)系統(tǒng)······································7

4.6水位流量關(guān)系曲線·······································································8

4.7附圖、附表················································································8

5工程地質(zhì)····························································································9

5.1概述··························································································9

5.2區(qū)域構(gòu)造穩(wěn)定性··········································································9

5.3水庫工程地質(zhì)·············································································9

5.4擋水建筑物工程地質(zhì)···································································11

5.5泄水建筑物工程地質(zhì)···································································13

5.6輸水建筑物工程地質(zhì)···································································14

5.7廠區(qū)工程地質(zhì)············································································15

5.8通航建筑物工程地質(zhì)···································································16

5.9主要輔助建筑物和臨時(shí)建筑物工程地質(zhì)··········································16

I

NB/T5212—2022

5.10天然建筑材料··········································································17

5.11附圖、附件·············································································17

6工程規(guī)模··························································································19

6.1規(guī)劃、設(shè)計(jì)成果和工程任務(wù)··························································19

6.2徑流調(diào)節(jié)計(jì)算············································································19

6.3洪水調(diào)節(jié)計(jì)算············································································20

6.4工程特征值復(fù)核·········································································20

6.5水庫正常運(yùn)行方式和能量指標(biāo)·······················································21

6.6水庫初期蓄水和電站初期運(yùn)行方式················································21

6.7水庫泥沙沖淤分析和回水計(jì)算·······················································22

6.8附圖························································································22

7工程布置及建筑物··············································································24

7.1設(shè)計(jì)依據(jù)及基本資料···································································24

7.2樞紐布置··················································································24

7.3擋水建筑物···············································································24

7.4泄水建筑物···············································································25

7.5輸水建筑物···············································································26

7.6發(fā)電廠房及開關(guān)站······································································28

7.7通航建筑物···············································································29

7.8過魚建筑物···············································································30

7.9邊坡工程··················································································30

7.10安全監(jiān)測················································································31

7.11工程量匯總表··········································································31

7.12附圖·······················································································32

8機(jī)電及金屬結(jié)構(gòu)·················································································35

8.1概述························································································35

8.2水力機(jī)械··················································································35

8.3電氣························································································36

8.4控制保護(hù)和通信·········································································38

II

NB/T5212—2022

8.5金屬結(jié)構(gòu)··················································································40

8.6采暖通風(fēng)··················································································42

8.7附圖························································································42

9消防設(shè)計(jì)··························································································44

10工程分標(biāo)規(guī)劃···················································································46

10.1概述·······················································································46

10.2分標(biāo)規(guī)劃依據(jù)··········································································46

10.3分標(biāo)原則················································································47

10.4分標(biāo)方案及比選·······································································47

10.5選定的分標(biāo)方案·······································································47

10.6工程招標(biāo)計(jì)劃··········································································48

10.7附表、附圖·············································································48

11施工組織設(shè)計(jì)···················································································50

11.1施工條件················································································50

11.2施工導(dǎo)流················································································51

11.3料源選擇與料場開采·································································56

11.4主體工程施工··········································································58

11.5施工交通運(yùn)輸··········································································61

11.6施工工廠設(shè)施··········································································62

11.7施工總布置·············································································65

11.8施工總進(jìn)度·············································································68

11.9施工資源供應(yīng)··········································································69

11.10標(biāo)準(zhǔn)化工地建設(shè)及智慧工地建設(shè)················································69

11.11附圖·····················································································70

12建設(shè)征地和移民安置··········································································72

12.1概述·······················································································72

12.2設(shè)計(jì)依據(jù)················································································72

12.3建設(shè)征地范圍和實(shí)物指標(biāo)···························································72

12.4農(nóng)村移民安置規(guī)劃····································································72

III

NB/T5212—2022

12.5城市和集鎮(zhèn)遷建規(guī)劃·································································73

12.6企業(yè)處理規(guī)劃··········································································73

12.7專業(yè)項(xiàng)目處理規(guī)劃····································································73

12.8庫底清理················································································73

12.9補(bǔ)償費(fèi)用················································································73

12.10實(shí)施組織設(shè)計(jì)·········································································73

12.11附圖、附件············································································74

13環(huán)境保護(hù)與水土保持··········································································75

13.1概述·······················································································75

13.2環(huán)境保護(hù)················································································75

13.3水土保持················································································77

13.4附圖、附件·············································································77

14勞動安全與工業(yè)衛(wèi)生··········································································79

14.1概述·······················································································79

14.2安全設(shè)施················································································79

14.3職業(yè)病防護(hù)設(shè)施·······································································80

14.4治安反恐防范設(shè)施····································································80

14.5應(yīng)急設(shè)施················································································81

14.6標(biāo)識標(biāo)志················································································82

14.7實(shí)施方案················································································83

14.8附圖、附件·············································································83

15工程投資·························································································85

15.1分標(biāo)概算················································································85

15.2標(biāo)段招標(biāo)設(shè)計(jì)概算····································································86

15.3招標(biāo)設(shè)計(jì)總概算·······································································89

16財(cái)務(wù)分析·························································································91

附錄A水電工程招標(biāo)設(shè)計(jì)報(bào)告編制目錄·····················································92

附錄B水電工程分標(biāo)段招標(biāo)設(shè)計(jì)報(bào)告編制目錄············································96

附表C水電工程特性表··········································································99

IV

NB/T5212—2022

本規(guī)程用詞說明····················································································106

引用標(biāo)準(zhǔn)名錄·······················································································107

1總則·······························································································109

2基本規(guī)定·························································································110

3綜合說明·························································································111

3.1工程特性················································································111

3.2勘測設(shè)計(jì)過程、項(xiàng)目核準(zhǔn)或?qū)徟闆r············································111

3.3項(xiàng)目建設(shè)條件及建設(shè)管理要求·····················································111

3.4主要設(shè)計(jì)成果··········································································111

3.5附圖、附表及附文····································································111

4水文泥沙·························································································112

4.1水文氣象基本資料····································································112

4.2徑流·······················································································112

4.3洪水·······················································································112

4.4泥沙·······················································································113

4.5施工期水文預(yù)報(bào)和運(yùn)行期水情自動測報(bào)系統(tǒng)···································113

4.6水位流量關(guān)系曲線····································································113

5工程地質(zhì)·························································································114

5.1概述·······················································································114

5.2區(qū)域構(gòu)造穩(wěn)定性·······································································114

5.3水庫工程地質(zhì)··········································································114

5.4擋水建筑物工程地質(zhì)·································································115

5.5泄水建筑物工程地質(zhì)·································································116

5.6輸水建筑物工程地質(zhì)·································································116

5.7廠區(qū)工程地質(zhì)··········································································116

5.9主要輔助建筑物和臨時(shí)建筑物工程地質(zhì)·········································117

5.10天然建筑材料·········································································117

5.11附圖、附件············································································117

6工程任務(wù)、規(guī)模和運(yùn)行特性·································································118

V

NB/T5212—2022

6.1規(guī)劃、設(shè)計(jì)成果和工程任務(wù)························································118

6.2徑流調(diào)節(jié)計(jì)算··········································································118

6.3洪水調(diào)節(jié)計(jì)算··········································································118

6.4工程特征值復(fù)核·······································································119

6.5水庫運(yùn)行方式和能量指標(biāo)···························································120

6.6水庫初期蓄水和電站初期運(yùn)行方式···············································121

6.7水庫泥沙沖淤分析和回水計(jì)算·····················································121

6.8工程任務(wù)、規(guī)模和運(yùn)行特性附圖··················································122

7工程布置及建筑物·············································································123

7.1設(shè)計(jì)依據(jù)及基本資料·································································123

7.2樞紐布置················································································123

7.3擋水建筑物·············································································123

7.4泄水建筑物·············································································123

7.5輸水建筑物·············································································124

7.6發(fā)電廠房和開關(guān)站····································································124

7.7通航建筑物·············································································125

7.8過魚建筑物·············································································125

7.9邊坡工程················································································125

7.10安全監(jiān)測···············································································126

8機(jī)電及金屬結(jié)構(gòu)················································································127

8.1概述·······················································································127

8.2水力機(jī)械················································································127

8.3電氣·······················································································127

8.4控制保護(hù)和通信·······································································128

8.5金屬結(jié)構(gòu)················································································128

9消防設(shè)計(jì)·························································································129

10工程分標(biāo)規(guī)劃·················································································130

10.1概況·····················································································130

10.2分標(biāo)規(guī)劃依據(jù)·········································································130

VI

NB/T5212—2022

10.3分標(biāo)原則···············································································130

10.4分標(biāo)方案比選·········································································131

10.5選定的分標(biāo)方案······································································131

10.6工程招標(biāo)計(jì)劃·········································································132

11施工組織設(shè)計(jì)·················································································133

11.1施工條件···············································································133

11.2施工導(dǎo)流···············································································133

11.3料源選擇與料場開采································································134

11.4主體工程施工·········································································135

11.5施工交通運(yùn)輸·········································································136

11.6施工工廠設(shè)施·········································································137

11.7施工總布置············································································137

11.8施工總進(jìn)度············································································138

11.9施工資源供應(yīng)·········································································139

11.11附圖···················································································139

12建設(shè)征地移民安置···········································································140

12.1概述·····················································································140

12.2設(shè)計(jì)依據(jù)···············································································140

12.3建設(shè)征地范圍和實(shí)物指標(biāo)··························································140

12.4農(nóng)村移民安置規(guī)劃···································································140

12.5城市和集鎮(zhèn)遷建規(guī)劃································································141

12.6企業(yè)處理規(guī)劃·········································································141

12.7專業(yè)項(xiàng)目處理規(guī)劃···································································141

12.8庫底清理···············································································141

12.9補(bǔ)償費(fèi)用···············································································141

12.10實(shí)施組織設(shè)計(jì)·······································································142

13環(huán)境保護(hù)與水土保持········································································143

13.1概述·····················································································143

13.2環(huán)境保護(hù)···············································································143

VII

NB/T5212—2022

13.3水土保持···············································································143

14勞動安全與工業(yè)衛(wèi)生········································································145

14.1概述·····················································································145

14.2安全設(shè)施···············································································145

14.3職業(yè)病防護(hù)設(shè)施······································································146

14.4治安反恐防范設(shè)施···································································146

14.5應(yīng)急設(shè)施···············································································146

14.6標(biāo)識標(biāo)志···············································································147

14.7工程(工作)量··········································································147

14.8實(shí)施方案···············································································148

14.9附圖、附件············································································148

15工程投資·······················································································149

15.1概述·····················································································149

16財(cái)務(wù)分析·······················································································150

VIII

NB/T5212—2022

Contents

Foreword··········································································································1

1Generalprovision···························································································1

2Basicrequirement···························································································2

3Comprehensiveinstruction················································································5

3.1Engineeringcharacteristics······································································5

3.2Surveyanddesignprocessandapproval······················································5

3.3Projectconstructionconditionsandconstructionmanagementrequirements···········5

3.4Maindesignachievements·······································································5

3.5Attacheddrawings,schedulesandattachments···············································5

4Hydrologyandsediment···················································································7

4.1Hydrologyandmeteorology·····································································7

4.2Runoff·······························································································7

4.3Flood···················································

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論